HomeMy WebLinkAboutAttachment_Instructions and DEIS Revision SummarySTRONG’S YACHT CENTER
INSTRUCTIONS AND DEIS REVISION SUMMARY
NOVEMBER 2022
Volume 1: Text and Appendices A-D DEIS Text, Revised November 2022
• Modified per NPV and Town comments
• Modified for additional or revised reports
• Added Alternative Routing Plan
• Added Alternative Material Mitigation Plan Appendix C - Site Development Plans, as prepared by Young & Young Engineering; and Proposed Landscape Plan, as prepared by Jeffery T. Butler, P.E., P.C.
• Modified Sheets 1, 4, 5 and 6 for requested revisions by the Health Dept (see Appendix J and DEIS text for summary of changes)
Volume 2: Appendices E-N Appendix J – SCDHS Article 6 Documentation, Notices and Existing Facility Permits
• Added additional correspondence (3 total) and Water Design details Appendix L - Groundwater Modeling Report, as prepared by PWGC and Environmental Data Resources (EDR) Database Report
• Added EDR Report (existing groundwater quality)
• Modified Appendix Title to include EDR Report - New Appendix Sheet provided Appendix M – Boat Vessel Study
• Modified per NPV and Town comments
• Format adjustment (margin alignment) Appendix N – Ecological Impact Assessment
• Revised to include Alternative Material Mitigation Plan
Volume 3: Appendices O-V Appendix O - Traffic Impact Study, as prepared by Dunn Engineering, with modified Appendices, including Intersection Capacity Analyses Summaries and Results (no change to 2021 Traffic Volumes or 2021 Accident Data), and New Supplemental Data Appendix
• Modified per NPV and Town comments
• Modified to update No Build and Build Years
• Includes Vibration Analysis by Sound Sense (SEPARATE REPORT IN APPENDIX R)
• Includes ESAL Calcs and analysis by TSPE
• Includes Photographs of the Entire Route
• Added Alternative Routing Plan
• Added Alternative Material Mitigation Plan
STRONG’S YACHT CENTER
INSTRUCTIONS AND DEIS REVISION SUMMARY
NOVEMBER 2022
Appendix R – Acoustic Report and Vibration Report, as prepared by Sound Sense
• Acoustic Report - Modified per NPV and Town comments, evaluated the added Alternative Routing Plan and updated based on changes in No Build/Build Year.
• Vibration Report – Prepared in response to Town and OPRHP comments.
• Modified Appendix Title to include Vibration Report - New Appendix Sheet provided Appendix S – Air Quality Report
• Modified page 13 to respond to NPV Comment 19a.
• Format adjustment (margin alignment) Appendix T – Archaeology
• Modified to include Jan 2022 Supplemental Phase 1B and OPRHP correspondence dated Jan 24, 2022 accepting Phase 1B and requiring no additional archaeology work.
• Added April 8, 2022 correspondence requesting Construction Protection Plan Binder Spines, DEIS Cover Page and Volumes 1, 2 and 3 Pages
• Modified to include revision date
• Modified Appendix L and R titles, where necessary
No Changes have been made to: Volume 1: Appendices A, B and D Volume 2: Appendices E, F, G, H, I, and K Volume 3: Appendices P, Q, U and V