Loading...
HomeMy WebLinkAboutH2M Response 4 Groundwater/Gas RFP Page 5 of 6 Southold Landfill November 2015 Town of Southold Solid Waste Management District RFP For Post-Closure Groundwater £t Gas Sampling, Analysis, And Reporting On the Southold Town Landfill CONTRACTOR COST PROPOSAL - SEMI-ANNUAL GROUNDWATER SCHEDULE Cost Per Event j Sampling I i (Labor and ( Laboratory Quantity Units Expenses) Analysis Reporting Total Per Annual Total Item Event(1) 2015 4th Qtr One Per Event 6,018 777 1,404 8,199 8,199 Baseline Event 20162 nQtr One Per Event 6,018 777 1,404 8;199 -- Baseline Event 2016 41Qtr One Per Event 6,018 777 1,404 8,199 16,398 Baseline Event 2017 21 Qtr One Per Event -- Baseline Event 6,018 777 1,404 8,199 2017,e Qtr One Per Event Baseline Event ! 6,018 777 1,404 .8,199 16,398 2018 2" Qtr One Per Event j 6,018 777 1,404 8,199 Baseline Event ! -- 2018 41Qtr One Per Event Baseline Event 6,018 777 1,404 8,199 16,398 20192 nQtr One Per Event 6,018 777 1,404 8,199 Baseline Event -- 2019 4 •Qtr one Per Event 6,018 777 1,404 8,199 16,398 Baseline Event 1 Grand Total (9 sampling 73,791 events) Proposal Submitted By: Notes: (1) Includes Data Validation Firm Name: H2M architects + engineers Authorized Agent {print name):GEORGE W. DESMARAIS, P.E. Address: 538 BROAD HOLLOW ROAD Title: VICE PRESIDENT 4TH FLOOR EAST 11/19/15 Signature: Date: MELVILLE, NY 11747 (Attach any additional supportive statements or documentation as desired) Groundwater/Gas RFP Page 6 of 6 Southold Landfill November 2015 Town of Southold Solid Waste Management District RFP For Post-Closure Groundwater Sampling, Analysis, And Reporting On the Southold Town Landfill CONTRACTOR COST PROPOSAL - QUARTERLY GAS MONITORING SCHEDULE Cost Per Event _ Item Estimated Units Sampling Annual Total Quantity (Labor and Expenses) Reporting Total Per Event 2015 Event one Per Event $350.00 $130.00 $480.00 $480.00 2016 Event Four Per Event $400.00 $130.00 $530.00 $2,120.00 2017 Event Four Per Event $415.00 $135.00 $550.00 $2,200.00 2018 Event Four Per Event $425.00 $140.00 $565.00 $2,260.00 2019 Event Four Per Event $435.00 $145.00 $580.00 $2,320.00 Grand Total (17 $7,050.00 $2,330.00 $9,380.00 $9,380.00 quarters) Proposal Submitted By: Firm Name: Lockwood, Kessler& Bartlett, Inc. (LKB) . Authorized Agent(print name):_ Paul Larmano, PE, BCEE, LEED AP Address: One Aerial Way Vice President of Environmental Services Title: Syosset, New York 11791 Signature: � ��'� �'� Date: (Attach any additional supportive statements or documentation as desired)