Loading...
HomeMy WebLinkAbout(2) Sand Calculations                        02/23/2021         Tel: 631.286.0240 ● Fax: 631.286.6313 ● Website: li‐precast.com ● Email: info@li‐precast.com           Volume Calculations for Concrete Manufacturing Strong’s Marina - Retaining Wall & New Building Retaining Walls Unit Type  (Marco) Quantity  Total Conc.  Volume (ft3)  Total Conc.  Volume (yd3)  B 71 2,104 78  C 107 3,943 146  D 106 4,276 158  E 101 4,407 163  F 87 4,082 151  G 59 2,958 110  H 92 4,913 182  I 70 3,968 147  MACRO 693 30,650 1,135  Culvert  18'x9'x5' 16 3,465 128   TOTAL ‐ 34,115 1,264  Foundation Total Linear Feet of Foundation   2 X (350' + 140')  + 2 X (375' + 140')  = 2,010   ft    Foundation Area   (3.5' X 8”) + (1' X 2') = 4.35   ft2    Concrete Volume = 8,733   ft3  Concrete Volume = 323  yd3  Floor Slab Floor Slab Area   (350' X 140') + (375' + 140') = 101,500   ft2    Floor Slab Thickness = 1   ft    Concrete Volume = 101,500   ft3  Concrete Volume = 3,759  yd3  Total Total Concrete Volume  = 5,345  yd3  Percent by Volume of Sand in Concrete = 30  %  Total Sand Volume = 1,604  yd3  Figure 1: Typical Foundation