Loading...
HomeMy WebLinkAbout28087-Z FORM NO. 4 TOWN OF SOUTHOLD BUILDING DEPARTMENT Office of the Building Inspector Town Hall Southold, N.Y. CERTIFICATE OF OCCUPANCY No: Z-29704 Date: 09/11/03 THIS CERTIFIES that the building ALTERATIONS Location of Property: 17250 MAIN ST NEW SUFFOLK (HOUSE NO. ) (STREET) (HAMLET) County Tax Map No. 473889 Section 117 Block 9 Lot 30 Subdivision Filed Map No. Lot No_ conforms substantially to the Application for Building Permit heretofore filed in this office dated JANUARY 14, 2002 pursuant to which Building Permit No. 28087-Z dated FEBRUARY 15, 2002 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is NEW WINDOW ALTERATIONS & INSTALLATION OF NEW GAS HEATING BOILER IN EXISTING SINGLE FAMILY DWELLING AS APPLIED FOR. The certificate is issued to THEODOSIUS W VICTORIA (OWNER) of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF BEALTH APPROVAL N/A ELECTRICAL CERTIFICATE NO. 79554H 08/27/03 PLUMBERS CERTIFICATION DATED 07/09/03 TIMOTHY HORTON ut rized Signature Rev. 1/81 FORM NO . 3 TOWN OF SOUTHOLD BUILDING DEPARTMENT Town Hall Southold, N.Y. BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) PERMIT NO. 28087 Z Date FEBRUARY 15, 2002 Permission is hereby granted to : THEODOSIUS W VICTORIA PO BOX 218 NEW SUFFOLK,NY 11956 for MAKE WINDOW ALTERATIONS AND INSTALL A NEW STOVE AS APPLIED FOR at premises located at 17250 MAIN ST NEW SUFFOLK County Tax Map No. 473889 Section 117 Block 0009 Lot No. 030 pursuant to application dated JANUARY 14 , 2002 and approved by the Building Inspector. Fee $ 150 . 00 42 Authorized Signature COPY Rev. 2/19/98 Form No.6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with then A. For new building or new use: 1. Final survey of property with accurate location of all buildings,property lines, streets, and unusual natural or topographic features. 2. Final Approval from Health Dept. of water supply and sewerage-disposal (S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1% lead. 5. Commercial building, industrial building, multiple residences and similar buildings and installations, a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings (prior to April 9, 1957)non-conforming uses, or buildings and"pre-existing"land uses: 1. Accurate survey of property showing all property lines, streets, building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is denied, the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees 1. Certificate of Occupancy- New dwelling $25.00, Additions to dwelling$25.00, Alterations to dwelling$25.00, Swimming pool $25.00, Accessory building$25.00, Additions to accessory building$25.00, Businesses $50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy-$.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy-Residential $15.00, Commercial $15.00 Date. 2 L2} '03 New Construction: Old or Pre-existing Building: X (check one) Location of Property: 172'.SO NEW SUFFif�Ll� AVS . ht6 W C U SLK House No. Street Hamlet Owner or Owners of Property: 71 5aVS VIC_7rC*J a Suffolk County Tax Map No 1000, Section Block 9 Lot _3p Subdivision Filed Map. Lot: Permit No. 150 3 7 Z Date of Permit.—;Z JJS lO Z Applicant: •Tjr ro V6CM P-14 Health Dept. Approval: Underwriters Approval: Planning Board Approval: Request for: Temporary Certificate Final Certificate: X (check one) Fee Submitted: $ Z$a o Applicant Signature co aq ?o y �OgOFFOL,rco O 00 CIO x Town Hall,53095 Main Road • Fax(631)765-9502 P.O. Box 1179 'y �� Telephone(631) 765-1802 Southold, New York 11971-0959 BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATION Dale: Building Permit No. ��� Owner: o Vo swe,s !/1riT%Lf,3Z (Please print) Plumber: (case print) I certify that the solder used in the water supply system contains less than 2/10 of 1% lead. (Plumbers Signature) Sworn to before me this day of �, l 20_0- JUNE.SAYFA Ndary pulite,State d Nwi Yc* No.4948506 A 0AW in SUIC&c0m v C11 `ame,.ri.c ter„ �y7J�0� Notary Public, Sy 41s4< County Electrical Inspection Certificate Issue Date Electrical Inspection Service, Inc. Application Number 8/27/03 375 Dunton Avenue 79554H East Patchogue, New York 11772 (631)286.6642 Issued To: Ted Victoria Street: 17250 New Suffolk Avenue Village: New Suffolk Zip: 11956 Town: Southold Section: Block: Lot: Contractor: Lic. It Was examined and found to be in compliance with the National Electrical Code. ❑ Commercial ❑ NV Defects ❑ Pool ❑X tat Floor ❑X Indoor ❑ Basement ❑ Hot Tub 191Residential ElDet. Garage 11Attic ❑ 2nd Floor ElOutdoor ElAddition ❑ Survey Switches Receptacles Fixtures GF/ Heaters A/C Fans 7 Dishwasher Washer/Amps Dryer/Amps Oven Range/Amps Microwaves Furnace Oil Gas Circulators Smoke Detector Bell Transformer Meter Amps Phase UG/OH Jacuzzi Television CO Detector Bldg. Permit: Other Equipment Hugo S. Surdi President Rough Inspection: 08/26/2003 Inspector: Ed Scavelli Final Inspection: 08/26/2003 Inspector: Ed Scavelli This certificate must not be altered in any manner. Inspectors may be identified by their credentials. BUILDING PERMIT EXAMINER CHECK LIST --s z. /49/0= DATE REVIEWED: J //.r/02. ,/ DATE SUBMITTED:i/�/Oy, APPLICANT NAME IEc Y1croR�a SCTM# DISTRICT: 1,000 SECTION: I i':� BLOCK: _ LOT: STREET: 11Z,50 f leM1 Surme4-- Ave• CITY: r. � e; — SUBNBDDIV. NAME: A PROJECT DESCRIPTION: ACrc A:noW5 70 tym. TIe[G edE,Sw - +AAA iLv -��A�tr ARCHITECT/ ENGINEER: NIA FAST TRACK? nb SINGLE&SEPARATE CERTIFICATION-REQUIRED? Ate NOTES: LOTS 40,000SF-100-24.Lot recognition.(CREATED before June 30, 1983),UNDERSIZED[ATS FROM JAN.1997 100-25.Merger.(A nonconforming at anytime atter 7/1, C7jtlMkrEj�:, CCfs-r- *-+Y ZONING DISTRICT: CONFORMING? REQ. LOT SIZE: ACT. LOT SIZE: REQ. LOT COV. ACT. LOT COV. REQ. FRONT PROP. FRONT REQ SIDE ACT. SIDE REQ. REAR PROP. REAR NO cwomga5 — (NrNgoL Vi>cc x- Ac.Ts. WATER FRONT? No DESCRIPTION: PANEL #: FLOOD ZONE: AGENCY PERMITS REQUIRED FOR REVIEW NO, N e-w BEDS APPROVALS REQUIRED: SUFFOLK COUNTY HEALTH DEPT: YES o , (BED#):_DTE:_/_/^ PERMIT#:R10- NEW YORK STATE DEC: rRa<urc 9nn5 YES o SOUTHOLD TOWN TRUSTEES: YES o TOWN ZONING BOARD APPROVAL: YES o TOWN PLAN. BOARD APPROVAL: YES o TOWN HISTORICAL PRE (SPLIA): YES o NYS ENERGY: YES OP EGRESS (18 H min.?4 sq total) VENT (SQ. FT, x 4%) LIGHT (SQ. FT.x 8%) BUILDING PERMITS OPEN/EXPIRED: BP -Z/C/0 Z- HAVE PRE CO'S : Y OR N BP -Z/C/o Z- NOTES: FEE STRUCTURE: FOUNDATION: SF FIRST FLOOR : SF SECOND FLR : SF INTI' OTHER TOTAL TOTAL: SF FEE FEE FEE 'OT( SF)- ( SF)= SF X$—=$—+$—+$—=$ 70-1802 BUILDING DEPT. INSPECTION [ ] FOUNDATION IST [ ROUGH PLBG. [ ] FQUNDATION 2ND [ ] INSULATION W [ ✓] F ING [ ] FINAL FIREP E A CHIMNEY RE RMRKS. `J DATE /v lPJ �L INSPECTOR S�7 ?I M-1802 BUILDING DEPT. INSPECTION [ ] FOUNDATION IST [ ] ROH PLBG. [ ] FOUNDATION 2ND [ INSULATION [ ] FRAMING [ ] FINAL [ ] FIREPL & CHIMNEY REMARKS: DATE INSPECTO 7 i M-1802 BUILDING DEPT. INSPECTION [ ] FOUNDATION IST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] 1 LATION [ ] FRAMING [ FINAL [ ] FIREPLACE A CHIMNEY REMARKS: / DATE INSPECTOR �/. FIELD INSPECTION REPORT DATE COMMENTS a FOUNDATION(1ST) y -------------------------------------- x C FOUNDATION(2ND) ,I z Ael F �y c 4/ice' ROUGH FRAMING& PLUMBING S y r r INSULATION PER N.Y. STATE ENERGY CODE /3 FINAL AD TTI AL COMMENTS — O Z m b - - y O _ z x r� y - x d b y TOWN OFSOUTHULD BUlLIJ1NUYtlLM11 AYYldI:.&IA N n,ril BUILDING DEPARTMENT Do you have or need the following,before applying TOWN HALL _ Board of Health SOUTHOLD,NY 11971 3 seta ofBuilding Plans TEL: 765-1802Survey PERNIIT N �Sog�� check Septic Farm N.Y.S.D.E.C. Trustees Examined 2-11 20 2. Contact: Approved 2-II5' 20 2 Mail to: Disapproved a/c 1 Phone: 3 /t0� 3 l�,J ding Inspector JAN 1 4 m s I APPLICATION FOR BUILDING PERMIT. Lj Dateyl >IOy 107 20QZ INSTRUCTIONS a.This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 3 sets of plans, accurate plot plan to scale.Fee according to schedule. b.Plot plan showing location of lot and of buildings on premises,relationship to adjoining promises or public streets or areas,and waterways. c.The work covered by this application may not be commenced before issuance ofBuilding Permit. d.Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work e.No building shall be occupied or used in whole or in part for any purpose what-so-ever until a Certificate of Occupan is issued by the Building Inspector, APPLICATION IS HEREBY MADE to the Building Department.for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk County,New York,and other applicable Laws,Ordinances or Regulations,for the construction of buildings,additions,or alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code,housing code,and regulations,and to admit authorized inspectors on premises and nbuilding for necessary'inspealions. OCCUPANCY OR UNDERWRITERS CERTIFICATE t USE IS UNLAWFUL REQUIRED (Sigoamm of applicant or name,if a corporation) WITHOUT CERTIFICATE 13[yc 2►£S I /rev suxxi u� 119 OF OCCUPANCY PROVIDE OPENINGS FOR (Mailingaddrossofapplicant) EMERGENCY ESCAPE AS State whether applicant is owner,Icpil pNgTy1, �er, general contractor, electrician,plumber or builder N.Y. STATE BUILDING CODE. Name of owner of premises (as on the tax roll or latest A If applicant is a corporation, signature of duly authorized officer DATE' 2/i s/z. 9HZ��Z_ RE= $ 150 BY. �)F42 (Name and title of corporate officer) NOTIFY BUILDING DEPARTMENT AT 785-1802 9 AM TO 4 PM FOR THE . FOLLOWING INSPECTIONS: Builders License No. L FOUNDATION - TWO REQUIRED Plumbers License No. FORPOUREDC ONCREVE 2 ROUGH - FRAMING & PLUMBING 3 INSULATION, Electricians License No. 4 FINAL - CONSTRUCTION MUST BE COMPLETE FOR C.O. Other Trade's License No. ALL CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE N.Y. 1. Location of land on which proposed work will be done: STATE CONSTRUCTION & ENERGY LE VT2,To Nr--" SU�o� A� �_ �j Q�SIBRFOR House Number Streetram°eT�RmtvRa County Tax Map No. 1000 Section Lri Block q Lot Subdivision Filed Map No. Lot (Name) State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy S lNG LE - MAA I.4 ( D Wt=W N Cj ' b. Intended use and occupancy S Nature of work(check which applicable):New Building Addition Alteration Repair Removal Demolition Other Work Nif-�W Wtf l0C1V6 ,Nom r!�J¢lWr SToV (Description) Estimated Cost 71Cyo.t' 4000 _ -- Fee (to be paid on filing this application) If dwelling,number of dwelling units Number of dwelling units on each floor If garage, number of cars If business, commercial or mixed occupancy, specify nature and extent of each type of use. Dimensions of existing sti uchlres,if any: Fronrt LO 13 ,r Rear 2G ' 3f` Depth 31 `Z " Height r Number of Stories t Dimensions of same structure with alterations or additions: Front — Rear Depth Height — Number of Stories. Dimensions of entire new construction: Front Rear — Depth - Height Number of Stories Size of lot: Front Rear Depth 0. Date of Purchase 22Lr 2000 Name of Former Owner_}E1.1tZ 4 V6C,' all f-t 1. Zone or use district in which premises are situated M 1 .2. Does proposed construction violate any zoning law, ordinance or regulation ty0 3. Will lot be re-graded W0 Will excess fill be removed from premises: YES NO 17M NF-N s"1KAw- 73`{-7663 4. lvamesofOwner ofgremises7� yteJuntaa- Address,NEW`S11�d�honeNo.�z-gbb-uoso . Name of Architect Address Phone No Name of Contractor Address Phone No. 5. Is this property within 100 feet of a tidal wetland? *YES NO___�____ • IF YES, SOUTHOLD TOWN TRUSTEES PERMITS MAY BE REQUIRED 6. Provide survey,to scale,with accurate foundation plan and distances to property lines. 7. If elevation at any point on property is at 10 feet or below,must provide topographical data on survey. )TATE OF NEW YORK) SS: ;OUNTY OF ). 7 &e; rc Yl !f►...- �. being duly sworn,deposes and says that(s)he is the applicant (Namt Ofindivich* S' )abbfb named, S)He is the (Contractor.A Corporate officez, )f said owner or Owners, and is duly,authoryze%40 perform or have performed the said work and to make and file this application; hat all statements contained in tbis applicationaze true to the best of his knowledge and belieiy and that the work will be )erformed in tk a manner set f& i is tfi6;applit Jdon'filed therewith. 5wogtobeforelfi `9 ).1A `T• ` day of _ ANTHONY sAGUNO . Signature of Applicant Notary Public. state of New York No. 01 BA5063169 Qualified in Queens county Commission Expires July 15, 0-) opt ti6T vJlty a ; vA urJ =„ , �NuT c�2jyNT ivlhTuSry�Sa�I�I. Wd 4VUT CERTIFICWE ' OF OCCUPANCYQ4ti� NA fit M [D ,*T p �q y +4fSa nC>ac+E � w NinJt7Acgt 6�ttttr+Cr ov-o+c s�•�&+�. Zy�V&" nwc��.cc.v (T,f0caa } tl yf #� 7Z")cba rt 1 2 x 3$e# ►vrinri?E3i►1 WINDOW t b PROVIDE OPENINGS F0 9v�tYJT EMERGENCY ESCAPE A cn" REQUIRED BY PART. 714 F ' ` `` ) r-Eocy sw*T N.Y. STATE BUILDING CO tri � �`"`� �r ,��.r� XAtf. l` f` Ap"Kw EY: DEawN BY lilt, 0.41E y� IR MWSED f Wt 1DU W 1N�G tt?M+7 Apo t-OC ATOV� J I" KAST w I lVCj AS Nirp.- " DrnwnNc wunwEa �>�lk�';•tiN4 %R�t'�C war ^' � �, C+lS.�'V Cy S'RDVk. WES7 hl►rtl� UNDERWRITERS CERTIFICATE REQUIRED v�rsr+a gaq i ON few" 7tus� A tv SLAkf.T W1#44, *rove roll 7'a 11Eft.`+WRit. KPi s�H� e►y vAclvla.1^ New supoo- t tv y , 1 ., DAn, v,/oGKa5t' i CJ1'T r .�d A� IN saA AV� VWCV DRIW#4r NUM*R 2 F- s�v�. rntsna+.c:�7iorJ 2 t. WAY r_-A$T wf"C, � /NSFALLLA7-t oN IST SPREE j' NY, SCME- DRAWN 64 i's.tiZ.Dt�vt� laG�`Y'f�vV ORA NnNG NUMBER tNSt'1iLU�7idhl �`'��� Wtp1� PROVIDE OPENINGS FOR EMERGENCY ESCAPE AS +hlJr,.� REQUIRED BY PART. 714 OF N.Y. STATE BUILDING CODE. ST w+NEt � >�v�t WrMDr1�,l •--a� IN-smuArtPN ( 1 3 wwpow hNDER.S1� G�itS 1s7 _sem r mov soprvmK DAEE:"- RENSEO ORAWiW,NUAM@R � II��TALLATION OPERA- -ING AN D ��RVICE INSTRUCT104 S FOR s k SERIES 2 POPW. R VE iVl GAS - Fi!? ED BOIL � c us �ISTEp h Si TOV— For service or repairs to boiler, call your heating contractor. When seeking information on boiler, provide Boiler Model Number and Serial Number as shown on Rating Label. Boiler Model Number Boiler Serial Number Installation Date Heating Contractor Phone Number Address 13Ekrnhcu�ni AMERICAS BOILER COMPANY Burnham Corporation Lancaster,PA 17604-3079 www.twmham.com 8141775812-3/01 Price-$3.00 .A, 16 6 '$' GAS PIPING 1N HIDDEN Oct OUTLINE NOT FURNISHED `� �-3 DIA D BY MANUFACTURER I VENT SAFETY RELIEF 2i VALVE GLOVER '`_ __________ _ ___ N ------------------ {' #sus# +s � li RETURN {ar REO AYR #■ �# BLOWER CONNECTION PRESSURE SWITCH i CIRCULATOR i DIA HOLE -+1 3 WAT ER OR ELECTRICAL TEMP/PRESSURE CONNECTION GAUGE Li IGNITION MODULE P 2 GAS VALVE fl' FPT) n } W FLAME ROLL-OUT SWITCH FLOOR LINE E4J FLOOR LINE Figure 1:Elevation Views Dimensions [in inches] Water ContentAppo>E Shipping Boiler Model A B C D [Gallons] Weight-(lb.) 203 PV 20% .141A 10-1/16 15-5/8 3.2 265 23'/a 1T/. 11 15-5/8 4 309 j 205PV 27 21 13'x4 15% 4.7 357 206PV 30% 24% 15-1/8 15% 5.5 419 I. Pre-lnstallatig! y,vx C. Appliance is design certified forinstallation on combustible flooring.The boiler must not be installed Carefully read bns before on carpeting. installing boiler. tlu to follow all D. Provide clearancebetweenboilerjacket and instructions rl c 'r'order can cause materialinaccordancewithlocalfwe p persona] -Adeath. ordinance.SeeFigure2forminimumclearancefrom ' combustible material for closet installation.For alcove "eat carefully for a�signs installationProvide top clearance of 27 inches and right Inspectof damage.All side clearance of 6 inches. aqui is carefully manufactured,i Recommended service inspected and clearance is 24 inches from left side,right side and front. packi d t?ur responsibility ceases upon delivery of Service clearances maybe reduced to minimum boiler to carrier in good condition.Any claim for damage g shipment or shortage in shi clearances to combustible materials. against carrier by consignee.No claims for variances or E. Install on level noor..Forbasement Shortages will be allowed Boiler Man thstallationprovide by ufact user, solid base,such as concrete,if floor is not level or if unless presented within sixty(60)days after receipt of water may be encountered on floor around boiler. equipment F. Install near outside wall for through wall venting. B. Installation must conform to the requirements ofthe to Section V.Vantin for �� authorityg, length having jurisdiction.In the absence of such requirements,installation must conform to National Fuel Gas Code,NFPA54/ANSI2223.1 and/or CAN/ WARNING CGAB149Installation Codes.Where required by the authority havingimisdiction,the installation must Certified as Category 111 appliance. Install 1 conform to the Standardfor Controls and Safety vent system in accordance with Section DevicesforAutomaticallyFiredBoilers,ANSUASME V. Venting. Do not vent using masonry CSD-1. chimney, Type B gas vent, or other Category I venting system. G Protect asi tionsy po tsfromwater g gni stemcom nen CLOXT �' � �6 � };•`�'f�f:<.�<«::f'::.>..:> � Igs spraying, ran, etc.)during boiler r opatonanDE and service(circulator replacement,condensate trap, � i7 control replacement etc.). z � K Provide combustion andventilation airinaccordance with applicable provisions of local '"p `''E" building codes,or National Fuel Gas Code,NFPA 541ANSI Z223.1, Section 5.3,Air for Combustion and Ventilation,or s u Sections7.2,7.3 or7.4 Of CAN/CGAB149 Installation T- A,R -T Codes. 36 UPI r WARNING Adequate combustion and ventilation ton a'tr must t be Provided t 0 assure ur e r P 0 Pe r 3s ` `;`t' ` b r ..:.��..;;.;:;. combustion. y �L The following guideline is based on the National Fuel .; Gas Code,NFPA54/ANSIZ223.1. FRONT WLII RIGRT SIDE VIEW 1. Determine volume ofspace(boilerroom).Rooms communicating directly with ' g y space(through 5 $NWINUM RADIAL CLEARANCE ARd1ND VENT PIPE, openings not furnished with doors)are considered ` part of space. Figure 2: Minimum Clearances to Combustible Volume[ft3]=Length[ft]x Width(ft]xHeight[ft] Construction for Closet Installation 4 2. Determine Total Input of all appliances in space. a. Direct communication with outdoors.Minimum Round result to nearest 1,000 Btu per hour(Btuh). free area of 1 square inch per 4,000 Btu per hour 3. Determine type of space.Divide Volume by Total input of all equipment in space. Input. b. Vertical ducts.Minimum free area of l square a. If result is greater than or equal to 50 W per inch per 4,000 Btu.per hour input of all 1,000 Btuh,spate is considered an unconfined equipment in space.Duct cross-sectional area space. shall be.same as opening free area. Btuh,space C. Horizontal ducts.Minimum free area of 1 per b. If result is less than 50 W r 1000 B square inch per 2,000 Btu per hour input of all is considered a confined space. equipment in space.Duct cross-sectional area 4. Determine building type. A building of unusually shall be same as opening free area. tight construction has the following characteristics: Alternate method for boiler located within confined a. Walls and ceiling exposed to outside atmosphere space.Use indoor air if two permanent openings have a continuous water vapor retarder with a communicate e rating of I perm or less with openings gasketed sufficient volume�such with additional that combined volume of all and sealed,and, spaces meet criteria for unconfined space. Size each b. Weather-stripping has been added on openable opening for minimum free area of 1 square inch per 1,000 Btu per hour input of all equipment in windows and doors,and; spaces,but not less than 100 square inches. c. Caulking or sealants applied in joints around 7. window and door frames,between sole plates Ventilation Duct Louvers and Grilles.Equipoutside openings with louvers to prevent entrance and floors,between wall-ceiling joints,between of rain and snow,and screens to prevent entrance of i wall panels,at plumbing and electrical insects and rodents.Louvers and grilles must be I penetrations,and at other openings. fixed in,open position or interlocked with 5. For boiler located in an unconfined space in a equipment to open automatically before burner building of other than unusually tight construction, operation. Screens must not be smaller than 1A inch adequate combustion and ventilation air is normally mesh. provided by fresh air infiltration through cracks Consider the blocking effect of louvers,grilles and around windows and doors. screens when calculating the opening size to 6. For boiler located within unconfined space in provide the required free area.If free area of louver building of unusually tight construction or within or grille is not known,assume wood louvers have confined space,provide outdoor air through two .20-25 percent free area and metal louvers and ( permanent openings which communicate directly or grilles have 60-75 percent free area. by duct with the outdoors or spaces(crawl or attic) freely communicating with the outdoors. Locate one L Do not install boiler where gasoline or other opening within 12 inches of top of space.Locate flammable vapors or liquids,or sources of remaining opening within 12 inches of bottom of hydrocarbons(i.e.bleaches,cleaners,chemicals, space.Minimum dimension of air opening is 3 sprays,paint removers,fabric softeners,etc.)are used inches. Size each opening per following: or stored. ll. Unpack Boiler Do not drop boiler. Do not bump boiler jacket A Remove all boiler hold-down fasteners. against floor. E. Tilt the boiler to one side and slide a wooden slat A. Move boiler to approximate installed position. under the two raised feet. F. Tilt the boiler to the other side and slide another B. Remove all crate fasteners. wooden slat under the two raised feet. C. Lift outside container and remove with all other inside G. Slide the boiler forward or backward off the skid using protective spacers and bracing. Save two of the the two wooden slats as runners. wooden slats from the container sleeve for use in Steps E and F. H. Move boiler to its permanent location. 5 I� III. Water Piping and Trim {'fa j. F. Spueheatmgand&meshcwaterheatingwi&AUmm i water heater.Install Alliance water heater as a separate heating zone.Referto Alliance Installation,Operating and Failuretop pipe boiler may result Service Instructions for additional information. in improper motion and damage to boiler o f b G. .ffboilerisusedinconnectionwithrefrigerationsystems, boiler mustbe installed with chilled mediumpiped m parallel with the heating boiler using appropriate valves to ntchilledmedmmfrom boiler gure A. Design molastallboilerandsystempipingtoprevent l entering ,seeFi 4. o tion of boiler water. Also consult I=B=RInstallation and Piping Guides. r H. Ifboilerisconnectedtoheatingcofislocatedinair * handling units where they may be exposed to refrigerated air,boilerpiping mustbe equipped with flow control j Oxy i n contamination of boilerwater will valves to prevent gravity arculationofboilerwater during cause corrosion of iron and stool boiler operation of cooling system components, and can lead to boiler I. Use a boiler bypass ifthe boileris to be operated in a failure. B u rn ha m's standard warranty system which has a large volume or excessive radiation does not cover problems caused by where low boiler water temperatures may be encountered oxygen contamination of boiler water. (i.e.converted gravity circulation system,etc.). Install pipe tee between emulator andboiler return along Oxygen contamination sources are system leaks with second tee in supply piping as shown in Figure 3. requiring addition of makeup water,fittings,and oxygen Bypass should be same size as the supply and return lines permeable materials in distribution system.Eliminate with valves located in bypass and supply outlet as oxygen contamination by repairing system leaks, ilfistratedinF' 3 inordertore repairing fittings,andusin no eable materials in figure She water flow to � � g n�rin maintainhigherbofierwaxertemperaxures. distribution system. Aftertheboileris operational(reference Section VII. B. Connect system supply and return pipingtoboiler.See System Start-Up)set by-pass and boiler supply valves to Figure 3.Also consult I=B=R Installation and Piping half throttle position to start.Operate boiler until system Guides.Maintainminimum'/sinchclearancefromhot watertemperature reaches normal operating range. waterpiping to combustible materials. Adjust valves to provide 1800 to 200OF supply water C. Install Circulator with flanges,gaskets and bolts temperature.Opening theboder supplyvalve will raise provided. Five foot circulator harness allows circulator system temperature,while opening the by-pass valve will lower system supply temperature. to be mounted on supply or return. Connect harness to circulator and secure any excess conduit. J. Ahotwaterbofierinstalledaboveradiadonlevelmustbe provided with a low waxer cut-offdevice as part of D. Install Safety ReliefValve.Seefture3.SafetyRelief installation. Valve must be installed with spindle in vertical position. Installation of the relief valve must be consistant with K Oil,grease,and otherforeign materialswhich the ANSI/ASME Boiler and Pressure Vessel Code, accumulate in new hat water boilers and a new or SectionIV. reworked system should be boiled out,and then thoroughlyflushed. Aqualifiedwatertreatmentchemical specialist should be consulted for recommendations regarding appropriate chemical compounds and concentrations which are compatible with local Safety relief valve discharge piping must environmeztalregulations. be piped near floor to eliminate potential L Aftertheboilerandsy of severe bums. Do not pipe in any area stemhavebeencleanedand where freezing could occur. Do not install flushed,and be£orereiillingtheentire system add appropriate water treatment chemicals,ifnecessaryto Jany shut-off valves. bring the pHbetween 7 and 11. K Install Drain Valve in 3/e"NPT connection intee provided. See Figure 1. 6 SUPPLY SYSTEM SUPPLY TO SYSTEM SIDE CIRCULATOR (PREFERRED LOCATION) TO ADDITIONAL ZONES FOR MULTIPLE ZONE OR CIRCUIT OPERATION BALANCING VALVE OR ZONE VALVE AIR ELIMINATOR WATER AIR VENT ZONE SUPPLY FULL PORT SYSTEM #I BALL VALVE RETURN DIAPHRAGM TANK HOSE 818 SUPPLY THERMOMETER CHECK OR BACK FLOW PREVENTION VALVE BOILER BOILER. SUPPLY PRESSURE REDUCING BY-PASS VALVE OR MANUAL FILL VALVE SAFETY RELIEF PIPE DISCHARGE TO WITHIN 4" VALVE OF FLOOR OR TO DRAIN SHUT-OFF VALVE 0 ON SINGLE CIRCUIT APPLICATIONS, BALANCING VALVES AND ZONE VALVES ARE NOT NEEDED. ON MULTIPLE CIRCUITS WITHOUT ZONE VALVES, A BALANCING BY-PASS / 0 VALVE SHOULD BE USED WITH EACH ZONE. THROTTLE VALVE SYSTEM RETURN SIDE CIRCULATOR HOSE BIB (ALTERNATE LOCATION DRAIN VALVE FRONT OF BOILER Figure 3: Recommended Boiler Piping For Series -Loop Hot Water Heating Systems WATER CHILLER HEATING SHUT-OFF BOILER SHUT-OFF VALVES VALVES AIR CUSHION TANK } CIRCULATOR SUPPLY MAIN TO RETURN MAIN FROM COMBINED HEATING COMBINED HEATING & COOLING SYSTEM & COOLING SYSTEM Figure 4: Recommended Piping for Combination Heating&Cooling(Refrigeration)Systems 7 ... ?,.. IV. Gas Piping A. Size gas piping.Design system to provide adequate 3. Install sedimenttrap,ground Jointunionandmanual gas supply to boiler. Consider these factors: shut-offvalve upstream of boiler gas control valve 1. Allowable Pie drop from point of delivery to and outside jacket See Figure 6. boiler.Mariam allowable system pressure is 1/2 4. All above ground gas piping upstream from manual psig.Actual'point of delivery pressure may be less; shut-off valve must be electrically continuous and contact W supplier for additional information bonded to a grounding electrode.Do not use gas Minimum gas valve inlet pressure is listed on piping as grounding electrode.Refer to National rating label. Electrical Code,ANSI/NFPA 70 and/or CSA C22 Electrical Code. 2. Nfaxcimum gas demand.Table 1 lists boiler input rate Also consider existing and expected future gas C. Pressure test.The boiler and its gas connection must urilzation equipment(i.e. water heater,cooking be leak tested before placing boiler in operation- equipment). 1. Protect boiler gas control valve.For all testing over Table 1• Rated Input '/s psig,boiler and its individual shut-offvalve must be disconnected from gas supply piping.For testing Boiler Input Rate Gas at%psig or less,isolate boiler from gas supply j piping by closingboder's individual manual shut-off [cubic feet per hour] Connection valve. Number Size Natural Gas LP/Propane 2. Locate leaks using approved combustible gas 203PV 62 24'/. % detector,Soap and water,or similar nonflammable solution.Do not use matches,candles,open flames, 204PV 96 38% % or other ignition source. 205PV 130 52 j 206PV 164 65% 3. Length of piping and number of fittings.Refer to :F Table 2 for maximum capacity of Schedule 40 pipe. .;.+ i'r! • ;, Table 3 lists equivalent pipe length for standard fittings. `"%'��, •, 4. Specific gravity of gas. Gas piping systems for gas :l r./.1..�� F f•F� :j.F:,, •r with a specific gravity of 0.70 or less can be sized `` F directly from Table 2,unless authority having r` MANUAL jurisdiction specifies a gravity factor be applied.For SHUT—OFF specific gravity greater than 0.70,apply gravity VALVE :;' ` factor from Table 4. If exact specific gravity is not shown choose next higher value. For materials or conditions other than those listed GROUND— above,refer to National Fuel Gas Code,NFPA 54/ JOINT UNION .:'r FrFj%,.:F.{+,I;��F/'S/F��+ f%f•}3r ANSI Z223.1 or size system using standard engineering methods acceptable to authority having TEE F.+S: jurisdiction. <;:;•:;•:'fi..r."•:, ;s+< f, : :. B. Connect boiler gas valve to gas supply system. <F ,..:i:". <'" W• 3" MIN. •„F ,;,:.:.� 1. Use methods and materials in accordance with local plumbing codes and requirements of gas supplier. In absence of such requirements,follow National Fuel Gas Code,NFPA 54/ANSI Z223.1 and/or CAP CAN/CGA B149 Installation Codes. 2. Use thread(joint)compounds(pipe dope)resistant Figure 6: Recommended Gas Piping to action of liquefied petroleum gas. 8 Table 2: Maximum Capacity of Schedule 40 Pipe in CFH For Gas Pressures of 0.5 psig or Less Length 0.3 inch w.c. Pressure Drop 0.5 inch w.c. Pressure Drop [Feet] % % 1 1% % '/ 1 1% 10 132 278 520 1,050 175 360 680 1,400 20 92 190 350 730 120 250 .40 950 30 73 152 285 590 97 200 375 770 40 63 130 245 500 82 170 320 660 50 56 115 215 440 73 151 285 580 60 50 105 195 400 66 138 250 530 70 46 96 180 370 61 125 240 490 80 43 90 170 350 57 118 220 460 90 40 84 160 320 53 110 205 430 100 38 79 150 305 1 50 103 1 195 400 Table 3: Fitting Equivalent Lengths Table 4: Specific Gravity Correction Factors Nominal Pipe Size Specific Correction Specific Correction Fitting Gravity Factor Gravity Factor % E2. 1 1 0.50 1.10 1.30 1.07 45°Ell 0.71. j 0.55 1.04 1.40 1.04 900 Ell 1.62. 0.60 1.00 . 1.50 1.00 Tee(As Elbow) 3.1 4.1 5.2U 0.65 0.96 1.6 0.97 0.7 0.93 1.7 0.94 0.75 0.9 0.8 0.87 V. Venting A. General Guidelines. 1. Vent system installation must be in accordance with Saf-T-Vent,Flex-L International Inc.,-Star-34, National Fuel Gas Code,NFPA 54/ANSI Z221.3, Protech Systems,Inc.-FasNSeallrm,andZ-FlexU.S., Part 7,Venting of Equipment;and/or CAN/CGA Inc.-Z-Vent.The use of these alternate B149 Installation Codes, Section 7,Venting manufacturer's venting systems will require adapters Systems and Air Supply for Appliances;or to connect to the Burnham supplied vent connector applicable provisions of local building codes. and vent terminal.These adapters are not supplied Contact local building or fire officials about with this unit and should be obtained from the restrictions and installation inspection in your area. supplier of the alternate manufacturer's venting 2. This appliance requires a Special Gas Vent.Use system. See Table 5 for complete list of Burnham Vent Connector and Vent Terminal in Vent Vent System Components. Accessory Carton provided with boiler(See Repair Parts,Key No. 8).The product is designed to use WARNING Burnham supplied AL 29-4C*Stainless Steel vent Do not use this appliance with nonmetallic vent system components. The following manufacturers systems such as Hart&Cooley Ultravent, Plexco offer similar AL29-4C componentsandare Plexvent, or Selkirk-Metalbestos Sel-Vent. approved for use with this product: Heat-Fab Inc. - 9 Table 5: Burnham Vent System Components (d)Place in operation the appliance being inspected- Follow the Lighting(or Operating)Instructions. Burnham' Burnham Adjust thermostat so appliance will operate FVenttem *Cartoned Component continuously. nent Part Part (e)Test for spillage at the drafthood relief opening after Number Number 5 minutes ofmainburner operation.Usetheflame of 61160112 8116135 a match or candle,or smoke from a cigarette,cigar or 3" Dia. Pipe x 1 Ft pipe. 3" Dia. Pipe x 3 Ft 61160101 8116058 (1) After it has been determined that each appliance 3" Dia. Pipe x 4,Ft "" 8116176 remaining connected to the common venting system properly vents when tested as outlined above, 3" Dia. Pipe x.5 `Ft 61160111 8116059 return doors, ,exhaust fans,fireplace 3" Dia. 9.0°lzlbow 61160121 8116060 dampers and any other gas burning appliance to their previous conditions of use. 3" Dia. P,B1bow 61160131 8116061MOM (g)Any improper operation of the common venting �.. 'on Cofiplete with 9 'th Lockin Band( ) system s should be correctedcted so the installati * " 6116033 Contains (4)4 ft lengths conforms with the National Fuel Gas Code,NFPA 6116040 Contains (2)4 ft lengths 54/ANSIZ223.1.Whenresizingamyportionofthe 3. Vent length restrictions are based on equivalent feet common venting system, the common venting of vent pipe(total length of straight pipe in feet plus system should be resited to approach the tables o lemur 5 equivalent feet for each 450 or 900 elbow). Do not size cet IIin the nal Fdetermined uel Gas appropriate 54/ exceed themaximumcertifiedventlengthof25 ANSI2223.1. j equivalentfeet. The minimum certifiedventlengthis 7 equivalent feet. Do not include vent terminal or C. InstallVent Connector. vein connector in equivalent feet calculations. 1. Remove vent connector from vent accessory carton. 4. Do not install venting system components on the 2. Remove gaskets,orifice plate and hardware from exterior ofthe building except as specifically required blower outlet flange. by these instructions. 3. Assemble orifice plate gaskets,orifice plate,and B. Removal of Existing Boiler.Forinstallations not vent connector.See Figure 7. involving the replacement of an existingboiler,proceed 4. Secure vent connector with washers and locknuts. to Step C. WASHER LOCKNUT When an existing boiler is removed from a common VENT ventmg system,the commonventing system is likely to CONNECTOR be too large for proper venting of the remaining ;;,< ,:, appliances.Atthe time of removal of an existing boiler, ..•.;: the following steps shall be followed with eachk" appliance remaining connected to the common venting system placed in operation,while the other appliances remaining connected to the common venting system are not in operation: (a) Seal any unused openings in the common venting ORIFICE system. PLATE (b)Visually inspect the venting system for proper size Ff ... and horizontal pitch and determine there is no ,>., -:: .. .:{:::! ORIFICE •�'-;x`•,,,.,r,✓.��••� PLATE blockage or restriction,leakage,corrosion,and other ' GASKETS deficiencies which could cause an unsafe condition (c)Insofar as is practical,close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the 4r,.•,. ' •�:..•..:::!.::•�,f�,;,:,.:• building.Turn on clothes dryers and any appliance ,::• ;{ not connected to the common venting system.Turn ``' on any exhaust fans, rang f such as range-hoods and bathroom exhausts,so they will operate at maximum ; speed.Do not operate a summer exhaust fan.Close Figure 7:Vent Connector Installation fireplace dampers. 10 D. InstallVentPipe,General 2. Vent terminal location restricted per following: , 1. Start at vent connector.Work toward vent terminal. a. Minimum 12 inches above grade plus normally expected snow accumulation level,or 7.feet 2. Use%inch pipe strap to support horizontal runs, above grade if located adjacent to public maintain vent location and slope,and prevent sags. walkway.Do not install over public walkway Do not restrict thermal expansion movement. where local experience indicates condensate or Maximum support spacing is 5 feet. vapor from Category III appliances creates a 3. Provide minimum 5 inch clearance to combustible nuisance or hazard. materials.Use thimble when penetrating combustible APPLY MINIMUM 1/4-,BEAD of LOCKING BAND— SEALANT ENTIRELY AROUND PIPE. wall' DO NOT USE'SKEET METAL NO MORE THAN 1/8' PROM END. a. 203PV and204PV-Single wallthimble,Burnham SCREWS TO SECURE JOINTS. BELL END BEAD END PartNo.8116116.Otherwallthimble manufacturers are American Metal Products,Hart &Cooley,and Metal Fab. f b. 205PV and206PV-Double wall thimble,Burnham PartNo.8116115(accomodates 5"to 8'h"wall thickness).Another wall thimble manufacturer is "— Hart&Cooley. -+--`TOWARD BOILER 4. Cut pipe to length using hacksaw with minimum 32 SMOOTH SEALANT FOR CONTINUOUS SEAL AROUND EDGE OF BELL REMOVE BEAD END WHEN teeth per inch or circular saw with metal abrasive BEFORE ATTACHING LOCKING BAND. ,.CUTTING PIPE. BELL'END NEEDEFOR wheel.Remove bead end only-bell end accepts next AASSPLY NECESDITIONAL SARY. SEALANT NE)ff PIPE ORNSERTINnTnNGG fitting or pipe.Cut must be square with pipe.Scrape off buffs with sharp edged tool. Figure 8: Typical Joint Detail Note:If remaining pipe(less bell)must be used, beaded end of mating pipe/fitting must be crimwithin 10ped. b. Minimum 10 3 feet above any forced air inlet located wfeet. 5. Seal all joints using Dow Corning Silastic 732 RTV, c. Minimum 4 footbelow,4 foothorizontally from, Dow Corning Silastic 736 RTV,Polybac#500 RTV,or or 1 foot above any door,window,or gravity air Sil-bond RTV 4500(Acetoxy).Do not use other inlet adhesives or sealants. d. Minimum 4 feet horizontally from,and in no case 6. Procedure for joining pipe and fittings.See Figure 8. above or below,unless a 4-foot horizontal a. Clean pipe or fitting.Remove all dirt and grease. distance is maintained,from electric meters,gas b. Slip locking band over pipe/fitting bell. meters,regulators and relief equipment. e. Minimum 12 inches from overhang or corner. c. Apply continuous '/4 inch bead of sealant around bead end of pipe/fitting no more than 1/s inch 3. Use wall thimble when passing through combustible from end. outside wall(thimble use optional for d. Insert pipe/fitting into bell.Smooth sealant for noncombustible wall).Insert thimble through wall continuous seal around gap between bead and from outside.Secure outside flange to wall with nails bell.Apply additional sealant if necessary. or screws,and seal with adhesive material.Install inside flange to inside wall,secure with nails or e. Slip locking band over joint and tighten. Do not screws,and seal with adhesive material. secure joint with sheet metal screws or pop rivets. 4. For noncombustible wall when thimble isnot used, E. Horizontal(Through Wall)Vent Installation. size opening such that bell with locking band I. Maintain minimum'/.inch per foot slope in attached cannot pass through. horizontal runs.Slope pipe down toward vent 5. Join vent terminal to vent pipe.Cut vent pipe to terminal, locate vent terminal 3 inches(minimum)and 6 inches (recommended)from wall when joined to inside vent piping.See Figure 9.Vent terminal clearance to vinyl wall surfaces is 6 inches. Moisture and ice may form on surfaces 6. Insert vent pipe through thimble/opening from around vent terminal. To prevent outside and join to vent system.Apply sealant deterioration,surfaces should be in good between vent pipe and opening/thimble to provide repair (sealed, painted etc.) weathertight seal. 11 T r too"TOWA $�a' ...Aw- aEaF a F Ss i y y. :::x> t• ra. ,�CmeA rp —2AL AK.mef V/ +:- lR1mi 1.OM A0 Or 1IO47[ QAAIR M1///LY OII H DIW" 1 :•: 71[2 MpT 1Ni I/G VGIMLV40W]rLtuGk%�V/ •:•.••• V KINEW KSKI 6 CARR O=V/ Sl COl®USl7BLE•A1L C011E IM ; SIIiC18 1fA17.T�ta DOtlB(X TAMXAtL 1Ri1®1E r eeeewre Ir s Mer v 2mauocs ' a i ROOM eb Of OI lx :`if.:{:iiiii :>;i:•{:i•::6i" lOWri LAIC 'r nn AWA :::::xai•::i'<:::::ii:i NON—COl®US[1961•ALL smec'�aGYOu as vi MM RAIL TIMM= F F Figure 9: Recommendations for Thimble and Wall Penetration ' VL Electrical A. General.Install wiring and-ground boiler in Instructions. accordance with requirements of authority having 1. Zoning with Circulators,Domestic Hot Water jurisdiction,or in absence of such requirements the Priority.Provide DPDT relay(included with PAL). National Electrical Code,ANSI/NFPA 70,and/or the Connect coil to Alliance thermostat(prewired with CSA C22.1 Electric Code. PAL). Connect normally open contacts(red and white wires in PAL control harness)to transformer B. Install thermostat.Locate on inside wall approximately terminals'R'and Y. Disconnect yellow circulator 4 feet above floor.Do not install on outside wall,near wire. Connect normally closed contacts(violet fireplace,or where influenced by drafts or restricted air wires in PAL boiler harness)to yellow relay wire flow,hot or cold water pipes,lighting fixtures, and yellow circulator wire. television,or sunlight.Allow free air movement by avoiding placement of furniture near thermostat. 2. Zoning with Circulators,Nonpriority. Connect Alliance circulator zone control(or red and white C. Wire thermostat.Provide Class II circuitbetween wires in PAL control harness)to transformer thermostat and boiler.Run wires through grommet in terminals R'and Y. Jacket Left Side Panel. Set thermostat heat anticipator 3. to 0.6 amps.See Figure 10. Zoning with Zone Valves. Connect Alliance thermostat to zone valve. Connect zone valve end D. Wire boiler.Boiler is rated for 120 VAC,60 hertz,less switch to relay terminals'R'and'G. See Paragraph than 12 amperes.Provideindividualbranch circuit with F. fused disconnect.Connect to black and white wires and green ground screw.See Figure 10. F. For.installations using zone valves provide separate transformer for zone valve wiring. Consult zone valve E. Alliance waterheater(ifused).See Figure 10.Also refer manufacturer for assistance. to Alliance Installation, Operating and Service 12 1 BLOWER —ER ND SUPITEMS SUCTION L1 tI / /1 INSTALLER .BY HK z ¢ PRESSURE • POWER 60/1 LY • G• 14 ELECTRICAL SWITCH REVERSE ACTING ALLIANCE (. E1 LZ DND I = DISCONNECT • • Ipl '� Rx 2=c 1 a CIRCULATOR CONTROL LLIAN CIRCULATOR HONEYWELL R8222U,0 ( R RE h I 1•R ixt (sc2 umc 4) (s¢x17T2 a) 241 THERMOSTAT WK BK I 1 FUSED (BY OTHERS) ___IJ 1 1 BLOWER '. (DISCONNECT1 ml r----0.--=LJ I 1 0' .z SWITCH ZR1 i �.... -wn I---------�--� PRIMARY (511 NOW 2) r SERVICE r-- ---r----------1E j j--------- hep SECONDARY W" I O W o Y HONEYWELL 11 1 CONTROL CENTER 1 J L_ I I I (lore D 0348A PILOT I THERMOSTAT RELAY I II r------- --�---- IK ------• II 11 1 SPANK (• 6A I 1 1 ___ 1 I 4 II I I I I I ALLIANCE 1 CIRCULATOR i �"'��'�' i 1 t--o--i I---T L I I - I I 1 (IR 111719 a) I I 2R2 1 BLOWER 1 I s tUM� FRS I 1 RELAY 1 K NONEYWELI R8285D 1 I 211/pq _____ JJ 112 LIMIT CONTROL CENTER I I TF Opp I E ieTULE) (PI INNGG LIMrc�- I I IW on 3 ------'� w '- ---- L FL_i Lk w/PV �------- SUCTION 1 IGNITER/ 1 -QL 1 ) w (1) a------1 / �♦ PRESSURE I SENSOR 1 SWITCH I 1 ♦ --�-- HONEYWELL 58670E - LIMIT 1 1 DUAL AG OPTION `� FLAME (FRS) IGNITION MODULE HONEYWELL I(EXTERNAL UNR 1 1 4 SCHEMATIC DIAGRAM LEGEND VRO204C PIPING) NETIBULE) I 1 ----- LOW VOLTAGE SIZE 18 AWG TYPE TEW/ANM STRANDED WIRE- 105•C GAS VALVE �•-o-�o--- J L--- W s ---� LOW VOLTAGE SIZE 18/2 AWC POWER LIMITED CIRCUIT CABLE- 105'C r UNE VOLTAGE SIZE 1 AWG TYPE TW OR TEW/AWM WIRE ♦\ / a i z LINE VOLTAGE SIZE IS AWG TWE TW OR TEW/AWM WIRE _ I I I IONITER/SENSOR - HONEYWELL 394800-36 CABLE- 25MC � I w /PV CROUNO- CONTINENTAL SRGX600 SIZE 18 AWO WIRE-2D0'C WIRE SLACK DUAL LIMIT OPTION MODULE I NOTES: BL- OWE L w 1. IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE APPLIANCE MUT BE REPLACED,IT MUST BE BL/RD- BLUE WITH RED TRACE CAS REPLACED WITH WIRE AS SHDWN OR ITS EQUIVALENT. GR GR/YE- GREEN WITH YELLOW TRACE - VALVE 2.CANADA ONLY- GREEN GROUND WIRE ATTACHED FROM TRANSFORMER TERMINAL'C'TO _ RANGE LADDER DIAGRAM LEGEND JACKET SCREW IN VESTIBULE. PI PINK 3.ALLIANCE WATER HEATER CONTROLS SUPPLIED BY INSTALLER(SHOWN FOR DOMESTIC HOT WATER RD- RED --24V WIRING PRIORITY AND CIRCULATOR ZONING). WH- WHITE 4. REVERSE ACTING CIRCULATOR CONTROL,IF USED, SUPPLIED BY INSTALLER. YE- YELLOW 120V WIRING Figure 10: Wiring Diagram VII. System Start-up A. Safe operation and otherperformancecritenaweremet & Open zone valve to second zone to be purged,then with gas manifold and control assembly provided on close first.Repeat this step until all zones have been boiler when boiler underwent tests specified in purged,but always have one zone open. At American National Standard for Gas-Fired Low- completion,open all zone valves. Pressure Steam and Hot Water Boilers,ANSI 221.13. 9. Close bib cock,continue filling system until pressure B. Fill heating system with water andvent air from system. gauge reads 12 psi.Close fill valve. Use the following procedure on a Series Loop System Note:•If makeup water line is equipped with pressure equipped with zone valves.See Figure 3. reducing valve,system will automatically fill to 12 1. Close isolation valve in boiler supply piping. psi.Leave globe valve open. 2 Isolate all circuits by closing zone valves or 10.Open isolation valve in boiler supply piping. balancing valves. 11.Remove hose from bib cock. 3. Attach hose to bib cock located just below isolation C. Check main burners.See Figure 11.Rear of burner valve m boiler supply piping.Terminate hose in five must be in vertical slot in rear of burner tray.Front of gallon bucket at a suitable floor drain or outdoor burner must be seated on orifice. area). MWF13LD 4. Starting with one circuit,open zone valve. CMAIN BURNER BRACKET GAS 5. Open bib cock. SLOT 1N BURNER----- •----- .....--------------............1�,.....----..........n.--.. ._ MANIFOLD TRAY FOR MAIN 1 a 6, Open fill valve.Makeup water line should be located BURNER INSERTION HI PIN CLIP ERE USED) If directly above isolation valve in boiler supply "r piping. INSULATION OOPS P`,IEECE 7. Allow water to overflow from bucket until discharge t' from hose is bubble free for 30 seconds. BASE TRAY BURNER TRAY 13 Figure 11: Main Burner Installation I ' j THERMOSTAT CALLS FOR HEAT PRESSURE REGULATOR GAS CONTROL ADJUSTMENT KNOB (UNDER CAP SCREW) WIRING TERMINAL RELAYS ENERGIZED INLET PRESSUR5 OUTLET PRESSURE BLOWERSTARTS TAPTAp CIRCULATOR STARTS INLET OUTLET SUCTION PRESSURE SWITCH: NORMALLY CLOSED POSITION THERMOCOUPLE TO NORMALLY OPEN POSITION CONNECTION_ PILOT OUTLET (STANDING PILOT ONLY) RED RESET BUTTON PILOT ADJUSTMENT (STANDING PILOT ONLY) (UNDER CAP SCREW) IGNITION MODULE ENERGIZED 30-45 SECOND DELAY (PREPURGE) Figure 12: Gas Valve Pressure Tap I � D. Preparetocheckoperation. IGNITION SOURCE I (SPARK) ON 1. Obtain gas heating value(in Btu per cubic foot)from PILOT GAS VALVE OPENS gas supplier. 2 Connect manometer to pressure tap on gas valve. TRIAL FOR IGNITION SeeFigure 12. PILOT NO PILOT CONTINUOUS 3. Fornatural gas fired boiler,temporarily turn off all LIGHTOFF LIGHTOFF RETRY f other gas-fired appliances. MAIN GAS VALVE PILOT GAS VLAVE Follow Operating Instructions to place boiler in OPENS CLOSES i operation.See Figure 17. IGNITION IGNITION � SOURCE OFF SOURCE OFF e F. Sequence of Operation.See Figure 14.If boiler fails to operate properly,see Troubleshooting Tree on pages CALL FOR DELAY 5 � 17-18. HEAT ENDS MINUTES� II` G. Check gas piping and connections between Gas Valve and Manifold,Orifices and Pilot Tubing.Use soap RELAYS BLOWER j solution or other approved method.See Figure 13. DE-ENERGIZED STOPS H. Check pilot burner flame.See Figure15.Flame should IGNITION f ' MODULE DE-ENERGIZED be steady,medium hard blue enveloping 3/8 to%inch GAS VALVES CIRCULATOR of sensing probe. CLOSE sroas I. Check main burner flame.See Figure 16.Flame should have clearly defined inner cone with no yellow tipping. To CTION PRESSU RE ED SWITCH: LY Orange-yellow streaks should not be confused with true yellow tipping. Figure 14: Sequence of Operation PIPING SHOWN IN HIDDEN OUTLINE NOT FURNISHED BY MANUFACTURER COMBINATION IGNITION CENTER IGNITION ELECTRODE/ ELECTRODE/SENSING FLAME Fi FLAME SENSOR GAS CONTROL VALVE PROBE '.. iy� HONEYWELL PILOT TUBING 9348 PILOT {� BURNER MANIFOLD 3/B GROUND WIRE (TO IGNITION MODULE) GROUND f T-ii STRAP IGNITION/SENSOR LEAD CTO IGNITION MODULE) I i i I i Figure 13: Schematic Pilot and Gas Piping 14 Figure 15: Pilot Burner Flame INCANDEOCENT OUTER MANTLE Table 6: Gas Flow Rate in Cubic Feet per Hour j BLUE WITH OCCASIONAL ORANGE FLASHING Seconds Size of Gas Meter Dial OUTER CONE for One One-Half One Two DARKER TRANSPARENT BLUE Revoll$lon Cu..Ft. Cu. Ft. Cu. Ft. INNER CONE 30 60 120 240 SHARPLY OUTLINED WITH BRIGHT LIGHT BLUE 32 56 113 225 FLAME RETENTION INNER CONE 34 53 106 212 PARTIALLY LIFTED FROM BURNER 36 50 100 200 -- 38 47 95 18 + 40 45 90 ISO 42 43` 86 172 Figure 16: Main Burner Flame 44 41 82 " 164 J. Checkthermostat operation.Raise and lower 46 39 78 157 temperature setting to start and stop boiler operation. 48 37 75 150 K. Checkignitioncontrol module.shut-off.Disconnect 50 36 72 144 igniter/sensor cable from Terminal 9(SPARK).Gas valve 52 35 69 138 should close and pilot and main burners should 54 33 67 133 extinguish. L. Check low water cut-off(ifused).Drain boiler water 32 64 129 5 56 6 31 62 124 below LWCO set point.Burners should extinguish. M. Check limit60 30 60 120 1. Adjust thermostat to highest setting. a. Boiler must not be overfired.Reduce input rate 2 Observe temperature gauge.When temperature is by decreasing manifold pressure.Do not reduce indicated,adjust limit to setting below observed more than 0.3 inch w.c.If boiler is still overfired, temperature.Main burners and pilot burner should contact your Burnham distributor or Regional extinguish and blower stop. Office forreplacementGasOrifice. 3. Adjust limit to setting above observed temperature. b. Increase input rate if less than 98%of rating label Ignition sequence should begin. input.Increase manifold gas pressure no more 4. Adjust thermostat to lowest setting.Adjust limit to than 0.3 inch w.c.If measured input rate is still desired setting, less than 98%of rated input: L Remove Main Burners per procedure in N. Adjust gas input rateto boiler(Natural Gas). Section VIII:Service. 1. Adjust thermostat to highest setting. ii Remove gas orifices.Drill one(1)drill size 2 Check manifold gas pressure.Manifold pressure is larger(drill size is stamped on orifice,or seeKeyNo.4D). listed on rating label.Adjust gas valve pressure iii Reinstall gas orifices and main burners. regulator as necessary(turn adjustment screw Measure input rate. counterclockwise to decrease manifold pressure,or clockwise to increase manifold pressure).If pressure 6. Recheck Main BurnerFlame. can not be attained,check gas valve inlet pressure. 7 Adjust thermostat to normal setting. If less than minimum gas supply pressure listed on rating label,contact gas supplier for assistance. 8. Return other gas-fired appliances to previous 3. Clock gas meter for at least 30 seconds.Use Table 6 conditions of use. to determine gas flow rate in Cubic Feet per Hour. O. Adjust gas input rate to boiler(LP/Propane). � 4. Determine Input Rate.Multiply gas flow rate by gas heating value. 1. Adjust thermostat to highest setting. 5. Compare measured input rate to input rate listed on 2. Check manifold pressure.Adjust gas valve pressure rating label. regulator to obtain 10 inches w.c.manifold pressure. 15 7L� FOR YOUR SAFETY READ BEFORE OPERATING NING' N you do not follaw these instructions exactly.a fire or explosion my mauB IW4AIRq —' causing property damage,personal injury.or loss of W A.This appliance Is equipped with an Ignition device 3w If you cannot reach your gas supplier,all the fin which MmmoicdW,Ughte the pilot Do II2ltry to tight deparinwaL the pilot by hand. c.Use only your hand to push M or tum the gas control S.BEFORE OPERATING smell all around the appliance knob.Never use tools.M the knob will not push in or area for gee.Be sure to small MAID the floor tum by hand,don't try to repair it,call a qualified service because some gas Is heavier than air and will settle filen.Force afiarrPted repair may on the Hoot. result M a a fin re or explosbm WHAT TO DO IF YOU SMALL GAS D.Do not use this appliance if any pan has been under a Do not try to light any 8101)D rrce. water.Msuedlately all a qualified service technician tale �Do not touch arty electric switch;do not use any to hrsleapedaPPliance and to replace any pan of the phone M your building. control system and any gas control which has been Immediately all your gas supplier from a neigh- under water. bogs phone.Follow the Ips supplier's Mstr 1 Cion. OPERATING INSTRUCTIONS 1.STOPI Read the safety information above on this7. Rotate gas control knob do&wise IT from"ON" label. position to"OFF".Mala emcee knob rests egaMst stop. 2.Set the thermostat to lowest setting. a.Waft five(S)minutes to dear out any gas.Than smell for pas.including natio floor N you smell gas. 3.Tum off all electric power to the appliance. STOPI Follow"B"M the safety Mfamation above oa this labeL E you do not arms gas,go to the next step. 4.This appliance Is equipped with an ignition device .- _ which automatically lights the pilot Do 10 try to 9. R fl, gas control *OFF"to"ON".Mab am rest againstcouertarclockwissy stop..Do tight the pilot by hand. not fora. !i.Remove front door. as corrrROL KNOB 1 o.Replace front door. 6.Locate the gas control vale at time and of to m 11.Tuon an electric powerto the appliancegas gsuPPIY PIPs going cAs 12.Set thermostat to desired setting. into the boiler.The KKUET blown eltrr oblce plastic ;knob Is the 13.N the appliance will not operate.follow the knob looted on top of instructions"TO TURN OFF GAS TO APPLIANCE" i the gas control valve. PoSmOmr BOU:ATOR� and all your service technician or gas supplier. TO TURN OFF GAS TO APPLIANCE 1.Set the thermostat to lowest setting. 4. Rotate gas control knob ciocirwia ''y from"ON" position to"OFF".Mab euro knob rem against stop. 2.Tum an all electric power to the appliance N service is to be performed. 8. Replace front door. 3.Remove front door. (SV9500fS MIX),VR8204MW04) Figure 17: Operating Instructions pressure.Adjust gas valve pressure regulator as subsequent boiler operation. necessary(turn adjustment screw counterclockwise 2. Ventilate the boiler room,set the high limit to its to decrease manifold pressure,or clockwise to maximum setting.Set the thermostat to call for increase manifold pressure). If pressure can not be heat. Allow the boiler to fire for at least an hour o: attained,check gas valve inlet pressure.If less than until the odor from the cornstarch has dissipated. minimum gas supply pressure listed on rating label, contact gas supplier for assistance. 3. Return the high limit and thermostat to their desired settings. 3. Recheck Main Burner Flame 4. Adjust thermostat to normal setting. Q. Review User's Information Manual and system operation with owner or operator. P. COMBUSTION CHAMBER BURN-OFF R. Post instructions near boiler for reference by owner 1. The mineral wool combustion chamber panels and service personnel.Maintain instructions in legibi contain a cornstarch based binder that must be condition. burned out at installation to prevent odors during 16 O %, , John G. Bonnar w q, 4 formerly Jessie 'M. McCormick b t � oCb 41 � tip o, a 100.65' - q W5.65' _b J �" Chores K. Bittner mti a ; R formerly Frank E. Johnson o e ,'decclrPs',1 1 - N.6'045120"£. 125.57' o N 'p ti+ n I to 6048'50"W 176.52` - -- ----- ts� n{'49`50"£. 15,077' � N.6-4B'S0"£, F5.73 o % m ^1 As ss s •, Hugh F Murray $ jg asf q formerly Albert ✓. Vars , 5 050'00"W. 150.79' - '' S.615000"W 151.20' - 1 I FIRST S TREE T I s I �