HomeMy WebLinkAboutNEW SUFFOLK SHIPYARDOEC PERNIT #UI4BER
!-/.738:00941/00002-0
FACZ LiT~//PROGRA/I NL~ER(S)
iTYPE OF PEI~[T i #e~ D Rone~[
Article 15, Titte 5: Protection
of ~aters
Article 15, Title 15: ~ter
Article t5, Tit[e 15:
Tr~rt
Article 15, Tit~e 15= L~
~sL~ ~Lts
~c ~ R~r~tJ~[
t~der tile Envirer~nt~i
ri Nodification O Peraft to Construct
6NYCRR 608: Water ~uaLity
Certification
O Article 17, TitLes ?, 8: SPDES
a Article 19: Air PoLlution
Control
ArticLe 25, TitLe Z7: Ninsd Land
Rec[aeation
D ArticLe 2/~-' Fre~k~ter Wet[ands
I ArticLe 25: Tide[ Wet[ands
D ArticLe 27, TitLe 9~ 611YC~ 3Ti:
Itazardeus t~aste llans~eent
D ArticLe ~,* Coastal Eresion
O Article~: FLoodplain
Nar~emont
[] Articles 1, ~, 17, 19, Z7, 37;
~IYCRR.TBO: Radiation Control
Other:
PER#IT ISSUED TO
Neu SuffoLk Shipyard
AODRES$ OF PERH[TTEE
Neu Suffolk Road
Ne~ Suffolk, NY 11956
COHTACT PERSON FOR PERNITTED ~K
Em-ConsuLtants, Ittc.~ 1~L;9 No~th Sea R~., $outh~torl NY 11~
N~E A~ ~DRESS OF PROJECT/FACZLZTY
TELEPNONE ~I~BER
TELEPhOnE NUNBER
¢516) 28~-6360
Ne~ Suffolk Shipyard
LOCATION OF PROJECT/FACILITY
SCTN #I000-117-05-29, t
COUNTY
Suffolk
Southotd School House Creek
#YTN COORDINATES
Replace Z?6 Linear feet of bulkhead#ithJn 18". Dredge 10 feet sea.rd of 118 Linear feet of bulkhead to a aaxiu
depth of /* feet bela mean [o~ater and place resultant 100 cubic yards of material es backfill. Remove existing3' x
60' fixed ~alk along southerly bulkhead. InstaLL · 4t x &t ptetfor,, a 3~ x 20' hinge~ ramp and a 6~ x &O~ floating
dock. Pour a neu 6t x 12~ concrete pad for a gasoline dispenser to replace prior gas pump already removed. ALL ~ork
shaLL be in accordance with the attached NYSOEC approved plan.
By acceptance of this permit, the permittee agrees that the per~it is contingent :loon strict compliance ufth the
ECL. al[ applicable regulations, the Genera[ Conditions specified '(see pa~e ~) and any ~ecfa[ Conditions included ss part of
this permit.
DEPUTY REGZONAL PERMIT AOIdINISTRA- #)DRESS
TO~:
Roger Evans atdp. /*0, SUNY, Roo~ 219, Stony Brook, NY 1!7~0-2~56
AUTHOR[ZED SIGNATURE ~~ DATE
pri,
inspect ions
1, .The permitted site or facility, including relevant records, is subject to in-
spection at reasonable hours and intervals by an authorized representative of
the Depar~t of Envirorrrental Conservation (the Depar~t) to determine
v~ether the permittee is coq)lying with this permit and the EEL. Such represen-
tat ive trey order the work suspended pursuant to B2L 71-0301 and SePA 401 (3). A
copy of this permit, including ail referenced rmps~ drawings and special
conditi~, trust be available for inspection by the Deparlm~t at all tirms at
the project site. Fei lure to produce a copy of' the permit upon request by a
Deparlrmnt representative is a violation of this permit.
Pen~it ~ and Rmaml$
2. The Deparlmmt reserves the right to rmdify, suspend or revoke this permit when:
a) the scope of the permitted activity is exceeded or a violation of any
condition of the permit or provisions of the El:/. and pertinent regula-
t ior~ is found;
b) the permit v~s obtained .by misrepresentation or failure to disclose
re I event, facts;
c) newrmterial, inforrmtion is discovered; or
d) envirorrmntal conditions, relevant technology, or applicable lan or
regulation have rmterial ly changed since the permit v~s issued,
The permittee trust su~rnit a separate written application to the Departrmnt for
rene¢~l, rmdification or transfer of this permit. Such application rrust include
any forrm, fees or supplm"ental inforrmtion the Deparlrmnt requires. Any
renenal, rrodification or transfer granted by the Deparlwent rrust be inwriting.
..
The permittee mjst submit a renenel application at least:
a) 180 days before expiration of permits for State Pollutant Discharge
E'I iminat.ion Syste"n (Si=[:;ES), Hazardous V~bste IVana~t Facilities
(~M=), rmjor Air Pollution Control {AEC} and Solid V~ste IVana~nt
Facilities (S/~F); and
b) 30 days before expiration of all other permit types.
5. Lhless expressly provided for by the Deparlrmnt, issuance of this permit does
not rrodify, supersede or rescind any order or determination perviously issued by
the Deparlrmnt or any of the terms, conditions or requiremnts contained in such
order or determination.
Other Legal {3bi igations of Pemittee
6. The permit.tee has accepted expressly, by the execution of the application,, the
fu,J] Je~J .reSponsir~iiity for ail dam~s, direct or indirect, of v~atever
nature and by. re,myer suffered, arising out of the project described in this
permit and has agreed to indemnify and save harmless the State fr(]"n suits,
actions, damges and costs of every nam and description resulting fro-n this
project. ,.
This permit does not convey to the permittee any right to trespass upon the
lands or interfere with the riparian rights of others in order to perform the
penmitted work nor does it authorize the irrpain~ent of any rights, title, or
interest in real or personal property held or vested in a person not a party to
the permit.
8. The permittee is responsible for obtaining any other permits, approvals, lands,
easm-ents and rights-of-v~y that rmy be required for this project.
Page 2 of 5
ADDITIONAL GENERAL CONDITIONS FOR ARTICLES 15 (Title $}, 24, 25, 34 and 6 NYCRR Part 608
9 T~at if future operations by the State of New York require an al-
teration in the position of the structure or work herein auth6rized, or
if, in the opinion of the Department of Environmental Conservation 13.
it sha]) cause unreasonable obstruction to the free navigation of said
waters or flood flows or endanger the health, safety or welfare of
the people of the State. or cause loss or destruction of the natural
resources of the State, the owner may be ordered by the Department to
remove or alter the structural work, obstructions, or hazards caused
thereby without expense to the State, and if, upon the expiration or
revocation of this permit, the structure, fill, excavation, or other
modification of the watercourse hereby authorized shall not be com- 15.
plated, the owners, shall, without expense to the State, and to such
extent and in such time and manner as the Department of Environmental
Conservation may require, remove ale or any p.ort!on of the uncompleted
structure or fill and restore to its former condition the navigab[e
and flood capacity of the watercourse. No claim shall be made against
the 5tote of New York on account of any such removat or alteration.
t0 That the State of New York shall in no case be iiabfe for any damage 16
or injury to the structure or work herein au thoriz'ed which may be caused
by or result from future operations undertaken by the State for the.
conservation or improvement of navigation, or for other purposes, and
no claim or right to compensation shall accrue from any such damage
1t, Granting of this permit does not refieve the applicant of the responsi- I7
biJity of obtaining any other permission, consent or approval from
the U,S Army Corps of Engineers, U.S. Coast Guard, New York State
Office of General Services or Iota] government which may be required.
All necessary precautions share be taken to preclude contamination
of any wetland or waterway by suspended solids, sediment~, fuels,
solvents, lubricants, epoxy coatings, paints, cbncrete, ieachate c~ any
Tidal Wetland ]
other environmentally deleterious materiai~ associated with the
project.
Any material dredged in the prosecution of the work herein permitted
shall be removed evenly, without Jeaving large refuse piles, ridges across
the bed of a waterway, or floodplain or deep holes that may have a
tendency to cause damage to navigable channel's or to the banks of
a waterway.
There s~all be no,unreachable ~nterfetence with navigation by the work
herein authorized.
if upon the expiration or revocation of this permit, the project hereby
authorizedhas ~ot been completed, the applicant shall without expense
to the 5tare, amd to such extent and in such time and manner as the
Department of Environmental Conservation may require, remove ali o;~
any portion of the uncompleted structure or fill and restore the site
to its former condition. No claim shah be made against the State of
New York on account of any such removal or alteration_
If granted under 6 NYCRR Part 608, the NYS Department of Environ-
menta[ Conservation hereby certifies that the subject project wfl[ not
contravene effluent limitations or other limitations or standards under
Sections 301. 302, 303, 506 and 307 of the Clean Water Act of 1977
(PL 95-2~7) provided that alt of the conditions [isted herein are met.
All activities authorized by this permit must be in strict conformance
with the approved plans submitted by the applicant or his agent as part
of the permit application..
EnConsul~ants, Inc
Such approved plans were prepared by
sheets 1-3 o'f 3 dated 10/04/o~4 last revised
3/]5/9.5
e
SPECIAL CONDITIONS
Any debris or excess material from construction of this
project shall be completely removed from the adjacent area
(upland) and removed to an approved upland area for
disposal. No.debris is permitted in tidal wetlands and or
protected buffer areas.
There shall be no disturbance to vegetated tidal wetlands or
protected buffer areas as a result of the permitted
activity.
All fill shall consist of "clean" gravel and soil (not
asphalt, slag, flyash, broken concrete or demolition
debris.).
All.peripheral berms, cofferdams, rock revetments, seawalls,
gabions, bulkheads etc. shall be completed prior to
placement of any fill material behind such structures.
Equipment operation below apparent high ~water is strictly
prohibited.
The new bulkhead shall be constructed within a' maximum of
18" seaward of the structure, measured from face of old
sheathing to face of new sheathing (as shown on the approved
x-section).
DtC PE R,',¢IT
!-4738-00941/00002-0
PRO(;RAM ~t A('ILiTY NUMBER
Page
'~ of ~
For Article
NEW Y('~-~'~TATE DEPARTMENT OF ENViI~ONMENTAL CONSERVi/"" iN
SPECIAL CONDITIONS
25 ( Tidal Wetland
There shall be no discharge of runoff or other effluent over
or through any bulkhead or shoreline stabilization structure
or into any tidal wetland or adjacent area.
Supplementary Special Conditions (A) through (F) attached
DEC PERMIT NUMBER
1-4738-0094 1/00002-0
FACILITY ID NUMBER
PROGRAM NUMBER
Page
of 5
sU1 ~EM~.NTAR¥ SP~.CIAL CONDi?IL~ ~
'The following conditions apply to all Tidal Wetlands; Freshwater
Wetlands; Coasta'l Erosion Management; and Wild, Scenic, and
Recreational Rivers Permits:
A copy of this permit, including all conditions and
approved plans, shall be available at the project site
whenever authorized work is in progress. The permit
sign enclosed with the permit shall be protected from
the weather and posted in a conspicuous location at the
work site until all authorized work has been completed.
The permittee shall require that any contractor,
project engineer, or other person responsible for the
overall supervision of this project reads, understands,
and complies with this permit and all its general,
special, and supplementary special conditions. Any
failure to comply precisely with all of the terms and
conditions of this permit, unless authorized in
writing, shall be treated as a violation of the
Environmental Conservation Law. If any of the permit
conditions are unclear, the permittee shall contact the
Division of Regulatory Affairs 'at the address on page
one or telephone (516) 444-0365.
If project design modifications become necessary after
permit issuance, the permittee shall submit the
appropriate plan changes for approval by the Regional
Permit Administrator prior to undertaking any such
modifications. The permittee is advised that
substantial modification may require submission of a
new application for permit.
At least 48 hours prior to commencement of the project,
the pe-~mittee and contractor shall sign and return the
top portion of the enclosed notification form
certifying that they are fully aware of and understand
all terms and conditions of this permit. Within 30
days of completion of the permitted work, the bottom
portion of that form shall also be signed and returned,
along with photographs of the completed work and, if
required, a su~ey.
For projects involving activities to be undertaken in
phases over a period of more than one year, ~he
permittee shallnotify the Regional Permit
Administrator in writing at least 48 hours prior to
recommencing work in subsequent years.
The granting of this permit does not relieve the permittee
of the responsibility of obtaining a grant, easement, or
other necessary approval from the Division of Land
Utilization, office of General Services~ Tower Building,
Empire State Plaza, Albany, NY 12242 (516) 474-2195, which
may be required for any encroachment upon State-owned lands
underwater.
DEC Permit No. 1-4738-0094 t/00002-0
Page 5 of 5
O~d Cove
C,
9
NEW SUFFOLK
ROAD
S~...'~, :-. ..... ~1'~ i:,J"( 11968
lo~.~,' ..~O,~ ~ H SF_.A ROAD
SOUTHAMPTON, NY 11988
516-28,,.3-6.360
LIS Army Corps
of Engineers
New York District
Jacob K. Javits Federa~ 15uiiding
New York, N.Y. ~O275-OO90
ATTN: Regula¢ory Branch
PUBLIC
NOTICE
In ~p~g rear
Public Notice Nu~oer:
Issue Date:
Expiration Date:
94- 09770-L2
December 16, 1994
January 17, 1995
To Whom It May Concern:
The New York District, Corps of Engin~rs has received an application for a Deparhment of ~.e
Army permit pursuant to Section 10 of the Rivers and Harbors Act of i899 (33 USC 403) and Section
404 of the Clean Water Act (33 USC i344).
APPLICANT:
New Suffolk Shipyard
New Suffolk Road
New Suffolk, NY i 1956
ACTIViTY: Replace/consWact bulkheads, dredge wihh upland disposal, install pier assembly
WATERWAY: School House Creek, Shelter tsIm~d Sound
LOCA~ON: New Suffolk, ToWn of Sou~o!d, Suffolk County, New York
A detailed description and pla~'s of the applicant's activity are enclosed re assist in your review.
The decision whether ~ issue a permit will be based on an evaluation of the probable impact,
including cumulative impacts, of the propos~ activity on the public interest. Tha~ decision will reflect
the national concern for bo~ protection and utilization of important resources. The benefits which
reasonably may be expected m accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesrhetks, genera
environmental concerns, wetlands, historical properties, fish ~d wildlife values, floodplain values, land
use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safelT, food and fiber production, mineral needs, consideration of properly ownership
and,in general the needs and welfare of r~he people.
The Corps of Engineers is soliciting comx~ents from hSe public; Federal, state, and local agencies
and officials; indian Tribes; and other interested parties in order to consider and evaluate the impacts of
this proposed activity. Any comments receivai will ~e. considered by the Corps of Engineers to determine
whether to issue, modify, condition er deny a permit for this proposal. To make this decision, comxnents
are used m assess impacts on endangered species, historic properties, water quality, general
environmental effect% and ~e other public in~erest factors iisted above. Cormments are used in
preparation of an Environmental Assessment and/or an Environmemal Impact Statement pursuant to the
National Environmental. Policy A~, Comme~t.s are also used to determine the need for a public hearing
and to determine the overall public interest of the proposed activin.
ALL COMMENTS REGARDING THE PERMrT APPLICATION MUST BE PREPARED IN
WPd'FING AND MAILED TO REACH THIS OFFICE BEFORE TIlE EXPIRATION DATE OF THIS
N._OTICE, o~herwise~ it will be presumed that ~lere are no objections to the activity.
Any person may req_uest~ in writing, before hSis public notice expires, that a public .hearing be
held t9 collect information necessary to c~nsider this application. Requests for public hearings shall state,
U. ke~y ~ aff~ ~y ~er~[y ~nd~er~ o: threatened sp~e~ o~ ~¢~r ¢rh[c~ haNtaL How¢ver~
pursuant to S~don ? cf 5ac ~nda:~er~ Spez~s Act (~ 6 U.S.C. ~ ~3 ~)~ Cqe D~s~ Eng[n~r ~s consulting
the ~deNn~ promu~g~Id hi t':-,e A,J:mh:~tr.a':~:~ U.S. Envkoamenta: Prcm~on Agency, under au~or/ty
~arsumnt to Secticn 307 {c) af'&_e Cc~;~ Zs::e Mmsagement Act of !972 ~ ~end~ [16 U.S.C.
1456 (c)].~ for actMti,gs ~,~der .~ons[dar:sion fla", ~e locat~ wk~[n ~,e co~t~ zone of a. state whfch h~
a f~er~iy approv~ co~t:i zon~ :n~aahemez. t program, ~e applnc~t h~ cenifi~ in ~ae permit
appncat:on ~:at the activhy con:Fi:e: ~.+:h~ ~:c:: w:::. ~e co~dus~ :na m~:ner that is consistent wiCn, d~e
toucan'once w:~:, ebj~tfon m~ or wa:ye: of tit: appl:cmnfs ce~ifiCat~o'n. No' permk d~:sbn w~i~
made until one of :me actions occur. For toffy:ties w:hh:n :~_e coastal zone of New York State,
applic~t's ceo::ficatfon ~:,~ sccomp~ny~n~ :nformatfcn is ~,vaiiah.:e from ~e Cons:stency Coordinator,
New York State Dep~cment of 8tate~ Dirts:on of Coastal Resources and Water,out Revit~nation,
Co~t0t Zone M~ag.:ment Prc, gr~m., 152 veash~n~on Avenue, A[bmxy, New York ~2231, Telephone
(5i8) 474-3~2. Co~men~ regs'd[:,~ 'die ~pNcmafs ce~[~cedon, mud cop[es of m?' loners to ~fs o~ce
co~enting upon ~:s propose:, s'ne::d be sc
concurrent% ~e ¢: ..... * ~s oeta:::~d or ,'=~ ,~*~ ~,~ t~Jicw::[ go'vernmen~ au~orization for
acfivi~ under co:~s:der'~zion:
- New York State
persom ~own by you to be ;'~*~.~; ~::d who ~:;~
,.~.~ ........ not rezefv~ a copy of ~s not:ce.
if you have tony ~ue:t:c. ns sonc~nx:ng fi:is a~plicat:on: you may contact this office at (212)
284-39~2 a_nd ask for Marc He:.:~-::.
FOR THE DiST.RICT ENGiV,'dF2.:
Enclosures
CENAN-OP-RE
P*JBLIC NOTICE
NO. 94-09770-L2
WORK
The applicant, New Suffolk Shipyard, has requested Department of the Army authorization for
replacement and construction of bulkheads and a pier assembly and dreAging of material from School
House Creek, Shelter Island Sound, at New Suffolk, Town of Southold, Suffolk County, New York with
ten years maintenance md subsequent upland disposal.
The work would involve replacement and consmaction of approximately 303 linear feet of bulkhead on
the southwest side of the shipyard. The work would include replacement within t8 inches of 36 linear
feet, 26 linear feet, and 24 thnear feet of bulk_head on the east, north, and west sides of the travel lift slip,
respect[velL and of 34 Hnear feet and 22 linear feet of bu[khead on the south and' west sides of the boat
storage building, respectively. The work would also involve construction of a 103 linear foe(section of
bulkhead, with the eastern 43 linear feet to be located immediately south of a one story frame office
building and the western 60 linear feet to be constructed 18 - 30 inches in front of an existing but
deteriorating and bulging bulkhead. The 43 linear foot section would replace a deteriorated retaining walt
situated on the north side of the hame structure. The work would involve also the replacement within
18 inches of 33 linear feet and t5 linear feet of bulkhead on the westermmost end of the shipyard.
The proposed project would involve dredging, with ten years maimenance, along 1!8 linear feet of
bulkhead to a dist~mce of up to 10 feet seaward and to a maximum depth of 4 feet below mean low water
with the approximately 100' cubic yards of dr~dged material (90% sand, 10% silt) to be used to backfiit
between the old and new bulkheads and beneath the frame building. Dredging would be done using a
jet pump on a barge or on shom,~ required. Su5sequent maintenance dredging woutd be conducted
every 4 7 5 years with an anficip~te~I amount of J0 cubic yards of material each time, also to be disposed
of in the same manner.
The project would also involve the construction of a 4 foot x 4 foot platform,' a 3 foot x 20 foot hinged
ramp, and a 6 foot x 6(~ foot float to be located seaward of the 103-foot bulkhead section.
The stated purpose of this project is to create a stable base for the one story frame office building aped
to restore' water depth for boat dockage.
3
ROAD
Telephone
(516) 765-t$0!
Town Hall. 53095 Main Road
P.O. Box 1179
Southold, New York !1971
$OUTIqOLD TOWN . '~." ~. ',:.: ....... ~ -
CONSERVATION ADVISORY COUNCIL -'
At the meeting of the Southold Town Conservation Advrsory Council held
Mondayt January 22, 1996, the following recommendation was made:
NJ-16
NE~. SUFFOLK SHIPYARD 117-5-29.1 to erect a structure (site of the
structure is now a deteriorated metal building).
The CAC was informed that the Trustees have already .given a letter of
non-jurisdiction, therefore no recommendation was needed by the CAC.
New Suffolk Road, New Suffolk
Albert Il Kmpski, President
John Holzapfel, Vice President
William G. Atbertson
Martin H. Gan'ell
Peter Wenczet
Town Hall
53095 Main Road
P.O: Box 1179
Southold, New York. 11971
Telephone (516) 765-1892
Fax (516) 765-1823
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
January 12, 1996
En-Consultants Inc.
I329 North Sea Road
Southampton, NY 11968
Re: NEW SUFFOLK SHIPYARD
SCTM ~1t7-5-29.1
Dear Mr. Haje,
According to the information given, and a copy of the survey
submitted the construction of a new structure to house a
portable pump-out unit is out of the Wetland Ordinance under
Chapter 97 of the Town Code.
Please remember that during construction anyactivity with 75'
of the wetland would require a permit from this Board.
If' you have.a~y questions, please call our office.
Yours truly,
Albert J. Krupski, Jr.
President, Board of Trustees
AJK/djh
cc~
Bldg. Dept.
CAC
Board Of $outhold Town Trustees
SOUTHOLD, NEW YORK
PERMIT NO.
DATE: ...5./.2.5./.95 ...........
iSSUED TO ....... NE.~...S TJ.FF O LK... $.HI_P YARD ............................................
ufl orizaiion
Pursuant to the provisions of Chapt-er 615 of the Laws of
the Sfafe of New York, 1893; and Chapfer 404 of ')he Laws mc the
State of New York I952; and the Southold Town Ordinance en-
titled "REGULATING AND THE PLACING OF OBSTRUCTIONS
IN AND ON TOWN WATERS AND PUBLIC LANDS and +he
REMOVAL OF SAND, GRAVEL OR OTHER MATERIALS FROM'
LANDS UiNDER TOWN WATERS;" and in accordance with the
Resolution of The Board adopted a+ a meeflng held on .... 5J.;].5.,~.9.5 .....
19,195..,, and in consideration of the sum of $.i~LSQelO~J ..... paid by
Z J [ ~ ~T[ ~ ~m ~ ~ ~ t m~m~ I k m~m~ ....... ~k ~'~ mm ~ ~m~ ~ ~ ~ ~m m ~[~ ~ .......
O~ ....... N~'' ~O~ ......................................N' Y' andsubject to the
Terms and Conditlons )is+ed on +he reverse side hereof,
of SoufhoJd Town Trustees authorizes and permlfs +he tCoJJowing:
Replace 276 If of blkhd, within 18", dredge 10t seaward of 118
if of b!khd, to max. 4~ below MLW, 100 cy of backfill, remove
exist. 3~X60~ walk, install 4~X4' platform, 3'x20t ramp, 6~x60
new 6'xi2~ concrete pad for gasoline dispenser, all as per DEC
planaJJ in accordance with the detailed specifications as presented in
date~e originating application.= 3/]5 / 95.
IN WITNESS WHEREOF, The said Board of Trustees here-
by causes ifs Corporate Seal to be affixed, and these presents +o
be subscribed by a maiori+y of +he said Board as of +his da+.e.
Albert J. Krupski, President
John Hotzapfel, Vice President
William G. Albertson
Martin H. Gan'ell
Peter Wenczet
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Town Hall
53095 Main Road
P.O. Box 1179
Southold, New York 11971
Telephone (516) 765-1892
Fax (516) 765-1823
May 26, 1995,
Eh-Consultants Inc
Roy Haje
1329 North Sea Road
Southampton NY 11968
Re:
NEW SUFFOLK SHIPYARD
SCTM #117-5-29.1
Dear Mr. Haje,
The following action was taken by the Board of Town Trustees
during its regular meeting held on May 25, 1995 regarding the
above matter:
WHEREAS, Eh-COnsultants Inc., on behalf of NEW SUFFOLK
SHIPYARDapplied to the Southold Town Trustees for a permit
under the provisions of the Wetland Ordinance of the Town of
Southold, application dated March 16, 1995, and,
WHEREAS, said application was referred to the Southold Town
Conservation Advisory Council for their findings and
recommendations, and
WHEREAS, a Public Hearing was held by the Town Trustees with
respect to said application on May 25, 1995, at which time all
interested persons were given an opportunity to be heard, and,
WHEREAS, the Board members have personally viewed and are
familiar w~th the premises in question and the surrounding area,
and,
WHEREAS, the Board has considered all the testimony and
.documentation submitted concerning this application, and,
WHEREAS, the structure complies with the standard set forth in
Chapter 37-18 of the Southold Town Code, which will be listed on
a separate page, and,
WHEREAS, the Board has determined that the project as proposed
will not affect the health, safety and general welfare of the
people of the town,
.NOW THEREFORE BE IT,
.RESOLVED~ that the Board of Trustees approves the application of
En-Consultants Inc., on behalf of NEW SUFFOLK SHIPYARD to
replace 276 1.f. of bulkhead within 18", dredge 10' seaward of
118 1.f. of bulkhead to a max. depth of 4' below MLW and
place resultant 100 c.y. of material as backfill, remove
existing 3' X 60' of fixed walk along southerly bulkhead,
install a 4' X 4' platform, a 3' X 20' hinged ramp and a 6' X
60' floating dock, pour a new 6' X 12' concrete pad for a
gasoline dispenser to replace prior gas pump already removed,
all as per DEC approved plan dated 3/15/95. Located: New
Suffolk Road, New Suffolk.
Permit to construct project will expire two years from the date
it is signed. Fees must be paid, if applicable, and permit
issued within six months of the date of this notification.
Two inspections are required and the Trustees are to be notified
upon completion of said project.
FEES: None
Very truly yours,
Albert J. Krupski, Jr.
President, Board of Trustees
AJK/djh
cc. CAC
E ArticLe 15, TitLe 15: ~ter
D A~icte ~, Title 27~ Ni~ L~
I~L~ ~lts
~ A~icLe 15, ~itLe ~7:
13 Other:
PGR~IT ISSUED TO
tim* ~uff~t~ Shipyard
N~ ~ffoLk R~
J?EL~PflO~
En-ConsuLtants, ITY;., 1329 North ~ea R,'i,r $outhampl:o~q NY 11~68
ldM4~ AND AODRES$ OF PRI~iECT/FACILITY
jTELEPHONE IIUNBER
C516) 28~-6360
N~ ~rffotk Shipysrd
LOCATION OF PRGJECT/FACILZT¥
$Cl14.#1000-11T-05-29.1
COUHTY
Suffotk
JTOI,J j t~TERCOUR~ J NYTNC:OC)RDIliATE$
Sou~hoid school House Creek
RepLace 276 Linear feet of buLkhead uithin 11t.. Dredge 10 feet ~ d 118 Lf~e~ f~t ff ~i~ to a ~i~
~t~ of.4 f~t ~Lw ~ L~ ~ter ~'pL~ ~uLt~t 1~ ~ic ya~ of mteriaL ~ ~kfilL. R~ existi~ 3~ x
~' fix~ ~[k e[~ Wherly ~[~e~. l~talL s 4' x4' ptatfom, a 3' x20' hf~ r~ ~ 6, x ~' f[Mti~
'~k. P~r a ~6' x IZ~ ~rete ~ for a ~oli~di~ to ~t~ ~or ~s ~ al~ r~. ALL uork
~aLL ~ in ~c~ ~i~ the att~ NY~EC ~r~ pt~.
By acceptance of this permit, the per~tttee agrees that the ~mit is =ti~ ~ strict c~Lia~ Nith the
ECL, alL a~lic~Le ~[ati~, the ~rat C~iti~ ~ifi~ (m ~ ~ ~ ~ ~iat C~iti~ i~L~ as ~rt of
DE~ REGI~ ~tT ~IHI~T~-
T~:
Roger Eva~ BL~. ~0, ~Y, R~ 219, St~ B~, NY 11~-~56
AUTHORIZED SIGNATURE ___..~_. ~
JDATE
Ap~i L 10,
Page 1 of 5
EN-CONSUL~,~NTS INC.
]329 NORTH SEA
5]6-283-6360
EN-CONS,Ui_T~NTS/NC.
1329 NORTH SEA RD.
SOUTHA[v~PTON, N.Y. I,'9~8
51&283-~3~0
C
NEW SUFFOLK ROAD
.~Et~-CONSULT~NTS INC,
01329 NORTH SEA RD. '
~SOUT'R'~t~PTON, N.Y. 11968
5i~-283-6860
0
'%.
EN-CONSULTANTS
.~32,.q NORTH SEA RD.
SOUTHA~P?ON, N.Y.
516-283-6360
/"= .2',o'
EN-CONSULTANTS
Z329 NORTH SEA RD.
SOUTHAMPTON, N.Y. 11968
516-283-6360
T~tephon¢
(516) 765-1801
· ' ._ SOUTI~OLD TOWN
CONSERVATION ADVISORY COUNCIL
Town Hall, 53095 Main Road
P.O. Box 1179
Southold. New York 1197~.
TO:
FROM:
DATED:
RE:
Southold Town Board of Trustees,
SoUthold Town Conservation AdvisOry Council
May 18, 1995
Recommendation of APp'lications
The Southold Town Conservation Advisory Council met Thursday, May 18, 1995
at L~:30 P.M. Present were: Stephen Angell, Chairman; and CAC members
Bruce Loucka, Robert Keith, John Hagerty, Betty Wells, Allan Connell, and
Patricia I saksen.
The following recommendations were made:
RECOMMENDATION OF WETLAND APPLICATIONS
No. 12~7
Moved by Robert Ke|th~ seconded by Patrlcla lsaksen, it was
RESOLVED to recommend to the Southoid Town Board of Trustees APPROVAL
of the Wetland Application of NEW SUFFOLK SHIPYARD 117-5-29.1 to replace
bulkheading on southwest side of marina/shipyard. From east to west: replace
(within 18") 3 sides of travel lift slip, 36', 26', 3~'; 3/~' section on south
side of boat storage building and 22' sec. tion on west side of boat storage
building; construct 103' section, easterly q~ of which will be located
immediately south of one story frame office building to replace a deteriorated
retaining wall located on the north side of that structure; remaining 60' west
will be built 18"-30" in front of existing bulkhead due to bulges in present
bulkhead; replace (within 18") 33' and 15' bulkhead sections.
Dredge an area up to 10' off 118' of bulkheading to maximum depth of t~, below
MLW. Resultant 100 +/- c.y. of spoil witl be used to backfill between new and
old bulkheads. Remove existing 3' x 60' of fixed walk located along southerly
bulkhead. Build a ~' x ~' platform, 3' x 20' hinged ramp, 6' x 60' float.
Pour a new 6' x 12' concrete pad for a gasoline dispenser which will replace a
prior gas pump which was removed. Existing tank buried in upland will be
retained and used
"-'Meeting of
MAY 18, 1995
Purpose of project is to create a stable base for one story frame office
building now suspended over the water on locust posts. There and
deteriorated bulkhead at north side of building are allowing building to settle
and crack, As new foundation cannot be installed under building without
moving it, applicant believes this to be the only method to correct, problem.
New Suffolk Road, New Suffolk
Vote of Council: Ayes: Ail
Motion carried.
No. 1250
Moved by Bruce Loucka, seconded by Allan Conneil, it was
RESOLVED to recommend to'the Southold Town Board of Trustees
DISAPPROVAL of the Wetland Application of ARNOLD BLAIR AND KAREN '
BLAIR 37-7-10.2 to construct a six foot chain link fence to mark the boundary
lines of applicant's property as shown on survey.
The CAC recommends disapproval because the fence would deny access to the
beach and it appears from the survey provided that the fence is going across
Beach Court which does not appear to be the applican[~s property. Also the
proposed fence could possibly destroy beach vegetation.
Cedar Lane. East Marion
Vote of Council: Ayes: All
Motion carried.
No. 1251
Moved by Allan Connell, seconded by Bruce Loucka, it was
RESOLVED to recommend to the Southold Town Board of Trustees the following
for the Wettand Application of VIRGINIA CROPPER AND CECELIA KEMPLER
66-3-9 to 1~) construct single family residence, 2)timber bulkhead along
westerly bank of Pettys Pond, 3) catwalk and dock as per submitted plans.
1) The CAC recommends APPROVAL OF THE SINGLE FAMILY DWELLINC.
2) The CAC recommends DISAPPROVAL OF THE BULKHEAD. There is no
demonstrated need for the bulkhead. The area is well stabilized; there is no
erosion problem; and the house is far enough back so that it is not in danger.
Since there is no need for the bulkhead then there is also no need for bring in
clean fill and/or sand to backfill.
3) The CAC recommends APPROVAL OF TIlE DOCK AND TIlE CATtJ/ALK IF
OF AN APPROPRIATE LENCTH TO REACH UPLAND.
Arshamomaque Avenue, Southold
Vote of Council: Ayes: Ail
Motion carried.
Page 2
DOCKAGE
LARRY TUTHILL
SCHOOLHOUSE CREEK
NEW SUFFOLK, NEW YORK 11956
TEL. (516) 477-16§2
May 14, 1995
Southold Town Trustees
Main .Road
Southold, NY 11971
To whom it may concern:
!TOWN O'F SOUTHOLD
I. Larry Tuthill, have reviewed the plans
submitted for a 'permit from the Southold Town
Trustees for the construction of a bulkhead in
Schoolhouse Creek, New Suffolk for New Suffolk
Shipyard, submitted by En-Consultants and have
no objections to this project.
Sincerely,
Larry Tuthill
cc Eh-Consultants
Albert J'. Kmpski, President
John Holzapfel; Vice President
William G. Albertson
Martin H. Garreli
Peter Wenczel
Town Hall
53095 Main Road
P.O. Box 1179
Southold, New York 11971
Telephone (516) 765-I.892.
Fax (516) 765-1823
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
s.E.Q.R.A.
NEGATIVE DECLARATION
NOTICE OF NO SIGNIFICANT EFFECT ON THE ENVIRONMENT
APPLICATION NO. 1000-117-5-29.1
NAME: New Suffolk Shipyard
DATE: April 26, 1995
Chapt. 97 - Wetlands
Chapt. 37 - Coastal Erosion
RESOLVED that pursuant to Article 8 of the Environmental Conservation.
Law, State Environmental Quality Review and 6NYCRR Part 617,
Section 617.i0 and Chapter 44 of the Code of the Town of Southold,
notice is hereby given that the Southold Town Trustees, as Lead
Agency for the action described below, has determined that the
project will not have a significant effect on the environment.
Please take further notice that this declaration should not be
considered a determination made for any other department or agency
which may also have an application pending for the same or similar
project.
TYPE OF ACTION: Type I
DESCRIPTION OF ACTION: Applicant requests a Wetland Permit to
replace all bulkheading on southwest side of marina/shipyard. From
east to west: replace (within 18") 3 sides of travel lift slip,
36',26',34'. Replace (within 18") 34' section on south side of boat
storage building and 22' section on west side of boat storage
building; construct 103' section, easterly 43' of which will be
located immediately south of one story frame office building to
replace a deteriorated retaining wall located on the north side of
that structure; remaining 60' west will be built 18" -30" in front of
existing bulkhead due to bulges in present bulkhead; replace (within
18") 33' and 15' bulkhead sections.
Dredge an area up to 10' of 118' of bulkheading to maximum depth of
4' below MLW. Resultant 100+/- c.y. of spoil will be used to
backfill between new and old bulkheads. Remove existing 3' X 60' of
fixed walk located along southerly bulkhead. Build a 4' X 4'
platform, 3' X 20' hinged ramp, 6' X 60' float. Pour a new 6' X 12'
concrete pad. for gasoline dispenser which ~ill replace a prior gas
pump which was removed. Existing tank buried in upland will be
retained and used.
Purpose of project is to create a stable base for one story frame
office building now suspended over the water on locust posts.
NOTE: If Board does not want a new bulkhead put in front of building
they will consider the replacement of the two returns.<
LOCATION: New Suffolk Ave., New Suffolk SCTM #1000-117-5-29.1
REASONS SUPPORTING THIS DETERMINATION:
1. An on'site inspection has been conducted by the Board of
Trustees.
2. An environmental assessment, submitted by the applicant and
reviewed and completed by the Board'of Trustees, has indicated that
no significant adverse effects to the environment are likely to occur
should the .project be implemented as planned.
cc. 'CAC
Telephone
(516) 765-~801
Town HM1. 53095 Main P~oad
P.O. Box 1179
3outt~old. New York 11971
TO:
FROM:
DATED:
RE:
_ SOUTHOLD TOWN
CONSERVATION ADVISORY COUNCIL
Southold Town Board of Trustees
Southold Town Conservation Advisory, Council
April 20, 1995
Recommendation of Wetland Applications
The Southold Town Conservation Advisory Council met Thursday, April 20,
1995 at ~:30 P.M. Present were Stephen Angell, Chairman; Bruce Loucka,
Member; Robert Keith, Member; Jack Hagerty, Member; Patricia isaksen,
Member; Allan Connetl, Member and Betty Wells, Member. The following
recommendations were passed:
RECOMMENDATION OF WETLAND APPLICATIONS
No. 1239
NEW SUFFOLK SHI'PYARD 117-5-29.1 to replace all buikheading on southwest
side of marina/shipyard. From east to west:, replace (within 18") 3 sides of
travel lift slip, 36', 26', 3~'; replace (within .18") 3¥ section on south side.
of boat storage building and 22' section on west side of boat storage building;
coristruct 102' section, easterly ~3' of which will be located immediately south
of one story frame office building to' replace a deteriorated retaining wall
located on the north side of that structure; remaining 60' west will be built
18" - 30" in front of existing bulkhead due to bulges in present bulkhead;
replace Cwithin 18") 33' and 15' bulkhead sections.
Dredge an area up to 10' off 118' of bulkheading to maximum depth of ~' below
MLW. Resultant 10 +/' c.y. of spoil will be used to backfill betw&en new and
old bulkheads. Remove existing 3' x 60' of fixed walk located along southerly
bulkhead. Build a zp x ~' platform, 3' x 20~ hinged ramp, '6' x 60'. f~°at.
Pour a new 6' x 12' concrete pad for a gasoline dispenser which will replace a
prior gas pump which was removed. Existing tank buried in upland will be
retained and used.
Purpose of project is to create a stable base for one story frame office
building now suspended over the water on locust posts. These and
deteriorated bulkhead at north side of building are allowing building to settle
and' crack. As new ~foundation cannot be installed under :building without
moving it, applicant believes this to be the only method to correct problem.
Meeting of 4/20/95
New Suffolk Road, New Suffolk
CAC was advised that the application was WITHDRAWN. No rdcommendatlon.
No. 12~0
Moved by Stephen Angeil, seconded by Allan Conneli, it was
RESOLVED to recommend to the Southold Town Board of Trustees APPROVAL
WITH STIPULATIONS of the Wetland Application of JOHN SCHLECHT ~J~-1-2~
to construct 110 +/- I.f. of stone revetment against eroded bluff and backfill
with 100 +/- c.y. of clean sand. to be trucked in from' upland source.
Construct /~' x 35~ fixed walk and stairway over revetment for pedestrian
access. (See Marianne Clarke #.1241 and Beryl WilCox #12/~2)
56425 North Road, Southold
The CAC recommends approval with the stipulation that the sand buried, rocks
be planted with beachgrass and plant any backfill with non-turf buffer.
Vote of Council: · Ayes:
Motion carried.
No. 1241
Moved by Stephen Angell, seconded by Allan Connell, it was
RESOLVED to recommend to the Southold Town Board of Trustees APPROVAL
WITH STIPIJLATIONS of the Wetland Application of MARIANNE CLARKE
'q~-1-25 to construct 103+/- I.f. of stone revetment against eroded bank and
backfill with 75+/- c.y. of clean sand to be trucked in from upland source.
Construct a 4' x 35' fixed walk to stairway for pedestrian access over
revetment.. Remove existing damaged deck. (Also see #12L~0 and #12/~1')
56525 North Road, Southold
The CAC recommends approval with the stipulation that the sand buried rocks
be planted with beachgrass and plant any backfill with non-turf buffer,
Vote of Council: Ayes: All
Motion carried.
No. 1242
Moved by Stephen Angeli, seconded by Allan Connell, it was
RESOLVED to recommend, to the Southold Town Board of Trustees APPROVAL
WITH STIPULATIONS of the Wetland Application of BERYL WILCOX ~!~-1-23
to construct 103+/1 l.f. of stone revetment against bluff and backfill with
100+/- c.y. of clean sand to be trucked in from upland source. Construct a ~
x 35' timber walkway to stairs for pedestrian access over revetment. (See
#12~0 and #12~1)
56305 North Road, Southold
The CAC recommends approval with the stipulation that the sand buried rocks
be planted with beachgrass and plant any backfill with non-turf buffer.
Vote of Council: Ayes: All
Motion carried.
Page 2
Albert J. Krupski, President
· John Hblzapfel~ Vice President ·
William G. Albertson
Martin H. Gan-ell
Peter Wenczel
Towi~
53095 Mai~
P.O. Box ",.
Southold, New Y~.
Telephone (516) 7t
Fax (516) 765-h
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Office Use Only
Coastal Erosion Permit Application
~_Wetland Permit Application
Grandfather Permit Application
Trustee Lands Permit Application
Waiver
~completed ApplicatloH ~/~
...Incomplete
SEQRA Classification:
Type I _~ .Type It Unlisted
Coordination:(date sent.)
~CAC Referral Sent:
Receipt of CAC Repo~(~ate)
ead Agency Determination: o
echnical Review:(date)'~;~
ublic Hearing:(date).-
Decision: Apprgved (Y/N) (date)
TOWN OF SOUTHOLD
Name of Applicant New Suffolk Shipvard
-Address New Suffolk Road, New Suffolk, New York i1956
Phone Number:(516) 734-6311
Suffolk County Tax Map Number: 1000 - it7-5-29.1
Property Location:
New Suffolk Road, New Suffolk
(provide LiLCO Pole ~, distance to cross streets, and location)
Agent: Eh-Consultants, Inc.
(If applicable)
Address: t329 North Sea Road, Southampton, New York
li968
Phone: 516/283-6360
?"~ard of Trustees Applicat.~i'~]
GENERAL DATA
Land Area (k~x~q4~K~x~: 2.287 acres
Area zoning: Waterfront commercial
Previous use of property: Shipyard
Intended use of property: SAME
Prior permits/approvals for site improvements:
Agency Date
~¥~DRC June 7. 1994
goutbold Town Trustees
August 2, 1994
No prior permits/approvals for site improvements.
Has any permit/approval ever been revoked or suspended by a
governmental agency?
X No YEs
If yes, provide explanation:
Project Description (use attachments if necessary):
SEE ATTACHED
PROJECT DESCRIPTION
Replace all bulkheading on southwest side of
marina/shipyard, From east to west: replace (within
18") 3 sides of travel lift slip, 36', 26', 34'; replace
(within i8") 34' section on south side of boat storage
building and 22' section on west side of boat storage
building; construct 103' section, easterly 43' of which
will be located immediately south of one story frame
office building to replace a deteriorated retaining wall
located on the north side of that structure.; remaining
60' west will be built 18" - 30" in front of existing
bulkhead due to bulges in present bulkhead; replace
(within 18") 33' and 15' bulkhead sections.
Dredge an area up to 10' off 118' of bulkheading to
maximum depth of 4' below MLW. Resultant 100± c.y. of
spoil will be used to backfill between new and 'old
bulkheads. Remove existing 3' X 60' of fixed walk
located along southerly bulkhead. Build a 4' X 4'
platform, 3' X 20' hinged ramp, 6' X 60' float. Pour a
new 6' X 12' concrete pad for a gasoline dispenser which
will replace a prior gas pump which was removed.
Existing tank buried in upland will be retained and used.
Purpose. of project is to create a stable base for one
story frame officebuilding now suspended over the water
on locust posts. These and deteriorated bulkhead at
north side of building are allowing building to settle
and crack. As new foundation cannot be installed under
building without moving it, we believe this to be the
only method to'correct problem.
?"'~oard of Trustees Applicat~n
AUTHORIZATION
(where the applicant is not the owner)
Dion'Lvnch, General Manaqer X~~X~K New Suffolk Shipyard,
(print owner of property) (mailing address)
New Suffolk Rd, New Suffolk
Eh-COnsultants, In'c.
do hereby authorize
(Agent)
to apply for permit(s) from the
Southold Board of Town Trustees on my behalf.
~!~ ( Own~~ture )
Board of Trustees Applica/ "Dh
County of Suffolk
State of New York
Dion Lynch BEING DULY SWORN
DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE
DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED H~REtNARE
TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL
WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION
AND AS MAy BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES.
THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN
TRUSTEES ~AR/~LESS A~'~ F~EE FROI~.ANY A~ND ALL D~4AGES AND CLAIMS
ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN
COMPLETING THIS APPLICATION, I F_EREBY AUTHORIZE THE TRUSTEES,
THEIR AGENT(S) OR REPRESE/TrATIVES(S), TO ENTER ONTO MY PROPERTY
TO INSPECT THE PREMISES IN CONJUNCTION WITH REVIEW OF THiS
/ Signat~e '
SWORN TO BEFORE ME THIS
Notary
Board of 'Trustees Application
wETLAND/TRUSTEE LANDS APPLICATION DATA
Purpose of the proposed operations: sEE ATTACHED.
Area of wetlands on lot: 0 square feet
PerCent coverage of lot: 0 %
Closest distance between nearest existing structure and upland
edge of wetlands: 0 feet
Closest distance between nearest, proposed structure and upland
edge of wetlands: n feet
Does the project involve excavation or filling?
No × Yes
If yes, how much material will be excavated? 100 cubic yards
How much material will be filled? t00 cubic yards
Depth of which material will be removed or deposited: 4' below MLW
feet
Proposed slope throughout the area of operations: level
Manner in which material will be removed or deposited:
Clamshell bucket.
Statement of the effect, if any, on the wetlands and tidal
waters of the town that may result, by reason os such proposed
operations (use attachments if appropriate):
Ar~a ~n front of bulkheads will be dredged onlv to restore previously
existing depth needed for operation of marina. No long-term adverse
effec~ ~nticipated.
Area below building will be filled. Due to constant shading, it is of
little value and serves onlv as debris .trap. It's loss will have no
· adverse effect.
6
Appends,,
S~ate Environmental Qual;~y Review
SHORT ENVIRONMENTAL ASSESSMENT FORM
For UNLISTED ACTIONS Only
PART ~--PROJECT ~NFORMATION ~o be completed by Appiic~t or Project sponser}
1. APPMCANT ~PONS~R ~ 2. P~ECT NAME
3. PR~E~ LOCATION:
Uunic~oa~ty Southold County Suffolk
4. PRECISE LOCATION (Street ad0ress ~0 road ~me~ecUons, pfomtnem
SEQR =
5. iS PROPOSED ACTION:
6. DESCRIBE PROJECT BRIEFLY:
New Suffolk Road, New Suffolk
SCTM 91000-117-5-29.1
~ Modific~tionlaiteration
SEE ATTACHED
7. AMOUNT OF LAND AFFECTED:
Initially 2.2 8 7 acres Ultimately 2.2 8 7 acres
8. WILL PROPOSED ACTION COMPLY W~TN EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICT;ONS?
~ Yes [] No If No, describe UrJef~y
WHAT ~S PRESENT LAND USE tN V~CINITY OF PROJECT?
~'_ Residential ~ lnc~uetriat [] Commercial
Descries:
[] Agriculture
~ Par~lForestlO~en space [] Ot~er
10. DOES ACTION INVOLVE A PERMIT APPROVAL. OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (FEDERAL.
STATE OR LOCAL)?
~" Yes ~ No if yes. list agency,s) an~ psrmit~aop~ova~s
DEC, COE, DOS
1 ~. DOES ANY ASPECT OF THE ACTION HAVE A CU~RENTkY VALJD PERMIT OR APPROVAL?
[] Yes ~ No tf yes. ;let agency name an~ permttlapprova~
12.
Ao~3jican. USDonsor
Signature:
AS A RESULT OF' PROPOSED ACTION WILL EX[STiNG PERMITIAPPROVAL REOUJFIE MODIFICATION?
Yes No
r~al'n~: 'J~i'=%~' ,~]/~] ~/~;~.~T'~ ~'3~,7 ~--~11]~1 T~C. Date;
R~%I L ~ IIAJE, ~REUIDENT
If the action is in the Coastal Area, and you are a state agency, compJete the
Coastal Assessment Form before proceeding with this assessment
OVER
PART 1--PROJECT INFORMATION
Prepared by Project Sponsor
NO'TI.CE. This document~ is designed to assist in determining whether the action proposed may have a significant effect
oi~ the environmeht Please complete the entire form, Parts A through E, Answers to these questions will be considered
as part'of the application for approval and may be subject to further verification and public review. Provide any additional
information you believe will be needed to complete Parts 2 and 3.
]t is expected that completion of the full EAF will be dependent on information currently available and will not involve
new studies, research or investigation. If information requiring such additional work is unavailable, so indicate and specify
each instance,
NAME OF ACTION
LOCATION OF ACTION dnclude Street Address+ Municipality and County)
New Suffolk Road, New Suffolk
NAME OF AFPUCANT/SPONSOR
Roy L. Hale, President, Eh-COnsultants,
ADDRESS
1329 Nor%h Sea Road
C]TWPO
Southampton
NAME OF' OWNER df 0ifferenfl
New Suffolk Shipyard
ADDRESS
New Suffolk Road
CiTY/PO
New Suffolk
OESCRIPTION. OF
Inc.
SUS~'N ESS TELEPHONE
516) 283-6360
STATE t Z~P COD5
N.Y. 11968
BMSINESSTELECNOHE
<516~ 734-6311
STATE ] ZIP COBB
N,Y, [~956
SEE ATTACHED
Please Complete Each Question-Indicate N.A. if not applicable
A. Site Description
Physical setting of overall proiect, both developed and undeveloped areas.
t. Present land use: ~Urban ~[ndustriaJ L~Commercia~
~Forest ~--Agricufture Z]Other
2, Total acreage of pro)ect area: 2.29 acres.
APPROXIMATE ACREAGE
Meadow or BrusI~[and (Non-agricultural
Forested
Agricultural ,qnc]udes orchards, cropland, pasture, etc.)
Wetland (Freshwater or tidal as per Articles 24, 25 of ECL)
Water Surface Area .60
Unvegetated (Rock. earth or fill)
' Roads, buildings and other paved surfaces .47
Other(;ndicate type) dirt and bluestone 1.22
3. What is predominant soil type{s) on project site? '~ '~ I ~d I ~nrl
~,Residentiat (suburban) ~Rurai {non-farm)
PRESENTLY AFTER COMPLETION
acres acres
acres acres
acres acres
acres acres
acres .6 0 acres
acres acres
acres .3 [3 acres
acres 1.31 acres
a. Soil drainage: ~_,Well drained % of site 1~Moderatet¥ weII drained 100 % of site
~Pooriy drained 96 of site
b. If an'.' w_.'r:cuJturai land is involved, how many acres of soil are classified within soil group ~ through ~' Of the NYS
Land :;ia_<.~,ficanon System? N/____~_A acres. (See I NYCRR 370).
z '.? :her .... :~ ~ :bt :~utcropotngs on prolect site? ~--Yes
~. ~' " '. ;'~</¢';Ci./
PROJECT DESCRIPTION
Replace all bulkheading on southwest side of
marina/shipyard. From east to west: replace (within
18") 3 sides of travel lift slip, 36', 26', 34'; replace
(within 18") 34' section on south side of boat storage
building and 22' section on west side of boat storage
building; construct 103' section, easterly 43' of which
will be located immediately south of one story frame
office building to replace a deteriorated retaining wall
located on the north side of that structure; remaining
60' west will be built 18" - 30" in front of existing
bulkhead due to bulges in present bulkhead; replace
(within 18") 33' and 15' hula, head sections.
Dredge an area up to 10' off 118' of bulkheading to
maximum depth of 4' below MLW. Resultant 100± c.y. of
spoil will be used to backfill between new and old
bulkheads. Remove existing 3' X 60' of fixed walk
located along southerly bulkhead. Build a 4' X 4'
platform, 3' X 20' hinged ramp, 6' X 60' float. Pour a
new 6' X 12' concrete pad for a gasoline dispenser which
will replace a prior gas pump which was removed.
Existing tank buried in upland will be retained and used.
Purpose of project is to create a stable base for one
story frame office building now suspended over the water
on locust posts. These and deteriorated bulkhead at
north side of building are allowing building to settle
and crack. As new foundation cannot be installed under
building without moving it, we believe this to be the
only method to correct problem.
5. ,,\pproximate percentage of proPo.sed project site with slopes: :~0-10% ]_00 _ % ~_!0't5% %
[]15% or'.~..ater %
6. I~, proie~t ,~ubstantiaiiv contiguous to, or contain a building, site, or district, listed on the State or the National
Registers of H?storic Places? .~Yes ~XNo
7. Is proiect substantially cont guous to a site listed on the Register of National Natural Landmarks? --Yes ~No
8. What is the depth of the water table? 4-+ (in feet)
9. Is site located over a primary, principal, or sole source aquifer? []Yes [~No
10. Do hunting, fishing or shell fishing opportunities presently exist in the project area.~ UYes ~No
11. Does proiect site contain any species of plant or animal life that is identified as threatened or endangered?
?Yes ~No According to Roy T., Hale
identify each species
12. Are there any unique or unusuaf land forms on the project site? [i,e., cliffs, dunes, other geological formations)
~Yes ~-No Describe
t3. Is the proiect site presently used bt,' the community or neighborhood as an open space or recreation area?
_~Yes ._--No If yes, explain Commercial marina and shipyard
14. Does the present site include scenic views known to be important to the community? :~__ .No
15. Streams within or contiguous to proiect area: N/A
a, Xlame or Stream and name of River to which it is tributary
16. Lakes, ponds, wet]and dreas within or contiguous to project area:
a~ Name Schoolhouse Creek
17 Is the sire served b% e×~sttng public utilities? ~_Yes ~No
ai If Yes, does sufficient capacity exist to allow connection?
b] ]f Yes. will improvements be necessary to allow connection?
Size (In acres) 500+
~Yes ~No
~Yes ~No
t8. ts the site located in an agricultural district certified pursuant to Agriculture and Markets Law, Article 25-AA.
Section 303 and 3042 ~_Yes R-No
19. Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article
of the ECL, and 6 NYCRR 6172 1rYes _-No
20 Has the site ever been used for the disposa~ of solid or hazardous wastes? .~Yes :X~Xo
B. Project Oescriptior~
1, ?hvsical dimensions and scale, of proiect (fill in dimensions as appropriate)
a. Total contiguous acreage owned or controlled by proiect sponsor 2.29
b. Project acreage to be developed: . ~R acres initially;
c. Proiect acreage to remain undeveloped 1 . qq acres.
d. Length of project, in miles: N/A (If appropriate)
'e. tf the proiect is an expansion, indicate percent of expansion proposed redLlct'i_orP/o;
f. Number of off-street parking spaces existing 50+
g. ,Mhximum vehicular trips generated per hour 6 °5+_
h. If residential: Numt~er and type of housing units:
One Family Two Family Muftiple Family
Init:ali,. N/A
: Z~'..m,,';~o~ ~n fee~' of !arrest proposed structure 32 height; 42 width:
.... : ....... ";.- :!,~,:.,_, :~ r~,uoiic thoroughfare f)roject wifl occupy
acres.
acres ultimatek
; proposed nn r'B~nrj-~,
(upon completion of project)?
Condominium
much natural material {i.e 'ock, earth, etc.) wil] be removed from t~..site?
2. How
3. Will disturbed areas be reclaimea? [~Yes E~No ~N/A
-. ~. :If yes, for what intended purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation? []Yes ~No
c. Will upper subsoil be stockpiled for reclamation? E2Yes ~JNo
4, How many acres of vegetation [trees, shrubs, ground covers) will be removed from site? 0 acres.
5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?
(number).
r-lYes X3No
6. If single phase project: Anticipated period of construction 2
7. If multi-phased:
a. Total number of phases anticipated
b. Anticipated date of commencement phase
c. Approximate completion date of final phase
d. Is phase 1 functionally dependent on subsequent phases?
8. Will blasting occur during construction? i"TYes ~]No
9. Number of iobs generated: during construction 6
10. Number of jobs eliminated by this project 0
11. Will pro:ject require relocation of any proiects or facilities?
months, [including demolition).
month
month
IDYes
F-INo
tons/cubic yards
year, (includin~ demolition).
year.
; after project is complete 10
[~Yes [~No If yes, explain
t2. Is surface liquid waste disposal involved.~ []Yes ~No
a. If yes, indicate type of waste (sewage, industrial, .etc.) and amount
b. Name of water body into which effluent will be discharged
13. ts subsurface liquid waste disposal involved? []Yes ~No Type
14. Wilt surface area of aR existing water body increase or decrease by proposal? ~Yes
Explain
15. is project or any portion of proiect Iocated in a 100 year flood plain? [~Yes ~No
16. Will the project generate solid waste? ~Yes ~No
a. If yes~ what is the amount per month tons
b. If yes, wil) an existing solid waste facility be used? ~Yes ~]No
c. If yes. give name ; location
d. Will any wastes not go into a sewage disposal system or into a sanitary landfill? ~Yes
e. tf Yes, explain
~No
17. Will the p'roject involve the disposal of solid waste? E~Yes
a. tf yes, what is the anticipated rate of disposal?
b. If yes, what is the anticipated site life? years.
18. Will project use herbicides or pesticides? ~Yes ~No
[~No
tons/month.
19. 'Will project routinely produce odors (more than one hour per day)? rCrYes ~No
20. Will project produce operating noise exceedin~ the local ambient noise levels? F'iYes
21. Will project result in an increase in energy use? t-~Yes ~No
If yes , indicate Wpe(s)
22. if water supptv is from wells, indicate pumping capacity ~/A gal[oas/minute.
23. Total anticipated water usage per day ~/~ gallons/day.
24 Doe~ profect invoive Local, State or Federal funding? ~Yes
25. Approvals Required:
,. me
Ci:~y, To%~n', Village Board ~Yes ~.'No
City, Town, Village PianninB Board ~Yes ~No
City, Town/Z6~li/~oaSr~ee ~Yes ENo
City, Count',' Health Department [~Yes []No
Other Local Agencies ,mYes []No
Other Re§ional Aoencies EYes [:]No
State Agencies ~]Yes ,re. No
Federal Agencies ~.'Yes ~No
Trustee wetland
DEC TW, DOS CZM
COR Sec%ion 10,
404
C. Zoning and Planning Information
1. Does proposed action involve a planning or zoning decision?
[]Yes E~No
if Yes, indicate decision required:
~zoning amendment ~zoning variance []$peciat use permit I-]subdivision
~new revision of master plan :~resource management plan []other
What is the zoning ciassification(s)of the site? MI, MII
Submittal
Date
10/94
10/94
=site ptan
3. What is the maximum potential development of the site if devefoped as permitted by the present zoning?
Marina, shipyard
4. What is the proposed zonin§ of the site? NO change.
5 What is the maximum potential development of the site if developed as permitted by the proposed zoning?
6 Is the proposed action consistent with the recommended uses in adopted [oca[ fand use plans? ]~Yes
7 What are the predominant land use{s) and zoning classifications within a % mile radius of proposed action?
MI, MIT, marinas
8 ts the proposed action compatible with adioining/surroundin§ land uses within a 'A mite? :~3Yes
9 If the proposed action is the subdivision of [and, how many lots are proposed? N/A
a. What is the minimum lot size proposed?
10. Will proposed action require any authorization(s) for the formation of sewer or water districts~ ~_Yes
~1. Will
fi~3
12. Will the proposed action result in the generation of traffic significantly above present teveJs? ~Yes
a, If yes, is the existing road network adequate to handle the additional traffic? =Yes ~.,No
~No
~No
,'~No
the proposed ac.don create a demand for any communitv provided services (recreation~ education, police.
protecti('~.)? -Yes ,,~. No
a. if yes. is existing capacity sufficient to handle projected demand? -~Yes -'No
:~No
D. Informational Details
· Attach anv additional information as may be needed to clarify your proiect. If there are or may be any adverse
impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or
avoid them.
E. Verification
, certif, that the info/a~ion prov_,jzJed//jabove is true to the best of my knowledge.
_// j'~.
qpplicant~C;~onsor Nam~ /Rov /~. J~je Date
qignature __ ~'tl~ .,~,/~'-- ~'~ Tide President
~ ~oy L. ~a3~~
t{ ,'.he acti,,;~ ~-: in ~he Coas[aJ Area, and you are a state a~enc¥, com.u[e~e the Coastal Assessment ,Corm before proceeding
New :~ ~t;~*te i~-P~~'~f Environmental Conservation
RE: LEAD AGENCY COORDINATION REQUEST
Thomas C. JOdtng
Commissioner
JAN 3 995 :
TOWN OF SOUTHOLD._
The purpose of this request is to determine under Article 8 (State Environ-
mental Quality Review - SEQR) of the Environmental Conservation Law and 6 NYCRR
Part 617 the following: "
Your agency's interest in acting as lead agency;
Your agency's jurisdiction in the action described below; and
Issues of concern which your agency believes should be evaluated.
Enclosed is a copy of the permit application and a completed Part I of the
Environmental Assessment Form to assist you in responding.
Project Location: ,,: ~ ~'~-~' L"- ~ ' }
DEC Project Number: : ~. -- '
SEQR Classification: Type t [ ] Unlisted ~1~
DEC Contact Person: ~~
DEC Position:
DEC has no objection to your agency or another agency assuming lead agency
status for this action, but reserves the right to comment on this action if
a positive determination of significance is made.
-2'
[]
DEC has no objection to your agency or another agency assuming lead agency
status for this action, but we have the following concerns regarding this
project {see 'mcomments" below).
DEC wishes to assume lead agency status for this action.
[]
The proposed action has been identified by DEC as occurring wholly or
partially within or Substantially contiguous to a critical environmental
area {CEA) that was designated by
It is the position of this Department that your agency, if it has a juris-
· diction over the action, shouTd assume the lead agency role based on the
existence of the CEA and the fact that the anticipated impacts are
primarily of local significance.
[ ] Other. (See comments below)
Comments (Optional)'
Response:
Please respond to this request within 30 days of the date·of this letter.
If no response is received within 30 days, we will assume that you have no
objection to DEC. or another agency assuming the rote of lead agency, and have no
comments to offer regarding the proposed action at this time. If neither your
agency nor any other involved agency, including DEC, has indicated a will-
ingness to serve as lead agency within 30 days of this letter:
[ ] We will petition the Commissioner of DEC to designate a lead agency
f°r this action.
[ ] We will petition the Commissioner of DEC to designateyour agency as
lead, presuming you have jurisdiction.
Please feel free to contact this office for further information or
discussion.
Enclosures
CC:
(see distribution list)
/'NEW YORK STATE DEPARTMENT OF ENVIRONMENTAl-
u~:,,.. AI'PLICATION NUMBER
'Ti ~-'' ~ ~RA'/ ~RPS OF ENGJNEER$ APPLI~T1ON
~OINT ~PP~i( ~ FOR PERMIT ~ ~" ~
~a~ read AlL i~ct~s ~ back ~tom completing this application. Pl~se ~ or print clearly in ~ A~ ~ditional information ~
,~A~TIC~ ~, T~ 1, AeTIC~ 43 6NYCRR ~ [~KE GEORGE RECR~ATiON ZONE) ' ' ~.
~ARTIC~ ~S, TIT~ 3 IAQuArIc PESTICIDES CONTROL) ~6NYCRR 327 (AQUATIC VEGETATION) ~6NYCRR 32a (F~SH] ~6NYCRR 32~INSE~S)
S ~ARTIC~ 1~ TIT~ S ~YCRR ~ {PROTECTION OF WATERS)
T ~ Far ~ ~stmct~. r~o~s~ct~, or r~it of a D~ or o~" jm~dment s~cmm. "
A ~F~ t~ dism~ance of a STRE~ BED OR BANKs ot ~c~vation in or fi~t of NAVIGABLE WATERS. '~ WATER QUALI~ CERTIFICATION
T
E ~A~TIC~ 15, nT~ lS ~YCRR ~ ~ATER SUPPLW' ~6NYCRR ~2 (LONG ~S~NO WELL)
~AeTIC~ lS, rile ~ ~YCRR ~ ~fLD, SCENIC AND RECREATIONAL RIVERS)
~AeT~C~ 24 6NYCRR ~2, ~3 (FR[SHWATER WET~NDS] .
~AgTIC~ 25 6NYCRR ~1 (TIDAL WET~NDS) ~AR~C~ ~ 6NYCRR 5~ {COASTAL EROSION]
~SEcnON ~0 (RIVER AND HARBOR A~ OF t8~) for s~ms and ~ in navi~ble wamn of t~ U.S. ~COASTAL CONSISTENCY CERTiFI~TION,
~SE~ON ~ {CLEAN WATER A~ OF 19~ for dis~sa~ of d~g~ or. fil~ martial in wate~ 0f ~ U.S.
~SECTION t03 (~RINE PRoTE~ION, RESEARCH AND 5AN~UAR[ES A~ for ~e t~~ of ~g~ ma~ials for dumping in~ ocean
1, LIST PREVIOUS PERMITIAI~?LtCATEON NUMBERS AND DATES {If any)
Permit #1-4738-00941/00001-0, elf.
2° ^PPLICJ%NT IS A/AN [~Owne¢ []Op~atot []Lessee
6/7/94, exp. 6/30/97
J~MunicipaJityiGovemmental Agency (Check as many as apply)
3. NAME OF APPLICANT (U~ Fuji Namej
New Suffolk Shipyard
MAILING ADDRESS
New Suffolk Road
POST OFFICE
New Suffolk
4, NA,~E oF r~lowner
RoY L. Maie,
MAILING ADDRESS
1329 North Sea Road
POST OFFICE
Southampton
[~Agent/Contact Person {Check one}
Eh-COnsultants, Inc.
PROJECT/FACILITY LOCATION {Mark Io~ation on map, see Number la on reveme side)
County qLIF~n] ~r I Town orcity Southold
STREET ADDRESS (If differe,t from applicant)
POST OFFICE
6. NAME DE STREAM OR 8ODY OF WATER School Mouse Creek
TELEPHONE ~hem can be reach~ du~ng day)
616) 734-6311
STATE I ZIP CODE
NY 11956
TELEPHONE ~here can be mach~ dudng day)
{516) 283-6360
J ZtPCODE
NY 11968
J Village
STATE I Z]? CODE
7. HAS WORK BEGUN ON PROJECT.~ If YES, at:ach explanation on starting work without permit, include dates, J 8. WILL PROJECT UTILIZE STATE LAND?
[~¥es [~No Show work on map andJot drawings. [ [~]Yes ~--"fNo
9. PROPOSED uSE: ~ Private 10. PROPOSED STARTING DATE: j 11. APPROXIMATE COMPLETION DATE: 12. ~EE OF (NYS Pe~it O~ty)
~ Public ~ Comme,ciai ASAP J 6 months
13_ PROJECT DESCRIPTION: {e.g, quanti~ and ~pe of material to be excavate, d~ged or us~ for fill or rip rap. Iocati~ of disposal sites; ~pe of
structure to be ins~l~; height of dam: s~e of im~unden: c~pacities of pro~ wa~r sources; ~ent of d~ribution system; etc.]
SEE ATTACHED
14. WILL THIS PROJECT REQUIRE ADDITIONAL FEDERAL, STATE AND/OR LOCAL PERMITS? [] Yes [] No if yes, please list:
COE, DOS, Town of Southold Trustees
15. CERTIFICATION:
I hereby affirm that under penality of perjury that information provided on this form and ail akac, hments submitted herewith is true to the best of my ktlowledge
and belief. False statementS made he~ein are punishable as a Class A misdemeanor'pursuant to Section 2~0,45 of the Penal Law.
Further, the applicant accepts fuji responsibility for all damage, direct or indirect, of whatever nature, ~nd by whomever suffered, arising out of the project
described herein and agrees to indemnify and save harmless the State from suitS, actions, damages and costS of every name and description resulting from said
project. In addition, Federal Law, '[g U.S.C- Section 100~ g~vides for a fine of no~ more tgan $t0,000 or imprisonment for not'mOre than five years, ot both,
where an applicant knowingly and willfully falsifies, conc~-S~aJ,~, or cove~F~ up a,cpatedai fac:t; or know, ingly makes or uses a false, fi~titous or fraudulent statement.
[~l hereby authorize the agent named in Number 4(a~'ve to s~/mi~i~ap~plication on mY behalf.
October 14, 1994 ),~-.,~ ~,._ ?~"~¢r-~. President
DATE RO~ ]~ I G N~I~-~]:~'~ tITLE
JJ
PLEASE READ ALL INSTRUCTIONS ON REVERSE SIDE
PROJECT DESCRIPTION
RePlace all bulkheading on southwest side of
marina/shipyard. From east .to west: replace (within
18") three sides of travel lift slip, 36', 26', 34';
replace (within 18") 34' section on south side of boat
storage building and 22' section on west s±'de of boat
storage building; construct 103' section, easterly 43'
of which will be located immediately south of one story
frame office building to replace a deteriorated retaining
wall located on the north side of that structure;
remaining 60' to west will be built 18"-30" in front of
existing bulkhead due to bulges in present bulkhead;
replace (within 18") 33~' and 15' bulkhead sections.
Dredge an area up to 10' off 118' of bulkheading to
maximum depth of 4' below MLW. Resultant 100± c.y. of
spoil will be used to backfill between new and old
bulkheads.
Remove existing 3' X 60' of fixed walk located along
southerly bulkhead. Build a 4' X 4' platform, 3' X 20'
hinged ramp, 6' X 60' float. Pour a new 6' X 12'
concrete pad for a gasoline dispenser which will replace
a prior gas pump which was removed. Existing tank buried
in upland will be retained ~and used.
Purpose of project is to create a stable base for one
story frame office building now suspended over the water
of locust posts. These and deteriorated bulkhead at
north side of building are allowing building' to settle
and crack. .As new foundation cannot be installed under
building without moving it, we believe this to be the
only method to correct the problem.
Leakage through present bulkhead allowed gas pump and
lines to settle and break causing a small spill reported
to DEC (cc correspondence attached). This will not occur
once new wall has been installed and backfilled.
..... F .tT 1--PROJECT INFORM~ ,~0.~ .' Prepared by Project Sponsor
NOTICE: This document is designed to assist in determinin8 whether the action proposed may have a significant effect
on the environment. Please complete the entire form, Parts A through E. Answers to these questions will be considered
as part of the application for approval and may be subject to further verification and public review. Provide any additional
information you believe will be needed to complete Parts 2 and 3.
It is expected that completion of the full EAF will be dependent on information currently available and will not involve
new studies', research or investigation. If information requiring such additional work is unavailable, so indicate and specify
each instance.
NAME OF ACT]ON
LOCATION OF ACTION (include Street Address, Municipality and County)
New Suffolk Road, New Suffolk
NAME OF APPLICAN~SPONSOR
Roy L'. Haje, President, Eh-Consultants,
ADDRESS
1329 North Sea Road
CITY/PO
Southampton
NAME OF OWNER (If different)
New Suffolk Shipyard
ADDRESS
New Suffolk Road
CITY/~O
New Suffolk
DESCRIPTION oF ACTION
BUSINESS TELEPHONE
Inc. (516) 283-6360
I STATE t ZiP CODE
N.Y. 11968
BUS;NESS TELEPHONE
(516) 734-6311
STATE ~ZIPCODE
N.Y. ~t956
SEE ATTACHED
Please Complete Each Question-Indicate N.A. if not applicable
A. Site Description
Physical setting of overall proiect, both developed and undeveloped areas.
1, Present land use: ,.'-,Urban []Industrial
[]Forest []Agriculture
2. Total acreage of project area: 2,2 9 acres.
APPROXIMATE ACREAGE
Meadow or BrushJand (Non-agricultural)
Forested
· Agricultural (Includes orchards, cropland, pasture, etc.)
Wetland (Freshwater or tidal as per Articles 24, 2,5 of ECL)
Water Surface Area
Unvegetated {Rock,, earth or fill)
Roads, buildings and other paved surfaces
Other (Indicate type) dirt and bluestone
3. What is predominant soil type{s) on project site?
.~Commercia]
E~Other
[-]Residential (suburban)
.60
.47
1.22
[]Rural {non-farm)
PRESENTLY AFTER COMPLETION
acres acres
acres acres
acres acres
acres acres
acres .6 0 acres
acres acres
acres .3 8 acres
acres 1.3 t acres
a. Soil drainage: ()Well drained % of site k~Moderately well drained !0O % of site
[]Poorly drained 56 of site
b. [f any agricultural land is involved, how many acres of soil are classified within soil group I through 4 of the NYS
Land Classification System? N'/A acres. (See I NYCRR 370).
4. Are there bedrock outcroppings on project site? .~Yes [~No
a. 'What is depth to bedrock? (in feet)
2
PROJECT DESCRIPTION
Replace all bulkheading on southwest side of
marina/shipyard. From east to west: replace (within
18"). three sides of travel lift slip, 36', 26', 34';
replace (within 18") 34' section on south side of boat
storage building and 22' section on west side of boat
storage building; construct 103' section, easterly 43'
of which will be located immediately south of one story
frame office building to replace a deteriorated retaining
wall located on the north side of that structure;
remaining 60' to west will be built 18"-30" in front of
existing bulkhead due to bulges in present bulkhead;
replace (within 18") 33' and ~15' bulkhead sections.
Dredge an area up to 10' off 118' of bulkheading to
maximum depth of 4' below MLW. Resultant 100± c.y. of
spoil will be used to backfill between new and old
bulkheads.
Remove existing 3' X 60' of fixed walk located along
southerlY bulkhead. Build a 4' X 4' 'platform, 3' X 20'
hinged ramp, 6' X 60' float. Pour a new 6' X 12'
concrete pad for a gasoline dispenser which will replace
a prior gas pump which was removed. Existing tank buried
in upland will be retained and used.
Purpose of project is to create a stable base for one
story frame office building now suspended over the water
of locust posts. These and deteriorated bulkhead at
north side of building are allowing building to settle
and crack. As new foundation cannot be installed under
building without moving it, we believe'this to be the
only method to correct the problem.
Leakage through present bulkhead allowed gas pump and
lines to settle and break causing a small spill reported
to DEC (cc correspondence attached). This will not occur
once new wall has been installed and backfitled.
5. Approxi~mate percentage of proPOsed project site with slopes: :~0_10%''~ '100 ' % ,.7,!0-15% %
[]15% or 8rearer %
6. Is project substantially contiguous to, or contain a. bu[[ding, site~ or district, iisted on the State or the National
Registers of Historic Places? ,, [-].Yes ~_No
7. Is proiect substantially contiguous to a site listed on the Register of National Natural Landmarks? ~_Yes F~No
8, What is the depth of the water table? 4+ (in feet)
9~ Is site located over a primary, principal, or sole source aquifer? ~Yes J-iNo
10. Do hunting, fishing or shell fishing opportunities presently exist in the project area? []Yes ENo
tl. Does project site contain any species of plant or animal life that is identified as threatened or endangered?
EYes :~No According to Roy L. Ha~e
Identify each spec[es
~2, Are there any unique or unusual land forms on the project site? .(i.e., cliffs, dunes, other geological formations)
~-Yes, ~No Describe
13. !s the project site presently used by the community or neighborhood as an open space or recreation area?
~Yes ~-'No If yes, explain Commercial marina ~and shipyard
14. Does the present site include scenic views known to be important to the community? -Yes :)Y :Wo
15. Streams within or contiguous to protect area: N/A
a. Name of Stream and name of River to which it is tdbutar~
16. Lakes, ponds, wetland areas within or contiguous to project area:
a. '~ame Schoolhouse Creek
17. ts the site served by existing public utilities,~ ~Yes E~No
a} Ir Yes, does su[f[cJent c'apacity exist to allow connectJon.~
b) if Yes. will improvements be necessary to allow connection?
b. Size (In acres) 500+
~Yes ~No
~Yes ~No
18. Is the site located in an agricultural district certified pursuant to Agriculture and Markets Law, Article 25-AA,
Section 303 and 304~ ~.'Yes .~No
19. [s the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article 8
of the ECL, and 6 NYCRR 6177 ~Yes : ~No
20. Has the site ever been used for the disposal of solid or hazardous wastes? -TYes if~_No
B. Project Description
1. Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contiguous acreage owned or controlled by project sponsor 2.29
b. Project acreage to be developed: '~fi acres initially; qR
c. Project acreage to remain undeveloped -[ . c)1 acres.
d. Length of project, in miles: N/A (If appropriate)
e, If the project is an expansion, indicate percent of expansion proposed reductior~;
f. Number of offlstreet parking spaces existing 50_+
g. Maximum vehicular trips generated per hour
h. If residential: Number and type of housing units:
One Family Two Family
initially N/A
Ultimately
i. Dimensions (in feet) of largest proposed structure
].
acres.
acres ultimately.
; proposed nm r,h~g~.
(upon completion of project)?
Multiple Family
32 height; 42 width;
Linear feet of frontage along a public thoroughfare project will occupy is?
Condominium
86 ,eng~h.
ft.
2. How m, uch natural material"~,.~:, roc~,,.earth, etc.) will be removed from._:,ne si'~,.J]' 0
3. Will disturbed areas be reclaimed? [Z]Yes ~No ~N/A
a. [f yes, for what intended purpose is the site being reclaimed?
b, Will topsoil be stockpiled for reclamation? I-IYes []No
c. Will upper subsoil be stockpiled for reclamation? []Yes [~No
4. How many acres of veaetation (trees, shrubs, ground covers) will be removed from site? 0 acres.
5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?
OYes :~No
6. If single phase project: Anticipated per[od of construction 2
7. If multi-phased: gi/A
a. Total number of phases anticipated
b. Anticipated date of commencement phase 1
c. Approximate completion date of final phase
d. Is ph,~'se I functionally dependent on subsequent phases?
8. Will blasting occur during construction? []Yes :~No
9. Number of jobs generated: during construction 6
10. Number of lobs e[iminated by this project 0
11. 'Will proiect require relocatfon of any projects or facilities?
(number).
months, (including demolitionJ.
month
month
r-lYes
[~No
tons/cubic yards
year, (including demolition).
year.
; after project is complete 20
~]Yes [~No if yes, explain
12. is surface liquid waste disposal involved? F~Yes [~No
g. If yes, indicate type of waste (sewage, industrial, etc.) and amount
b. Name of water bod,v into which effluent will be discharged
13. Is subsurface liquid waste disposal involved? [Yes ~No Type
t4. Wilt surface area of an existing water body increase Or decrease by proposal?
Explain
15. ]s project or any portion of proiect located in a 100 year flood plain? E~Yes
16. Wil
b.
C.
d_
e.
E]Yes
~No
I the project generate solid waste? ~Yes [~No
if yes, what is the amount per month tons
if yes, will an existing solid waste facility be used? Q--]Yes r-iNo
If yes, give name ;location
Will any wastes not go into a sewage disposal system or into a sanitary landfill?
If Yes, explain
~Yes
E~No
17. Will the project involve the disposal of solid waste? ~Yes i~No
a_ if yes, what is the anticipated rate of disposal? tons/month..
b. If yes, what is the anticipated site life? years.
18, Will project use herbicides or pesticides? ~Yes r~No
19. Wi[[ project routinely produce odors (more than one hour per day)? Z~Yes ~[~]No
20. Wit( project produce operating noise exceeding the local ambient noise [eveb? F-JYes
21. Wit( project resutt in an increase in energy use? ~Yes ~No
If yes , indicate type(s)
22. [f water supply is from we(Is, indicate pumping capacity N/~ gallons/minute.
23. Total anticipated water usage.per day ~/A gallons/day.
24. Does project involve Local, State or Federa] funding? ~Yes ~No
If Yes, explain
~No
4
~5., Apl~rovaIs Required:
City, Town, Village Board ~Yes ~No
City, Town, Village Planning Board ~Yes ~No
city, Town Yes
City, County. Health Department ~.'Yes E~No
Other Local Agencies ~Ye5 ~No
Other Regional Agencies ~Ye.s F~No
State Agencies ,K],Yes ~No DEC
Federal Agencies ~Yes ~No
C. Zoning and Planning Information
1.
Submittal
Type Date
Trustee ·wetland
11/94
TW, DOS CZM 10/94
section 10, 404 10/94
Does proposed action involve a planning or .zoning decision? ~Yes ~No
If Yes., 'indicate decision required:
~zoning amendment _~zoning variance L~specia] use permit ~subdivision ~sJte plan
~newrrevision of master plan ~resource management plan ~other
What is the zoning classification(s)of the site? ~4I, MIX
What is the maximum potential development of the site if' developed as permitted by the present zoning?
Marina, shipyard
4. What is the proposed zoning of the site? No chanqeo
5. What is the maximum potential development of the site if developed as permitted by the proposed zoning?
N/A
6. Is the proposed action consistent with the recommended uses Jn adopted local land use plans.~ _~sYes
7 What are the predominant land use(s) and zoning classifications within a N miIe radius of proposed action?
MI, MI1, marinas
8 is the prdposed action compatibie with adjoining/surrounding' land uses within a ~A mite?' :~Ye~
9. if the proposed action is the subdivision of land, how many lots are proposed? N/A
a. What is the minimum tot size proposed?
10.
11.
12.
~No
F~No
Will proposed action require any authorization(s) for the formation of sewer or water districts? ~Yes i~No
Will the proposed action create a demand for any community provided services (recreation, education, police,
fir~ protection)? ~Yes ,~No
a. If yes, is existing capacity sufficient to handle projected demand? -rYes ~No
Will the proposed action result in the generation of traffic significantly above present levels? ~Yes :~2No
a. ti: yes is the existing road network adequate to handle the additional traffic? ~.Yes ~No
Informational Details
Attach any additional information as may be needed to clarify your project. If there are or ma~ be any adverse
E. Verification
~ certifv that tbe')informction provided above is true to the best of my knowledge. '
Applicant/$ponsor....~me L/~ L. Eaje Date 11/14/94
Signature _ k~_ ~ Tide President
If the action ~5 ~n ~he Co%sta] Area, and you are a state agency, complete ~he Coastal Assessment Fo~m before proceeding
wiih this ass-~ssmenL
impacts associated with your propoaa{, please discuss such impacts and the measures which you propose to mitigate or
avoid them.
NEW SUFFOLK
· ! L~ ~.--_r~ ,o '~
· .~.-., '~-',4,C ~ .
...,~.~ .~.~.~.- .~ ...
,,. ~ 4, ~ ~ I. -. . ~ . J~ ;~: . ~ ,.29 NOR,H S~ROAD
NEW SUFFOLK ROAD < ~ '~'/~ w 5w~o ~ < /
EN-CONS ULTANZ..,q,
1329 NORTH SEA ROAD
'...SOUTHAMPTON, NY 1'1t~88
516-,283-6~60
EN'CO NSULTANTS, INC.
1,3~9 NORTH. S~'O~., ROAD
SOUTHAMPTON, NY'
GAlL S. ~HAFFER
STATE OF NEW YORK
DEPARtmeNT Of STATE
ALBANY, NY 12231-0001
October 25, 1994
Mr. Roy L. Haje, President
Eh-Consultants, Inc.
1329 North Sea Road
Southampton, N-Y 11968
F-94-537
U,S. Army Corps of Engineers/NY
District Permit Application
New Suffolk Shipyard
Town of Southold
Request for Additional Information
Dear Mr. Haje:
Pursuant to 15 CFR 930.58, the foE[owing data and information is necessary to enable the
Department of State to adequately assess the coastal zone effects of this proposed project.
Enclosed, please find a copy of your Federal Consistency Assessment Form (FCAF).
Although you have checked C. COASTAL ASSESSMENT, 2.c. ia the affirmative, it
does not appear that the proposed activity would occur within a designated significant,
habitat. Please amend this item and return the corrected FCAF to DOS.
DOS is opposed to the filling of tidal wetlands for non-water dependent uses. Filling
of this section of ~he Schoolhouse Creek in order to suppo~ a non-water dependent
office is not compatible with the goals of Policy #44. Therefore, ptease move the
non-water b~fitding to an upland position. In this manner, the building will be
structurally supported concurrent with preservation of littoral zone. Furthermore,
this area created by the relocation of the office could then be utilized for tree water
dependent uses.
· Please identify the location of disposal of excavated material such as the gas pump
· pad amd deteriorated bulkhead. If a disposal site has not yet been identified, please
agree to 'the following condition within your written response to this letter:
All excavated materials shall be disposed ~ an approved upland facility or shall be
placed so as not to reenter coastal waters nor negatively affect coastal fish and
wildlife habitats and wetlands.·
~."~'~ printed on recycled paper
Mr. Roy L. Haje
Page 2'
4. When was the existing bulkhead installed?
Pursuant to t5 CFR 930.60(a), the'review of your consistency certification will' begin after
we receive and determine that the necessary data and information is adequate to assess
coastal zone effects.
Any additional information Which you believe will facilitate our consistency review of this
project would be appreciated.
A copy of th/s letter has been sent to the U.S. Army Corps of Engineers.
Please call me at (518) 474-6000 if you have any questions.
S/ncerely, -~
Waiter F. Meyer
Coastal Resources Specialist
WFM/jtb
cc: COE/NY District - Sophie Ettinger
NYS DEC/Region 1 - Robert Greene
Town of Southold
C
G
NEW SUFFOLK ROAD
,' Albert J. Kmpski. President
John Hotzapfel, Vice President
William G. Atb~rtson
Martin H. Garrell
Peter Wenczel
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Town Hall
53095 Main Road
P.O. Box 1 t79
Southold, New York 1 t971
Telephone (516) 765-1892
Fax (516) 765-t823
Office Use Only
Coastal Erosion Permit .Application
___Wetland Permit Application
Grandfather Permit Application
___Trustee Lands Permit Application
Waiver
_Received Application:
Clerical Review:
--_Completed Application _Incomplete
_SEQRA Classification:
Type I~Tlrpe Ii Unlisted~
Coordination:(date sent)
CAC Referral Sent:
'Date of Inspection:
--~Receipt of CAC Report:(date)
Lead Agency Determination:
Technical Review:(date)
Public Hearing:(date)
Decision: Approved (Y/N) (date)
_~'AppliCation Fee:$
Name of Applicant New Suffolk ShiDvard
· Address New Suffolk Road, New Suffolk, New York 11956
Phone Number:(516) 734-6311
Suffolk County Tax Map Number: 1000 - 117-5-29.1
Property Location: New Suffolk Road, New Suffolk
(provide LILCO Pole 0, distance to cross'streets, and location)
Agent: En-Consultants, Inc.
(If applicable)
Address: 1329 North Sea Road, Southampton, New York 11968
Phone: 516/283-6360
Board of Trustees APplication
GENERAL DATA
Land Area (~X~q~K~X~; 2.287 acres
Area Zoning: Waterfront commercial
Previous use of property: Shipyard
Intended use of property: SAME
Prior permits/approvals for site improvements':
Agency Date
~V~DRC June 7. 1994
Soutbo]d Town Trustees August 2. 1994
No prior permits/approvals for site improvements.
Has any permit/approval ever been revoked or suspended by a
governmental agency?
X No Yes
If yes, provide explanation:
Project Description (use attachments if necessary):
SEE ATTACHED
PROJECT DESCRIPTION
Replace all bulkheading on southwest side of
marina/shipyard. From east to west: replace (within
18") 3 sides of travel lift slip, 36', 26', 34'; replace
(within 18") 34' section on south side of boat storage
building and 22' section on west side of boat storage
building; construct 103' section, easterly 43' of which
will be located immediately south of one story frame
officebuilding to replace a deteriorated retaining wall
located on the north side of that structure; remaining
60' west will be built 18" - 30" in front of existing
bulkhead due to. bulges in present bulkhead; replace
(within 18") 33' and 15' bulkhead sections.
Dredge an area up to 10' off 118' of bulkheading to
maximum depth of 4' below MLW. Resultant 100~ c.y. of
spoil will be used to backfill between new and old
bulkheads. Remove existing 3' X 60' of fixed walk
located along southerly bulkhead. Build a 4' X 4'
platform, 3' X 20' hinged ramp, 6' X 60' float. Pour a
new 6' X 12' concrete pad for a gasoline dispenser which
will replace a prior gas pump which was removed.
Existing tank buried in upland will be retained and used.
Purpose of project is to create a stable base for one
story frame office building now suspended over the water
on locust posts. These and deteriorated bulkhead at
north side of building are allowing building to settle
and crack. As new foundation cannot be installed under
building without moving it, we believe this to be the
only method to correct problem.
Board of Trustees Application
AUTHORIZATION
(where the applicant is not the owner)
I!
Sion Lvnch, General Manaqer X~(~J~[X~q~ New Suffolk shipyard,
(print owner of property) (mailing address)
New Suffolk Rd, New Suffolk
En-Consultants, Inc.
do hereby authorize
(Agent)
to apply for permit(s) from the
Southold Board of Town Trustees on my behalf.
{Ow~oris7 S~' n~ature)
Counny of Suffolk
State of New York
Board of Trustees Application
Dion Lynch BEING DULY SWORN
DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICAN~ FOR THE ABOVE
DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE
TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL
WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION
AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES.
THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND T~Y TOWN
TRUSTEES.HARMLESS AB~ F~EE FROM ANY AND ALL D~AGES AND CLAIMS
ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN
COMPLETING THIS APPLICATION, I ~E~REBY AUTHORIZE THE TRUSTEES,
THEIR AGENT(S) OR R~PRESENTATIVES(S), TO ENTER ONTO MY PROPERTY
TO INSPECT THE PREMISES iN CONJUNCTION WITH REVIEW OF THIS
swoP TO TH*S
WETLAND/TRUSTEE LANDS APPLICATION DATA
PurpoSe of the proposed operations: s~.E ATTACHED.
Area of wetlands on lot: 0 square feet
Percent coverage of lot: 0 %
Closest distance between nearest existing structure and upland
edge of wetlands: 0 feet
Closest distance between nearest· proposed structure and upland
edge of wetlands: 0 feet
Does the project involve excavation or filling?
No ~ Yes
If yes, how much material will be excavated? 100 cubic yards
How much material will be filled? 100 cubic yards
Depth of which material will be removed or deposited: 4' below MLW
feet
Proposed slope throughout the area of operations: level
Manner in which material will be removed or deposited:
Clamshell bucket.
Statement of the effect, if any, on the wetlands and tidal
waters of the town that may result by reason os such proposed
operations (use attachments if appropriate):
Ar~ ~ ~ront of bulkheads will be dredged only to restore previously
existing depth needed for operation of marina. No long-tarm adverse
eff~c~ anticipated.
Area below building will be filled. Due to constant shading, it is of
l~ttle value and serves only as debris trap. It's loss will have no
.adverse effect.
.il PRO~CT I.D. NUMBER
j 617.21
Appendix C
State Environmental Quality Review
" SHORT ENVIRONMENTAL ASSESSMENT FORM
For UNUSTED ACTIONS Only
PART I--PROJECT INFORMATION (To be completed by Applicant or Project sponsor)
1, APPLICANT SPONSOR i 2. PROJECT NAME
New Suffolk Shipyard by En-Consult~nts, Inc.
3. PROJECT LOCATION:
Municipality Southold County Suffolk
4, PRECISE LOCATION (Street address and road intersections, prominent landmarks, etc., or provide map)
SEQR
5. IS pROPOSED AC11ON:
[~ New ~ Expansion
0. DESCRIBE PROJECT BRIEFLY:
New Suffolk Road, New Suffolk
SCTM #1000-117-5-29.1
[] ModificationlaJteratio~
SEE ATTACHED
AMOUNT OF LAND AFFECTED:
Initially 2.2 8 7 acres Ultimately 2.2 8 7 acres
WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS?
~ Yes [] No If No, ~lescribe Driefly
9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT?
~. Residential ~,~ Industrial [] Commercial
Describe:
[] Agriculture [~ Park/Forest/Open space [] Other
10. DOES ACT;ON INVOLVE A PERMIT APPROVAL OR FUND/NC, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (FEDERAL.
STATE OR LOCAL)?
~ Yes ~ No If yes, list agency(s) and permit/approvals
DEC, Cf)E, DOS
11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL?
[~ Yes ~ No If yes. list agency name and permit/approval
12, AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION?
[] Yes .,~ No
I CERTIFY THAT THE iNFORMATiON PROVIDED ABOVE J$ TRUE TO THE BEST OF MY KNOWLEDGE
Ap=lican. t/s~onsor name: N~W ~LIf~Ol~ ,qhipy~r~ hy ~.n-Cnn,~t~l~n~q, Trlc. Date:
S~gnature:
ROY L. IIAJE, ~RE3IDENT
If the action is in the Coastal Area, and you are a ·state agency, complete the
Coastal Assessment Form before proceeding with this assessment
OVER
PART 1--PROJECT INFORMATION
Prepared by Project Sponsor
NOTICE." ti-his document is designed to assist in determining whether the action proposed may have a significant effect
o~q the environment. Please complete the entire form, Parts A through E. Answers to these questions will be considered
as part of the application for approval and may be subject to further verification and public review. Provide any additional
information you believe will be needed to complete Parts 2 and 3,
it is expected that completion of the full EAF will be dependent on information currently available and will not involve
new studies, research or investigation. If information requiring such additional work is unavailable, so indicate and specify
each instance.
NAME OF ACTION
LOCATION OF ACTION (Include Street Address, Municipality anci County)
NeW Suffolk Road, New Suffolk
NAME OF APPLiCANT/SPONSOR
Roy L. Eaje, President, Eh-COnsultants,
ADDRESS
1329 North Sea Road
CITY/PO
Southampton
NAME OF OWNER (If different~
New Suffolk Shipyard
ADDRESS
New Suffolk Road
CITY/PO
New Suffolk
DESCRiPTiON OF ACTION
I BUSINESS TELEPHONE
Inc. (516) 283-6360
STATE ZliF: CODE
N.Y. 11968
BUSINESS TELEPHONE
( 5:I. 6) 734-63il
STATE J ZJP CODE
N.Y.
SEE ATTACHED
Please Complete Each Question-Indicate N.A. if not applicable
A. Site Description
Physical setting of overall project, both developed and undeveloped areas.
l. Present tand use: 'Industrial ~Commercial ~Residential (suburban)
___Urban
- Forest
--Agriculture FI-Other
Total acreage of proiect area: 2.29 acres.
APPROXIMATE ACREAGE
Meadow or Brusl~land (Non-agricuJtura[)
Forested
Agricultural (Includes orchards, cropland, pasture, etc.)
Wetland (Freshwater or tidal as per Articles 24, 25 of ECL)
Water Surface Area
Unvegetated (Rock. earth or fill)
Roads. buildin§s and other paved surfaces
Other (indicate type) dirt and bluestone
3. What is predominant soil type{s) on project site?
L~Rurai (non-farm
PRESENTLY AFTER COMPLETION
acres acres
acres acres
acres acres
acres acres
· 60 acres .60 acres
acres acres
.47 acres .38 acres
1.22 acres 1.31 acres
a. Soil drainage: m'Wetl drained % of site :z~2Moderate[v well drained ~ % of site
~Poorly drained % of site
b. if an;.' agricultural land is invoived, how many acres of soil are classified within soil group t through - of the '4YS
Lane; C'.as~fication System? N/A acres. (See 1 NYCRR 370).
',m ~her~ .... :r-',":~: ')utcroDpings on project site? ~Yes
L ! ..... ~ ",>~:rr;ck~ tin
PROJECT DESCRIPTION
Replace all bulkheading on southwest side of
marina/shipyard. From east to west: replace (within
18") 3 sides of travel lift slip, 36', 26', 34'; replaoe
(within 18") 34' section on south side of boat storage
building and 22' section on west side of boat storage
building; construct 103' section, easterly 43' of which
will be located immediately south of one story frame
office building to replace a deteriorated retaining wall
located on the north side of that structure; remaining
60' west will be built 18" - 30" in front of existing
bulkhead due to bulges in present bulkhead; replace
(within 18") 33' and 15' bulkhead sections.
Dredge an area up to 10' off 118' of bulkheading to
maximum depth of 4' below MLW. Resultant 100± c.y. of
spoil will be used to backfill between new and old
bulkheads. Remove existing 3' X 60' of fixed walk
located along southerly bulkhead. Build a 4' X 4'
platform, 3' X 20' hinged ramp, 6' X 60' float. Pour a
new 6' X 12' concrete pad for a gasoline dispenser which
will replace a prior gas pump which was removed.
Existing tank buried in upland will be retained and used.
Purpose of project is to create a stable base for one
story frame office building now suspended over the water
on locust posts. These and deteriorated bulkhead at
north side of building are allowing building to settle
and crack. As new foundation cannot be installed under
building without moving it, we believe this to be the
only method to correct problem.
5. Approximate percentage af proposed profect site with slopes: ~]0-10% ]_00 % :-:!0-tS% %
1~15% or 8rearer %
6. l~,,projec~t JubstantiaJ]¥ contiguous ?o, or contain a building, site, or district, listed on the State or the National
Registers of Historic Places~ ~Yes ~[No
7. Is proiect substantially contiguous to a site listed on the Register of National Natural Landmarks? _-Yes I-]No
8. What is the depth of the water tab]e? 4+ [in feet)
9. Is site located over a primary, principal, or sole source aquifer? ~lYes i-[No
10. Do hunting, fishing or shell fishing opportunities presently exist in the project area.~ F-!Yes --No
11. Does project site contain any species of plant or animal life that is identified as threatened or endangered?
~Yes X'~No According to ROy T,. I-Iaje
Identify each species
12. Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formations)
'-'Yes :~No Describe
13, Is the project site presently used bY the community or neighborhood as an open space or recreation area?
_--No If yes, explain Commercial ma,rina and ~hi~yard
14. Does the present 5~te ~ndude scenic views known to be ]mDo~ant to the commu~i~ Yes ~o
15. Streams within or contiguous to pro~ect area: N/A
a, Name or Stream and name of River to which it is tributary
16. Lakes. ponds, wed,md areas within or contiguous to project area:
a. Name Schoolhouse Creek
17. Is the site served b% existing public utilities? ~_Yes ~No
a) If Yes, does sufficient capacity ex[st to allow connection?
b) tf Yes. will improvements be necessary to allow connection?
b. Size (In acres) 500+
"~Yes m
~Na
~Yes .miNo
18. Is the site located in an agricultural district certified pursuant to Agriculture and Markets La%~'. Article 2S-AA.
Section 303 and 304~ ~Yes ~'No
19. ls the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Articie 8
of the ECL, and 6 NYCRR 6177 _~Yes ~No
20. Has the site ever been used for the disposal of solid or hazardous wastes? ~Yes :~No
B. Project Description
1. Phvsicai dimensions and scale of project (fill in dimensions as appropriate)
2.29
a, TotaJ contiguous acreage owned or controlled by project sponsor
b. Project acreage to be developed: .3R acres initially;
c. Proiect acreage to remain undeveloped I . q~ acres.
d. Length of project, in miles: N/~ (If appropriate)
-e. tf the proiect is an expansion, indicate percent of expansion proposed rec~uct:[_o~r~/~;
f. Number of off-street parking spaces existing 50_+ ; proposed
g. M~ximum vehicular trips generated per hour ~. 5_+ (upon completion of project)?
h. If residential: NumOer and type of housing units:
One Family Two Family Multiple Family
tnltial]x N/A
U!t~matelv
:)!n'.,,.',n~;on~.~n ~eet' of :argest proposed structure 32 height; 42 width:
~ ' '-" ": ..... ~::~ ........ ,,~,~ ='~ ~ub]Jc thnrou~hfare, proiect will occu~v, is? _'~64
acres.
acres ukimatelv.
Condominium
86
2. How much natural material (i.e., rock, earth, etc.} wilt be removed from the site? 0
3. Will disturbed areas'be reclaimed? E2Yes []No I~N/A
-, ~. '~f ,/es, for what intended purpose is the site being reclaimed?
b. Will t~psoil be stockpiled for reclamation? iTYes r~No
c. Will upper subsoil be stockpiled for reclamation? I-IYes ~No
4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site? 0 acres.
5. Wi[I any mature forest (over 100 years o[d) or other locally-important vegetation be removed by this project?
"E3Yes gE]No
6. If single phase project: Anticipated period of construction 2
7. if multi-phased:
a. Total number of phases anticipated
b. Anticipated date of commencement phase
c. Approximate completion date of final phase
d. [s phase I functionally dependent on subsequent phases?
8. Will blasting occur during construction? i']Yes ~No
9, Number of jobs generated: during construction 6
10. Number of joss eliminated by this project 0
11. Will project require relocation of any projects or facilities?
(number).
months, Iinciuding demolition).
month
month
iTYes
I-'lNo
tons/cubic yards
year, (including demolition).
year.
; after project is complete 10
~.Yes ~No if yes, explain
t2. Is surface liquid waste disposal involved? ~.-,Yes ~No
a. ]f yes, indicate type of waste (sewage, industrial etc.) and amount
b. Name of water body into which effluent wi[I be discharged
13. Is subsurface liquid waste disposal involved? ?1Yes ~No Type
14. Wilt surface area of an existing water body increase or decrease by proposal?
Expiain
15. ls proiect or any portion of project located in a 100 year flood plain?
~6. w~
a.
b.
C.
d.
[]Yes
[~Yes ENo
II the proiect generate solid waste? ZYes ~No
]f yes, what is the amount per month tons
If yes, will an existing solid waste facility be used? I!Yes [No
If yes, give name ;location
Wilt any wastes not go into a sewage disposal system or into a sanitary landfill?
If Yes, expiain
ZYes
?,No
17. Wilt the project involve the disposal of solid waste? []Yes.
a. If yes, what is the anticipated rate of disposal?
b. If yes, what is the anticipated site life? years.
18, Will project use herbicides or pesticides? ~Yes r~No
19 -Will
20. Will
21. will
22.
23
~No
tons/month.
project routinely produce odors (more than one hour per day)? ~Yes :~]No
proiect produce operating noise exceeding the local ambient noise levels? I-IYes
Project result in an increase in energy use? ~Yes ~No
If yes , indicate type(s)
If water supply is from weIls, indicate pumping capacity ~7/A gallons/minute.
TotaI anticipated water usage per day ~/A gal[ons.~dav,
Does pr¢;lect invoIve Local. State or Federal funding? ~Yes 2:No
~No
25. Approvals Required:
City., ?~w~. Village Board ~Yes
City, Town, Village Planning Board ~Yes ~No
City, Town/Z,6~i/~'j~'~aSr~ee ~]Yes L~No
City, County Health Department ~Yes l-lNg
Other Local Agencies OYes ~No
Other Regional Agencies []Yes i-lNg
State A~encies ~]Yes ~No
Federal Agencies ~Yes ~No
C. Zoning and Planning Information
1.
Type
Trustee wetland
DEC ~W, DOS CZM
COR ~c~on 10,
404
Does proposed action involve a planning or zoning decision? [~Yes [~No
If Yes, indicate decision required:
~zoning amendment ~zoning variance ~specia[ use permit ~subdivision
mlnew,revision of master plan ~resource management plan ~other
What is the zoning cJassification(s)of the site? MI,
--site pIan
Submittal
Date
10/94
10/94
3. Whatisthe maximum potentialdevelopmentofthesiteifdevetopedaspermitted bythepresentzoning?
Marina, shipyard
4. What is the proposed zoning of the site? No change.
5. What is the maximum potential development of the site if developed as permitted by the proposed zoning?
6. ts the proposed action consistent with the recommended uses in adopted ~oca] land use plans? ~Yes
7. What are the predominant land users) and zoning c(assifications within a V~ mile radius of proposed action?
MI, MII, marinas
10
11
12
Dm
~No
ls the proposed action compatible with adjoining~surrounding ]and uses within a V, mite? :~Yes ~No
If the proposed action is the subdivision of land, how many lots are proposed? N/A
a. What is the minimum lot size proposed?
Will proposed action require any authorization~s) for the formation of sewer or water districts? ,-IYes '~'No
Wi[I the proposed action create a demand for any community provided services (recreation, education, police.
fir_~ protecting)? --Yes ;~No
a. If yes. is existing capacity sufficient to handle projected demand? L~Yes _--No
Will the proposed action resuJt in the generation of traffic significantly above present levels? mYes ~No
a. If yes, is the existing road network adequate to handle the additionaJ traffic? ~.Yes ~No
Informational Details
Attach any additional information as may be needed to ctarify your project. If there are or may be any adverse
E. Verification
r certify that the information provided above is true to the best of my knowledge.
Appiicant/S~onsor Name Ro',; L. ~a~e Date
Signature Tide President
Roy L. Ha3e
If the acti~)n ~,: in Ihe Coastal Area, and ,you are a state age,cy, compiete the Coastal Assessment Form before proceeding
wir~ .his a~ -merit.
impacts associated with vour proposal, please discuss such impacts and the measures which you propose to miti§ate or
avoid them.
Albeh J.' Krupski. President
Jphn Hoizapfe].. Vice .President
William G. Albertson
Martin H. Gan'ell
Peter Wenczel
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Town Hall
53095 Main Road
P.O. Box 1 I79
Southold, New York 1 I971
Telephone (516) 765-1892
Fax (516) 765-I823
Office Use Only
__Coastat Erosion Permit Application
Wetland Permit Application
.. Grandfather Permit Application
Trustee Lands Permit Application
Waiver
Received Application:
Clerical Review:
Completed Application
Incomplete
SEQRA Classification:
Type I Type II__Unlisted__
Coordination:(date sent)
CAC Referral Sent:
Date of Inspection:
Receipt of CAC Report:(date)
Lead Agency Determination:
Technical Review:(date)
Public Hearing:(date)
DeciSion: Approved (Y/N) (date)
Application Fee:$
Name of Applicant New Suffolk ShiDvard
'Address New Suffolk Road, New Suffolk, New York 11956
Phone Number:(516) 734-6311
Suffolk County Tax Map Number: 1000 - 117-5-29.1
Property Location: New Suffolk Road, New Suffolk
{provide LiLCO Pole ~, distance to cross st'reets, and location)
Agent: Eh-Consultants, Inc.
(If applicable)
Address: 1329 North Sea Road, Southampton, New York 11968
Phone: 516/283-6360
Board of TrUstees APPlication
GENERAL DATA
Land Area (k~X~/4~K~X~: 2.287 acres
Area Zoning: Waterfront commercial
Previous use of property: Shipyard
Intended use of property: SAME
Prior permits/approvals for site improvements:
Agency Date
~¥~DRC June 7. 1994
Southold TOWD Trustees August 2. 1994
No prior permits/approvals for site improvements.
Has any permit/approval ever been revoked or suspended by a
governmental agency?
X No Yes
if yes, provide explanation:
Project Description (use attachments if necessary):
SEE ATTACHED
PROJECT DESCRIPTION
Replace all bulkheading on southwest side of
marina/shipyard. From east to west: replace (within
18") 3 sides of travel lift slip, 36', 26', 34'; replace
(within 18") 34' section on south side of boat storage
building and 22' section on west side of boat storage
building; construct 103' section, easterly 43' of which
will be located immediately south of one story frame
office building to replace a deteriorated retaining wall
located on the north side of that structure; remaining
60' west will be' built 18" - 30" in front of existing
bulkhead due to bulges in present bulkhead; replace
(within 18") 33' and 15' bulkhead sections.
Dredge an area up to 10' off 118' of butkheading to
maximum depth of 4' below MLW. Resultant 100± c.y. of
spoil will be used to backfill between new and old
bulkheads. Remove existing 3' X 60' of fixed walk
located along southerly bulkhead. Build a 4' X 4'
platform, 3' ~X 20' hinged ramp, 6' X 60' 'float. Pour a
new 6' X 12' concrete pad for a gasoline dispenser which
will replace a prior gas pump which was removed.
Existing tank buried in upland will be retained and used.
Purpose of project is to create a stable base for one
story frame office building now suspended over the water
on locust posts. These and deteriorated bulkhead at
north side of building are allowing building to settle
and crack. As new foundation cannot be installed under
building without moving it, we believe this to be the
only method to correct problem.
Board of Trustees Application
AUTHORIZATION
(where the applicant is not the owner)
Dion Lynch, General ManaGer
(print owner of property)
New Suffolk Rd, New Suffolk
Eh-Consultants, inc.
~~X~ New Suffolk Shipyard,
(mailing address)
do hereby authorize
(Agent)
to apply for permit(s) from the
Southold Board of Town Trustees on my behalf.
Owner ' s s~nature)
Board of Trustees AppliCation
County of Suffolk
StaSe of New York
Dion Lvnch BEING DULY SWORN
DEPOSES AND AFFIRMS THAT HE/SHE IS'THE APPLICANT FOR THE ABOVE
DESCRIBED PERMIT(S) AND THAT ALL STA~S CONTAINED HEREIN ARE
TRUE TO ~ BEST OF HIS/HERKNOWLEDGE AND BELIEF, AND THAT ALL
WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION
AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES.
THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD.AND THE TOWN
TRUSTEES HARMLESS A~CD FREE FROM ANY AND ALL DAMAGES.AlfD CLAIMS
ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN
COMPLETING THIS APPLICATION, I PLE~EBy AUTHORIZE THE TRUSTEES,
THEIR AGENT(S) OR REPRESENTATIVES(S), TO ENTER ONTO MY PROPERTY
TO INSPECT THE PREMISES IN CONJUNCTION WITH REVIEW OF THIS
sworn To BEfORe. TH s o7{
WETLAND/TRUSTEE LANDS APPLICATION DATA
Purpose of the proposed operations: .~w.F. ATTACHED.
Area of wetlands on lot: 0 square feet
Percent coverage of lot: 0 %
Closest distanoe between nearest existing structure and upland
edge of 'wetlands: 0 feet
Closest distance between nearest, proposed structure and upland
edge of wetlands: n feet
Does the project involve excavation or filling?
No × Yes
If yes, how much material will be excavated? i00 cubic yards
How much material will be filled? 100 cubic yards
Depth of which material will be removed or deposited: 4' below MLW
feet
Proposed slope throughout the area of operations: level
Manner in which material will be removed or deposited:
Clamshell bucket.
Statement of the effect, if any, on the wetlands and tidal
waters of the town that may result by reason os such proposed
operations (use attachments if appropriate):
Arum ~n frnnf of bulkheads will be dLedged only to restore previously
existing depth needed for operation of marina. No long-term adverse
effect anticipated.
Area below building will be filled. Due to constant shading, it is of
little value and serves onlv as debris trap. It's loss will have no
adverse effect.
6
~ROJECT I.~. NUMBER
61;'.21
Appendix C
State Environmental Quality Review
SHORT ENVIRONMENTAL ASSESSMENT FORM
For UNLISTED ACTIONS Only
PART I--PROJECT INFORMATION (To be compIeted by Applicant or Project sponsor)
-~, APPLICANT SPONSOR 2. PROJECT NAME
New Suffolk ShiDvard by En-Consultz nts, Inc.
3, PROJECT LOCATION:
Municipality Southold County Suffolk
4. PRECISE LOCATION (Street a;dress and road intersections, prominent landmarks, etc. or prOvide rnap;
SEQR
5. IS PROPOSED ACTION:
--[~ Ne'# [] Exl:ens[on
6. DESCRIBE PROJECT BRIEFLY:
New Suffolk Road, New Suffolk
'SCTM %t000-117-5-29.1
[] ModificAtion/alterAtion
SEE ATTACHED
7. AMOUNT OF LAND AFFECTED:
Initially 2.2 8 7 acres Ultimately 2.2 8 7 acres
8. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS?
~Yes [] No If No. ~escribe i~riefly
9, WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT?
[-. Residential ~ lnaustl'ial [~Commercial
Describe:
[] Agriculture [] Par~ForesttOpen space [] Other
"~0. DOES AC~ON INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (FEDERAL.
STATE OR LOCAL)?
~ Yes ~,= No if yes, list Agency(s) end permit/approvals
DEC, COE, DOS
11. DOES ANY ASI~ECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL?
[] Yes ~ No If yes. [[st agency name and permit/al=provaJ
?2. AS A RESULT OF PROPOSED ACTION WILL EX]STING PERMIT/APPROVAL REQUIRE MODIFICATION?
[] Yes [] No
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE iS TRUE TO THE BEST OF MY KNOWLEDGE
Appttcan.tlsD0nsor heine: N~w ~qU{Fo]~ Shipyard by Rm-Cnn.~]~n~m, T~lC. Date:
Signature:
ROY L- LLAJE, FRE~IDEZCT
If the action is in the Coastal Area, and you are a state agency~ complete the
Coastal Assessment Form before proceeding with this assessment
OVE~
PART 1--PROJECT INFORMATION
Prepared by Project Sponsor
NoTicF. This document is designed to assist in determining whether the action proposed may have a significant effect
on the environment. Please comptete the entire form, Parts A through E. Answers to these questions will be considered
as part of the application for approval and may be subiect to further verification and public review. Provide any additional
information you believe will be needed to compfete Parts 2 and 3.
It is expected that completion of the full EAF w/ii be dependent on information currently available and w/Ii not involve
new studies, research or investigation. If information requiring such additional work is unavailable, so indicate and specify
each instance.
NAME OF ACTION
LOCATION OF ACTION (Inciuae Street Address, Municipality and County)
New Suffolk Road, New Suffolk
NAME OF APPLiCANT/SPONSOR
Roy L. Haje, President, En-Consultants,
ADDRESS
1329 North Sea Road
CiTY/PO
Southampton
NAME OF OWNER {If c~ifferent~
New Suffolk Shipyard
ADDRESS
New Suffolk Road
CiTY/PO
New Suffolk
DJ=SCRIPT]ON OF ACTION
I BUSINESS TELEPHONE
Inc. (516) 283-6360
STATE I ZIP CODE
N.Y. I 11968
SUS~NESS TELEPHCNE
516) 734-6311
STATE i ZIP CODE
N.Y. ~1956
SEE ATTACHED
Please Complete Each Question-Indicate N.A. if not applicable
A. Site Description
Physical setting of overall project, both develoPed and undeveloped areas,
I. Present ]and use: ~Urban ~lndustria[
~Forest ~Agricu[ture
2, Total acreage of project area: 2 o 29 acres,
APPROXIMATE ,ACREAGE
Meadow or Brushland (Non-agricuitura])
Forested
Agricultural (Includes orchards, cropland, pasture, etc.)
Wetland !Freshwater or tidal as per Articles 24, 25 of ECL)
Water Surface .Area
Unvegetated (Rock, earth or fill)
Roads, buildings and other paved surfaces
Other (Indicate type) dirt and bluestone
3. What ['s predominant soil type(s) on project site?
a. Soil drainage:
~Commercial
~Other
~___ Residential (suburban)
.6O
.47
1.22
~RuraJ non-farm
PRESENTLY AFTER COMPLETION
acres acres
acres acres
acres acres
acres acres
acres .6 0 acres
acres acres
acres .3 8 acres
acres 1.31 acres
~_We]l drained % of site ~__L'Moderatety we[] drained 100 % of site
_--Poorly drained 96 of site
b. If an',.' agr:cuJtural land is involved, how many acres of soil are classified within soil group t through z of the NYS
Land "::ass~fication System? N/~ acres. (See ! NYCRR 370).
~.? ~her~- '.--:r ':";; .';utcroopmgs on proiect STte~ ~Yes ~No
PROJECT DESCRIPTION
Replace all bulkheading on southwest side of
marina/shipyard. From east to west: replace (within
18") 3 sides of travel lift slip, 36' 26' 34'
, , ; replace
(within 18") 34' section on south side of boat. storage
building and 22' section on west side of boat storage
building; construct 103' section, easterly 43' of which
will be located immediately south of one story frame
office building to replace a deteriorated retaining wall
located on the north side of that structure; remaining
60' west will be built 18" - 30" in front of existing
bulkhead due to bulges in present bulkhead; replace
(within 18") 33' and 15' bulkhead sections.
Dredge an area up to 10' off 118' of bulkheading to
maximum depth of 4' below MLW. Resultant 100± c.y. of
spoil will be used to. backfill between new and old
bulkheads. Remove existing 3' X 60' of fixed walk
located along southerly bulkhead. Build a 4' X 4'
platform, 3' X 20' hinged ramp, 6' X 60' float. Pour a
new 6' X 12' concrete pad for a gasoline dispenser which
will replace a prior gas pump which was removed.
Existing tank buried in upland will be retained and used.
Purpose of project is to create a stable base for one
story frame office building now suspended over the water
on locust posts. These and deteriorated bulkhead at
north side of building are allowing building to settle
and crack. As new foundation cannot be installed under
building without moving it, we believe this to be the
only method to correct problem.
5. Approximate percentage ,)r proposed prolect site with sJopes:
~ ~15% or greater %
6. Is iJroje~t ,~ubstan. tiaJ[,~ contiguous to, or contain a building, site. or district, listed on the State or the National
Registers of Historic Places? ~Yes ~No
7, ts project substantially contiguous to a site listed on the Register of National Natural Landmarks? ,Yes ENo
8. What is the depth of the water table? 4+ (in feet)
9. Is site located over a primary, principal, or sole source aquifer? ~]Yes liNg
10. Do hunting, fishing or shell fishing opportunities presently exist in the' project area? I-;Yes _--No
11. Does project site contain any species of plant or animal life that is identified as threatened or endangered?
~Yes X-_No According to Roy T,, ~-~e
Identify each species
12. Are there any unique or unusual land forms on the project site? (i.e., c[iffs, dunes, other geological formations)
~Yes :gE No Describe
13. Is the project s~te presently used by the community or neighborhood as an open space or recreation area?
~Yes _--No If yes, explain Commercial ~arina and shiFyard
14. Does the present site include scenic views known to be important to the community? --Ye~ ]~__Xo
15. Streams within or conti~uous to proiect area: N/A
a. Name ot Stream and name of River to which it is tributary
16. Lakes. ponds, wetland areas within or contiguous to project area:
a. Name Schoolhouse Creek
17. is the site served b% existing public utilities? ,.~Yes [~No
a'~ If Yes, does sufficien~ capacity exist to allow connection?
b) If Yes. will improvements be necessary to allow connection?
b. Size (in acres) 500+
-IYes ?'No
~No
t8. is the ,qte located m an agricultural district certified pursuant to AgricuJture and Markets Law. Article 25-AA.
Section 303 and 304? ~Yes '~No
19. Is the site ]ocated in or substantially contiguous to a Cdtica[ Environmental Area designated pursuant to ArtJc[e 8
of ~he ECL. and 6 NYCRR 6177 _~Yes --No
20 Has the site ever been used for the disposal of solid or hazardous wastes? ~Yes ~No
B. Project Description
~. Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contisuous acreage owned or controJled by project sponsor 2,29
b. Project acreage to be developed: . ~ g acres initially;
c. Project acrease to remain undeveloped ] . 91 acres.
d. Length of project, in miles: N/A {If appropriate)
'e. If the proiect is an expansion, indicate percent of expansion proposed redu~t'io~;
f. Number of off-street parking spaces existing 50+-
g. M:~ximum vehicular trips generated per hour
h. If residentia]: Number ~nd type of housing un:its:
One Fami]v Two Family Mu[tiple Family
Inl~laii~ N/A
U!timateiv
: r):m,.n,~on'-'.~n ~e~:t~ of !argest proposed structure 32 height; 42 . width:
~ '::-,' : ........ ~-- :i,m,_,' ~ nub[i[ :horougi~fare protect ,.viii occupy is? 264
acres.
acres ultimatelx,
; proposed
[upon completion of project)?
Condominium
2. How much natural materiat (i.e., rock, earth, etc.) will be removed'from the site?
3. Will dis{'urbed areas be reclaimed? []Yes []No :~N/A
a. *If .yes, for. what intended purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation? r-lYes I-INo
c. Will upper subsoil be stockpiled for reclamation? I-lYes []No
4. How many acres of vegetation (trees, shrubs, ground covers) wilt be removed from site? 0 acres.
5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?
EYes ~No
6. if single phase project: Anticipated period of construction 2
7. tf multi-phased:
a. Total number of phases anticipated
b. Anticipated date of commencement phase 1
c. Approximate completion date of final phase
d. Is phase I functionally dependent on subsequent phases?
8. Will blasting occur during construction? []Yes :~No
9. Number of jobs generated: during construction 6
t0. Number of jobs eliminated by this project 0
11. Will proiect require relocation of any projects or facilities./
(number).
months, (including demolition).
month
month
F'tYes
i,lNo
tons/cubic yards
year, (including demolition).
year.
; after project is complete Z0
[]Yes [~No [f yes, explain
12. ts surface liquid waste disposal involved? iT, Yes IXINo
a. If yes, indicate type of waste (sewage, industrial etc.) and amount
b. Name of water body into which effluent will be discharged
13. Is subsurface liquid waste disposal involved? OYes ]~]No Type
14. Will surface area of an existing water body increase or decrease by proposal?
Explain
15. Is proiect or any portion of project located in a i00 year flood pJain.~ ~Yes
t6. Will the project generate solid waste./ ~Yes
a. If yes, what is the amount per month tons
b. If yes, will an existinB solid waste facility be used? O-Wes I-lNo
c. If yes, give name ; location
d. Will any wastes not go into a sewage 'disposal system or into a sanitary landfill?
e. If Yes. explain
[]Yes ..T~o
~No
F"Yes
17. Will the project involve the disposal of solid waste? l-lYes
a, tf yes, what is the anticipated rate of disposal?
b. If yes. what is the anticipated site life? years.
18. Will proiect use herbicides or pesticides? ~_Yes ~No
19. Will
20. Will
21. Wit[
22.
23.
24
~No
tons/month.
project routinely produce odors (more than one hour per day)? F~Yes :~_No
project produce operating noise exceeding the focal ambient noise levels? I-Wes
l~roject result in an increase in energy use? i~Yes ~No
If yes , indicate type(s)
If water supply is from wells, indicate pumping capacity N/A gallons/minute.
Total anticipated water usage per day ~/A gallons/day.
Does prnrect involve Local, State or Federal funding? -'Yes
~No
25. Approvals Required:
Ckyl~'Tbw~n,~Village' Board ~Yes E~No
City, Town, Village Planning Board ~Yes ~No
City, Town/Z,b~fi/~}'~r~ee tEYes
City, County Health Department OYes ~No
Other Local Agencies ~Yes E:]No
Other Regional Agencies ~Yes i-]No
State Agencies ~Yes ?,No
Federal Agencies I~Yes
C. Zoning and Planning Information
1.
Type
Trustee wetland
DEC TW, DOS CZM
COE ~ec%~on 10,
404
Submittal
Date
10/94
]0/94
Does proposed action involve a plannin§ or zoning decision? OYes iXINo
If Yes, indicate decision required:
~zoning amendment ~zoning variance [:]special use permit f-]subdivision
~new.revision of master plan ~:resource management plan Fl, other
What is the zoning classification(s)of the site? MI, MII
=site plan
3. What is the maximum potential development of the site if developed as permitted by the present zoning?
Marina, shipyard
4. What is the proposed zoning of the site? NO change.
5, What is [he maximum potential development of the site if developed as permitted by the proposed zoning?
N/~
6~ Is the proposed action consistent with the recommended uses in adopted local ]and use plans.~ ~Yes
7. What are the predominant land use(s) and zoning classifications within a ~A mite radius of proposed action?
MI, MII, marinas
8
9.
10
11
12
~No
Is the proposed action compatible with adjoining/surroundin8 land uses within a t,4 mite? :~:]Yes ~No
If the proposed action is the subdMsion of land, how many lots are proposed? N/A
a. What is the minimum lot size proposed?
Will proposed action require any authorization(s) for the formation of sewer or water districts,z ~Yes ~No
Wilt the proposed action create a demand for any community provided services (recreation education, police,
fi~_~ protection)? ~.Yes ~-~'. N o
a. If yes, is existin~ capacity sufficient to handle projected demand? -~Yes =No
Will the proposed act[on result in the generation of traffic significantly above present levels? -!Yes ]~No
a. If yes, is the existing road network adequate to handle the additional traffic.~ =Yes ~.,No
D. Informational Details
· Attach any additional information as may be needed to clarify your project, if there are or may be any adverse
impacts associated with your proposal please discuss such impacts and the measures which you propose to mitigate or
E. Verification
] certif~ that the information, provided above is true to the best of my knowledge.
Appiicant.'Sponsor Name Rov L. Haje Date
Si~jnature Title President Roy L. Haue
if the action ~,; in {he Coastal .Area, and you are a state agency, complete the Coastal Assessmenl Form before proceeding
avoid them.
G,
NEW SUFFOLK ROAD
OVO~
>tToddn~
A4~N
a^o3
9
.i!: '~dNl 'S..LNV. LqF~SNOO'"N~
,oZ' =./ - .~:
N/O/F MICHAEL J. WITHERS
N/O/F 8. G ~-- ~' -----'
AL~XAN~R ~
87'55' E.
40.00'
S. 8T°55'00' E.
t57.56'
SCHooL
HOUs£
ORCHARD STREET
AREA = 2287Acres to tie lines
SURVEY OF
NEW SUFFOLK SHIPYARD
A T NEW SUFFOLK
TO WN OF SOUTHOLD
SUFFOLK COUNTY, N. Y.
1000 - 117 - 05 - 291
Sca/e: 1" =40'
Feb. 14, 1994
April 26~1994 (Dry We/Is~ M.H.W,M,)
Prepar,~d in accordance wJlh the minimum
standards for lille surveys os esloblished
by the t?.A.L.$, and approved and adopted
for suct. use by The New York Side lend
Title A~sociolion.
ORS, P.C.
P. O. BOX 909
MAIN ROAD
SOUTHOLD, N.Y. 11971
94- 105