Board Of Southold Town Trustees
SOUTHOLD, NEW YORK
PERMIT NO. .'-!.s-a:-o
DATE: .' 4/24{96 .
ISSUED TO uuufJ$I:I:ERSI$I,.ANP :F:ERRYDI.sTEJÇX
Autqnrtlatinu
Pursuant to the provisions of Chapter 615 of the Laws of
the State of New York, 1893; and Chapter 404 of the Laws of the
State of New York 1952; and the South old Town Ordinance en-
titled "REGULATING AND THE PLACING OF OBSTRUCTIONS
IN AND ON TOWN WATERS AND PUBLIC LANDS and the
REMOVAL OF SAND, GRAVEL OR OTHER MATERIALS FROM
LANDS UNDER TOWN WATERS;" and in accordance with the
Resolution of The Board adopted at a meeting held on . .41?4196u.
19. 96u, and in consideration of the sum of $ex:empt.. paid by
ofuuuu N. Y. and subject to the
Terms and Conditions listed on the reverse side hereof,""
of Southold Town Trustees authorizes and permits the following: '>:~
Grandfather Permit to reconst. east ramp includ. install. of 65+!~
l.f. of steel sheetpile blkhd. & backfill with 70+ c.y. over 250+ ¡~
s. f. & new counter weight supports & protective dolphins seawar'I;;
of high tide line. Silver ~l Cove Fishers Island Ii':
aU in accordance with the detailed specifications as presented inyt
the originating application. I~
IN WITNESS WHEREOF, The said Board of Trustees h~re- !i~1
by causes its Corporate Seal to be affixed, and these presents to t:J
be "b'c<;b.d by . majodty 01 t~:"Olth;, date. ... ~
kG~~ ,~
¡",j
,;~
t,.)
:r~
;~ì
~:2,:t1~
.........._-Ç\.~.:_;;...__..~.
r"""~T,.,;;~~~'7
~
tø:.'..' -{~Lß.~
" .. ."....
;'. 1
~ -'! ~L~'.;;;' -ro
SïAïE OF NEW YORK
DE?ARTMENT OF STATE
Al8ANY, NY 12231-0001
Al.EXANDER F. TREADWELL
SECRETARY OF STATE
June 4, 1996
Keith B. Neilson
Docko, Inc.
P.O. Box 421
Mystic, CT 06355
Re: F-96-212
U.S. Army Corps of Engineers/New York
District Permit Application #96-03700-12
Fishers Island Ferrv District. Silver Eel Pond
. .
Town of Southold, Suffolk County
DEC #1-4738-00396/00004
Dear Mr. Neilson:
:,iiS
The Department of State has completed its evaluation of your Federal Consistency
Assessment Form and certification that the above proposed permit activity complies with
New York State's approved Coastal Management Program, and will be conducted in a
manner consistent with this program.
Pursuant to 15 CFR Section 930.63, and based upon the project information submitted, the
Department of State concurs with your consistency certification. This concurrence is without
prejudice to, and does not obviate the need to obtain. all other applicable licenses, permits,
and approvals required under existing State statutes.
The U.S. _i\rmy Corps of Engineers is being notified of this decision by copy of this letter.
Sincer~ly, UÎ
¡J/~1n t~;;}.t;J . ¡
Gé7 R Staff" - d ¡It--
orge. <Jr /Ij
Director ¡
Division of Coastal Resources
and Waterfront Revitalization
GRS:KDV:dlb
cc: COE/New York District - Sophie Ettinger
DEC/Region 1- Robert Greene
Town of Southold - Albert Krupski
o printed on recycled paper
"
STATE OF NEW YORK
DEPARTMENT OF STATE
ALBANY, NY 12231-0001
ALEXANDER F. TREADWELL
SECRETARY OF STATE
April 18, 1996
Keith B. Neilson
Docko, Inc.
P.O. Box 421
Mystic, CT 06355
Re: F-96-212
U.S. Army Corps of Engineers/New York
District Permit Application
Fishers Island Ferry District, Silver Eel Pond
Town of Southold. Suffolk County
Acknowled!!ement of Federal Consistency
Assessment Form
Dear Mr. Neilson:
The Department of State received your Federal Consistency Assessment Form and
supporting information on April 12, 1996 and has determined that the submitted
documentation is adequate to commence our review of your proposed project. We will
contact you if additional information may be necessary for consistency review purposes.
You and the Corps of Engineers will be notified of our decision when we have completed
our review of this project for its consistency with the New York State Coastal Management
Program. The Corps of Engineers cannot issue a permit for this project unless the
Department of State concurs with your consistency certification.
Please call Kevin D. Vienneau at (518) 474-6000 j£ you have any questions.
Sincerely, J(
Ú);tltcWn d. M,-I ,
William F. Barton J JlI-
. Chief, Consistency Review
and Analysis Bureau
Division of Coastal Resources
and Waterfront Revitalization
WFB:dlb
cc: COE/New York District - James Haggerty
NYS DEC/Region 1 - Robert Greene
Town of Southold - Albert Krupski
Q printed on recycled paper
- .--., ._--,- ~., "..,-.~ ~--"" ~-'.~--,- .--
Telephone
(516) 765-1801
Town Hall. 53095 Main Road
P.O. Box 1179
Southold, New York 11971
SOUTHOLD TOWN
CONSERVATION ADVISORY COUNCIL
At the meeting of thé Southold Town Conservation Advisory Council held'
Monday, April 22, 1996, the following action was made:
WR-36
The Council did not inspect and therefore cannot make a recommendation for
the Waiver Request of the FISHERS ISLAND FERRY DISTRICT 12-1-10 to
reconstruct the east ramp in the Silver Eel Cove including the installation of
65 +/- I.r. of steel sheetpile bulkhead with backfill (70 +/- c.y. over 250 +/-
s.f.), new counterweight supports, and protective dolphins, waterward of the
high tide line.
Fishers Island
9661 Z Z ~d\f
STATE OF NEW YORK
DEPARTMENT OF STATE
ALBANY. NY 12231-0001
ALEXANDER F. TREADWEL.l.
SECRETARY OF STATE
April 18, 1996
Albert J. Krupski, Jr.
Trustee, Town of Southold
53095 Main Street
P.O. Box 1179
Southold, NY 11971
Re: F-96-212
U.S. Army Corps of Engineers/New York
District Permit Application
Fishers Island Ferry District, Silver Eel Pond
Dear Mr. Krupski:
Enclosed is a copy of the information submitted to the Department of State for review of
the above-referenced project with respect to its consistency with the Coastal Management
Program for your information and preliminary review. Please contact Kevin D. Vienneau,
the DOS reviewer assigned to this project, at (518) 474-6000 to discuss your concerns, and
any additional information which may be necessary to assist you in reviewing this project.
Any comments you may have will assist the Department in reaching a decision as to the
consistency of the proposed action with the approved NYS Coastal Management Program.
Please note, however, that if we do not hear from you within 45 days of the date of tbis
letter, we will presume that you have no objections to the proposed project.
Sincerely, ¡J i?
W)JJ~ciI' V~Á¿ .
William F. Barton 'JU-
Chief, Consistency Review
and Analysis Bureau
Division of Coastal Resources
and Waterfront Revitalization
Enclosures
WFB:dlb
o printed on recycled paper
Docko, Inc.
,
P.O. Box 421, Mystic, CT 06355 (860) 572-8939 Fax: (860) 572-7569
.<:
April 5, 1996
Mr. Albert J. Krupski, President
Southold Board of Trustees
POBox 728
Southold, NY 11971
Re: Fishers Island Ferry District
East Ramp Reconstruction
Dear Mr. Krupski:
On behalf of our client, we request a Waiver for the reconstruction of the existing east ramp,
at the Fishers Island Ferry District property on Fishers Island. We enclose herewith the following
in support of this permit application:
- Two prints each of plans titled:
Project: "East Ramp Reconstruction"
Waterway: Silver Eel Cove
Location: Fishers Island, Town of Southold
Suffolk County, New York
Fishers Island Ferry District
April 1, 1996
Applicant:
Date:
- Two copies of the Southold Board of Trustees permit application pages 1 & 2, Corps
and DEC Applications, Tax Assessor's map, photographs and location map.
I trust that you will fmd this application package complete and acceptable; please let me
know if the need for further information arises.
Very truly yours,
DOCKO, INC.
r;;;¿ iBJ...2kI~
Keith B. Neilson, P.E.
KBN :cmc
Enclosures
cc: Fishers Island Ferry District
ACOE: Jim Haggelty
NYS DEC: Roger Evans
NYS DOS: Corey
File: 95-10-623 - DUPONT.APP
I
f -=>" f
_'UII
ªI
·M"'U"'I
.
'"
ë
== ~
:: -
.S ~ -C :s
'tì .... .2 .;!¡
= 0..... Q
...
~ æ~~
= orZ~!::
o 0 ~
~~Eo;~~
~ .... ~ ~
....o"'i::"'-.o
s<U j ª j ~
= "::"I "'u "'.....
=1-.... ....
~r.:¡ ~= ~.....~
....-~Qa.,)=
~~=C-=:.
~œsJJs..ê"
~
~
íI:)
~
o
íI:)
íI:)
r.:¡
íI:)
íI:)
-<
Þ<
-<
Eo;
~..
:= =
.:.: $ 0
u ¡;. ..
~ ~ ~
.ë'~ u
~~j
~
'"
!!
,
l \
1 o~
1 -=]
1
1 "
.I _,.ru ""0-0-'
11 '(,."
:, -..
/\ 0,
,,t '¡'G>' t
~, c
~ ~
r, ..
'\,
8
- ;¡
~ §
. .
¡ I; ~:
-
~
"'0",
'?z-...
~
..'"
0",
I
~!_~"".
, .
. 1
-- :] --- .
'OQ(o,.nl)
¡~
..
-~.:.
- ~'_"U'()
¡
g~ ~: :1~:;~~;~~~~.:
0-1-'-?oS"
O'''''¡'''Þ>s/
~4'O)
....
=
=I
u
.. "
- ~
Q,....
Q,=I
<Q
i1~!I¡
h.I¡JI ¡
ill:' .¡
1
I! 11 ¡¡i'¡
¡: ..1
a-!w...., i
,',I, !
~~ ~!H
~
.
C\J .
t
;"\'U 0:
o
:
01 I i
61 ! ;
",I :8,
~i :2
01. ;
(1)1 ~: i j
!i' "'I ~ .3
.: .. . ,
~I ~: ¡ j
...
u
~
"
~:
2.2 ~
~ ~ . ~
~~~.2.
o ~~:
> Þ- ~""O.
~ )0. ~ ~
5 tV~
o ¡} ~
u.::
@g
'"
I ;
:¡
,> "
"
I I,
=~"
..~~
!
.
~ ~; Ë t
¡ II
""0.1' ¡ t
td ~.i ~
~j!Jl~
!::t:l
II! I .
It: I ~
1111,
!
~ J ! i g
JHJI
--f~¡"i)
!
I ti 1\
dt
~ I i
~.! Î
>" ! ] I
lJiu"
:~ .j
.. ~ä i ~
,. ·1
. .~,..
! ~~1 i
fJj
i !
I-__J,'
I' ! 32
I !
I
I
,
I
I
I
._--+~----
,
I
I
I
I
I
1
I
,
I
I
I
I
,
I
,
I
I
~!
I", I
'J
It,
! '
I j....
-/
-----
----
30 .~
-----,
, '
----...-----
o . '33
__oj
---
\ ')
/ r/ I C //
, ) /)1
I r / ï _
( \ ~/:Séaflower Reef_/
~!y,g t ------,
J:: --I
/
c/ '
,.
---
. _ V>:-·o---·ì
:"/p.:-Ñ j / 0
1-" '! /
. ! CO/
. - I ~ ",,'
: ! O~'1)O~, /
- '-"~' 'C"
" ~ßJ~O,-,\t / '"
__-ß~_ / .
'-j
35
.
!
/
.... ."
/
/"
>:·1', ß
/'" .......'''''-..,/
,
I
,
I
I
I
I
I
I
"I
I
I
I
I
,
I
I
I
,
'--
@
/1
o
-
\
$
1 \
:?;.::' ··:,:(:{<:..t_____.~:.:...-- _ . --.... .? .
... / / -~>---'\' ') ì - / .0'
... /, 't\\\:~:pµng' (_ __ /~;~::/_
"t:;:;'!/ ~ ' '.: -- ~-:;~~:S(' ~'
\) ~\,~~,,,, /:'/'~'~{~ "J
~I,;' /, ',:~__,.'! ~ /./ 11\ .,\ Ham"1ock /(!4)
I,' 1'1:r'Y!- S u.th; --\i.'.;' 'I ,
:' I' ¡'/ I -..'!',' umpHng. '~)·:I / ,'_', / "
' j, " \.. ". G'/ .-/'
i '\ "L........//"""\ ~-~ /~~ ./ __ -30
\. IJ', " . ,
o
Ii{
/
I
/
LOCATION MAP
Project:
Waterway:
Location:
°East Ramp Reconstruction"
Silver Eel Cove
Fishers Island, Town of Southold
Suffolk County, New York
Fishers Island Ferry District
April 1, 1996
'c~:
Applicant:
Date: "
-------
/"
/
(
1.
\
)
",~
'~"'"
,
23-
c<
17
"
,
,
,
"
"
"
"
,
",
,
"'"
45: '"
,
"
"
,
"
37
S 0
,
,
,
,
'èO-~
"
'------..
----\
\
)
ISLAND- "
22
.'
. 3t
\ 42
\43
\
\
\
43 \45
\
58
- -/
/29
I
I
I
LOCATION
MAPREF CHART 12372
GRAPHIC SCALE
1000 YARDS
1000 500 0
o
o
~
o ~e
o 0
00
00
000
o 0
o (.._._. 00 0
.......... ----__ 00
.-....-. ..........--.,
.J .'\
\
,
I
FIS HERS IS LAND
SOUND
~
-^-^-^--
-^--^--^-
N/F ./
GADA F AMIL Y /
PARTNERSHIP /
EQUESTRIAN AVE .1"'/
FISHERS ISy NY/'~
06390 ,.
~
GENERAL NOTES
1. Elevations shown are based upon
mean low water (MLW). Reference is
made to the conversion related to Silver Eel.
2. Tidal data is referenced to the NOAA
1996 tide tables.
3. Project Descrition:
Reconstruction of the east ramp in the Silver Eel Cove
including the installation of 65 +/- If of steel
sheetpile bulkhead, new counterweight supports,
and protective dolph ins, waterward of the high tide line.
4. Project Purpose:
Reconstruct the existing east ramp for the Fishers Island
Ferry Terminal.
5. These drawings represent a class 'D' map for permit purpose
only; they are not Constuction Contract Documents
I
\ (", N/F
I i \ GADA FAMILY
\ (. "
. '-.-,,'
\. . ..;
o 0
SILVER EEL
COVE
~""
/)~'i'Ji¡~~ .-
~~~~
OVERALL PLAN VIEW
~
-^--^--^-
-^--^--^-
PROJECT:
ORIGINAL SCALE:
'·-200'
200
100
o
.......
TOWN OF
SOUTHOLD
PROJECT:
EAST RAMP RECONSTRUCTION
LOCATION:
WATERWAY:
DATE:
APPLICANT:
FISHERS ISLAND, TOWN OF SOUlHOLD
SUFFOCK COUNTY, NEW YORK
SILVER EEL POND
APRIL 1, 1996
FISHERS ISLAND
FERRY DISTRICT
SHEET 1 OF 4
AGENT -
DOCKO, INC.
P_O_ BOX 421, MYSTIC, CT 06355
860 572 8939 FAX 572 7569
Mopping Prepared by
RESOURCE MANAGEMENT a. HA....ING
ABOVE:
East ramp as seen from the bridge of MV MUNNA TAUCKET upon arrivaJI at Silver Eel Cove
on Fishers Island. Note proximity of ramp favoring port side of the ferry necessitating
widening to the east. Photographs taken early March 1996.
BELOW:
Closeup view of the northeast comer of the bulkhead system with deteriorated steel sheet
piling, cap and fence along east boundary of existing bulkhead in area to be widened to
accommodate 18' wide ramp. Ramp support beam is visible just below the center of the
photograph. Ramp counterweight tower is visible along right edge of photograph.
-.- ~~~~~-+ .JPr'::~~
. .. ~~. .
~.
,.......-;
""';-
Cocko, Inc.
P.O. Box 421, Mystic, CT 06355 (860) 572-8939 Fax: (860) 572-7569
April 5, 1996
Mr. James Haggerty
US Army Corps of Engineers
Jacob Javits Federal Center, Room 1937
New York NY 10278-0090
Re: . Fishers Island Ferry District
East Ramp Reconstruction
Dear Mr. Haggerty:
On behalf of the Fishers Island Ferry District, we request a Department of the Army
Nationwide Pemùt for reconstruction of an existing ramp at the property of the Ferry District on
Fishers Island, New York. We enclose herewith the following in support of this pemùt
application:
- Two prints each of plans titled:
Project: "East Ramp Reconstruction"
Waterway: Silver Eel Cove
Location: Fishers Island, Town of Southold
Suffolk County, New York
Fishers Island Ferry District
April 1, 1996
Applicant:
Date:
- Two copies of Corps of Engineers and DEC Application Forms
- Two copies of Location Map and Tax Assessor's Map
I trust that you will frod this application package complete and acceptable; please let me
know if the need for further information arises.
Very truly yours,
DOCKO, INC.
{ødøJJ~
Keith B. Neilson, P.E.
KBN:cmc
Enclosures
cc: Fishers Island Ferry District
NYS DEC: Roger Evans
Town of Southo1d: Albert 1. Krupski
NYS DOS: Corey
File: 95-10-623 DUPONT.APP
APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT
(33 CFR 325)
OMB APPROVAL NO. 0702-0036
Expires 30 June 1992
Pùblic reporting burden for tlús collection of information is estimated to average 5 hours per response for the majority of cases, including the time for reviewing
instructions, searching existing data sources, gathering and maintaitùng the data needed, and completing and reviewing Ibe collection of information. Applications for
larger or more complex projecrs, or those in ecologically sensitive areas, will take longer. Send comments regarding this burden estimate or any other aspect of this
collection of informatiœ, including suggestions for reducing this burden, to Washington headquarters Services, Directorate for informatiœ Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302; and to the Office of information and RegulatoIY Affairs, Office of Management and Budget,
Washington, DC 20503.
The Department of the Army permit program is authorized by Sectiœ 10 of the Rivers and Harbors Act of 1899, Sectiœ 404 of the Clean Water Act and Section 103
of the Marine, Protection, Research and Sanctuaries Act. These laws require permits authorizing activities in or affecting navigable waters of the United States, and the
transportation of dredged material for the purpose of dumping it into ocean waters. Information provided on this form will be used in evaluating the applicatiœ for a
permit. Information in this application is made a matter of public record through issuance of a public notice. Disclosure of the information requested is voluntary;
however, the data requested are necessary in order to communicate with the applicant and to evaluate the permit application. If necessa¡y information is not provided,
the permit applicatiœ cannot be processed nor can a permit be issued.
One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to tlús application (see sample
drawings and iustructious) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed
in full will be returned.
1. APPLICATION NUMBER (To be as¡¡igned by Corps)
3. NAME, ADDRESS, AND TITLE OF AUTHORIZED AGENT
DOCKO, JNC., KEITH B. NELSON, P.E.
P. O. BOX 421
MYSTIC CT 06355
2. NAME AND ADDRESS OF APPLICANT
MR. REYNOLDS DUPONT, JR, CHARIMAN
FISHERS ISLAND FERRY DISTRICT
POBOX H
FISHERS ISLAND NY 06390
Telephone no. during business hours
AlC ( )
AlC (203 ) 572-8939
(Residence)
(Office)
Telephone no. during business hours
Statement of Authorization: I hereby designate and authorize
DOCKO. JNC. to act in
my behalf as my agent in the processing of tlús permit application and to
furnish, upon request, supplemental information in support of the application.
AlC (516)
788-7873
(Office)
AlC
(Residence)
4. DETAILED DESCRIPTION OF PROPOSED ACTIVITY
4a. ACTIVITY
RECONSTRUCTION OF THE EAST RAMP IN. THE SILVER EEL COVE JNCLUDING THE INSTALLATION OF
65,:: LF OF STEEL SHEETPILE BULKHEAD WITH BACKFILL (70,:: CY OVER 250,:: SF), NEW COUNTERWEIGHT
SUPPORTS AND PROTECTIVE DOLPHJNS, WATERWARD OF THE HIGH TIDE LJNE.
4b. PURPOSE
RECONSTRUCT THE EXISTJNG EAST RAMP FOR THE FISHERS ISLAND FERRY TERMINAL. THIS IS A PUBLIC
TRANSPORTATION FACILITY.
4c. DISCHARGE OF DREDGED OR FILL MATERIAL
NOT APPLICABLE
5. NAMES AND ADDRESSES OF ADJOINING PROPERTY OWNERS, LESSEES, ETC., WHOSE PROPERTY ALSO ADJOINS THE WATlli{WAY
EAST: TOWN OF SOUTHOLD, POBOX 728, SOUTHOLD NY 11971
WEST: U.S. COAST GUARD STATION, C/O COAST GUARD STATION NEW LONDON, CT 06320
I
6. WATERBODY AND LOCATION ON WATERBODY WHERE ACTIVITY EXISTS OR IS PROPOSED
THE SITE IS LOCATED ALONG THE SOUTHWESTERN SHORE OF SILVER EEL COVE.
7. LOCATION ON LAND WHERE ACTIVITY EXISTS OR IS PROPOSED i
¡
ADDRESS: I
THE SITE IS LOCATED ON FISHERS ISLAND AS SHOWN ON THE ATTACHED LOCATION MAP AND
ASSESSORS MAP, AT THE WEST END OF TRUMBULL DRIVE AT THE FISHERS ISLAND FERRY TERMINAL.
STREET, ROAD, ROUTE OR OTHER DESCRIPTIVE LOCATION
SUFFOLK NEW YORK 06390
COUNTY STATE ZIP CODE
TOWN OF SOUTHOLD, BOARD OF TRUSTEES
LOCAL GOVERNING BODY WITH JURISDICTION OVlli{ SITE
8. Is lUly portion of the activity for which authorization sought now complete? [ ] YES [X] NO
If answer is "yes" give reasons, month IUld year the activity was completed. Indicate the existing work 01\ the drawings.
THE EXISTING RAMP HAS BEEN IN OPERATION FOR APPROXIMATELY 30 YEARS.
9. List all approvals or certifications and dettlals received from other federal, intelBtate, state or local agencies for any structnres, construction, discharges or other
activities described in this application;
ISSUING AGENCY TYPE APPROVAL IDENTIFICATION NO. DATE OF APPLICATION DATE OF APPROVAL DATE OF DENIAL
NYS DEC TIDAL WETLANDS PENDING APRIL 5, 1996 PENDING
SOUTHOLD AMENDMENT PENDING APRIL 5, 1996 PENDING
BOARD OF TRUSTEES
10. Application is hereby made for a permit or permits to authorize the activities described herein. I certify that I am fillIliliar with the information contained in the
applicatiol~ and that to the best of my knowledge and belief snch Ìlúormation is tme, complete, and acenrate. I further certify that I possess the authority to
wldertaIœ the proposed activities or I am -acting as the dnly authorized agent of the applicant
. (d ®J~L{/'111ro
SIGNATURE OF APPLICANT DATE SIGNATURE OF AGENT DATE
REYNOLDS DUPONT JR, CHARIMAN DOCKO, INC., KEITH B. NEILSON
FISHERS ISLAND FERRY DISTRICT
TIle application must be signed by the person who desires to oodertaIœ the proposed activity (applicant) or it may be signed by a dnly autllorized agetlt if the statement
in block 3 bas been filled out and signed.
18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of TIle Ultlted States knowingly and willfnlly
falsifies, conceals, or covers up by any tric~ scheme, or device a material fact or makes any false, fictitious or fraudulent statements or representations Of makes or uses
any false writing or doClllllent knowing same contain any false fictitious or fraudulent statement or entry, shall be fined not more than $10,000 or imprisoned not more
than five yea!S, or both.
Docko, Inc.
~ P.O. Box 421, Mystic, CT 06355 (860) 572-8939 Fax: (860) 572-7569
April 5, 1996
Mr. Michael Corey
NYS DOS
162 Washington Avenue
Albany NY 12230
Re: Fishers Island Ferry District
East Ramp Reconstruction
Dear Mr. Corey:
On behalf of the Fishers Island Ferry District I have prepared pennit application documents to the
U.S. Army Corps of Engineers, State DEC and Town of Southold for East Ramp Reconstruction at
their Fishers Island, New York terminal. Enclosed is the coastal consistency work sheet for this project
for your review. In addition we enclose the following in support of this application:
- One set of plans titled:
Project: "East Ramp Reconstruction"
Waterway: Silver Eel Cove
Location: Fishers Island, Town of Southold
Suffolk County, New York
Fishers Island Ferry District
April I, 1996
Applicant:
Date:
- A copy of the DEC Joint Application, including the Short Environmental Assessment Form,
Tax Assessors Map and location plan, U.S. ACOE and Town pennit applications.
I trust that you will fmd this application package complete and acceptable; please let me know if
the need for further information arises.
Very truly yours,
DOCKO, INC.
~~!ir--
Keith B. Neilson
KBN:cmc
Enclosures
cc: Fishers Island Ferry District
ACOE: Jim Haggerty
Town of Southold
NYS DEC: Roger Evans
File: 95-10-623 DUPONT.APP
._~_.~- ~ ~,.;....-_...~ -- --. . .... -.-......... "'''' ..... '"""....
COASTAL MANAG!:MËÌ\lT PROGRAM
Federal Consistencv Assessment Form
An applicant,seeking a permit, license, waiver, certification or similar type of approval from a federal agency which is subject to
the New York State Coastal Management Program (CMP, shall complete this assessment form for any proposed activity that will
occur within and/or directly affect the State's Coastal Area. This form is intended to assist an applicant in certifying that the
proposed activity is consistent with New York State's CMP as required by U.S. Department of Commerce regulations (15 CFR
930.57). It should be completed at the time when the federal application is prepared. The Department of State will use the
completed form and accompanying information in its review of the applicant's certification of consistency.
A. APPLICANT
1. Name: Fishers Islañd Ferry District, Reynolds duPont, Jr., Chariman
(please print)
2. Address: POBox H, Fishers Island, NY 06390
3. Telephone: Area Code (51 q 788-7873
B. PROPOSED ACTIVITY
1. Brief description of activity: Reconstruction of the east ramp in the Silver Eel Pond, including
the installation of 65± LF of steel sheetpile bulkhead with backfill (70± CY over 250±
SF), new counterweight supp:>rts and protective dolphins waterward of the high tide Un
2. Purpose of activity: Reconstruct the existing east ramp for the Fishers Island Ferry
District.
3. Location of activity:
Suffolk
County
ToWn of Southold
Southwest shore of Silver
Eel Pond.
City, Town or Village
Street or Site Description
4. Type of federal ¡)ermitllicense required:
5. Federal application number, if known:
6. If a state permit/license was issued or is required for the proposed activity. identify the state agency and provide the
application or permit number, if known:
C. COASTAL ASSESSMENT Check either "YES" or "NO" for each of the following questions. The numbers following each
question refer to the policies described in the CMP document (see footnote on page 2) which may be affected by the proposed
a. Waterfront site? (2, 21, 221 . . . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b. Provision of new public services or infrastructure in undeveloped or sparsely populated
sections of the coastal area? (51 .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
c. Construction or reconstruction of a flood or erosion control structure? (13, 14, 1 6) . . . . . . . . . . . . .
d. State water quality permit or certification? (3D, 38, 40) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
e. State air quality permit or certification? (41, 431 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
YES NO
X
1L
X-
.x-
1L
x
3. Will the proposed activity reauire any of the following
4. Will the proposed activity occur within and/or affect an area covered by a State approved local
waterfront revitalization program? (see policies in local program document'l . . . . . . . . . . . . . . . . . . . . .
D. ADDITIONAL STEPS
1. If all of the questions in Section C are answered" NO", then the applicant or agency shall complete Section E and submit
the documentation required by Section F.
2. If any of the questions in Section C are answered "YES", then the applicant or agent is advised to consult the CMP, or
where appropriate, the local waterfront revitalization program document'. The proposed activity must be analyzed in more
detail with respect to the applicable state or local coastal policies. In the space provided below or on a separate pagels}'
the applicant or agent shall: (a) identify, by their policy numbers, which coastal policies are affected by the activity, (bl
briefly assess the effects of the activity upon the policy; and, (c) state how the activity is consistent with each policy.
Following the completion of this written assessment, the applicant or agency shall complete Section E and submit the
documentation required by Section F.
E. CERTtFICA TION
The applicant or agent must certify that the proposed activity is consistent with the State's CMP or the approved local
waterfront revitalization program, as appropriate. If this certification cannot be made, the proposed activitv shall not be
undertaken. If this certification can be made, complete this Section.
"The proposed activity complies with New York State's approved Coastal Management Program, or with the applicable approved
local waterfront revitalization program, ane will be conducted in a manner consistent with such program."
Applicant/Agent's Name:
Docke, Inc., Keith B. Neilson, P .E.
Address:
POBox 421, Mvstic cr 06355
Applicant/Agent's Signature:
p;:;t ¡:¿J a:2 ~
I
Telephone: Area Code ( 86~
Date:
tile; (0¡0
F. SUBMISSION REQUIREMENTS
1. The applicant or agent shall submit the following documents to the New York State Department of State, Division of
Coastal Resources and Waterfront Revitalization, 162 Washington Avenue, Albany, New York 12231.
a. Original signed form.
. .
r
ENVIRONMENTAL QUESTIONNAIRE
This is intended to supplement ENG Form 4345, Application for Department of the
Army Permit, or the Joint Application for Permit used in the State of New York.
.. Please provide complete answers to all questions below which are relevant to your
project. Any answers may be continued on separate sheet(s) of paper to be
attached to this form.
PRIVACY ACT STA TEMENT
The purpose-of this form is to" provide the Corps of Engineers with basic information
regarding your project. This information will be used to facilitate evaluation of your
permit application and for public dissemination as required by regulation. Failure to
provide complete information may ·result in your application being declared
incomplete for processing, thereby delaying processing of your application.
. GENERAL--APPLICABLE TO ALL PROJECTS
1. Explain the need for, and purpose of, the proposed work.
See Attached Narrative and
Drawings.
-2. Provide the names and addresses of property owners adjacent to your work site
(if not shown on the application form or project drawings).
"
(Please note that depending upon the nature and extent of your project, you may
be requested to provide the names and addresses of additional property owners
proximate to your project site to ensure proper coordination.)
3. Photographs of the project site should be submitted. For projects in tidal areas,
photographs of the waterway vicinity should be taken at low tide. Using a separate
copy of your plan view, indicate the·locationand direction of each photograph as
well as the date and time at which the photograph was taken. Provide a sufficient
number of photographs so as to provide a clear ljnderstandiÓd of conditions on and
proximate to your project site.
4. Provide a copy of any environmental impact statement, ofiaoy other environmental
report which was prepared for your projeèt.
(continued on next page)
Page 1
5. Provide a thorough discussion of alternatives to your proposal This discussion
shòuld include, but"iiot necessaT/7y be liir1itød to, the "no action" alternative and
alternative(s) resulting in less _disturbance to waters of the United States. For filling
projects in waters of the United States, including wetlands, your alternatives
,. discussion should demonstrate that there are no practicable alternatives to your
proposed filling and that your project meets with current mitigation policy (i.e.
avoidance, minimization and compensation).
DREDGING PROJECTS
Answer the following if your project involves dredging.
1. Indicate the estimated volume of material to be dredged and the depth (below
mean low water) to which dredging would occur. Would there be overdepth
dredging?
2~ You can apply for a ten-year permit for maintenance dredging. If you wish to
apply for a ten-year permit, please provide the number of additional dredging events
during the ten-year life of the permit and the amount of material to be removed
during future events.
3. Indicate of your drawings the dewatering area {if applicable} and disposal site for
the dredged material (except landfJ71 sites). Submit a sufficient number of
photographs of the dewatering. and disposal sites as applicable so as to provide a
clear indication of existing conditions. For ten-year maintenance dredging permits,
indicate the dewatering/disposal sites for future dredging events, if known.
4. Describe the method of dredging (i.e. clamshell, dragline, etc.) and the expected
duration of dredging.
....
5. Indicate the physical nature of the material to be dredged (i. e. sand, silt, clay,
etc.) and provide estimated percentages of the various cons'titP,ents if available. For
beach nourishment projects, grain size analysis data is required.
'-
(continued on next page)
Page 2
6. Describe the method of dredged material containment (i.e. hay bales,
embankment, bulkhead, etc.) and whether return flow from the dewatering/disposal
site would reenter any waterway. Also indicate if there would be any barge
overflow. .
MOORING FACILITIES
Answer the fol/owing if your project includes the construction or rehabilitation of
recreational mooring facilities.
1. It is generally recommended that any fixed piers and walk ramps be limited to four
feet in width, and that floats be limited to eight feet in width and rest at least two
feet above the waterway bottom at mean low water. Terminal floats at private, non-
commercial facilities should be limited to 20 feet in length. If you do not believe
your proposal can meet with these recommendations, please provide the reason{s).
2. Using your plan view, show to scale the location(s), position{s) and size(s)
(including length, beam and draft) of vesse/{s) to be moored at the proposed facility,
including those of transient vessel(s) if known.
3. For commercial mooring sites such as marinas, indicate the capacity of the facility
and indicate on the plan view the location{s) of any proposed fueling and/or sewage
pumpout facilities. If pumpout facilities are not planned, please discuss the rationale
below and indicate the distance to the nearest available pumpOllt station.
4. Indicate on your plan view the distance to adjacent marine structures, if any are
proximate and show the locations and dimensions of such stf'(¡ctures.
'.0-:,.
"- .
.~-
(continued on next page)
Page 3
5. Discuss the need for wave protection at the proposed facility. Please be advised
that if a permit is issued, you would be required to recognize that the moorina
facility may be subject to wave action from wakes of passing vessels, whosë
operations would not be required to be modified. Issuance of a permit would not
relieve you of ensuring the integrity of the authorized structure{s} and the United
States would not be held responsible for damages to the structure{s} and vessel{s}
moored thereto· from wakes from passing vessels.
BULKHEADING/BANK STABILIZA TION/FILLlNG ACTIVITIES
Answer the following if your project includes construction of bUlkheading {also
. retaining_walls and seawalls} with backfill, filling of waters/wetlands, or any other
bank stabilization fills such as riprap, revetments; gabions, etc.
1. Indicate the total volume of fill (including backfill behind a structure such as a
bulkhead) as well as the volume of fill to be placed into waters of the United States.
The amount of fill in waters of the United States can be deteimined by calculating
the amount of fl71 to be placed below the plane of spring higb tide in tidal areas and
below ordinary high. water in non-tidal areas.
2; Indicate the source{s} and type{s} of fill material.
3. Indicate the method of .fill placement {i.e. by hand, bulldozeF, crane, etc.}. Would
any temporary fills be required in waterways or wetlands to provide access for
construction equipment? If so, please indicate the area of such waters and/or
wetlands to be filled, and show on the plan and sectional views.
The foregoing requests basic information on the most common types of projects
requiring Department of the Army permits. It is intended to 15bviate or reduce the
need for requesting additional information; however, additional information may be
requested above and beyond what is requested in this form.-
". -" . ~~.
Please feel free to add any additional information regarding your project which you
believe may facilitate our review. __
Page 4
Cocko, Inc.
~-
P.O. Box 421, Mystic, CT 06355 (860) 572-8939 Fax: (860) 572-7569
April 5, 1996
Mr. Roger Evans
NYS DEC, Regulatory Affairs
Building 40, SUNY
Stony Brook, NY 11790-2356
Re: Fishers Island Ferry District
East Ramp Reconstruction
Dear Mr. Evans:
On beha1f of the Fishers Island Ferry District, we request a Tidal Wetlands Permit,
including Water Quality Certifications, as necessary, for the East Ramp Reconstruction at their
Fishers Island, New York terminal. We enclose the following in support of this permit
application:
- Four prints each of plans titled:
Project: "East Ramp Reconstruction"
Waterway: Silver Eel Cove
Location: Fishers Island, Town of Southold
Suffolk County, New York
Fishers Island Ferry District
April I, 1996
Applicant:
Date:
- Three copies of the DEC Joint Application, including the Short Enviromnental
Assessment Form, Tax Assessor's Map and location plan as well as
Army Corps of Engineers and Town Permit Applications.
I trust that you will [md this application package complete and acceptable; please let me
know if the need for further infonnation arises.
Very truly yours,
DOCKO, INC.
r:¥~
Keith B. Neilson
KBN:cmc
Enclosures
cc: Fishers Island Ferry District
ACOE: Jim Haggerty
Town of Southold
NYS DOS: Corey
File: 95-10-623 - DUPONT.APP
April 5, 1996
Mr. Roger Evans
NYS Department of Environmental Conservation
Division of Regulatory Services
Region 1 NYS DEC Region 1 Headquarters
SUNY Campus, Building 40
Stony Brook NY 11794
Re: Fishers Island Ferry District
East Ramp Reconstruction
Agent Authorization
Dear. Mr. Evans:
Please accept this letter as authorization for Mr. Keith Neilson of Docko, Inc. to act as
our agent for the Fishers Island Ferry District's east ramp reconstruction project requested at our
property on Fishers Island. Suffolk C01illty Tax Map #1000-012, Block 1, Lot 10.
Yours truly, ~ ¿
CðYVVttLSS~ -. ..... ~
J~/ U'Iit.ü/ckcLfb-nf; 'Tv. (!l~>W'-Ct~
/ v - Reynolds duPont, Jr., Chairman
Fishers Island Ferry District
cc:FILE
95·19-3 (6I95)-7e DEC APPLICATION NUMBER
NEW YORK STATE 0 (, n f]
DEPA'RTMENT OF ENVIRONMENTAL CONSERVATION : '.,:
UNITED STATES ARMY CORPS OF ENGINEERS US ARMY CORPS APPLICATION NO
JOINT APPLICATION FOR PERMIT
Please read ALL Instructions on back before completing this application. Please type or print clearly In Ink. Attach additional information as needed.
o FRESHWATER WETLANDS OTIDAi. WETLANDS 0 WATER SUPPLY 0 LONG ISLAND WELL
o PROTECTION OF WATERS FOR:
o A. Construction or placement of docks and moorings 0 B. Construction, reconstruction, or repair of a DAM or other impoundment structure
o C. Disturbance of a STREAM BED or BANKS or excavation in or fill 01 NAVIGABLE WATERS 0401 WATER QUALITY CERTIFICATION
o COASTAL EROSION CONTROL 0 LAKE GEORGE PARK COMMISSION (Docks and Moorings) 0 WILD, SCENIC OR RECREATIONAL RIVERS
o AQUATIC PEST CONTROL FOR: 0 A. Aquatic Vegetation Control 0 B. Fish Control 0 C_ Insect Control
1. LIST PREVIOUS PERMIT/APPLICATION NUMBERS AND DATES (If any) IF OTHER THAN INDIVIDUAL, PROVIDE
TAXPAYER ID NUMBER
DISTRIBUTION
1st COpy Permit Administrator
2nd COPY Corps of Engineers
3rd COpy Program
4th COPY NYS Agency
5th COpy Applicant
2. APPLICANT IS AlAN
o Owner
3. NAME OF APPLICANT (Use Full Name)
Fishers Island Ferry District, Reynolds duPont, Jr.
MAILING ADDRESS
POBox H
POST OFFICE
Fishers Island
4. NAME OF 0 Owner JQ9 Agent/Contact Person
Docko Inc. Keith B. Neilson P.E.
MAILING ADDRESS
POBox 421
POST OFFICE
Mystic
5. PROJECTJFACILITY LOCATION (Mark location on map, see Number 1a on reverse side)
County ·Suffolk I Town or city Town of Southold
STREET ADDRESS/LOCATION (If different from applicant)
Trumbull Drive, Fishers Island
POST OFFICE
POBoxH
6. NAME OF STREAM OR BODY OF WATER
·0 Operator
o Lessee
ŒJ Municipality/Governmental Agency
(Check as many as apply)
(Check one)
ZIP CODE
06390 .
I Village Fishers Island
ZIP CODE
NY 06390
Silver Eel Çove
DEC USE ONLY
NYTM·E
NYTM-N 4
7. HAS WORK BEGUN ON PROJECT?
Show work on map and/or drawing.
It YES, attach explanation on starting work without permit, include dates_
DYes ffio
10. PROPOSED USE:
¡¡aprlvate 0 Public
o Commercial
8_ PROPOSED STARTING DATE
May 1996
11_ WILL PROJECT OCCUpy STATE LAND?
DYes aNo
9. APPROXIMATE COMPLETION DATE
May 1996
12. PROPOSED PURPOSE:
Reconstlnct the existing east ramp for the Fishers Island Ferry Terminal.
13. PROJECT DESCRIPTION: (e.g. quantity and type of material to be excavated, dredged or used lor fill or rip rap, location of disposal sites; type of
structure to be installed; height of dam; size of impoundment; capacities of proposed water sources; extent of distribution system; size of marina
and type of docks and moorings to be installed; etc.)
Reconstruction of the east ramp in thr Silver Eel Pond including the installation of
65± LF· of steel sheetpile bulkhead with backfill (70± CY over 250±SF), new counter-
weight,supports and protective dolphins waterward of the high tide line.
14. WILL THIS PROJECT REQUIRE ADDITIONAL FEDERAL, STAT.E AND/OR LOCAL PERMITS?
Town of Southold, NYS OOS
15. Separate Authorization or Leller 01 NO JURISDICTION Should be Received from DEC and the US Army Corps Prior to Initiation of Work in Wetlands
and Waterways.
I hereby afUrm that information provided on this form and all attachments submitted herewith is true to the best of my knowledge and belief.
FaJse statements made herein are punishable as a Class A misdemeanor pursuant to. Section 210.45 of the Penal Law. Further, the applicant accepts
tul! responsibility for all damage, direct or indirect, of whatever nature, and by whomever suffered, arising out of the project described herein and agrees
to indemnify and save harmless the State from suits, actions, damages and costs of every name and description resulting from said project. In addition,
Federal Law, 18 U.S.C. Section 1001 provides lor a fine of not more than $10,000 or imprisonment for not more than five years, or both, where an
applicant knowingly and willfully falsifies, conceals, or covers up a material fact; or knowingly makes or uses a false, fictitious or fraudulent statement.
o I her y authorize e agent named in Num . abo s mit this plication on m¥lehaly. t? I ~ /'\ f. <
ft. Rt'101, .'¡; ciJ(Ovv J IF ~t v-íA^6lv-.-
IIILt:
c¡ c¡ (p
A President, ~, lric.
:xx Yes
o No
If yes, please list:
>.----------
-----.
.- ._.._-_...,-_.._--.~--
rrèñi iiI-iúi"W¡n"'ii1i.~jAi.. ~i:OO_l;;ftl (10 OoC;¡\JIH¡:m:Höa ú)'" A¡;jÜi1Cyj
A. DOES ACTION EXCEED ANV TYPE I THRESHOLD IN 6 NVCRR. PART 617.4? If ~~'. coordlnal~ Ih~ ,~Yi~w proc~.. .nd u.e I~ FU~~ EAF.
Dv.a ONo
B. WI~L ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR, !'ART 617.6? If No, a nagatiYell8claration
may be superaed8Ø by anoth.r InvOlved ag.ncy.
Dv" DNo
C. COULD ACTION RESULT IN ANv ADVERSE EFFECTS ASSOCIATED WITH THE FOLLOWING: (An.wers ma~ be handwrillen, if legible)
CI. Existing air quality, surlac. or groundwater quality or quanlily, nols. leyels, exisllng traWc patterns, $Olld waste production or disposal,
potential lor .roalon, dralnag. or 1I0000Ing probl.ma? Explain briefly:
C2. Aesthetic, agricultural, archaeological, hisloric, or olher natural or cultural resources: or community or neighborhOod character? Explain brlelly:
C3. Vegetallon or launa, 111111, ahel/ll8h or wlldl/le apeciee, .Ignlficanl habilat., or threatened or endangered species? Explain brlell~:
.
04. A community's exlallng piana or goal. as oftlclall~ adopted, or a change In use or inten.il~ 01 use of land or other natural resources? Explain briefl~
05. Growth, aubMquent Ø8velopment, or related activitiea likely to be induced by Ihe proposed action? explain briefly.
ca. Long term, a/Ioft t8llll, cumulative, or olher .tfecla not Identified In C1-c5? explain brlelly.
C7. Other impacta (Including cI1angtlln uae of .ither quanlily or Iype of energy)? Explain briefly.
..
..
D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTA~ CHARACTERISTICS THAT CAUSED THE ESTAB~ISHMENT OF A CEA?
OVes ONo
E. IS THERE. OR IS THERE UKELV TO BE, CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS?
o Yea 0 No If V.s, explain briefly
PART Ill-DETERMINATION OF SIGNIFICANCE (To be completed by Agency)
INSTRUCTIONS: For each adverse effect Identified above, determine whether it is substantial, large, important or otherwise significant.
Each effect should be assessed In connection with its (a) setting (i.e. urban or rural); (b) probability of occurring; (c) duration; (d)
Irreversibility; (e) geographic scope; and (f) magnitude. If necessary, add attachments or reference supporting materials. Ensure that
explanations contain sufficient delail to show that all relevant adverse impacts have been idenli fied and adequately addressed. If
question D of Part II was checked yes, Ihe determination and significance must evaluate the potential impact ot the proposed action
on the environmental characteristics of the CEA.
o
o
Check this box if you have identified one or more potentially large or significant adverse impacts which MAY
occur. Then proceed directly to the FULL EAF and/or prepare a positive declaration.
Check this box (f you have determined, based on the information and analysis above and any supporting
documentation, that the proposed action WILL NOT result in any significanl adverse environmental impacts
AND provide on attachments as necessarY. the reasons supporting this determination:
Name of Lead ^¡ency
Prml or Type Na.me of Responsible Officer in Lead ^Kency
Titl~ of Responsible Ofiicer
.
Sianature of Responsible Officer in Lei.d Aeency
SI&nature or Preparer (If different from re)ponsible officer)
Date
2
Albert J. Krupski, President
John Holzapfel, Vice President
Jim King
Martin H. Garrell
Peter Wenczel
Town Hall
53095 Main Road
P.O. Box 1179
Southold, New York 11971
Telephone (516) 765-1892 .
Fax (516) 765-1823
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Þ eµl€b
'1/.a.1. {n
1&-. F .
ùffice Use Only
. Coastal Erosion Permit Application
~tland Permit Application
father Permit Application
AV aive endment/C ng~
Received Applicatiçm: ¿If/&,
Received Fee:$
Completed Application
" ~complete .
SEQRA Classification:
Type I_Type II /Unlisted.
oordination:(date s~~ .
CAC Referral Sent: V L~-
r1)ate of Inspection: ''I "1,~
Receipt of CAC Repor: I
Lead Agency Determination:
Technical Review:
Public Hearing Held: 1.(1..2-0/ If'
Resolution: I f
APR
2 !996
Name of Applicant
Fishers Island Ferry District
Address
POBox H, Fishers Island NY 06390
Phone Number: (516) 788-7873.
Suffolk County Tax Map Number: 1000 - 012-1-10
Property Location: West end of Trumbull Drive.
Docko, Inc., Keith B. Neilson, F.E.
(provide LILCO Pole i, distance to cross streets, and location)
AGENT: Dock.o, Inc., Keith B. Neilson, P .E.
(If applicablê~-"
Address: POBox 421, Mystic cr 06355
Phone: (860) 572-8939
FAX# : (860) 572-7569
1
Board of Trustees Applic~~ion
GENERAL DATA
Land Area (in square feet):
2.8 Acres
Area Zoning: M-2 ( Marine 2)
Previous use of property: Ferry Tenninal
Intended use of property: Ferry Tenninal
Prior permits/approvals for site improvements:
Agency
u.s. Anny Corps of Engineers
Date
April 1, 1992
N.Y. State DEC
February 11, 1992
No prior permits/approvals for site improvements.
Has any permit/approval ever been revoked or suspended by a
governmental agency?
xx
No
Yes
If yes, provide explanation:
Project Description (use attachments if necessary):
Reconstruction of the east ramp in the Silver Eel Cove including the install-
ation of 65± LF of steel sheetpile bulkhead with backfill (70± CY over 250±
SF), new counterwèiÐ"httsupports, and p=tective dolphins, waterward of the
high tide line.
2
jl_~, --.""'''.t.=-,,,,,..__.
NARRATIVE STATEMENT
East Ramp Reconstruction
Fishers Island Ferry District
April 5, 1996
This narrative statement is intended to be an Executive Summary of the proposed east ramp
reconstruction project as well as providing direct information solicited in the environmental form
ENG Form 4345 Supplement for the U.S. Army Corps of Engineers permit application.
Project Description:
This project is the reconstruction of the east ramp utilized by the Fishers Island Ferry in
Silver Eel Cove on Fishers Island. The scope of work includes removal of an existing 14' wide
by 24' long steel and wood ramp, counterweight towers, protective dolphins (3 pile) and a ramp
support beam structure. The new work will include placement of approximately 65LF of steel
sheet piling waterwa!d of the high tide line, including a tie-back system into the existing bank,
placement of a new pile supported ramp support beam, with pile braces, ramp support framework
and bmnper, counterweight towers, protective 3 pile dolphins and an 18' wide by 24' long steel
and wood ramp.
The new sheet piling will be placed 2 to 3 feet in front of the existing steel sheet piling
which faces to the north and 5' .:t in front of the sheet piling along the easterly edge (side) of the
ramp illld access drive. Prior to driving sheet piling along the northerly face the stone scour
protection laying on the bottom sediments will have to be removed and stock piled to permit
driving of the sheet pile and then replaced in front of the sheet piling for scour protection. The
sheet piling along the· easterly edge of the ramp must be 5' beyond the existing sheet piling in
order to provide adequate room to accommodate the new wider ramp as shown in the application
drawings.
Project Purpose:
The existing ramp and bulkheading system at the east end of Silver Eel Cove was built
approximately 30 years ago. The entire system has corroded and deteriorated extensively and
must be replaced in order to provide the Ferry District with a second loading slip on the island
for use during peak periods or when -adverse weather necessitates using the more protected slip.
Adjacent Property Owners:
The Town of Southold owns land adjacent to the Fishers Island Ferry Terminal site both on
the east and west waterfront edges.
Photographs:
Photographs of the project site are attached herewith, as is a copy of the Short Form
Environmental Impact Statement prepared for the New York State DEC joint permit application.
1
Alternatives:
There are only 3 real options for the Ferry District to pursue at this time. The do nothing
option is not considered viable or appropriate because the existing east ramp is in such condition
that failure to rehabilitate the structure will necessitate the discontinuance of its use.
The next option is to reconstruct the ramp exactly the way it is today, however, the existing
ramp is too narrow to properly serve either ferry, MY RACE POINT and MY
MUNNATAUCKET, the beams of which are 33' and 3D' respectively. The existing ramp does
not land on the center of the vessels but favors the port side in both cases, thus requiring vehicles
to be maneuvered, sometimes adversely, to disembark but more importantly to load the vessel.
It is in the best interest of operational efficiency and safety to have the ramps centered on the
ferries.
The option selected is the best option because it will provide a wider ramp for easier vehicle
maneuvering and the ramp will be almost exactly centered for both existing ferries. This
widening will require the existing sheet pile embankment retention structure and ramp support
to be wider as well, thus yielding the configuration depicted in the application drawings.
Bulkheading I Bank Stabilization I Filling Activities:
The total amount of fill to be placed behind the bulkhead will be approximately 70 CY.
This constitutes fill waterward of the existing sheet pile bulkhead. The fill will be clean granular
material providing a suitable pavement support base and sub-base and will be topped with hot
mix asphalt binder and surface courses. Fill will be placed by mechanical methods, probably
dumped in bulk, graded and compacted in layers to assure uniform compaction throughout the
10 foot vertical height from existing bottom sediments to fuùshed grade. There will be no need
for temporary illl and no wetlands will be disturbed as a result of this project.
Accessory Structures:
The proposed counter weight lifting towers, dolphins and ramp support beam and bumper
system will be virtually identical to the structures that now exist for the CUlTent east ramp. The
will. just be located in a position which will allow for the proper operation of the wider ramp.
2
14-16·4 (11/95)-Text 12
PRÒJECT tD.NUMBER
617;20
Appendix C
Slale Environmental Quality Review
SHORT ENVIRONMENTAL ASSESSMENT FORM
For UNLISTED ACTIONS Only
PART I-PROJECT INFORMATION (To be completed by Applicant or Project sponsor)
SEaR
1. APPLICANT ISPONSOR I 2. PROJECT NAME
Fishers Island Ferrv District East Ramo Reconstuction
3. PROJECT LOCATION:
Municipalli¡ii . TOwn öf Southold County Suffolk
4. PRECISE LOCATION (Street address and road intersections, prominent landmarks, etc., or provide map)
The east ramp abuts Trumbull Drive at the easterly end of the Fishers Island Ferry
terminal.
5. IS PROPOSED ACTION:
o New o Expansion [ Modification/alteration
6. DESCRIBE PROJECT BRIEFLY: .
Reconstruction of the east ramp in the Silver Eel Cove, including the installation
of 65± LF of steel sheetpile bulkhead with backfill (70± CY over 250± SF), new
counterweight supports and protective dolphins waterward of the high tide line.
7 _ AMOUNT OF LAND AFFECTED:
Initially 0.1 acres Ultimately acres
6. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS?
Ðyes ONo If No, describe briefly
--
9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT?
o Residential o Industrial o Commercial o Agriculture o Park/Forest/Open space }¡;)3IOther
Describe: There is residential land around the site, but the site itself is a ferry
terminal, functioning as the transportation center for virtually all passenger, vehicles
provisions, fuel and equipment to Fishers Island.
10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (FEDERAL,
STATE OR LOCAL)?
. IJaY<iS. ONo If yes, list agency(s) and permit/approvals
U.S. Army CorpS of Engineers Permit, Rivers and Harbors Act of 1899
Town of. Southold, Wetlands and Coastal Erosion Permit.
11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALlO PERMiT OR APPROVAL?
~~s ONO If yes, list agency name and permit/approval
The ferry terminal facilities were builtin support of Fort Wright over many decades.
The ¡;e:rry District has operated here since 1 957 ; all facilities pre-existed current
12. AS A RESULT, OF PROPOSED ACTiON WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION?
DYes· '!ENO
I CERTIFY THAT THE INFORMATION PRqVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE
- 4/5"/1£
Applicant/sponsor name: Mr. Reynolds duPont, Jr. Chariman Dáte:
~ . FisherZ;.~ ~eqØ D~mct ¡¿y,L c!..J1ñ-¡-:J> I
cJl.1:IIVi'M /r-...
Signature: ¡ S5t 6'>1.P-v ·(~~·Y ~'k/ l¿oI
I
If the action is in the Coastal Area, and you are a state agency, complete the
Coastal Assessment Form before proceeding with this assessment
OVER
1
-^-^-^--
-'^--^-^-
-'^--^-^-
",
"'" X -16.2
..... .......................................
"..... .................................
.....,... ..................
... .............
MHW, Hit,ALONG BULKHEAD "'"
"-
'-
--
---
-....
.....-............
\,
SIL VER EEL
COVE
,
,
I
,
I
I
,
,
,
,
,
,
",////
/
X-16.7 ///,--
--......
,,"'....-
I
,
,
, I
',I
/
"""""""~,
.- .--_....-
....--.......... ....---.-
....---...-- ........----
-_....- -----...
_....- --
-_...- .-----
_...----- _.-....--
---- _....,.-
----.... -----
----~- ----....
.......-- ....-.-....-
-^-^-^--
-'^--^-^-
-'^--^-^-
--
-----...-
/
-_.--
....-....-
/
/
--_....-
........---
-"
--
--
--
--
--
--
--
----...--....----
,/
--
-_....-
,--
----
.:--..-----
/'
-----
--------
,
""""",
"
"
'"
/
/-
-_....--
-----
_/
---
,
,
"
-12.-&,
.....---
-
_/
------
-..............
",
~-.........
STEEL SHEET PILE BULKHEAD
,--- 7
EDGE OF P A VE:MENT
,-,
",/ ....,
// .........
, ,
/// ................
////--// --
/.----
------//
EXISTING
CONDITIONS
ORIGINAL SCALE: 1'-10'
10
"
o
10
EAST RAMP RECONSTRUCTION
PROJECT:
LOCA nON:
WATERWAY:
DATE:
APPLlCAN T:
FISHERS ISLAND, TOWN OF SOUTHOLD
SUFFOCK COUNTY, NEW YORK
SILVER EEL POND
APRIL 1. 1996
FISHERS ISLAND
FERRY DISlRlCT
SHEET 2 OF 4
AGENT -
DOCKO, INC.
P.O_ BOX 421, MYSTIC, CT 06355
860 572 8939 FAX 572 7569
Mapping Prepared by
RESOURCE MANAGI!H_T e. M........NG
/
/
/
/
/
/
I
J
/
/
/
17 _/
---
--
/ ..
I
I
1/
I
I
N~ TIE-BACK SYSTEM
I
I
/
-----
-----
ßf
_./
./
-----
~
~
\~
I
\
\
\
\
SIL VERI EEL
COV~
\
\ /
\ /
NEW MAlNTEN.¡!.NCE /
WALKWÞ?fS / I
~ / / /
~ IN,El, I I
"'lGQ, /DOrH~ W I
I I i I
~I / i
~/ I
~II
I I
\ \ \
I \ \
_/ \
/- \ \
./ / /NEW RAMP
24' LONG
18' WIDE
--
--
...-
...-
...-
./ 12'X12"
RAMP SUPPORT
(BENEATH) _---
./ / NEW %
_ / ./ DOLPHIN /f!?).
/ /
/ /
/NEW// L
_ OOONTER-WEIGH I
lpWE~/
----- / /
/ / /
---- .,/ ~o / / / / /
..... ./ / / / /......h
..NEW S.couR yROTEeT10N-' / VI V-Q;
_-STONE~~+l- ßÝ ç; /.,.$' vDC?
_--f50/+/-_____SF" -@:i(~>
--/ ----- #OQ;------
----- r§".£>-----
./ _____ -----~ ~ CJ
/ -- -!> _./-------------~#P~
_-./ _~r/2 e; +
I
I
/
/
i
I
I
I
I
I
I
I
I
I
j
I
I
I
I
I
I
I
I
I
I
I
/
/
/
/
I
I
i
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
/
,,'"
/
/
/
/
/
/
/
/
I
/
STEEL SHEET PILE ¡BULKHEAD
TO BIE ~ PLACE
(
/
j/--
/
/
6'+/-
PROPOSED NEW RAMP
ORIGINAL SCALE: f"cI0'
10
"
o
10
EAST RAMP RECONSTRUCTION
PROJECT:
LOCA nON:
WATERWAY:
DATE:
APPLlCAN T:
FISHERS ISLAND, TOWN OF SOUTHOLD
SUFFOCK COUNTY. NEW YORK
SILVER EEL POND
APRIL I, 1996
FISHERS ISLAND
FERRY DIS1RICT
SHEET 3 OF 4
I
"--
AGENT -
DOCKO, INC.
P.O_ BOX 421, MYSTIC, CT 06355
860 572 8939 FAX 572 7569
Mapping Prepared by
RaOU1FtCE MANAGEMENT e. MAPPING
PIPE
HANDRAIL
NEW RAMP
12' WIDE BY
24' LONG
(STEEL BEAM
SUPPORT wi
WOOD DECK)
NEW LIGHT TOWER
NEW 3 PILE.......-/
DOLPHIN
NEW COUNTER
WEIGHT TOWER
~ TOP OF
BULKHEAD
EL 6+/-
20' REPLACE 4' CHAIN LINK FENCE
PAVEMENT TO REMAIN
+1
NEW FILL AREA
DEADMAN
TIE BACK SYSTEM
RELOCATE STONE & BOULDERS
TO SUPPLEMENT SCOUR PROTECTION
EXISTING SHEET PILE
BULKHEAD TO REMAIN
NEW SHEET PILE BULKHEAD 30LF +1-
- FACE TO FACE DIMENSION 2' +1- EIW
I 5' +1- N/S DUE TO INCREASED RAMP WIDTH
SECTION
ORIGINAL SCALE: 1"=10'
10
!S
o
10
NEW RAIL ~
TOP OF
BULKHEAD
VARIES --.......
HT EL 3.6+1-
MHW EL 2.5
MLW EL 0.2
NEW PAVEMENT
REPAVE RAMP LANE
_ CUT OFF EXISTING BULKHEAD
NEW DEADMAN
NEW FILL AREA
PROJECT: EAST RAMP RECONSTRUCTION
LOCA nON: FISHERS ISlAND. TOI'IN OF soun;OLD
SUFFOCK COUNTY, NEW YORK
WATERWAY: SILVER EEL POND
DATE: APRIL I, 1996
APPUCANT: FISHERS ISlAND
FERRY DISTRICT
SHEET 4 OF 4
AGENT -
nOCKO, INC.
P _ 0 _ BOX 421, MYSTIC. CT 06355
B60 572 8939 FAX 572 7569
Mapping Prepared by
IRIESOURCI!! IMAINIAGI!!HI!!NT e. MAI'PING
CAM CONSISTENCY STATEMENT
I, Reynolds duPont, Jr., Chairman, Fishers Island Ferry District, certify that, to the best of my
knowledge and belief, the proposed East Ramp Reconstruction on Fishers Island, New York
complies with the State's approved Coastal Zone management program and that maintenance
activities will be conducted in a manner consistent with the program.
~tWlt55t~
Þ f!.e;VtzJ/Js du7d7Ahr. cha (;~~ t--