HomeMy WebLinkAboutH2M Response 4
Groundwater/Gas RFP Page 5 of 6
Southold Landfill
November 2015
Town of Southold Solid Waste Management District
RFP For Post-Closure Groundwater £t Gas Sampling, Analysis, And Reporting
On the Southold Town Landfill
CONTRACTOR COST PROPOSAL - SEMI-ANNUAL GROUNDWATER SCHEDULE
Cost Per Event j
Sampling I i
(Labor and ( Laboratory
Quantity Units Expenses) Analysis Reporting Total Per Annual Total
Item Event(1)
2015 4th Qtr One Per Event 6,018 777 1,404 8,199 8,199
Baseline Event
20162 nQtr One Per Event 6,018 777 1,404 8;199 --
Baseline Event
2016 41Qtr One Per Event 6,018 777 1,404 8,199 16,398
Baseline Event
2017 21 Qtr One Per Event --
Baseline Event 6,018 777 1,404 8,199
2017,e Qtr One Per Event
Baseline Event ! 6,018 777 1,404 .8,199 16,398
2018 2" Qtr One Per Event j 6,018 777 1,404 8,199
Baseline Event ! --
2018 41Qtr One Per Event
Baseline Event 6,018 777 1,404 8,199 16,398
20192 nQtr One Per Event 6,018 777 1,404 8,199
Baseline Event --
2019 4 •Qtr one Per Event 6,018 777 1,404 8,199 16,398
Baseline Event 1
Grand Total (9
sampling 73,791
events)
Proposal Submitted By: Notes: (1) Includes Data Validation
Firm Name: H2M architects + engineers
Authorized Agent {print name):GEORGE W. DESMARAIS, P.E.
Address: 538 BROAD HOLLOW ROAD Title: VICE PRESIDENT
4TH FLOOR EAST 11/19/15
Signature: Date:
MELVILLE, NY 11747 (Attach any additional supportive statements or documentation as desired)
Groundwater/Gas RFP Page 6 of 6
Southold Landfill
November 2015
Town of Southold Solid Waste Management District
RFP For Post-Closure Groundwater Sampling, Analysis, And Reporting
On the Southold Town Landfill
CONTRACTOR COST PROPOSAL - QUARTERLY GAS MONITORING SCHEDULE
Cost Per Event _
Item Estimated Units Sampling Annual Total
Quantity (Labor and
Expenses) Reporting Total Per
Event
2015 Event one Per Event $350.00 $130.00 $480.00 $480.00
2016 Event Four Per Event $400.00 $130.00 $530.00 $2,120.00
2017 Event Four Per Event $415.00 $135.00 $550.00 $2,200.00
2018 Event Four Per Event $425.00 $140.00 $565.00 $2,260.00
2019 Event Four Per Event $435.00 $145.00 $580.00 $2,320.00
Grand Total (17 $7,050.00 $2,330.00 $9,380.00 $9,380.00
quarters)
Proposal Submitted By:
Firm Name: Lockwood, Kessler& Bartlett, Inc. (LKB) .
Authorized Agent(print name):_ Paul Larmano, PE, BCEE, LEED AP
Address: One Aerial Way Vice President of Environmental Services
Title:
Syosset, New York 11791
Signature: � ��'� �'� Date:
(Attach any additional supportive statements or documentation as desired)