Loading...
HomeMy WebLinkAboutProposed Mitigation Traffic Impact Assessment GREE'NPORT MEDICAL OFFICES AND RESIDENCES TOWN OF SOU HOLD SUFFOLK COUNTY NEW FORE (SCTM 1000-34-2-1) DRAFFIC IMPACT ASSESSMENT NOVRECEIVED 12022 _�Board Pl OCTOBER 26, 2022 Lili%%A L.K. McLean Associates, P.C. 437 S. Country Road, Brookhaven, NY 11719 TABLE OF Page 1.0 Introduction.......,..,............. ... . ....... ............ 1 2.0 Existing Traffic Conditions............................................ ........ .__ ........ ..,...... ..,.,.2 3.0 Future "No Build" Traffic Conditions................................. __........,....,...............,....,..........4 4.0 Proposed Site Trip Generation, Traffic Distribution and Trip Assignment.................. 5 5.0 Driveway Intersection Location and Capacity Analysis...........................................___6 6.0 Pedestrian and Bicyclist Considerations........... ......m. ......,. -....... .................7 7.0 Accident Analysis........................... ......... ......... .., „ ......,.. ....................,........8 8.0 Proposed Traffic Mitigation........................ ....... ........ ...........9 9.0 Recommendations.............................................................,.......................................... ....... 11 A andi 2025 (Estimated Time of Completion) Traffic Volumes at the Roundabout Site Generated Weekday AM and PM Peak Hour Volumes—Original Proposal, Drawings VOL-01 and VOL-02 Westerly Driveway Intersection Capacity Analysis Results--Original Proposal Site Generated Weekday AM and PM Peak Hour Volumes—Downsized Proposal, Drawings VOL-03 and VOL-04 Westerly Driveway Intersection Capacity Analysis Results--Downsized Proposal Driveway Intersection Sight Distance—Drawing SD-01 1.0 INTODUC'TlON The project is located at the southeast corner of the intersection of Main Street (NY 25) and North Road (County Road 48/NY 25) in Greenport. A Location Map (Figure 1) is shown on the following page. The project proposes to construct four campus-style mixed use buildings on a vacant 4.7 acre parcel in the RO Zoning District. All four buildings will consist of three units of medical office space (4,847 SF) on the first floor, as well as ten workforce apartments on the second floor, with the exception of only five apartments in one of the buildings (35 total apartments). A Site Plan (Figure 2) follows the Location Map. Special exception approval is required by the Town Code to permit construction of apartments above professional offices. This Traffic Assessment focuses on potential traffic impacts of the project, using the State Environmental Quality Review Act (SEQR) as the guideline for the determination of any required mitigation measures for traffic impacts. The proposed reconstruction of the adjacent NY 25/CR 48 intersection by the NY State Department of Transportation (NYSDOT) has an effect on the scope of work to determine the traffic impacts of this project, as well as the location of the site's roadway access points. The reconstruction project will provide a roundabout at the intersection, as well as roundabout approach roadways. In Figure 3, NYSDOT's alignment of the roundabout and its approach roadways is superimposed on the development's Site Plan for the Revised Proposal. Federal and State funds have been programmed for the NYSDOT reconstruction project, and the project's (PIN 0801.01) current schedule is as follows: • Construction is expected to begin in Winter 2023/2024 • Construction is expected to be completed in Fall 2025 (three years from the date of this assessment). NYSDOT is fully aware of the development, and will be acquiring property from the developer of the site in order to construct the project (see NYSDOT property acquisition line on Figures 2 and 3). In its May 2022 Draft of the Final Design Report for the project, NYSDOT's consultant developed traffic volume projections for the Estimated Time of Completion (ETC) of the project. Since the completion of the proposed development is expected to approximately coincide with NYSDOT's construction completion, the approach utilized in this assessment is to use NYSDOT's ETC traffic volumes as the "No Build" traffic volumes along NY 25 at the site's two access driveways, in order to assess the traffic capacity of the driveway intersections. GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 1 i X x'r IL r � c � U � G �I S � y W Z W O_ N y W � O O Y o W x� W Q Z I' h LL LL H ° O j oO U U Q J W O Km f w t O i a r' w f of a � (" a i W C ��p r 6i! ri y U • tl Q � JC) r J n a e�SEEY�EYd� O t OI 1� a U N Q C w v` 0 Y 0 L � y 6 O G O N° CL E V 61 55,09 F hOPTN t D 49F74 V-97-1 CYC _ I a rry - .e , I t. �rrru Gw w w�"ww o m w m w»ua�r w,vlvA N uw " a.m w+ -GI )c I u yr - i - FIGURE Z-9 t6-22 SIVE rua..:..m�ws«am xu..sw en�m:..urca�w w,se Q ljl�T+ -. m - .nnm i (L I� ,� ��j��/// r�y,�,����/�ii�,�jadn�'71�ir1i'k�l��IlUl�l��Ylk""�u"��IVHIITi7P��V�➢I��(`��� C� I n�V M` c 1. S 62°20'39"W 35265' x I ti � „�� I S 6 39 W 94.18 �t 2 20' t mwo� �a P m '— .. — ,.; S 60' 44,. .. XNAPP PLACEAMU .._.._.— ��..... x'�"e"""%,".:WW^�., TOWN510TSouTNOL 2.0 FISTING TRAFFIC CONDITIONS Roadway Network As noted, NYSDOT will be reconstructing the NY 25/CR 48 intersection with a roundabout. The intersection is currently controlled by a Stop sign facing northbound motorists on NY 25 East who desire to turn left onto CR 48, as well as by Yield signs, one facing northbound motorists on NY 25 East who are turning right onto NY 25 East/North Road, and another facing motorists turning right from eastbound CR 48 onto NY 25 West, heading to downtown Greenport. The current roadway conditions adjacent to the site are summarized below: • County Road_48 North Road: This is the roadway west of the NY 25/CR 48 intersection. It consists of a single lane in each direction, with paved shoulders. The posted speed limit is 45 mph in the vicinity of the project site. The roadway is designated as NY State Bike Route 25, but the shoulders are not marked as bike lanes. • NY 25 Ngrth Road east of the NY 25 CR 48 intersection: NY 25 consists of a single lane in each direction, with paved shoulders. The posted speed limit is 45 mph in the vicinity of the project site. The roadway is designated as NY State Bike Route 25, but the shoulders are not marked as bike lanes. • NY 25Mvain Street south of the NY 25 CR 48 intersection: NY 25 consists of a single lane in each direction, with paved shoulders. The posted speed limit is 30 mph in the vicinity of the project site. • Sound Road: Sound Road intersects the north side of NY 25, about 100 feet east of the main NY 25/CR 48 intersection, and only about 30 feet offset from the north-to- eastbound NY 25 right turn connecting lane. It has a 30 mph posted speed limit and carries two-way traffic on an unmarked pavement. The S92 Suffolk County Transit Bus Route, a heavily utilized route, runs from East Hampton on the South Fork, through Riverhead and onto the North Fork, and along NY 25 through the NY 25/CR 48 intersection. Current service on weekdays and weekends between downtown Greenport and Orient Point occurs at variable intervals during the peak ridership times of the day. There are no bus stops in the vicinity of the site. The Suffolk County Department of Planning and the Environment is currently conducting a "Reimagining Transit" Study which is evaluating bus service on all of Suffolk Transit's routes. Site Traffic Obsery tions An LKMA Traffic Engineer conducted field observations on the roadways in the vicinity of the site during mid-day Saturday September 3, 2022 (Labor Day weekend). Photos appear on the following page. Since the Cross Sound Ferry to Connecticut is located only eight miles to the east, "platoons" of vehicles destined to and from the ferry terminal pass through the NY 25/CR 48 intersection. Eastbound vehicles on CR 48 may be traveling well in excess of the posted speed limit when ferry departure times are approaching, as delayed motorists attempt to make their reserved ferry departure time. Westbound motorists who have exited the ferry approach the CR 48/NY 25 intersection in clusters of vehicles. GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 2 yr a �t I ahr r �`y ya Looking south at the NY 25/CR 48 intersection, showing the S92 Suffolk Transit bus from Orient turning left onto westbound NY 25 toward downtown Greenport. dol i 'I _w r H �fi%�✓U,i r x %/�/lf/ l,,,,� r � /�/11i1���1>�frrt�!�o �i/�Al���f✓//'�/Frr frr� � r Looking east at the NY 25 intersection from CR 48. Left turning motorists from downtown Greenport have difficulties turning left onto CR 48, needing to wait for both westbound NY 25 motorists, who are awaiting a gap in oncoming eastbound CR 48 traffic to turn left, as well as eastbound CR 48 vehicles proceeding through the intersection. GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 3 3.0 FUTURE'-`N0 BUILD" TRAFFIC CQMD-I IONS As noted in the Introduction, NYSDOT's roundabout ETC traffic volumes are being utilized as the "No Build" traffic volumes along NY 25 at the site's two access driveways, in order to assess the traffic capacity of the proposed site driveway intersections. NYSDOT's traffic volumes include appropriate traffic growth factors, as well as consideration of other identified private development projects in the vicinity of the site which may result in traffic volume increases. In NYSDOT's Design Report, extensive traffic capacity analyses were performed for the existing dual "T" intersection configuration at NY 25/Main Street with CR 48/North Road, i.e. with the NY 25/Main Street intersection with CR 48/North Road considered the west intersection and NY 25/North Road with Sound Road considered the east intersection. The analyses note poor Levels of Service (LOS) for vehicles turning left from northbound NY 25 onto CR 48 at the west intersection. The Report then indicates the pursuit of the reconstruction of the existing "T" intersection of NY 25/Main Street with CR 48/North Road into a roundabout as a measure to mitigate the poor LOS, with the following results excerpted from the report. SIGNALIZED INTERSECTION CAPACITY ANALYSIS SUMMARY (EXISTING CONDITION-2017) NYS Route 25 at CR 48!Sound Road Level of Service and Delays (sec) ETC+20 Mitigation 1 (Routidabout) AM P[AK MIDDAY PEAK PM PEAK LANE GROUP MOVEMENT Queue We ratio Delay LOS Queue vlc ratio Delay LOS Queue v1c ratio Delay LOS (ft) (sec) (ft) (sec) (ft) (sec) EB LTR 3 0.53 9.6 A 3 0.49 9.4 A 2 0.44 8.4 A WB LTR 2 0.40 6.9 A 4 0.61 11.0 B 6 0 69 13.4 B NB LTR 1 023 6.7 A 2 0.38 8 3 A 2 0.34 7.4 A SB LTR 0 0.03 5.0 A 0 0.05 6.8 A 0 0-05 7.4 A OVERALL 0.53 $1 A 0.61 _ 9.8 A 0.69 10.6 B Notes: 1 The capacity analysis is conducted by SYNCHRO. version 10. which utilizes the Highway Capacity Manual. 2. For LOS definition. see Appendix C-3. Constrained traffic operations are presented in "Bold" letter font on this table 3. WB =Westbound. EB = Eastbound. NB = Northbound. SB = Southbound 4. LTR=Shared left.thru and right movement 5. "Overall v!c ratio is actually max vk ratio of an approach within the intersection. However. delay and LOS values are based on the weighted average of all signalized intersection approaches_ 6. Queue (ft) shows 95th Percentile queue length in feet. GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 4 The table indicates that with a roundabout, and for all weekday time periods 20 years after completion of construction, the overall Levels of Service (LOS) are A or B. The LOS is based on both the average delay per vehicle and the Volume-to-Capacity (v/c) ratio. When completed, the proposed development will generate a minor amount of traffic, a 6% increase at the roundabout relative to the estimated traffic volumes there in 2025 in the AM and PM peak hours. Since the proposed roundabout, now incorporated into DOT's construction contract, will operate at a very good LOS, the small amount of traffic generated by the proposed development will have a minor, if any, impact on the LOS. Therefore, with adequate available capacity the roundabout can easily accommodate the generated traffic (more information on Trip Generation is presented in Section 4.0). 4.0 PROPOSED SITE TRIP��d�dER47"I+c�FI T '4d�FlC�7ISTplllllTlC�fU"��t17 TRAFFIC AS.SI NME+I" 'T Vehicular trips to and from the developed site during the weekday morning and afternoon peak hours were generated using the Institute of Transportation Engineers' (ITE) Trip Generation Manual, 11th Edition. Due to the uncertainties associated with the County's potential rescheduling of S92 Bus Route service, as contemplated in the County's current Reimagining Transit Study, no credit for a reduction in vehicular trips was taken for anticipated trips to the site using the bus. In reality, some workers and medical office patients will utilize the bus to the site if bus stops are established in the vicinity of the site. The following ITE Land Use categories were utilized: • 720—Medical Office Building • 220—Multifamily Housing (Low Rise) Below are the anticipated entering and exiting vehicles, for the Original Proposal: Time Period Entering Vehicles Exiting Vehicles Weekday Morning Peak Hour (7:45-8:45 AM) Medical Offices 48 13 Apartments 8 26 TOTALS 56 39 Weekday Evening Peak Hour (4-5 PM) Medical Offices 23 54 Apartments 23 13 TOTALS 46 67 Given that the medical offices generate the majority of trips, and that their anticipated usage on a Saturday would be significantly lower (ITE has data with an insufficient sample size for Medical Office Buildings on Saturdays), a Saturday peak hour was not necessary to analyze. Based on the local population distribution, as well as the traffic flow efficiency of the roadway routes to the site, the following trip distribution was utilized for trips to/from the site: GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 5 • To/from the west via CR 48-55% • To/from the south via NY 25-35% • To/from the east via NY 25-10% Generated traffic was assigned to these roadways based on the distribution.. 5.0 DRIVEWAY INTERSECTINLQC'Ar10N ANDC P 'ITYAN ;LYSI The Site Plan indicates two driveways from the site to NY 25, located as follows: • A westerly (in terms of the direction of travel on NY 25) driveway to north-south Main Street, with its southern curb line located 19' feet from, and parallel to, the project's southerly property line • An easterly driveway to east-west NY 25/North Road located about 300' east of the proposed roundabout. This driveway is located at the point where NYSDOT's property acquisition for the roundabout terminates The westerly driveway access is located nearly as far south as possible. Because the speeds of eastbound through vehicles coming from CR 48 will be significantly lower in the future along the site's north frontage when vehicles are coming out of the roundabout, the easterly driveway location is best where shown on the Site Plan. Moving the driveway further to the east and further from the roundabout will increase eastbound approach speeds, making it potentially less safer for motorists to make right turns onto eastbound NY 25. It should be noted that NYSDOT's Design Report has future traffic volumes for NY 25 at both driveway access locations; however, those volumes were anticipated for a project ETC of 2023. As previously noted, the project ETC will be in 2025; therefore, these volumes were increased to the year 2025 using traffic growth factors. Given the locations of the driveways with respect to the roundabout, and considering DOT's proposed alignment of the approaches to the roundabout, in order to optimize safety at the driveway intersections the following turn prohibitions were assumed in performing the driveway intersection capacity analyses: • At the westerly driveway, southbound left turns to enter the site would be prohibited. These turns can be made as right turns entering the main site access (easterly driveway). As a result, motorists entering from the west would continue through the roundabout and instead make right turns to enter the site at the easterly driveway. Motorists entering the site from the east would use the roundabout to safely execute a U-turn, and then make right turns to enter the site at the easterly driveway. • At the easterly driveway, left turns entering and exiting the site would be prohibited. Instead, motorists who exit the site and desire to travel west on CR 48 would turn right from the westerly driveway onto northbound Main Street, then travel around the roundabout to access westbound CR 48. As noted above, motorists entering the site from the east would use the roundabout to safely execute a U-turn, and then GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 6 make right turns to enter the site. For those exiting motorists who desire to head south on Main Street, instead of turning left from the easterly driveway and using the roundabout to proceed southerly, they would turn left from the westerly driveway directly onto Main Street. Driveway intersection capacity analyses for the Revised Proposal were performed in accordance with Synchro Version 11 Software, which is based on the 6th Edition of the Transportation Research Board's Highway Capacity Manua(. Given that only 10% of the site's exiting traffic at the easterly driveway would execute a right turn, causing a negligible effect on intersection capacity, capacity analyses were not performed there. Capacity analysis results for the proposed westerly driveway intersection with Main Street are as follows. The LOS for unsignalized intersections is based on the average delay per vehicle for the most critical turning movement at the intersection. Weekday Peak Hour Time Period Critical Movement Level of Service Morning Westbound Left + Right Turns B Evening Westbound Left + Right Turns B Stop Line Sight distance measurements were taken in the field in the approximate driveway locations, in accordance with AASHTO guidelines. Figure SD-01 with this information, as well as photographs, is included in the Appendix. For the westerly driveway, the approximate Intersection Sight Distance (ISD) for motorists looking to the left exiting the site is estimated at 285 feet, which corresponds to a roadway Design Speed of 25 mph, less than the 30 mph posted speed limit. The ISD is restricted by a row of large trees in the existing Right of Way of NY 25, between the sidewalk and curb. During construction of the driveway, actual measurements of the sight distance should be obtained, to determine if one or more of the trees should be removed to provide adequate ISD. There is an additional ISD restriction looking to the right from the easterly driveway; however, with the recommended prohibition of exiting left turns from that driveway the ISD restriction is not applicable, as' exiting motorists will only be executing right turns. 6.0 P DfSTRIA.N AND BICYCLIST CONSIDERATIONS The Permits Section of NYSDOT has commented that a bus stop should be provided at the site. An eastbound bus stop along the north frontage of the site would conflict with NY Bike Route 25, which runs along the shoulders along NY 25, and continues west along CR 48 on the shoulders there. Bus stops in both directions of NY 25 could be authorized by Suffolk County Transit on Main Street following roundabout construction, in the 10' minimum width shoulders. The stops would be located north of the westerly driveway. Future bus stop locations are shown on Figure 3. GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 7 To optimize pedestrian safety, the applicant proposes to reconstruct the existing 4' wide sidewalk on the east side of Main Street with a 5' wide ADA-compliant sidewalk, from the north side of the westerly driveway to the limit of NYSDOT's sidewalk construction under the roundabout project, as shown on Figures 2 and 3. Passengers exiting buses on the west side of Main Street can walk a short distance to utilize the south roundabout crosswalk to cross Main Street. On the east side of Main Street, passengers exiting buses can then use new sidewalks to enter the site, adjacent to either the westerly or easterly driveway. 7.0 ACCIDEPVTANALW lS The NYSDOT Project Design Report contained a three-year accident (crash) analysis of the NY 25/CR 48 intersection. Noteworthy in the accident analysis was a high percentage of rear-end accidents occurring on the north-to-eastbound right turn connecting roadway carrying eastbound NY 25 traffic and approaching a Yield sign. These accidents are numbered 3, 4, 5, 6, 7, 11, and 12 on the diagram on the following page. All of these accidents involved an initial vehicle stopped at the Yield sign being rear-ended by a following vehicle. The acute angle of the ramp connection with NY 25/North Road, coupled with the speeds of approaching vehicles on eastbound CR 48 onto eastbound NY 25, are conditions which contribute to the driver of the first vehicle stopping to look over his shoulder at an approaching vehicle to see if he has an acceptable safe gap in traffic to proceed beyond the Yield sign. Given the Yield sign, the driver may be rolling at a low speed as he looks over his shoulder at the skewed intersection, and may actually start to turn before he realizes the gap is unacceptable and then stops abruptly. The following driver, seeing the first vehicle moving forward, may think the vehicle has proceeded and after he turns around and views an acceptable gap, immediately proceeds forward without looking. There is no need to update NYSDOT's accident analysis, because construction of the roundabout will reduce the number of significant (injury) accidents at the NY 25/CR 48 intersection and its approaches. This will occur because right-angle type collisions occurring at intersections with Stop sign control (e.g. for the northbound-to-westbound left turn movement) often result in injuries, sometimes severe, to vehicle occupants. The conflicting accidents at roundabouts involving vehicles approaching from different directions are low speed merging accidents, most of which do not result in injuries. The roundabout will reduce the speed of eastbound vehicles at the eastern driveway access, because these vehicles arriving there will be traveling at lower speeds after exiting the roundabout than the current speeds of eastbound vehicles from CR 48. The minimal traffic volume increases associated with the proposed development will not result in a significant increase in accidents at the roundabout. GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 8 e 14 1 1 2 1 to 1 5 d 9 11 Seven of the 16 accidents (44%) with available details involved rear end collisions at the northbound-to-eastbound yield sign. 8.0 PROPOSED TRAFFIC MITI In order to further limit the potential for traffic capacity and safety impacts, downsizing the proposed development has been proposed by the developer. The revised proposal consists of the deletion of one of the proposed buildings. Each of the three proposed buildings will now accommodate three units of medical office space (4,847 SF) on the first floor as well as ten workforce apartments on the second floor, for a total of 30 apartments. The figures on the following pages depict the proposed project: Figure 4—Revised Site Plan, dated October 26, 2022. With the elimination of the westernmost proposed building under the downsized proposal, the westerly driveway to north-south Main Street was able to be moved further north to increase its buffer from residences along the south property line. In order to maintain the maximum distance from the proposed roundabout, the driveway was curved, to intersect with Main Street approximately 16' feet from the project's southerly property line in order to ensure that the proposed south curb radius meets the existing curb just north of the south property line. GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 9 Figure 5—Revised Site Plan, dated October 20, 2022, showing NYSDOT's alignment of the roundabout and its approach roadways, along with NYSDOT's property acquisition line for the roundabout project Downsizing the project results in decreased trip generation. The table below indicates the proposed trips in the weekday morning and evening peak hours, and a comparison with the number of trips generated by the Original Project Proposal. Time Period Entering Vehicles Exiting Vehicles Weekday Morning Peak Hour (7:45-8:45 AM) Medical Offices 36 9 Apartments 8 24 44 (reduced from 56) 33 (reduced from 39) Weekday Evening Peak Hour (4-5 PM) Medical Offices 17 40 Apartments 21 12 38 (reduced from 46) 52 (reduced from 67) As in the Original Proposal, due to the uncertainties associated with the County's potential rescheduling of S92 Bus Route service, as contemplated in the County's current Reimagining Transit Study, no credit for a reduction in vehicular trips was taken for anticipated trips to the site using the bus. In reality, some workers and medical office patients will utilize the bus to the site if bus stops are established in the vicinity of the site. When completed, the downsized development will generate a minor amount of traffic, less than a 5% increase in traffic volumes at the roundabout relative to the estimated traffic volumes there in 2025 in the AM and PM peak hours, compared with a 6% increase in the Original Proposal. Since the proposed roundabout will operate at a very good LOS, the amount of traffic generated by the downsized development will have a minor, if any, and lesser impact on the LOS than the Original Proposal. Therefore, with adequate available capacity the roundabout can very easily accommodate the generated traffic. As with the Original Proposal, given that only 10% of the site's exiting traffic at the easterly driveway would execute a right turn, causing a negligible effect on intersection capacity, capacity analyses were not performed there. The LOS for unsignalized intersections is based on the average delay per vehicle for the most critical turning movement at the intersection. Under the Downsized Proposal, the average delays per vehicle are reduced slightly, and the revised very good LOS results for the proposed westerly driveway intersection are identical to those in the Original Proposal, and are as follows: GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 10 N 61'55'09"E T-' ( NH 4 AD� 498.74' / h�j^N 2 '� zm � o �,- 71'l a �� � �" " � �' �' nli�! '71,1✓,�'"—;�'-� �w�,aa Vw .m S 62°20'39"W �—35265' Y S 6220'39'W 1 " 194.18' ` 1 ------:.:.:._. u,e„w,�rc..,,rr®�,a,.��«.,.�.,,�.w�.xm�m.w s•..,r.� ,,.M1:�.,� ._...---=._... . ..... w`,.aP` -------- ..........— — .�.��«.< L_.—_.J KNAPP PLACE S 60"30'49" 7497' IM TOWN 5 U GL NO °o win°,u.:e w,u muo,mu um.+n ..rt w«v..no-.,=u°°.noiu.«.u....wn«w uuCTWAttS24N_0 E.nxo WI FIGURE A ra REVISED SIiE PLAN ..u,w,a.xwa..e arw.mx,w�.. _=n9WNS2E�PRbPGSA� mw vo me w.mn 9odAiEB,P.C. ,.,ice,muemv+m w.,arr w,mauwm a,..c.m.:u-w, r'wK•"••«` ,rr wm.«a nw�w:rorc uwwmwe..mm.m°mw amv.,,n, -rze.e:c-:rs^ ae�p mco xrN Gt Ss'n' 49,8.74' �m..ao..o. .,..o,,.. 94 - rF A ,. I S wn mva vAx�cn n� r� "l���a x7ren ___ :> _ om�� '`oma ��°°`�• .: $.. 1 �,��// •. _ -tiK., «` ieS` it ���� __ `��._.-_ • 5 _ —. i I S 62'20'39"W 20' ' 35265''x, I S 62� 39 W 94,18 n (( N N .�..,..,,.�,. . .. I ....... � S L._ KNAPP PLACE - 60'30'49" 79.97' ou THOL FIGUI' "P—REVISTALIGNMENAN WIiH RbU�NOA„BOUT AUGNMENi Weekday Peak Hour Time Period Critical Movement Level of Service Morning Westbound Left + Right Turns B Evening Westbound Left + Right Turns B 9.0 RECOMMENDATIONS Given the locations of the driveways with respect to the roundabout, and considering DOT's proposed alignment of the approaches to the roundabout, in order to optimize safety at the driveway intersections the following recommendations can be made: • At the westerly driveway, southbound left turns to enter the site should be prohibited • At the easterly driveway, left turns entering and exiting the site should be prohibited Since the proposed roundabout, now incorporated into DOT's construction contract, will operate at a very good LOS, the amount of traffic generated by the development will have a minor, if any, impact on the LOS. Therefore, with adequate available capacity the roundabout can easily accommodate the generated traffic. Since the reduced traffic generation under the Downsized Proposal will further reduce both the minor impact on the LOS of the roundabout, as well as average vehicle delays at the intersection of the westerly site driveway with Main Street, it is recommended that the Downsized Proposal be approved. In addition, the available Intersection Sight Distance (ISD) south of the westerly driveway will need to be measured during construction, in order to determine if one or more large trees within the existing NY 25 Right of Way should be removed to provide adequate ISD. GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 11 APPENDIX 2025 (Estimated Time of Completion) Traffic Volumes at the Roundabout Site Generated Weekday AM and PM Peak Hour Volumes—Original Proposal, Drawings VOL-01 and VOL-02 Westerly Driveway Intersection Capacity Analysis Results--Original Proposal Site Generated Weekday AM and PM Peak Hour Volumes—Downsized Proposal Drawings VOL-03 and VOL-04 Westerly Driveway Intersection Capacity Analysis Results--Downsized Proposal Driveway Intersection Sight Distance—Drawing SD-01 GREENPORT MEDICAL OFFICES AND RESIDENCES PAGE 12 TRAFFIC VOLUMES--NY 25/CR 48 INTERSECTION Source: NYSDOT Draft Final Design Report, PIN 0801.01 AM Peak Hour(7:45 to 8:45) Movement 2023 2025 EB-T 318 321 EB-R 110 111 WB-L 115 116 WB-T 255 257 NB-L 65 66 NB-R 94 95 TOTAL 957 966 PM Peak Hour(4:00 to 5:00) Movement 2023 2025 EB-T 254 256 EB-R 107 108 WB-L 182 184 W B-T 456 460 NB-L 124 125 NB-R 149 150 TOTAL 1272 1283 ' I I .rc 4 F I tl' I 1 u � 0 o a x ,V) m� O o ao a V) 0: O O a w W Y o O B O O f/1 Z U O r U 0 J ii W O � w r � K N 0 a z w w do N I � a q 1 U v o v ��l�. � � �/s l s eF€9933 pps (' �` o'�✓ � e�spep�epC a��d r3 s 55�e �s a N„,„„ •�I F�t�EY2S o ID C U wx Q x M O m Cl)r N J o w I 0 w ID- 00 LO17 t Y W W yIllll{' V III w 11 U Q (9 ¢w F z 0 U U ZfY Z L w III r tfflA p LU 2 w LU p ; � I I Y/y I I/1 J M I M J 2 Q N w to0 y a j a o z w w � z w o 0 � I a dpi br � a- z Y W � K O w LL z O O0 U Y U O J W O LL 7 a m z L, w rr U � O �(��� 6 ur /I w, J r� Ib n0 N' ti vil da ��y v 0 u, J Y� C"1 yd Cl) ^ EFa s i ImeMIN d' a atl l g �""A eE3EF?�FYd� J C') F (n C14 W x 2 x to O W > 0 O w to N N V I CO Y W J w W a >j w W d J J < U > <W ~ `' U" _V U W ui z C V I W ❑ p h h W W W SYNCHRO LEVEL OF SERVICE SUMMARY--2025 MAIN STREET AT PROPOSED WEST ACCESS DRIVEWAY I AM Peak Hour PM Peak Hour Mvmnt Mvmnt Mvmnt Inter. Inter. Mvmnt Mvmnt Mvmnt Inter. Condition Mvmnt Inter. Delay Vic LOS Delay LOS Delay V!C LOS Delay LOS (sedveh) Ratio (see/veh) (sedveh) Ratio (sedveh) Build NB-TR 0.0 0.00 A 0.0 0.00 A ETC SB-LT 0.0 0.00 A 0.8 A 0.0 0.00 A 1.1 A (2025) WB-LR 10.3 0.05 B 11.9 0.40 B Lanes, Volumes, Timings 13: Main Street & Driveway 1 09/14/2022 f- t Lane Group, WBL WBR NBT NBR SBL SBT Lane Configurations Y T+ +1 Traffic Volume(vph) 14 21 161 20 0 227 Future Volume(vph) 14 21 161 20 0 227 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Lane Util, Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.918 0.985 Flt Protected 0.981 Satd. Flow(prot) 1678 0 1835 0 0 1863 Flt Permitted 0.981 Satd. Flow(perm) 1678 0 1835 0 0 1863 Link Speed (mph) 30 30 30 Link Distance(ft) 196 220 348 Travel Time(s) 4.5 5.0 7.9 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 15 23 175 22 0 247 Shared Lane Traffic(%) Lane Group Flow(vph) 38 0 197 0 0 247 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft) 12 0 0 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1,00 1.00 1.00 Turning Speed(mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summa. Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 21.9% ICU Level of Service A Analysis Period(min) 15 BUILD AM PEAK HOUR ETC(2025) Synchro 11 Report RB Page 7 HCM 6th TWSC 13: Main Street & Driveway 1 09/14/2022 Intersection Int Delay,s/veh 0.8 Movement—_ Vh1 L WBR, NBT NBR SBL SBT Lane Configurations Y T 4 Traffic Vol, veh/h 14 21 161 20 0 227 Future Vol,veh/h 14 21 161 20 0 227 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None None Storage Length 0 - - - Veh in Median Storage,# 0 0 0 Grade, % 0 - 0 - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 15 23 175 22 0 247 Major/Minor Minorl Ma ort Ma or2 Conflicting Flow All 433 186 0 0 197 0 Stage 1 186 - - Stage 2 247 - - Critical Hdwy 6.42 6.22 4,12 Critical Hdwy Stg 1 5.42 - - - - Critical Hdwy Stg 2 5.42 Follow-up Hdwy 3.518 3.318 - - 2.218 Pot Cap-1 Maneuver 580 856 1376 Stage 1 846 - Stage 2 794 - Platoon blocked, % - - Mov Cap-1 Maneuver 580 856 1376 Mov Cap-2 Maneuver 580 - Stage 1 846 Stage 2 794 - - - NB - e. A roach° WB � SB HCM Control Delay, s 10.3 0 0 HCM LOS B Minor Lane%Ma or,Mvmt NBT ' NBRWBLn1; SBL SBT , Capacity(vehlh) - 719 1376 HCM Lane V/C Ratio 0.053 - - HCM Control Delay(s) - 10.3 0 HCM Lane LOS B A - HCM 95th %tile Q(veh) - 0.2 0 BUILD AM PEAK HOUR ETC(2025) Synchro 11 Report RB Page 8 Lanes, Volumes, Timings 13: Main Street & Driveway1 09114/2022 t ► Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Y T� +T Traffic Volume(vph) 23 37 275 16 0 292 Future Volume(vph) 23 37 275 16 0 292 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.917 0.993 Flt Protected 0.981 Satd. Flow(prot) 1676 0 1850 0 0 1863 Flt Permitted 0.981 Satd. Flow(perm) 1676 0 1850 0 0 1863 Link Speed (mph) 30 30 30 Link Distance(ft) 157 220 348 Travel Time(s) 3.6 5.0 7.9 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 25 40 299 17 0 317 Shared Lane Traffic(%) Lane Group Flow(vph) 65 0 316 0 0 317 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft) 12 0 0 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1,00 Turning Speed (mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 25.7% ICU Level of Service A Analysis Period(min) 15 BUILD PM PEAK HOUR ETC(2025) Synchro 11 Report RB Page 7 HCM 6th TWSC 13: Main Street & Driveway 1 0911412022 Intersection Int Delay,s/veh 1,1 Movement: WBL WBR NBT; NBR SBL SBT Lane Configurations Y ra 4 Traffic Vol, veh/h 23 37 275 16 0 292 Future Vol,veh/h 23 37 275 16 0 292 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None None Storage Length 0 - - - - Veh in Median Storage,# 0 - 0 0 Grade, % 0 - 0 - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 25 40 299 17 0 317 Ma or/Minor Minorl M 'orl Ma'or2 Conflicting Flow All 625 308 0 0 316 0 Stage 1 308 Stage 2 317 - - - Critical Hdwy 6.42 6.22 _ 4.12 Critical Hdwy Stg 1 5.42 - - Critical Hdwy Stg 2 5.42 Follow-up Hdwy 3.518 3.318 - 2.218 Pot Cap-1 Maneuver 449 732 1244 Stage 745 Stage 2 738 Platoon blocked, % - Mov Cap-1 Maneuver 449 732 1244 Mov Cap-2 Maneuver 449 - - - Stage 1 745 - Stage 2 738 - A r11,` .WB B SB HCM Control Delay, s 11.9 0 0 HCM LOS B W .. Mnor,Lo' olMorMvmt NBT iBRWLrt1 SBL, SBT, Capacity(veh/h) 590 1244 - HCM Lane V/C Ratio 0.111 - HCM Control Delay(s) 11.9 0 HCM Lane LOS B A - HCM 95th %tile Q(veh) 0.4 0 - BUILD PM PEAK HOUR ETC(2025) Synchro 11 Report RB Page 8 / f O � J O I u � r J O cn 2 0 O %r rqn Y00 aw a w O oN m.9 Z vwi 3 0 0 0 v a a u i p 2 U) Z w W Y 7 Q °p w z xw �N F < O O LL F LL a' 7 O � a Z W I C7 ^ w r d ¢ 10 N P�mmr H: n u lvp � U � d UYs N s S�E V N �z� � °:€g�i�•af awe a5H€fie€ `E@€Si $€ J H CO �,wV W X 2m F X J X N Cl) O W D W U) 2O ~ Lli M W V J W Z W W _ } a > z a ¢ a > Q w F z C9 U U Z F Z E5—LL W W LL,W p p 20 U) z W 41 W O Iy Y O O W b > F ^" �y 0 Q = N w a w�n o a 0 �> z 0 3 0 0 0 o a x N w j U W O N Y R' /, Po Z }U 2i 00 N Z W 0, 0 LL Z Q U r 1000 U Y u p LL tt 7 O N a z LU w w � I yv 4 Y i I fi fl P d � F f NW g� O� 6Q Wr Y� r ) iC 9 y46 III N m m I F- IM1 U W X F X X 0. x a vi U W O LU N m W U1 1 W U w w S U w (L > 2 > w � Q > a ¢w F- z C7 U U Z CY Z 0 LL 2 F-- LL LLU U z x W LU W SYNCHRO LEVEL OF SERVICE SUMMARY FOR 2025 MAIN STREET AT PROPOSED WEST ACCESS DRIVEWAY 1 AM Leak Hour I'M Peak flour MvmnL Mvmnt Inter. Mvmnt MvmnL Inter. Condition Mvmnt Mvmnt. Inter. Mvmnt Inter. Delay v/C LOS Delay LOS Delay v/C LOS Delay LOS (sedveh) Ratio (seelveh) (ser/veh) Ratio (sedveh) Build NB-TR 0.0 1 0.00 A 0.0 0.00 A ETC SB-LT 0.0 0.00 A 0.7 A 0.0 0.00 A 0.9 A (2025) WB-LR 10.2 0.05 B 11.7 0.09 B Lanes, Volumes, Timings 13: Main Street & Access Driveway 1 09/22/2022 ,or k- t ` Lane Gr a 1. WBR NBT NIBIR SBL SBT Lane Configurations Y 1� Traffic Volume(vph) 12 18 161 15 0 227 Future Volume(vph) 12 18 161 15 0 227 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.918 0.989 Flt Protected 0.981 Said.Flow(prot) 1678 0 1842 0 0 1863 Flt Permitted 0.981 Satd.Flow(perm) 1678 0 1842 0 0 1863 Link Speed(mph) 30 30 30 Link Distance(ft) 138 220 348 Travel Time(s) 3.1 5.0 7.9 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj.Flow(vph) 13 20 175 16 0 247 Shared Lane Traffic(%) Lane Group Flow(vph) 33 0 191 0 0 247 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft) 12 0 0 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1 00 1.00 1.00 1.00 Turning Speed(mph) 15 9 9 15 Sign Control Stop Free Free Intersection$umr 1 Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 21.9% ICU Level of Service A Analysis Period (min) 15 BUILD AM PEAK HOUR ETC(2025) Synchro 11 Report RB Page 5 HCM 6th TWSC 13: Main Street &Access Driveway 1 09/22/2022 Intersection. Int Delay, s/veh 0.7 Mov rnent WBL WBR NBT B ' SBL : BT Lane Configurations Y '+ t Traffic Vol,veh/h 12 18 161 15 0 227 Future Vol, veh/h 12 18 161 15 0 227 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None None Storage Length 0 - Veh in Median Storage,# 0 0 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 13 20 175 16 0 247 Major/Minor;., Minor1 'Ma ort: Ma oQ Conflicting Flow All 430 183 0 0 - - Stage 1 183 - Stage 2 247 - - Critical Hdwy 6.42 6.22 - Critical Hdwy Stg 1 5.42 - - - - Critical Hdwy Stg 2 5.42 Follow-up Hdwy 3.518 3.318 - Pot Cap-1 Maneuver 582 859 - 0 Stage 1 848 - 0 - Stage 2 794 0 Platoon blocked, % - Mov Cap-1 Maneuver 582 859 Mov Cap-2 Maneuver 582 - _ Stage 1 848 Stage 2 794 - A " roac WB„ NB: ; SB HCM Control Delay, s 10.2 0 0 HCM LOS B Mirror Lane%Ma orMvmt , NBT,, N BRWBLri1, Capacity(veh/h) 722 HCM Lane V/C Ratio - - 0.045 - HCM Control Delay(s) 10.2 _ HCM Lane LOS - - B - HCM 95th%tile Q(veh) 0.1 BUILD AM PEAK HOUR ETC (2025) Synchro 11 Report RB Page 6 Lanes, Volumes, Timings 13: Main Street &Access Driveway1 092212022 f- t Laneteu ii: SSR NBT NSM ,SBL - SBT Lane Configurations t Traffic Volume(vph) 18 29 275 13 0 292 Future Volume(vph) 18 29 275 13 0 292 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.917 0.994 Flt Protected 0.981 Satd. Flow(prot) 1676 0 1852 0 0 1863 Flt Permitted 0.981 Satd. Flow(perm) 1676 0 1852 0 0 1863 Link Speed (mph) 30 30 30 Link Distance(ft) 174 220 348 Travel Time(s) 4.0 5.0 7.9 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 20 32 299 14 0 317 Shared Lane Traffic(%) Lane Group Flow(vph) 52 0 313 0 0 317 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft) 12 0 0 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed(mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 25.4% ICU Level of Service A Analysis Period(min) 15 BUILD PM PEAK HOUR ETC(2025) Synchro 11 Report RB Page 5 HCM 6th TWSC 13: Main Street &Access Driveway 1 09122/2022 Intersection,. Int Delay,slveh 0.9 Minnetat- WBL WBR NBT NBR SBL SBT Lane Configurations t Traffic Vol, vehlh 18 29 275 13 0 292 Future Vol, vehlh 18 29 275 13 0 292 Conflicting Peds,#1hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None None Storage Length 0 - ~ Veh in Median Storage,# 0 - 0 0 Grade, % 0 - 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 20 32 299 14 0 317 Ma'orN or Minor1 Ma'or1 Ma or2 Conflicting Flow All 623 306 0 0 ~ Stage 1 306 - Stage 2 317 - Critical Hdwy 6.42 6.22 Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 - Follow-up Hdwy 3.518 3.318 Pot Cap-1 Maneuver 450 734 0 Stage 1 747 0 Stage 2 738 0 Platoon blocked, % Mov Cap-1 Maneuver 450 734 Mov Cap-2 Maneuver 450 - - Stage 1 747 - Stage 2 738 - ~ - A roach;,;,, ;WB NB; SB HCM Control Delay,s 11.7 0 0 HCM LOS B Mirtor,Lane�Ma orrMvmt�,; NBT NBRWBLn1 SBT Capacity(veh/h) 591 HCM Lane V/C Ratio - - 0.086 HCM Control Delay(s) 11.7 HCM Lane LOS - - B - HCM 95th %etile Q(veh) 0.3 BUILD PM PEAK HOUR ETC(2025) Synchro 11 Report RB Page 6 Y r oo t- 9 F �I dye Z w 10- � I 2' c/tJfi y� 2 3 � If WU � Y y �� If st r ,�. ir U5 cao o z a W Y � >O I J W U� (, w$ w0 Z ULL Z —� O� O O v z z Q O QO U Y r LL u' N 0 a z w c� ffO a 5 �yE W w x Y U N J�J w r ian.fa 0 m « RIM, ps a 9 tl e e6 EC w 6�5 tl: 45 �a8 .�g z0 z G ioN az 3 a� 0 0