Loading...
HomeMy WebLinkAbout49003-Z - I I..- DRAB NO INDE A-100 PLOT PLAN A-101 -FIRST FLOOR PLAN A-102 ATT 1 G PLAN A-105 EAST ELEVATION A-104 WEST ELEVATION _ A-105NOR7H ELEVAT O.N _1 200.0' I A-106 SOUTH ELEVATION l-- -- ----- ------- - - - - - - - - - - - - - - - - - - - � A-107 DOOR $ WINDOW .SCHEDULES I I A-108 FOUNDATION PLAN I O I A-IOcf FIRST FLOOR FRAMING PLAN I OPEN .PORGH I - A=110 - /�TTIG FRAMING PLAN I- m- A-11-I - ROOF FRAMING-PLAN _ - A-112 TYPICAL WALL SECTION - A 11,5 STAIR DETAIL5 A_-114= _- PORCH_-FRAMING : FROPOSEID RESIDENGI= _= �. -- —� _-A-115 ._ A-116 M15G. ,DETAILS A=117 MISG. DETAILS CC �I ,�� _ A-11.5 GENERAL NOT 1,6RAVEL DRI VE I = : = . _. - _ _. . _ _ O01D_ �1�B4�BBdG®Ef�: O O TOW FS®U =-_---- I - - . - - : ._ - - __ -_ DAVID TURNER ARCHITECT,- P.C. 366 WEST 30TH STREET,FIRST FLOOR, NEW YORK,-N.Y. 10001 _ (212)594-0840 - -PROJECT_ - - - - - - - _ - � - _ _ - - - _ __ °1=335 -GREEN. HILL LAN-E� - - -----' , _ _ . GREENPORT9 N.Y: - - SHEET DISTi�IGT: 1000 . LOT AREA 20;430-.6 SE - = HOUSE _F_O_.RGH A ZEA 1,588- F _ _ -PLOT PLAN_ _. . .. SECTION;--O��- - - - - - - - - BLOGK: 02 . LOT GOVERA-OE 6. l LOT:26 //�\ _ q�plk. J/� I -------- - - --- - - �,,�' tl�:l �p; .;•� DATE: I0-20722 C - OT / •I R _ �� - r�� I- I � / ,I R� _ _.__- _ _ _ _ r �9�� '� PROJECT No:DRAWING BY: SCALE 1"=30' 20ONYS RESIDENTIAL GODS �3 f CHK BY: 2020= NYS. ENERGY GODS DWG No: i .A- 100 . 00 'rECAD FILE No: 40 -O LEOENE� 4" 5'-2" 4" 5'-0" 4" 12'-4" INN- - ® NEW EXTERIOR FRAME AALLS. 2" X 6" � @ 16" OG. WITH 5/4" PLYWOOD SHEATHING O R-20 MINIMUM INSULATION WITH EITHER "ROGKAOOL" 6.5" R-25 OR 5" OF CLOSED CELL SPRAY FOAM INSULATION. 4 Uig 2 NEA INTERIOR PARTITIONS_ 2 x 4 O16" O.0 WITH 1/2" AALLBOARD EACH SIDE _ -O SMOKE /-CARBON MONOXIDE DETECTOR LIVINGLi Oo O - DAVID TURNER ARCHITECT, P.C. - O O 366 WEST 30TH STREET, FIRST FLOOR,NEW YORK,N.Y.10001 O � M (212)594-0840 PROJECT - O I_TG-HEN - - = _ - -2 - - - . 1335 GREEN HILLlANE GREENPORT, N.Y. A2o0 SHEET - - FIRST FLOOR DATE: 10-20-22 PROJECT No: AE3 A 711;c` DRAWING BY: E } 3 - CHK BY: 3ry DWG No: RST FLOOR FLAN ,�a B�m. � •rf A- 101 . 00 CAD FILE No: 2 OF Iq TT _G-__ 5 _GT _0 _ - O SCALE 1/4='=1' O" - O - _ - I -OFE-N TO EELOV� - O 0 O DAVID TURNER ARCHITECT, P.C.- 366 WEST 30TH STREET, FIRST FLOOR, NEW YORK,N.Y.10001 (212)594-0840 - - - -- - - PROJECT - -- - - - 335--GRE-EN HILL LAN GREENPORT, N.Y. SHEET - - ATTIC FLOOR DATE: 10-20-22 PROJECT No: DRAWING BY: CHK BY: scl' DWG No: ATT G FLAN A- R, 5CALE 1/4"=P-0" ®.�6� ' A- 10 2 . 00 a � TE E� i'J CAD FILE No: O� DAVID TURNER ARCHITECT, P.C. z , DATE: 10-20-22 I , ��`✓�, ? • +� ` PROJECT No: EAST E L.E\//AT 0 I V 366 WEST 30TH STREET, FIRST FLOOR, NEW YORK, N.Y. 10001 �� �P� -ma k DRAWING BY: (212)594-0840 CHK BY: SGALE I/ 4"=1'-O" CID PROJECT IgUl 9 k b _ DWG No: •a -i 1335 GREEN HILL LANE A- 1 -03 . 00 GREENPORT, N.Y: 1 °'1 CAD FILE No: 4 OF 17 i MEMNON O w BEST ELEVATION � � ` - DATE: SGALE 1/4°=l'-0° DAVID TURNER ARCHITECT, P.C. � ;'��Tl3 OJECTNo: 10-20-22 366 WEST 30TH STREET, FIRST FLOOR,NEW YORK,N.Y.10001 -� DRAWING BY: (212)594-0840 &g� J cc CHK BY: PROJECT y Y ' DWG No: 1335 GREEN HILL LANE ,� , �u®.'��'� ��' ������.. A 104 . 00 GREENPORT, N.Y. CAD FILE No: 5 OF 17 -1771 LHTI DAVID TURNER ARCHITECT, P.C. � � DATE: t�.t ;B �j'r. Q 10-20-22 S� � �� PROJECT No: _ 366 WEST 30TH STREET,FIRST FLOOR,NEW YORK,N.Y. 10001 *���� WING BY: NORTH E L E\/AAT C N (212)594-0840 9�C�J � CHK BY: DWG No: SCALE I/4°=1'-0° PROJECT 1335 GREEN HILL LANE '" N®, -A- 105 . 00 GREENPORT, N.Y. ',E® �` CAD FILE No: • 60F18 Hill DATE: 10-20-22 DAVID TURNER ARCHITECT, P.C. ` PROJECT No: 366 WEST 30TH STREET, FIRST FLOOR, NEW YORK, N.Y. 10001 �� 3A„�,}��a RAWING BY: SOUTH ELEVAT ON (212)594-0840 � CHK BY: DWG No: SCALE 1/4°=I'-0" PROJECT j�� L� 1335 GREEN HILL LANE - 1 06 . 00 GREENPORT, N.Y: �� � ' CAD FILE No: 7OF19 OT1' SIZE TYFE FINISH S EG 1 F I GAT I ON RE1-IAR<S W. x H. 1 2 TRIANGULAR FIXED DOUBLE PANE 2 a 51-4" x 51-g" DOUBLE HUNG VINYL-GLAD ANDERSEN WOOD DOUBLE PANE CLEAR OPNG > 20" w X 24" H (SILL < 50" AFF) 3 2 2'-6" x 51_011 DOUBLE HUNG VINYL-GLAD ANDERSEN WOOD DOUBLE PANE 4 2 11 2'-0" x 4'-0" DOUBLE HUNG VINYL-GLAD ANDERSEN WOOD DOUBLE PANE DOOR S(f,,H=)ULE DAVID TURNER ARCHITECT, P.C. 366 WEST 30TH STREET, FIRST FLOOR, NEW YORK, N.Y. 10001 (212)594-0840 DOORS FRAME m HDW. REM RS PROJECT 0 SIZE Q SET WIDTH HEIGHT MAT'L 1=1NISH MATERIAL FINISH IHR. -� 1335 ISLAND VIEW LN - A 5'-0" 6'-8" 1-3/5" WOOD DOUBLE CLOSET DOOR G RE E N PO RT, N.Y. B 6'-O" 7-0" 1-3/4" GLASS DOUBLE ENTRY DOOR SHEET G 3'-0" -7'-0" 1-5/4" GLASS ENTRY DOOR D 3'-0" -1'-0" 1-3/4" GLASS ENTRY DOOR DOOR & WINDOW SCHEDULE E 3'-0" 6'-8" I-3/8" WOOD P 2'-6" 6'-8" I-3/8" WOOD G 2'-6" 6'-8" I-3/8" WOOD DOUBLE CLOSET DOOR DATE: 10-20-22 �o �� PROJECT No: �, �.� DRAWING BY: CHK BY: kk: D �C WG No: !�r A- 107 . OO T CAD FILE No: 8 OF 11:1 a , loll ...,... o - ---------------------------------------------------------- ----------- III Eiji 111=M cn IE 1 . I r—=---------- ----------------------------------------50" AGGE55 VENT I1 - I I - I i � 9• 1 I 21-011 1 I # 4 CONTINUOUS - I REBARS I I PLACE (12" X 24") 1 I I CONCRETE FOOTING (5,500 PSI) I I I ON UNDISTURBED SOIL 4 j I T)O'F I (AL- SET I ON 1 1 -1 NOT TO SCALE - d I j 1 0 1 1 0 1 1 01 1 DAVID TURNER ARCHITECT, P.C. I 1 366 WEST 30TH STREET, FIRST FLOOR,NEW YORK,N.Y. 10001 I I (212)594-0840 1 I I 1 PROJECT GREEN HILL LANE 1 50" AGGE55 VENT i :_ i GREENPORT, N.Y. 1 I b I SHEET FOUNDATION PLAN I L- -- 1 O 10-2 1 f -z DATE: I - L-----------------------------------------------------------------------J trse >f�irJU ri 22 PROJECT No: DRAWING BY: U ' CHK BY: ' DWG No: A- 108 . 00 CAD FILE No: ci OF 1-7 40'-011 2" X 12" (9 18" OG I I I I I I I . 2-2X12" HrEADER I I I I DAVID TURNER ARCHITECT P.C. I I I I 366 WEST 30TH STREET,FIRST FLOOR,NEW YORK,N.Y.10001 - (212)594-0840 1 1 1 1 I I I I I I I I I I I I I I I I I I I I I I I I I I PROJECT I I I I I I 1335 GREEN HILL- LANE ' GREENPORT, N.Y. SHEET I I I I FIRST FLOOR FRAMING PLAN I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I g,� e� sl n.•� DATE: I0-20-22 ���`'`✓ `Li � �`�e ROJECT No: f�1J � DRAWING BY: i CHK BY: DWG No: No. ���� A- 109 . 00 .TEE CAD FILE No: 10 OF IQ 2" X 12'-' @10" OG I _I _ .I . O DAVID T URNER ARCHITECT, P.C. I I I I I I I I I I 366 WEST 30TH STREET,FIRST FLOOR, NEW YORK,N.Y. 10001 I I I I I I I I I (212)594-0840 PROJECT d I I I I - I - I I 1- 133.5 GREEN HILL-LANE - - GREENPORT, N.Y. SHEET I I I I I I I I I I ATTIC FRAMING PLAN DATE: -20- 10 tib t `� PROJECT No: DRAWING BY: CHK BY: Q ; DWG No: r ��•� A- 1 10 . 00 TE CAD FILE No: IIOi= IQ 2"X10" g24" O 1-- _ I - _ 8001= DIAPHRAM FRAMING FOR 130 MPH WINS A5 PER 2015 WPOM (5.5.5) 2" X 10" RIDGE - _ - - N DAVID TURNER ARCHITECT, P.C. 366 WEST 30TH STREET, FIRST FLOOR, NEW YORK,N.Y. 10001 I I I I I I I I I I I I I I I I I i I (212)594-0840 PROJECT 1335 GREEN HILL LANE - GREENPORT, N.Y. SHEET 1 I 1 I I I I I I I I I I I I I I I I ROOF FRAMING PLAN I- 1 I I 1 I I I I I 1 I I 1 I I I I 1 1 I DATE: 10-20-22 • � /j• 'PROJECT No: C� DRAWING BY: 41 L HK BY: �. WG No: �0. , - A- 1 11 . 00 CAD FILE No: 12 OF I-7 I" AIR SPACE ABOVE Lj TORCH DOWN ROOFING p 5/8" PLYWOOD SHEATHING FEB 1 0 2023 2"x10" ROOF RAFTERS 16" O.G. "IllINGOL I\/E LOADS TOWP4 0FSQI(MOLD R-35 BATT INSUL. • � FLOORS 40 LBS PER SF ROOFS 30 LBS PER 5F STAIRS 40 LBS PER SF GUTTER 5/8" SHEETROGK EXTERIOR BALCONIES 60 LB5 PER 5F I" WOOD FACIA 18 WIND LOAD 130 MPH SNOW LOAD 20 LB5 PER 5F 5/8" WOOD SOFFIT p SEISMIC, CATA60RY B W/ BIRD SCREEN 2" x 6" PLATE 5/8" OAK FINISH FLOORING 3/4" PLYWOOD SUB FLOOR C520 WITH 4 8d COMMON NAILS EACH END- WOOD SIDING W./ BUILDING FELT 5/8" PLYWOOD SHEATHING - - 2" x 6" @ -- R-25 BATT INSULATION _ - W/ I" AIR GAP p tr G520 WITH 4 Sd COMMON NAILS EACH END 2-2" x 6" PLATE DAVID TURNER ARCHITECT, P.C. 5/8 BOLTS WITH SQUARE R-25 BATT INSULATION WASHERS @ 36" O.G. W/ I" AIR GAP 366 WEST 30TH STREET, FIRST FLOOR, NEW YORK, N.Y. 10001 (212)594-0840 CONTINUOUS METAL FLASHING PROJECT - 10" GONG FOUNDATION -� 3 _ - - - - - - -- - - - -- -- 35 GREEN HILL LANE- GREENPORT; N.Y. 1.5" RIGID INSULATION p TOTAL R-25 4" CONCRETE RAT-SLAB vv # 10 NM SHEET p TYPICAL SECTION ENE DATE: 1-20-23 ✓tel r'' iw•� [�i ..n' PROJECT No: u " .sA�wl.'}`s', '�t DRAWING BY: 12 X 24 CONCRETE FOOTING '1"! "`' CHK BY: r DWG No: A- 1 12 . 00 T'F 1 SA AL SET 1 ON . NOT TO SCALE � ���� CAD FILE No: .� 13 OF 11 2 TREADS 1011 0II 5 RISERS @ -7.511 75II = OAK TREADS WITH .00 _� I" NOSING ( STAIN ) 20 1 1 56 1 1 8 r " 1 4" THK. YELLOW FINE RISER ( FAINT GRADE ) YELLOW FINE STRINGER ( PAINT GRADE ) 1 4" THK. aU TREAD A1�� SER � NOT TO SCALE UA - - LU �— - OAK-TREADS A 1 TH - I" NOSING-( STAIN ) I 4" 14" THK. DAVID TURNER ARCHITECT, P.C. 366 WEST 30TH STREET, FIRST FLOOR,NEW YORK, N.Y. 10001 (212)594-0840 PROJECT -------------------------_------ _. --_ - ---_ --- 1 GREEN HILL LANE - - 1335-GREEN- NE __ ------------------------ 335 GREENPORT, N.Y. STA I R FLAN SHEET NOT TO SCALE YELLOW -PINE LYELLOW FINE STRINGER OUT OF RISER ( FAINT STAIR DETAILS 12 DEPTH ( FAINT GRADE )5/4" THK. GRADE ) DATE: I0-20-22 PROJECT.No: S, 6 �v DRAWING BY: CHK BY: DWG No: GROSS SEDT 1 O 5ii? a `:' t2 NOT TO SCALE �o �, A- 113 . 0 0 CAD FILE No: 14 OF IQ 5/4" X 6" - 2" X 10" PT (D24" O.G. i \ \ \ \ / 1 1 1 WOOD DECK -T -- - -- - T-- -- ;j7 I-- -- - -—-—- - - �T- _ �l \ �� PLANKS - - �2" x 10" JOISTS I I I I I I I I I I I I I 24 - - �• I I I I I I_ I I L I I I I I I I I I I - - - - -- - - - - - - L J - _ - - ---_-- - - -- - ,�=- _�� TED - _ - � _ - - - - - - W- 2-xC P.T. SOL - - _ i - - - - - - NE - - =TOGETHER WITH I/2". BOLTS - - - - - UP 4" x 4" POST . --METAL BASE HOLDER = ;'. 3"x l0" W - ;.:...0 II•.;.: -CGRADE -LINE OOD LEDGER BOLTED O P?� ENERS TO EXIST WALL. USE TEG ST --AOR JOISTS- - - -- - DAVID TURNER-ARCHITECT, P.C. 366 WEST 30TH STREET, FIRST FLOOR, NEW YORK,N.Y. 10001 (212)594-0840 PROJECT• 4 e ----- — — ---- --- -- --------— -- --- -- ----- -- - — -- ------ - - - - --- — --- - . ..- ------- — - ---- -- --- - --- - -4335-GREEN- - - - - -- -- -- — — - -- •�` HILL-- LANE i GREENP-ORT; Ni Ir----_----- - -NEW GONG. SONOTUBE I I SHEET -- - -- - - - - - —__==---_--- -- - - FOOTING EOR -NEW- Ni POST PORCH FLOOR FRAMING SONOTUBE FOOTING ---------- AS PER DETAIL DATE: 1-20-23 5 t.. •;' PROJECT No: ------------ _ f U DRAWING BY: fit + CHK BY: ! t E DWG No: 12 TION THRU DEQ A- 1 l4a FORCH FLAN Al CAD FILE No: NTS SCALE 1/4"= 1'-0" 15 OF la I I I I I I I I I I I I I I I I I I I 2" X 8" RAFTERS (g 24" O.G. " TO EXIST. AALL�USE ETEGO FASTENERS FOR RAFTERS 77 OF - - - ------------ I ' ------------, ------=-=----I DAVID TURNER ARCHITECT, P.C. Li 366 WEST 30TH STREET, FIRST FLOOR, NEW YORK, N.Y. 10001 ------------� (212)594-0840 _ PROJECT '------------ 1335-GREEN -HILL LANE ' GREENPORT, N.Y. ------------ - SHEET PORCH ROOF FRAMING - ------------� I -------------t DATE: 1-20-23 PROJECT No: -------- --� tsr(^�h�� }�fsfs �i '{� DRAWING BY: ' ----------- Y T CHK BY: I DWG No: f A- 114b . 00 F0RC_,,H ROOF FRAC I NG- � �0 1s�6°� �` CAD FILE No: Sr,ALE 1/4"= 1'-0" 15 OF IQ 4" x 4" PT ON GONGRETE SONOTUBE 4' DEEP 2" X 10" PT (9 16" O.G. - I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I 2-2" X 10" PT ( I I I I I I I I I I I I I I I I I I 1 ------------ ------------ - - Li --=--------- DAVID TURNER ARCHITECT, P.C. 366 WEST 30TH STREET,FIRST FLOOR, NEW YORK,N.Y.10001 (212)594-0840 PROJECT - , - - - - - 1335 GREEN HILL LANE- \ ` GREENPORT, N.Y. - - - Ir------=--- - SHEET '------------ PORCH DETAILS I -------------� ------------I TE: 10-20-22 v PROJECT No: DRAWING BY: CHK BY: DWG No: r. t A- 1 14 . 0 0 6 - ®.� CAD FILE No: 5GALE 1/4"= 1'-0" 15 OF IQ \/ENT RISER 2'I LAV - TUB I 1^4/G _ 411 A771 C 4"FLOOR y VENT .211 i I I I DAVID TURNER-ARCHITECT, P.C.- LAV I D.W. I 2 GOMP. SINK 366 WEST 30TH STREET, FIRST FLOOR, NEW YORK,N.Y. 10001 (212)594-0840 TUB W/G 2 2. PROJECT L.. 4 _ -335 GREEN HILL LANE FIRST FLOOD 41 GREENPORT, N:Y. Y YASTE_ STA(f SHEET PLUMBING RISER ATE: I0-20-22 PROJECT No: DRAWING BY: ?IA$ *q N--` CHK BY: 5- `i �� DWG No: G NOT TO SALE - � '" 14°.�g� ,,' A- 115 . 00 CAD FILE No: 16 OF IQ ---- MODEL"MSC4"USE 10-16D NAILS ROOF RAFTER RAFTER TIE @ 16"O.C. TO HEADER, 18-10D NAILS TO MODEL"CS20" RIDGE&26-1 OD NAILS TO VALLEY ATTACHED W/(4) `16„ RAFTERS AS PER MGF. 8d NAILS MIN.A7 SPECIFICATIONS BOTH ENDS 16" _ _ _ _ RAFTER CONNECTOR lo, °o o° ° o o RIDGE o @ 16"O.C. 00 0 ou — ° e — — oa MODEL"H2A" oo \l ROOF RAFTER /° o 0 0 o RIDGE DOUBLE RIDGE o ;0 0 TOP PLATE ° 0 0 0I ° ° VALLEY RAFTER 00 00 (@ CATH'L CLGS.) c o WALL STUD o LSU26-(2x6); o VALLEY RAFTER 0 LSSU28(2x8,2x10&2x12) ° 0 0 -NOTE:THIS DETAIL IS UTILIZED WHEN WALL STUDS ALIGN DIRECTLY- = ROOF RAFTER W/RAFTER.WHEN RAFTER AND STUDS - ARE NOT ALIGNED, USE CONNECTORS IN DETAIL"S2"&"T"ON THIS PAGE RAFTER-TO-TOP PLATE TO STUD CONNECTION @ 16"OC RAFTER-TO-RAFTER VALLEY RAFTER-TO-RIDGE CONNECTION TYP. @ EACH RAFTER WHEN-STUDS ALIGN WITH RAFTERS 1 CONNECTION TYP. MODEL "H2A" BY 51MPSON STRONCG-T11= MODEL "GS" "LSU" BY SIMPSON STRONG TIE MODEL "MSG" BY SIMPSON STRONG-TIE- DAVID TURNER ARCHITECT, P.C. 366 WEST 30TH STREET, FIRST FLOOR, NEW YO_RK,N.Y. 10001 (212)594-0840 PROJECT - 1335 GREEN-HILL- L--ANE 0 GREENPORT, N.Y. H2,5A - SHEET MT131 MISC DETAILS H2,5A MTS MTS . . MTS _ DATE: 10-20-22 APROJECT No: o. DRAWING BY: Lw f CHK BY: DWG No: NOT TO SCALE ,;is H25A NITH TITER H ANCHOR - •�� � ^� A- 116 . 00 NOT TO SCALE CAD FILE No: 16 OF IQ NA I L I NC-7 SCHEDULE CONNECTION NAILING I. :JOIST TO SILL OR GIRDER,TOENAIL 3-8d 2. BRIDGING TO J015T,TOENAIL EACH END 2-8dI I � ���RAF I I & A I �� �O1�NE�TORS 3. T" X b" SUBFLOOR OR LESS TO JOIST,FACE NAIL 2-8d THESE DETAILS HAVE BEEN DESIGNED IN G_ ONFORMANGE WITH THE 4. AIDER THAN I"_X 6"SUBFLOOR TO EACH JOIST,FACE NAIL 3-8d - - "WOOD FRAME GONSTRUGTI.ON MANUAL (ANSI/AF$PA WFGM 2018)" • 5. 2" SUBFLOOR TO JOIST OR GIRDER,BLIND AND FACE NAIL 2=Ibd WIND SPEED OF 130 MPH - • 6. SOLE PLATE TO JOIST OR BLOCKING,TYPICAL FACE NAIL 16d 0 I6" O.G. SOLE PLATE TO JOIST OR BLOCKING,(9 BRACED HALL PANELS 3-16d PER 161, • "1. TOP PLATE To STUD AND NAIL 2-I6d. 8. STUD TO SOLE PLATE 4-8'd,TOENAIL OR 2-Ibd,END NAIL �I RA R �/I I �0�I�I E C T I 0 NI ( TA B l_E 2A) I ..q: DOUBLE 5TUD5,FAGS NAIL I6d"9-24"'04. 10. DOUBLED TOP PLATES,TYPP-FACE NAIL I6d I6"o.c. BASE TOP,OF WALL 8=I6d DOUBLETOP PLATES,LAP 5PL.ICE - _ = 2"X6" -I6.'� O.G: -(USE. 1.33 MULTIPLIER) 1I: BLOCKING BEN J TWEEOISTR S-O -TOP-PLATES;TOENAIL-- - 3-8d -- - _ - : - - _ FOR 10' WALLS 157 P.L.F 8d bO.C.2. RIMJOIST5 TO TOPLATE,-TOEAIL 7) X (1.36) 208.8 LBa: - ( UGTIO- N)( 5 - _ - 13. TOP PLATES,LAPS-AND-INTER9EGTION5,FAGS NAIL 2-I60 14. CONTINUOUS HEADER,TY 10.PIECES. Ibd ® I6" O.G.ALONG EACH EDGE 15._ CEILING-JOISTS TQ PLATE;TOENAIL' 0. - I - I6. CONTINUOUS HEADER TO STUD,TOENAIL _ _ `E-8d- I (� .�I J� D TABLE `2 .2'A) NOT TO 5 LE -- - - - - -- ?...CEILING-.JOISTS,LAPS OVER-PARTITIONS,FAGS NAIL 3=16d '_.- -- - _ - ._ _ _ - _ __ _ _ _. - - -- - - - - ---- - - - - _ ROOF/ GE I L i NG DEAD LOAD" � I O P5F 18. CEILING JOISTS TO PARALLEL'RAFTERS,FACE NAIL 3-I6d 24" (U - MULTIPLIER) - - - - - .. . ..-. _ ROOF- ,JOIST SP I NO C� S� 2 O A. RAFTER TO PLATE,TOENAIL �� MULTIPLIER) - - - _-r _ FLOOR JO I ST WALL STUD .SPG I NG 16 (U55 1.33 20. I"BRACE TO EACH STUD_AND PLATE,FACE NAIL - 2-8d. _ _ - -I 2' SPAM =- 18q .• 21. 1" LESS to OR LETO EACH BEARING,FACE NAIL " 2-8d 24' SPAM = 306 DAV1-D TU RNER ARCH ITECT, P.C., 22. AIDER THAN I"x8"TO EACH BEARING,FACE NAIL 3-8d 366 WEST 30TH STREET,FI ST FLOOR,NEW YORK,N.Y. 10 001 23. BUILT-UP CORNER STUDS I6d a 24" O.C. ROOF--TO WALL OF BEAM I8q x (2.0)- 378 LBS: .. _ - _ (212)594-0840 -Be,.. . _ - 606 x (2.0) .= C 12 LB - - -24.-BUILT-UP GIRDER 8 BEAMS - 20d'�.32" O.G.0 TOP AND - - -- - - 'PROJECT BOTTOM 8 STAGGERED,2-20d- - - - - - T - - -- -- - - m. S ANS cb EAS SPLICE - _ X=(1-.33) =- . `1=Bs. . :. 13.35 GREEN=HILL.LANE WALL TO FLOOR TO WALL _251 - 2=Ibd 6 EACH BEARING. _ 3.Oo X"(1.53) 407 LBs. 25: j' PLANKS G RE E N PO RT, N.Y. 26.,Mop_STRUCTURAL PANELS AND PARTICLEBOARD., SUBFLOOR;ROOF AND HALL-SHEATHING(TO FRAMING)(]"=25.4 mm) SHEET 1/2"AND LESS _ bd (5)_ I I T - - - - - - Iq/32"-3/4" 8d( ORbd(s) OI TL=00<ER UFL= I_� I _L=0A�5 (TAE3LE, 2 .2C) ad (55, -- MISC. DETAILS I I/8"._ 1 I/4" IOd(4) OR 8d(5) OUTLOOKER SPAG I NG OF 24" O.G. COMBINATION 5UBFLoOR-UNDERLAYMENT(TO FRAMING)(1"=25.4 mm) 3/4"AND LE55 bd (s) UPLIFT LOAD OF 744 LBs 8d (5) DATE:`-'"i-;"^ DATE: I0-20-22 I VW - 1 1/4" IOd(4)OR 8d(5) �f,Re�� !7.��,�� OJECT No: 27. PANEL SIDING(TO FRAMING) `� I �I �I ° DRAWING BY: I/2" OR LESS SIL=L= _ PLATE I O FOU ` E�ATIO `� (TABL=E 5.2A) :,, CHK BY: -- - 9 > �f DWG No: 28. FIBERBOARD SHEATHING FQjz 2 STORY BUILD 1 NG 32' LENGTH USE M I NUMUM 7 5/8" BOLTS f 1/2.. NO. 11 ) (6) ` 0 ®' A- 1 17 . 0 O NO. 16 GA. (q) s �T 20/32" NO. II GA. (8) CAD FILE No: 8d (4) 18 OF I a NO. I6 GA. (q) Mai GENERAL NOTES I. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF-THE NEW PLUMBING YORK STATE AND LOCAL BUILDING CODE, FIRE DEPARTMENT REGULATIONS, THE NEW YORK STATE BUILDING CONSTRUCTION I. ALL PLUMBING WORK MUST BE PERFORMED BY A LICENSED o MANUAL AND LOCAL BUILDING CODES, UTILITY COMPANY PLUMBER REQUIREMENTS, AND THE BEST TRADE PRACTICES. INCLUDING NYS ENERGY CONSERVATION AND CONSTRUCTION CODES. THE M05T 2. ALL BRANCH PIPING SHALL BE NEW BACK TO THE SUPPLY RISER, STRINGENT SHALL APPLY. AND BACK TO THE WA5TE/VENT STACK. NEW SHUT-OFF VALVES 2. BEFORE COMMENCING WORK THE CONTRACTOR SHALL FILE ALL SHALL BE BETWEEN THE RISER AND THE FIRST WALL PENETRATION WITH DI-ELECTRIC FITTINGS AS REQUIRED. REQUIRED CERTIFICATES OF INSURANCE WITH THE DEPARTMENT OF BUILDINGS, OBTAIN ALL REQUIRED PERMITS AND PAY ALL FEES 5. RISER DIAGRAM FOR WASTE AND VENT MUST BE PROVIDED FOR REQUIRED BY GOVERNING LOCAL AND NEW YORK STATE AGENCIES. THE KITCHEN AND BATHROOM WHEREVER THERE ARE FIXTURE RE- 5. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN LOCATIONS OR CHANGE IN TYPE (I.E. TUB TO A SHOWER). THE FIELD PRIOR TO GOMMENGING WORK AND SHALL REPORT ANY DISGREPENGIES BETWEEN DRAWING5 ANF FIELD CONDITIONS TO THE 4. PLUMBER MUST CHECK EXISTING WASTE AND VENT LINES TO BE ARCHITECT. FREE OF OBSTRUCTION. 4. FURNISH ALL LABOR, MATERIALS,-APPURTENANGES, EQUIPMENT 5. WATER SUPPLY NOTES OR DIAGRAMS MUST INDICATE BACK FLOW AND SERVICES NECESSARY AND REQUIRED TO COMPLETE ALL WORK IN THIS SECTION AS INDICATED ON THE DRAWINGS AND / OR PREVENTION DEVICES ON ALL HARD-PIPED FIXTURES AND SPECIFIED HEREIN. - APPLIANCES. THIS APPLIES TO REFRIGERATOR ICE MAKER (IF ANY) AND DISHWASHER. 5. EXAMINE THE CONDITIONS AND PREPARATIONS MADE FOR THE PERFORMANCE OF THIS SECTION OF WORK AND NOTIFY ARCHITECT 8. CHECK VALVES MUST BE FURNISHED ON BRANCH PIPING FOR HOT OF CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY AND GOLD WATER SUPPLY ADJACENT TO MASTER SHUT-OFF COMPLETION OF THE WORK. DO NOT PROCEED WITH THIS WORK VALVES. UNTIL ALL CONDITIONS ARE MADE SATISFACTORY FOR SUCH CHECK VALVES MUST BE QUIET TYPE. PERFORMANCE OF WORK. 6. ORDER ALL SPECIFIED MATERIALS AND FABRICATED ITEMS WITH SUFFICIENT LEAD TIME 50 AS NOT TO DELAY WORK IN ANY MANNER. .GAPPING PIPING AND CONDUIT 'Y. MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED, BUT 1. ALL ABANDONED PIPING AND CONDUIT REMOVED FROM SERVICE NECESSARY FOR PROPER CONSTRUCTION OF ANY PART OF THE SHALL BE TERMINATED AND GAPPED OFF AT THE NEAREST LIVE WORK SHALL BE INCLUDED AS IF THEY WERE INDICATED IN THE JOINT OR JUNCTION BOX. NO ABANDONED SERVICES SHALL JUST DAVID TURNER ARCHITECT, P.C. DRAWIN65. BE OUT AND LEFT IN PLACE WITHOUT REMOVAL BACK TO THE 8. THE CONTRACTOR SHALL COORDINATE ALL WORK PROCEDURES "LIVE" POINT, AND PROPERLY TERMINATED TO MEET CODE. 366 WEST 30TH STREET, FIRST FLOOR, NEW YORK, N.Y. 10001 WITH REQUIREMENTS OF LOCAL AUTHORITIES AND BUILDING (212)594-0840 MANAGEMENT., PROJECT 9. THE CONTRACTOR SHALL COORDINATE ALL WORK PROCEDURES 1335 -GREEN HILL LANE WITH THE-REQUIREMENTS OF LOCAL AUTHORITIES AND BUILDING ELEGTRIGAL MANAGEMENT. GREEN PORT, N.Y. 10. THE GONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION i- ALL ELECTRICAL WORK MUST BE PERFORMED BY A LICENSED OF ALL CONDITIONS AND MATERIALS WITHIN THE PROPOSED ELECTRICIAN. CONSTRUCTION AREA. THE CONTRACTOR SHALL DESIGN AND SHEET INSTALL ADEQUATE SHORING AND BRACING AFOR ALL STRUCTURAL 2. DUPLEX OUTLETS WITHIN 6FT OF SINKS ARE TO BE GE'CI TYPE. GENERAL NOTES OR REMOVAL TASKS. THE CONTRACTOR SHALL HAVE SOLE RESPONSIBLITY FOR ANY DAMAGE OR INJURIES CAUSED BY OR 5. ALL ABANDONED ELECTRICAL BOXES WITH REMAINING WIRING DURING THE EXECUTION OF THE WORK. ENTERING. OR LEAVING SHALL REMAIN ACCESSIBLE WITH REMOVABLE COVERS. II. THE CONTRACTOR SHALL LAY OUT HIS OWN WORK, AND SHALL PROVIDE ALL DIMENSIONS REQUIRED FOR OTHER TRADES (PLUMBING, ,6 �,# t�; �,, D 10-20-22 ELECTRICAL, ETC.) 4. THE ELECTRIC PANEL AND INTERCOM PANEL CANNOT BE vr� PROJECT No. RE-LOCATED WITHOUT SPECIFIC WRITTEN APPROVAL. ti 12. PLUMBING AND ELECTRICAL WORK SHALL BE PERFORMED BYE ' DRAWING BY: PERSONS LICENSED IN THEIR PROFESSIONS, WHO SHALL ARRANGE 5. ALL RECEPTACLE, SWITCH, OR LAMP HOLDER BOXES SHALL BES?��' CHK BY: FOR AND OBTAIN INSPECTIONS AND REQUIRED SIGN-OFFS. SET FLUSH TO FINAL FIN15HED SURFACE. EXTEND EXISTING BOXES #:i:9 : y Vis, DWG No: 13. THE CONTRACTOR SHALL DO ALL GUTTING, PATCHING, REPAIRING AS NECESSARY OR UTILIZE PLASTER RINGS OR OTHER DEVICES TO _ p' ENSURE THAT A CONTINUOUS GROUNDED METALLIC SURFACE IS IN r A A5 REQUIRED TO PERFORM ALL OF THE WORK INDICATED ON THE A- 1 18 . 0 O DRAWING5, AND ALL OTHER WORK THAT MAY BE REQUIRED TO PLACE BETWEEN BOXES AND FACEPLATES. �a• TE COMPLETE THE JOB. CAD FILE No: Iq OF Icl