Loading...
HomeMy WebLinkAbout45988-Z ��o�oSUFFOI oG Town of Southold 8/11/2022 -A) P.O.Box 1179 o _ x� 53095 Main Rd y�j�l dao Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 43320 Date: 8/11/2022 THIS CERTIFIES that the building ADDITION/ALTERATION Location of Property: 1905 Oaklawn Ave., Southold SCTM#: 473889 Sec/Block/Lot: 70.-3-22.1 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 3/8/2021 pursuant to which Building Permit No. 45988 dated 3/26/2021 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: i additions and alterations including covered porch and outdoor shower,to existing single-family dwelling as applied for. The certificate is issued to Zehil,Charles&Laura of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. 45988 5/19/2022 PLUMBERS CERTIFICATION DATED 5/2/2022 R EKy P(lumbing&Weating th izSignature r TOWN OF SOUTHOLD �o�svFFotKCo ay BUILDING DEPARTMENT TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 45988 Date: 3/26/2021 Permission is hereby granted to: Zehil, Charles 1905 Oaklawn Ave Southold, NY 11971 To: construct additions and alterations to existing single-family dwelling as applied for. At premises located at: 1905 Oaklawn Ave., Southold SCTM #473889 Sec/Block/Lot# 70.-3-22.1 Pursuant to application dated 3/8/2021 and approved by the Building Inspector. To expire on 9/25/2022. Fees: SINGLE FAMILY DWELLING-ADDITION OR ALTERATION $857.60 CO-ADDITION TO DWELLING $50.00 Total: $907.60 ector pF 50!/j�Ql h O Town Hall Annex Telephone(631)765-1802 54375 Main Road P.O.Box 1179 sean.devline-town.southold.ny.us Southold,NY 11971-0959 �QIycoU �^ BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: Charles Zehill Address: 1905 Oaklawn Ave city:Southold st: NY zip: 11971 Building Permit#: 459$$ Section: 70 Block: 3 Lot: 22.1 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: DBA: Express Electric License No: 3653ME SITE DETAILS Office Use Only Residential X Indoor X Basement X Service Commerical Outdoor 1st Floor X Pool New X Renovation X 2nd Floor Hot Tub Addition X Survey Attic Garage INVENTORY Service 1 ph Floor Heat 1 Duplec Recpt 20 Ceiling Fixtures 14 Bath Exhaust Fan 1 Service 3 ph Hot Water GFCI Recpt 1 Wall Fixtures 2 Smoke Detectors 1 Main Panel A/C Condenser 1 Single Recpt Recessed Fixtures 29 CO2 Detectors Sub Panel A/C Blower 1 Range Recpt 50A Ceiling Fan Combo Smoke/CO 1 Transformer UC Lights $' Dryer Recpt GeS Emergency Fixtures Time Clocks Disconnect Switches 22 4'LED Exit Fixtures 11 Pump Other Equipment: Hood, Double Oven, Gas Cooktop, Fridge, DW, W/D, 60A Sub 12 Circuit/ 11 Used Notes: Back of House Addition w/ Kitchen Renovation Inspector Signature: Date: May 19, 2022 S.Devlin-Cert Electrical Compliance Form S �oF so�rF�l4�� Town Hall Annex 0 J Telephone(631)765-1802 54Main Road Fax(631)765-9502 P.O..O.Box 1179 `" Southold,NY 11971-0959 Y� BLULDING DEPARTMENT TOWN OF SOIU`i'HOLD CERTIFICATION Date: d5�J2��2Z Building Permit No. 579$ Owner:Lbc,,.r-eL ?e ln:l _ (Please print) Plumber: (Please print)' lead. F certify that the solder used in the water supply system contains less than 2/10 of I% 5.. (Plumb�� Sigg�nature) Sworn to before me this.r2, day of.WAt A . 20C& Notary Public,c l.��- -County NOTARY PUBLIC,STAfErNES OF NEW YORK Registration No.01GA6392254 Qualified in Suffolk County commission Expires May 20,2023 # *q4qav TOWN OF SOUTHOLD BUILDING DEPT. `ycouNr+ 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ FOUNDATION 2ND [ _ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ]-- FIRE SAFETY INSPECTION. [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION - [ ] PRE C/O REMARKS: 2j 1:�oll vJA5 DATES INSPECTO sol/Th, TOWN OF SOUTHOLD BUILDING DEPT. �yco 765-1802 INSPEC ION [ ] FOUNDATION 1ST [ ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] -FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O REMARKS: R &4ftD o a DATE INSPECTOR l�r �pF SOUIy TOWN'OF SOUTHOLD BUILDING DEPT. 765-1802 r INSPECTION [ ] FOUNDATION IST [ ] OUGH PLBG. [ ] FOUNDATION-2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING ' [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O REMARKS: ON cd oln LOrl t.V� A, r DATE INSPECTOR �pSO F GTyO! # # TOWN OF SOUTHOLD BUILDING DEPT. coutm, 631-765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] I SULATION/CAULKING [ ] FRAMING /STRAPPING [ FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ]' RENTAL REMARKS: no V� T c DATE Vl000 INSPECTOR L-4 5 q e�8 lqoE ooLkto-,vA4ve pF SO(/T # # TOWN OF SOUTHOLD BUILDING DEPT. couto, 631-765-1802 INSPECTION [ ] FOUNDATION IST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY ( ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) NA ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: baht a DATE INSPECTOR n Sp;^ a• W :`Y h v:. rc Vis; x • • +l i v 11144 y.. ^l « f ' r NOW 40 W� F w � u • i' - _* S w. - I r .,�«-jr yr iP�wid��I 'h {y jr A � µz t i ` b : w Y l �wa 1 � r W f v - + y 4 - .k 1 « A x a 3 , i ,t P1 ;n� ek � H rap el i M �. 9 9 rt J " t /t ,1 1 . 1 i . �� lask"��� •fir-. � �' � ... "�,:� r4, } a gyp 1 , 1 v ik ve ooinewrap Air - r A �` 1� 1 �Q'aw� •yy i x. $ 1 .t t w , 1 ry *aa 1 - -. lk ` . t � k M � ..r,f"I h- •, fir t d r t �r 4/1' A R' ,a, C � .� • � � III � S / _ � '! ' w s � irk ; k .. kms' .s • aw. a•, r, t IUD? i ar 'l �y R ¢" s j r�P1I� � � '� 1 1. 1• rt � � .I�r w n 'fk g.. Y y. r � •. 'fir. - r� �.k1. �+• f AM ,.�► �►, v r•� +v 1� 144 f� �•'+`a �i' Y b -�� r FIELD INSPECTION REPORT ATE COMMENTS FOUNDATION(1ST) H C 'FOUNDATION(2ND) t� p� �o d1/ 1oc , A ROUGH FRAMING& t� , PLUMBING H W dAIA n wf WW 10 INSULATION PER N.Y: ►.� STATE ENERGY CODE vv o FINAL ADDITIONAL COMMENTS z "tro 0 N b H 9 TOWN OF SOUTHOLD—BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O.Box 1179 Southold,NY 11971-0959 Telephone(631) 765-1802 Fax(631) 765-9502 hgps://www.southoldtomm.gov Date Received APPLICATION FOR BUILDING PERMIT —21 ffice Use Only PERMIT NO. Building Inspector: MAR 8 2021 Applications-a d16rrhs' dgtbe"filldd-bbt"intheir entirety -,dl n co rn p ete., v"' applications wl, not bOwner's Authgraation e accepted Where the Applicant isnot fhe owner;an Date:3/6/2021 O,WNER(S) PROPERTY Name:CHARLES ZEHIL SCTM #1000-70.-3-22.1 Physical Address: 1905 OAK LAWN EXT. Phone#:646.468.6719 Email:CZEHIL.COM Mailing Address:SAME AS ABOVE CONTACT}PERSON2f Name:EILEENWINGATE FOR QUIET MAN STUDIO ---------- Mailing Address:2805 WEST MILL RD.. MATTITUCK Phone#:516-818-9754 Email:EILEEN QUIETMANSTUDIO.COM DESIGN if Y PROFEX. SSIONAL IN M Name:CONDON ENGINEERING, P.C1 Mailing Address:SIGSBEE ROAD, MATTITUCK - Phone 631-73.4.7250 CONDONER OPTONLINE-.1NET 4- - Name:TBD Mailing Address: Phone#: Email: E]NewStructure ®Addition RAlteration E]Repair ElDemolition Estimated Cost of Project: Dother $ Will the lot be re-graded? E]Yes RNo Will excess fill be removed from premises? E]Yes E]No INFOMATION t } R pRpPERTY ae LUNG ro arty.SI�iGLE FAI1iIILY:DWE i intended use of p P Existing-use-Of property.SIN LE FAMILY DWE1-1-1� ich remises is situated: Are there any covenants and restrictions with respect o Zone or usedistrict in wh p ? I]Yes pNo IF YES,PROVIDE A COPY. _ .... . this props -4® 1.. -777777777 , .<<, ', rofessional tSAesPonsible for all drainage and storm wad r en wading Zone ®FCB1Ck fox AfCE F�eaditi�,The.owner/contractor/design P went for the issuance of H Buildmgwt�erm P. °n buildings, Ilceble Caws, dinences or Regulations.fir•the construct► Chapter.236°of th®Town Code �P6KICATIOt�IS HEREBY MADEe Building�Pe ,imply with ell apPlfcsbte lacus,'ordlnancei;6ulltling coda, Ordipence of tris Tom"of 5oattiord Suffolk;Gounty,,New York and other aPP lic®nt agie n_ i cdoi►s False statements made herein are ._. K remises and in builiiing(s)for necessan) � additions,ake�ons orfbr ramova!or damolWon as herein described The app ? 3-y f: `:-•-[ - - nD151„�ode area regulgtions anatoaau�u�e�bio 21os5_of"t6�e,I�mr York'Stato;Panei few ._:;, ,.. - pu'nisheble as a das5 AiYtlsdomeanarp . :.-- �AuhorjzedAgent ®®wner rint name Appiication-SubMitted By lP ,� • �. . ..T o v Signature of Applicant: _ . Date. CONNIE D.BUNCH Notary Public,State of New York STATE OF NEW YORK) No.01BU6185050 SS: Qualified in Suffolk Pcountyil 1 � 'COUNTY OF ) Commission Exp ires being duly sworn,.deposes and says that(s)he is the applicant (Name of individ al signing contra )a ove named, (S)he is the (Contractor,Agent,Corporate Officer,etc.) this duly authorized to per or have performed the said work,and ed and belief;make and of said owner or owners,and is d y application;that.all statements to in this application are true to the best of his/her knowledge that the work will be performed. erformed in the manner set forth in the application file therewith. Sworn before me this � L M J � .20 day of Notary Public PitOPERTY_OWNEft:AIITHO UZATIO: .. (Where the applicant is riot the•olNneY) CHARLES ZEHIL 1905 OAKLAWN AVE EAT. I, residing-at EIL.EE�N WINGATE on ' do hereby authorize . to apply - my behalf7o the Town of Southold Building Department for approval as described herein. OWner's Sig ature Date Print Owndes:Name = 2 . BUILDING DEPARTMENT- Electrioa'I spector r 0 AUG 1 8 2021 TOWN OF SOUTHOLD ;� A�'i :• �' :: Town Hall Annex - 54375 Main Road'- PO Box 1179 e w; Southold, New York 11971-0 d3,UT�.PTNG�9� P`• /��Jj app Telephone (631) 765-1802 FAX (631 X165=950'2-'F' rogerr(a�southoldtownny.gov - seand ansoutholdtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (Ail Information Required) Date: Company Name: RF' l C Name: License No.: M E- 36S3 emAil: Phone No: e -q1i y 01 request an email copy of Certificate of Compliance Address.; - M ii CrSg P® 3®S JOB SITE INFORMATION (All Information Required) Name: Z5 /'f j I Address: ® rq w u e ,G.< o Cross Street: Phone No.: Bldg.Permit#: _�2288 email: Tax Map District: 1000 Section: 70 Block: Lot: BRIEF DESCRIPTION OF WORK Pease Print Clearly) Check All That Apply: Is job ready for inspection?: BYES ❑NO Ea/Rough In ❑Final Do you need a Temp Certificate?: ❑YES [Z'NO Issued On Temp Information: (All information required) Service Size ❑1 Ph ❑3 Ph Size: A # Meters Old Meter# ❑New Service ❑ Service Reconnect ❑ Underground ❑Overhead # Underground Laterals ❑1 ❑2 ❑H Frame ❑Pole Work done on Service? ❑Y ❑N Additional Information: PAYMENT DUE WITH APPLICATION Electrical Inspection Form 2020.xlsx 1�° TV LrA, i N11 fill, 4" ' . BUILDING DEPARTMENT- Electrical Ihspector AUG 1 8 2021 TOWN OF SOUTHOLD C* Town Hall Annex - 54375 Main Road'- .PO Box 1179 Southold, New York 11971-0956, Telephone (631) 765-1802 ":FAX (631)"765-9502 rogrr(@.southoIdtownnV.qov - seand(o)_southoldtownnV.clov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All information Required) Date: Company Name: , PRES-< Name: License No.: M E-- 3 A S-3 em4il: Phone No: —y/j' 01 request an email copy of Certificate of Compliance Address.J-e rn as M u r,r-aPC)&3e 3 o-S' k C�Lu i-e-1, 11)-y /19 vie I I r JOB SITE INFORMATION (All Information Required)) Name:, Address: 0A k to IJU Cm- -GOU7171461.4, &I-Y. Cross Street: Phone No.: Bidg.Permit#: VT988 email: Tax Map District: 1000 Section: 7.0 - Block: 3 Lot: BRIEF DESCRIPTION OF WORK (Please Print Clearly) Check All That Apply: Is job ready for inspection?: [ YES F-1N0 E31Rough In E]Final Do you need a Temp Certificate?: E]YES [O'NO Issued On Temp Information: (All information required) Service Size F-11 Ph F-]3 Ph Size: A # Meters Old Meter# EJ New Service F1 Service Reconnect F-1 underground []Overhead 1# Underground Laterals [:11 E:]2 E:]H Frame [:]Pole Work done on Service? Additional Information: PAYMENT DUE WITH APPLICATION vc Electrical Inspection Form 2020.xlsx PERMIT# � I Address: Y Switches Outlets GFI's �. Surface Imo► ► 1 �a Sconces 1ti H H's (.'i 4 k�, UC Lts I du, Fans Fridge HW Exhaust C Oven C� i�' "`'� �' Dryer Smokes 1t DW Service Carbon Micro Generator Combo Cooktop �� Transfer AC [` AH Mini � Special: Comments kaj APPROVED AS NOTED DATE-13 I. B.. # RETAIN STORM WATER RUNOFF xx xx PURSUANT TO CHAPTER 236 FEE: tJ . v BY: OF THE TOWN CODE. NOTIF , ,BUILDING �'EPARTMENT AT . 765-1802 -8 AM TO 4 PM FOR THE FOLLOWING INSPECTIONS: 1. FOUNDATION --TWO REQUIRED FOR POURED CONCRETE PL UMBER;CERTIFICATION 2. ROUGH - FRAMING & PLUMBING ONLE40-CbNTEI:T,BEFORE 3: INSULATION CR'T`1FICATE OF`OCC(UPANCY 4. FINAL - CONSTRUCTION MUST BE COMPLETE FOR C.O. SaPER USED IN WATER ALL CONSTRUCTION SHALL MEET THE S�fPPLYYS_7 EM,eANNOT REQUIREMENTS OF THE CODES OF NEW ECCE)FD.2110-OF-1% LEAD. YORK STATE. NOT RESPONSIBLE FOR DESIGN OR CONSTRUCTION ERRORS. COMPLY WITH ALL CODES OF NEW YORK STATE & TOWN CODES ALL PLUMBING WASTE: AS REQUIRED AND CONDITIONS OF &,WATER LINES NEED' N ZBA T ANG$EFORE COVERING," _ _ . SOUTHOLD)?OWN PLANNING BOARD 4UTHOLfl101t1�1IBI ISTEES ELECTRICAL N.Y.S. INSPECTION REQUIRED Blower door and ductwork OCCUPANCY OR testing required. USE: IS' UNLAWFUL WITHOUT CERTIFICATE Midst provide Manuals OF OCCUPANCY n,J and S as per NYS Fnergy Code ^ \7 PROJECT GENERAL NOTES DESIGN CRITERIA WINDOW INFORMATION z 1.ALL WORK MATERIAL,AND EQUIPMENT SHALL BE IN ACCORDANCE WITH THE CONSTRUCTION TYPE TYPE V PROPOSED WINDOWS ARE ANDERSEN = u NEW YORK STATE UNIFORM BUILDING CODE,AND THE NEW YORK STATE EXPOSURE CATEGORY B GLASS TO BE HIGH PERFORMANCE LOW-E GLASS ��y� ENERGY CONSERVATION CODE,AND LOCAL AUTHORITIES. GROUND SNOW LOAD 45 PSF SCREENS ARE PROVIDED FOR ALL OPERABLE WINDOWS AND DOORS LIVING AREAS AND DECKS 40 PSF ''8 o a A W P WIP. 2.ALL CONCRETE SHALL BE STONE AGGREGATE WITH A MINIMUM 28 DAY SLEEPING AREA 30 PSF HARDWARE: FINISH SELECTION BY OWNER gv �za STRENGTH OF 3,000 PSI. WIND SPEED 120 MPH INTERIOR FINISH: PREFINISHED WHITE "y SEISMIC DESIGN CATEGORY B 3.ALL LUMBER SHALL BE GRADE STAMPED DOUGLAS FIR-LARCH STRUCTURAL WEATHERING SEVERE GRADE#2 OR BETTER. FROST LINE DEPTH 36" TERMITE MODERATE TO HEAVY DRAWING SCHEDULE 4. PROVIDE DOUBLE HEADERS AND TRIMMERS AT ALL STAIR AND FLOOR DECAY SLIGHT N OPENINGS, POSTS AND PARALLEL PARTITIONS,AS NOTED ON DRAWING. ICE SHIELD UNDERLAYMENT YES A-000 COVER SHEET-DESIGN CRITERIA-GENERAL NOTES Z X A-0O1 SITE PLAN w REQUIRED Q ; A-100 BASEMENT CONSTRUCTION PLAN 5. BRIDGING TO BE PROVIDED FOR ALL JOISTS AND FLOOR BEAMS. SPACING A-101 FIRST FLOOR CONSTRUCTION PLAN , Q NOT TO EXCEED 8.0 FT. A-102 FLOOR PLAN CONSTRUCTION NOTES O Z DESIGN IN ACCORDANCE WITH AMERICAN FOREST PRODUCTS WOOD FRAME D-100 BASEMENT DEMOLITION PLAN z Z 6. ALL DIMENSIONS AND GRADE CONDITIONS TO BE VERIFIED BY CONSTRUCTION MANUAL FOR 1 &2-FAMILY HOUSE-PRESCRIPTIVE DESIGN D-101 FIRST FLOOR DEMOLITION PLAN CONTRACTOR(S) PRIOR TO START OF CONSTRUCTION AND ORDERING OF 0 MATERIALS. THIS FOUNDATION HAS BEEN DESIGNED FOR A SOIL BEARING METHOD. A-200 ELEVATIONS LU 0 < o CAPACITY OF TWO (2)TSF AND GRADES LESS THAN 5%. CONTRACTOR SHALL A-201 ELEVATIONS 0 Q O A-300 BUILDING SECTION A O 0 _ VERIFY THAT THESE CONDITIONS ARE MET. ALL FILL BENEATH CONCRETE SLABS WINDBORNE DEBRIS PROTECTION SCHEDULE A-301 BUILDING SECTION B d `n TO BE COMPACTED TO 95%RELATIVE DENSITY. PRECUT WOOD STRUCTURAL PANELS WITH A THICKNESS OF MIN.16"WITH 2 i A-302 BUILDING SECTION C a #6 WD SCREWS, SPACING: 12",ARE TO BE PROVIDED TO COVER THE GLAZED A-303 BUILDING SECTION D � N 7. ALL HEADERS 6.0 FT IN LENGTH AND OVER TO BE SUPPORTED BY DOUBLE OPENINGS OF THE PROPOSED ADDITION AND RENOVATION FOR ALL A-400 DETAILS ARCHITECT UPRIGHTS, 9.0 FT AND OVER BY TRIPLE UPRIGHTS. ALL HEADERS TO BE WINDOWS AND DOORS THAT DON'T HAVE OPERATIONAL WOOD SHUTTERS. A-401. DETAILS MINIMUM OF 2-2X8 OR AS SHOWN ON DRAWING. A-402 DETAILS 8. PROVIDE FIRESTOPPING AT ALL LEVEL PENETRATIONS. wQ 9. PROVIDE FLASHING AT ALL ROOF BREAKS, DORMERS, CHIMNEYS, V SKYLIGHTS, EXTERIOR DOORS,WINDOWS,AND DECKS, ETC.. F Q N 10. DO NOT SCALE DRAWINGS. 0�1 Lu VLo 11. DESIGN CONSULTANTS OR RECORD ARCHITECT ENGINEER ARE NOT Z Lo RESPONSIBLE FOR THE INSPECTION, SUPERVISION,OR ADMINISTRATION OF ❑ =3 �- O THIS CONSTRUCTION PROJECT. FEDERAL, STATE AND LOCAL ZONING AND h BUILDING CODE COMPLIANCE SHALL BE THE RESPONSIBILITY OF THE V V � CONTRACTOR. ® ® ® ® Illm, ® DRAWING ISSUE 12. THIS DRAWING IS AN INSTRUMENT PREPARED TO FACILITATE CONSTRUCTION AND SHALL NOT BE CONSTRUED AS A CONTRACT BETWEEN Id II-I BUILDER AND OWNER. Jill HI[[ 13. THIS STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH THE NEW YORK STATE ENERGY CONSERVATION CODE. ® ® 02.23.21 ISSUE FOR PERMIT 14. ENGINEER TO BE NOTIFIED IN WRITING OF ALL CHANGES PRIOR TO AND DURING CONSTRUCTION. , CIF NEVV yo DNTS RAWING SCALE gi Ii �.�P�� v 6 SyF� �1-� DRAWING NAME 15. ELECTRICAL AND MECHANICAL COMPONENTS TO BE DESIGNED AND * �P X92 'k COVER SPECIFIED BY OTHERS. SHEET uj _ ass 16. CONTRACTOR SHALL OBTAIN ALL PERMITS AND INSURANCE NECESSARY BUILDING PERMIT APPLICATION TO PROTECT THE ENGINEER AND OWNER. p �� 2-BR DWELLING TO BE EXPANDED: 5gA DRAWING NO. 17. DO NOT BACKFILL AGAINST FOUNDATION WALLS UNTIL FLOOR SYSTEM PROPOSED FIRST FLOOR EXTENSION WITH FULL BASEMENT A INSTALLATION IS COMPLETE. MISCELLAEOUS INTERIOR ALTERATIONS SUCH AS NEW KITCHEN NEW WINDOWS IN ADDITION AND REPLACEMENT SIDING AS NEEDED 000 UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC. 7209 OF THE N.Y.S. EDUCATION LAW PROJECT • LEGEND - AREA SUMMARY ® PROPOSED FIRST FLOOR ADDITIONS LOT AREA 41,768 SF D EXISTING HOUSE STRUCTURE TO REMAIN EXISTING BUILDING COVERAGE 1,818 SF ��z aF> zb ADDED BUILDING COVERAGE 663 SF . .. TOTAL BUILDING COVERAGE 2,481 SF o TOTAL LOT PERCENT COVERAGE 5.9% � �'` SURVEY BY: HAROLD F. TRANCHON JR. P.C. DATED: 12.27.2001 v� ZX OLu W Q > O' O Q 1— Z � Z N 66036' 10" E 333.28' cn Q p OOH OoD EXISTING ASPHALT DRIVEWAY a ON ��// • ARCHITECT x h W W o N LiuO Z N V W Q '� W �- Q Q = 106.0' o _ LOT 13 �' ,o Lo/ EXISTING 6 O O Z c� 2 STORY - Z LLLJ °0 Z FRAME 0 O QLo N HOUSE N Q N Z" 12.0' V V 'o QD WING ISSUE O 105.5' ,^ cel NEW lk N1, w Es 02.23.21 S 66°36' 10" W 335.00' A ��y SSUE FOR PERMIT cS N 2 DRAWING SCALE r 1'-30' w DRAWING NAME LOT 2 w SITE Ln �� PLAN PROPOSED SITE PLAN ��,o 03350' SCTM# 1000-70-3-22.1 R0FESSIo" DISK 500 DRAWING NO. SOUTHOLD TOWN A SUFFOLK COUNTY, NEW YORK /�''� 1 SITE PLAN oo GALE: 1'=30' UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC. 7209 OF THE N.Y.S. EDUCATION LAW KEYPLAN jl NEW WALL` 46'-0" ❑EXISTING WALL 6'-9,3/4,, 10'-6" 28'-8%4" 8" P.C. FOUNDATION WALL aEcr 3'-0" MIN.WITH 10"x 18"CONT. FOOTINGWe q AU �V I - - - - - - - - - - - - -y I -301 -30 3'-7t/4' '7 I d I a y _ N - - - - 7- - - t- - - - - - - - - - - - - - - - - - 1 - - - - 9 - - - - - - - - - I O w 310, I - - - - - - - - - - - - - - - - - - - - - — - - - - - - - - - - - - - - - - - - - - - - - - - -1 I ; KEYPLAN 65'-0" /® NEW WALL XI EXISTING 11-6" 46'-0" WALL 3'-7%a" 8'-5%2" (EQ.) B'-5Y2' (EQ.) 14'-4%2" 11'-1/4' 171-611 TOJECT U � Z of °� N z;N (Z)ZXtO---- ------- 20 E g4 _ 4 ------to G"— -- -30 30 � y = I 91_811 o PORCH A w a y -IU vG A 1 A31 FWH2968 ''I A 1 -------------160 8.4 ----- ----- Z ~ X (? ,19 (2) X8 13 2X8 i (3) 1.75 x 9.25 1.9E MICROLAM w Lu> MUD 1 I l u Jr�2n d 0 Z 21 3%z' ROOM 3/z _ �o Z >- 1 22 Lu 6,-0„ 10'-7%4' 6�_0„ 10'-7%4"(EQ) 10'-7%4' (EQ) _ `4 p' Y I co Q DI 0 0 = OUTDOOR N 0 o D o o GREAT N N A-2o o O H ER 1 \�+� N UNDRY I N N ROOM v 20 L _ uj I I._. 30� s n 3'-tol „ 15 2t'�%" - BENC BATH I I N x 3"" i @ @ (� N � ARCHITECT 2�/s 4�/e /4 I z � + 04 22 2868 4 I \ co - 23 .0 I �, L-- _ __-J __4068__ 13 04 i 4"X4"Xe" HHS ;� Lu 0 cN•L i i _ FLUSH (2)2X6 (2)2x8 ——— I N 21 68 W 8X40 BOLTIla ED @ 16" I (2)2X8 [HEADERTBD _ (2)2X8 � co ;< J �0 L-- - ---J /C STAGGERED I = ,NI I 12 W Q UW' 2'-10" 3'-11%Z' cam+, I X �o WALL OF 2ND 4"X4"Xe"HHS (� C1 i� o, i 1 3'-2" 4'-11" c., _ N Lu 3U h ;� 30 FLOOR ABOVE I I Sp6 M I I V Z Lu CR co " __ _ 8 _ � II— O oz _ I I ——— ——— 3'-10" i 13'-0" 0 La- A-2o x OFFICE I ; 13 (2)2x8co 0, N IJ- IJ -------------- Q ri U 10 j `� \ V V "O 10 N 2X6 CJ I I CL N , p R \ I/I e j ~ DRAWING ISSUE co @ 16"O/C i----- r r-----� i y N w @J 1 I Mx TR i i DW i i �, w@ zo O• I 2X8 RR I I 9 3 I - I I I I 1 0 I $ I \ 21 ►. II ; ; I I _ QU 3 OO 02.23. i[ @ t6O/CPANTRYISSUE EO R PERMIT y o KITCHEN 01.25.21 n , ,I „ 1 u L'--- — 1 u LUUJ ,n , „ , n ' PROGRESS SET 24, 11 -oN 3 1 �0 /z 7,-9/2 3 2-1 14-9 _ :• . Ul N L -- 01.05.21 C�F' PROGRESS SET cn DRAWING SCALE ' NAME LU O M -`\�'L -7--1 1 5 4��x 9 RD _ r sc 71wDRAWING CONST.O1 NOTES -TED HQ(_ DVI G G LVL N --- --- `�� �O PLAN SEE PAGE A-102 GARAGE E BE R L �O 83 S1 FOR FIRST 15-61G FOYER DRAWING NO. FLOOR PLAN NOTES DINING I -A- FIRST FIRST FLOOR- CONSTRUCTION PLAN UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC. 7209 OF THE N.Y.S. EDUCATION LAW 101 CALE: J•=,-.D• PROJECT first Floor Plan Notes: Foundation Notes: Framing Notes (continued): Z aU Wen The contractor is to verify all measurements in the field and any discrepancies 3. All Microllam (LVL) Lumber is to have the following minimum specifications: W z l�s 1. Install new cabinets throughout. are to be brought to the Engineer prior to construction. 4 P,T"o 2. Install new island with power and plumbing. Fb=2,600 psi 3. Install new counters; coordinate fabrication and installation of owner chosen stone 1 -All concrete 4,000 psi after 28 days minimum. Fv=285 psi a U ^v slab(s). Fc perp=750 psi in 4. Install owner supplied backsplash with matching contractor supplied Laticrete 2-All rebar ASTM A-615 Grade 60. E= 1,900,000 psi grout(color to be approved by owner). 5. Install owner supplied counter depth refrigerator in new location. 3-Footings are to be installed on undisturbed virgin soil.The bottoms of all A. All Glued Laminated Beams(GLB) aka Anthony Power Beam are to have the footings are to be installed a minimum of 3'below grade unless indicated following minimum specifications: 6. Install owner supplied under counter refrigerator drawers with millwork panel. cn otherwise. Z I- 7. -7. Install owner supplied gas range top. Fb=3,000 psi 0 w 8. Install owner supplied dishwasher with millwork panel. 4-All snap off form ties are to be removed and remaining openings are to be Fv=300 psi t= Lu 9. Install counter top microwave in new pantry, provide quad outlet inside cabinet. sealed/grouted. Fc perp=805 psi Q 9 o` 10. Install owner supplied undermount apron front farmhouse sink and faucet. E=2,100,000 psi 0 Z 11. Install new range hood. Adjust duct sizing as necessary for larger hood with 5-The foundation contractor shall coordinate with the plumbing and electrical Z ' Z LU higher CFM, due to range size and range requirements. contractors relative to installation of sleeves and other penetrations prior to 5. All beams fabricated with multiple Laminated Veneer Lumber boards are to 12. Install new crown, base and casings to match existing throughout. pouring concrete. be nailed/bolted in accordance with the manufacturer's specifications. p 13. Install 1"solid wood edge on 4"finished plywood shelf and metal rod in closet. N Q O 6-Install isolation joints along foundation walls and at column and other floor 6. All TJIs are to be installed in accordance with the manufacturer's 14. Install c-shaped pantry shelving: 1" solid wood edge on Q" finished plywood, 6 specifications and shall includes squash blockin and web stiffeners at bearin a O ~ shelves total. penetrations. P q 9 9 O O points on girders and other load bearing areas. W p, 0 15. Install new washer and vented dryer. 7-Installed contraction joints in the cellar floor slab every 18'minimum. °' cn 16. Install owner supplied undermount laundry sink and faucet. 7. All straps,connectors, plates, bolts, nails, etc. are to be galvanized or ARCHITECT 17. Install owner supplied bathroom vanity with sink and faucet. 8-Foundation excavation is not to be back filled prior to the installation of the stainless steel. Designated connectors, strap etc. on these drawings are made 18. Install white comfort height elongated Kohler Corbel WC: K-4144 and K-4143 floor framing. by Simpson unless indicated otherwise.All connectors, straps etc. are to be with trip lever to match owner selected faucet finish. nailed/bolted in accordance with the manufacturer's specifications. 19. Install curbless flush single slope shower floor with Luxe Linear Drain sized to fit 9-Backfill along foundation walls is to be clean material and is to be (www.lineardrains.com 877.398.8110) SP-XX square pattern in polished stainless mechanically compacted in 6"lifts to 95%of maximum dry density. 8. All floor sheathing is to be 2%2 inch AC type plywood,tongue and groove, J O or alternate metal finish to match owner selected shower fitting finish. Double up with an APA span rating of 48/24. Floor sheathing shall be glued and screwed Q J floor joists or use LVLs below as needed to accommodate floor slope. 10-Follow cold weather concrete treatment relative to add mixtures in to the floor joists(6"O.C. edges and 12"O.C. field ). Q 20. Provide blocking in walls for paper holder, towel bar, etc. accordance with ACI 212.3R. Use Air-Entraining admixtures per ASTM C260, N :::E 21. Install new starphyre clear glass shower door and panel, and CRL Geneva hinges AASHTO M154 or Water Reducing and Set-Controlling Admixtures per 9. All wall sheathing is to be 15/32 inch APA Rated Exposure 1 plywood and 6 0 K ASTM C494,AASHTO M 194 only. Do not use Calcium Chloride or other shall be nailed with 10d common nails 6" O.C. edges and 12"O.C.field. w (J 1:9on door. No metal brackets to be installed for fixed panel on bottom or left side. Z J Install recessed U channel along floor and left wall so that glass will recess into it, corrosive type admixtures Lo 10. Solid blocking is to be installed every 8'max or mid span of all floor joists 0 �- O and only glass will be seen,with no metal clips. Framing Notes: with spans exceeding 8'. Wc~ LO 22. Provide sound attenuation in walls surrounding bathroom and laundry room (especially between laundry and great room). 11. Double joists are to be installed below parallel walls. V V SO The contractor is to verify all measurements in the field and any discrepancies I P 23. Location for AC units. are to be brought to the attention of the Engineer prior to construction. DRAWING ISSUE 24. Location for meters. 12. Blocking is to be installed at all point load bearing points. Steel Notes: Wood Framing 13. Walls are to be framed with 2X4 or 2x6 inch studs spaced 16 inches OC 02.23.21 1. All lumber is to be No.2 or better Douglas Fir Larch (N)with the following unless indicated otherwise. ISSUE FOR PERMIT 01.25.21 • All steel is to be ASTM Specification A-992-50 minimum specifications: PROGRESS SET * All Tube Steel ASTM A500-GR-46 All bolts nuts and washers are to be hot dipped galvanized. 01.05.21 • All bolted connections are to be made with A-325 bolts. Fb= 825 psi PROGRESS wINCSSET CALE * All welded connections are to be done by a certified welder and conform to AWS Fv=95 psi ;��OF NEW YO }^-1-0, and AISC standards. Fc perp=625 psi �'�� E\N B SH�cP�'QDRAWING NAME • All weld joints are to use E70XX electrodes. E= 1,600,000 psi FLOOR PLAN I * � 2 Steel is to be cleaned and shop prime with one coat TNEMEC 37-77 W Chem-Prime CONST. 2. All Parallam (PSL) Lumber is to have the following minimum specifications: r- r�`"• at 2.0-3.0 MDF. NOTES n � * Y2"web stiffeners are to be installed at all point load bearing points and over all Fb=2,900 psi m column supports. Fv=290 psi DRAWING NO. * All columns are to be bolted to steel girders with%" bolts and to wood girders with Fc perp=750 psi YZ'lag bolts. E=2,000,000 psi ' A All girder splices are to be made above columns. 102 UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC. 7209 OF THE N.Y.S. EDUCATION LAW KEYPLAN Basement Demolition Notes: 1. Window to be removed. Prepare for new door in window location to provide access to new F$OJECi basement area. 2. Remove bay footing to prepare for new basement area. ��X 3. Protect existing basement areas. W z=` = U WC rR aU Z Q� m� Z X OW Lu a > o, O Q � Z Lu � Z W 00 Q- to 0 0 Wo' O d '- N ARCHITECT -- - - - - - - - - - G / - --- - -- - - \ W O N Q W@ to Z J LO H O III Q N III VVso III DRAWING ISSUE EXISTING BASEMENT 02.23.21 ISSUE FOR PERMIT 01.25.21 PROGRESS SET 01.05.21 PROGRESS SET DRAWING SCALE EXISTING POST WITH BEAM ABOVE pF NEW y J�-1'-0- /�`P �W 138/���O.p� DRAWING E � � � FLOOR 00 DEMO PLAN m2 TO DRAWING NO. 0 D BASEMENT- DEMOLITION PLAN UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC 7209 OF THE N.Y.S. EDUCATION LAW 100 GALE: <-=1%0- KEYPLAN First Floor Plan Demolition Notes: 1. Walls to be removed;flooring to be removed. Prepare for extension of floor area and new ffoJEcr exterior and interior walls. Remove subfloor as necessary for new radiant floor or alternate au �zN heating system. v 2. Windows and exterior doors to be removed and discarded. z�` W 3. Remove and discard bathroom and kitchen fittings and fixtures. w W °r A. Remove and discard washer and dryer. 5. Remove and replace door to garage only when new replacement door is on site for a I; installation. Current door to garage to remain for safety. N 6. Remove and dispose of all cabinets, counter tops, and backsplash, and prepare for new w kitchen layout. Q ; a 7. Remove and dispose of appliances: microwave, range,dishwasher. _ 8. Remove refrigerator and relocate appliance to basement or garage location, or dispose of, as 0 Q directed by owner. � Z 9. Remove and dispose of range hood. Prepare for installation of new, larger range hood to accommodate larger rangetop. Adjust duct size as necessary. Y 10. Doorway to remain, protect casing. vWi Q O 11. Door to remain, protect door, hardware and casing. O In 12. Remove base and crown from walls and prepare for new(new to match existing, leave in 0 a O place where in good repair). a N 13. Remove recessed and pendant ceiling fixtures and prepare for new recessed and pendant ARCHITECT fixtures. 34'-0" 17-6° 14. Prepare meter,AC, and outdoor shower for new locations. UJ 0 F—. - - - - O - - - - 7 II O I u j'� CL I I —— — — __� — I W U I Z J co I� —1 1 _ I— — I I O n to I II I L � L---1 DINING DRAWING ISSUE vv �o - - - �� MUD I - -J KITCHEN I ROOM I I I C2 11 PO DER 02.23.21 E ISSUE FOR PERMIT I 01.25.21 I �� PROGRESS SET 13-6 0 / I L– ----- j O `, I I 01.05.21 PROGRESS SET r W y DRAWING SCALE B0 — — — �I�— — — GJ A yFQ� ( DR WING NAME I ® III FLOOR 01 I I 10 1 r �, `� DEMO. PLAN DINING FOYER01 151_611 00 33 A �� DRAWING NO. D 1 FIRST FLOOR- DEMOLITION PLAN UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOIATION OF or" f^ OF THE N.Y.S. EDUCATION LAW 101 O 1 FCALE: 1'-0' PROJECT z A9 me v2-1 W ;y ao �g ROOF 0 ASPHALT ROOF y F VAPOR BARRIER W/ y ICE AND WATER SHIELD 4' PLYWOOD 2x8 ROOF RAFTER R-49,FOAM INSULATION cry Z X OW VERSATEX OR APPROVED SIMILAR PRODUCT 1X4 SMOOTH TRIM W BOARD ON ALL WINDOWS IN HOUSE, INCLUDING EXISTING a ' a PORTIONS OF ALL FACADES 0 Q Z � Lu NEW WALL D OWNER SELECTED VINYL SHINGLE SIDING w 4" PLYWOOD SHEATHING N Q O 2"x6" STUD O O R-21 BAIT. INSULATION O oo NOTE:EXTENT,OF NEW SIDING PER OWNER a- N VERSATEX OR APPROVED SIMILAR PRODUCT 1 X6 SMOOTH TRIM ARCHITECT BOARD of J O ITI1 IIITII IIITII 1141ll"KIIII 11 11 11 1] 11 11 11 11 11 11 H Q W W 11 L Z Lo 1 N � "pp VCJ � DRAWING ISSUE ❑❑ ❑❑ ❑❑ 11111E 101, 11%1111 1 10, 11 111 FIR ❑❑ ❑❑ ❑❑ �� 11 11 102.23.21 FOR OR'PERMIT ❑❑ ❑❑ ❑❑ :IEEE PROGRESS PROGRESS SET 01.05.21 _ PROGRESS SET ~ DRAWING SLE ��(jF NEW -k till 11DRAWING NAME EXTERIOR ELEVS PATIO/STEPS MATCH r is W TO BE COLUMN c� 2 COORDINATED DESIGN ON WITH FUTURE FRONT PORCH o �? DRAWING NO. PATIO �' A ,J EXTERIOR ELEVATION - REAR UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF IEC. 7209 OF THE N.Y.S. EDUCATION LA 2 00 ECALE: m 1!0 PROJECT z c� CU E� C7 d V'••= Vy���'�^1 �U h N Z F' OLu W Q O' Z Z 61 w � 0 12 O O O � � ce0, 0 a N ARCHITECT EXISTING 2 STORY HOUSE W Q Q~ J N 122.5 'o LLJ W to clo EXISTING 2 Z —' STORY HOUSE _ - Lo Q N �o DRAWING ISSUE IrIn EXISTING GARAGE OUTDOOR ROWER 02.23.21 U Ll 11 ISSUE FOR PERMIT 01.25.21 PROGRESS SET DRAWING SCALE 11 11 11 IT 11 111111 11 IT 11 1111 11 -k 0 1.,0. Or B EI/I/f'O DRAWING NAME I LlEXTERIOR * ELEVS W I W C7 m =(j DRAWING NO. Ro A EXTERIOR ELEVATION -WEST 2 EXTERIOR ELEVATION - EAST 201 SCALE i-1,-0° LE: °-1'-0° UNAUTHORIZED ALTERATION OR ADDMON TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC. 7209 OF THE N.Y.S. EDUCATION LAW PROJECT z W OU �V�N EXIST 2X4 CT Z <z �� W co �za� 110 �96EXIST �� F N 2X6 Cj @ 1 ' OIC O W GREAT ROOM CEILING ALTERNATE PRICE FOR ; Q a CATHEDRAL OR TRAY CEILING Z ROOF Lu Z ASPHALT ROOF tp Q O VAPOR BARRIER W/ Lu O O ~ ICE AND WATER SHIELD 4 PLYWOOD 12 Lo o 2x8 ROOF RAFTER 2'S O� w 0, 0 R49 FOAM INSULATION 2X8 pa @ 16 __ -y-- ARCHITECT NEW WALL 2X6 CJ @ 1-" C- EXIST TJI FJ @ 16"O/C OWNER SELECTED VINYL SHINGLE SIDING 4'PLYWOOD SHEATHING �______�_ ______ � 2"x6"STUD (3) 1.75 x19.5 1.9E MIdROLAM NEW FLUSH STEEL W 8X40 HEADER NEW FLUSH 5 "X 9 Q' uu O R-21 BATT. INSULATION i i i i LVL HEADER J V NOTE: EXTENT OF NEW SIDING PER OWNER Q GREATiROOM I KITCHEN DINING ROOM ~, N �u Ud Lo w ao L------J-L-'------J 0 Q N MATCH EXIST TA FJ @ 16"O/C EXIST TA FJ @ 16"O/C DRAWING ISSUE 02.23.21 ISSUE FOR PERMIT NEW FOUNDATION 01.25.21 10"P.C. FOUNDATION WALL NEW BASEMENTZ = EXISTING PROGRESS SET 2"LEDGE FOR FUTURE MASONRY x W BASEMENT 01.05.21 PROGRESS SET STEP OR PATIO w = DRAWING SCALE 8'-0"WITH 10"x 18"CONT. FOOTING $'=1'0° 4"P.C.SLAB W/VAPOR BARRIER /' DRAWING NAME It UPON 4"CRUSHED STONE c���`���WJy���/ate BUILDING C) SECTION ——————— — —— — — — — — — — — — — ————— — ——— — — —— ——— r s ►•' A ING NO. s'oN� 300 BUILDING SECTION A UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC. 72 OF THE N.Y.S. EDUCATION LAW CALE: J�>p o- PROJECT z n°a ^ as UP�' ROOFS ASPHALT ROOF 12 F N VAPOR BARRIER W/ 2.5F-- ICE AND WATER SHIELD @ 16,E o1C 4' PLYWOOD 2X8 RR 2x8 ROOF RAFTER cn R-49 FOAM INSULATION Oui w Q ' po. 2X6 CJ @ 16"O/C 0 Q Z � gz opo x000 Oo � ce o. O ARCHITECT NEW WALL OWNER SELECTED VINYL SHINGLE SIDING LAUNDRY ROOM HALL Q' PLYWOOD SHEATHING 2"x6"STUD J O R-21 BATT. INSULATION V NOTE: EXTENT OF NEW SIDING PER OWNER ~ t� Q w Z J Cq W) O Q to Q N DRAWING ISSUE MATCH EXIST TJI FJ @ 16"O/C EXIST TA FJ @ 16"O/C 02.23.21 ISSUE FOR PERMIT NEW BASEMENT 4" P.C.SLAB EXISTING 01'25'21 W/VAPOR BARRIER BASEMENT PROGRESS SET UPON 4"CRUSHED STONE 01.05.21 UPON V Z 2 Q H DRAWING SCALE W -0" pF NEW Y DRAWING NAME NEW FOUNDATION ��P �W S,y& O'Q� BUILDING 10" P.C. FOUNDATION WALL A a * �P. C'! SECTION 2"LEDGE FOR FUTURE MASONRY STEP r B OR PATIO b ° 8'-0"WITH 10"x18"CONT. FOOTING °. __ _ ___ _ _ _ _______ __ ____ _ ___ _ _ --- - - - ton _ DRAWING NO. 12'-0" A E-sloo BUILDING SECTION B 0 GALE: e,.0a PROJECT _ U V OU a � 4oog"Q zZ��� W _ W a• s. LiU ada4 ROOF a v ASPHALT ROOF 12 VAPOR BARRIER W/ 2.5F-- ICE AND WATER SHIELD 4' PLYWOOD a? p�C 2x8 ROOF RAFTER 2X N R49 FOAM INSULATION Z ~ (ALT INSULATION AT CEILING JOISTS) 0 w H W 2X6 CJ @ 16"O/C EXIS TJI FJ @ 1 'O/C O Z III L Z III w S< II 0 0 O II 0o =) \ OPEN TO / III \ OPEN TO / w Q. 0 \ MUD ROOM / iii \ MUD ROOM / °- N ARCHITECT NEW WALL OWNER SELECTED VINYL SHINGLE SIDING OFFICE \ / iii \ / HALL 31,PLYWOOD SHEATHING 2"x6"STUD \ / III \ / w 0 R-21 BATT. INSULATION NOTE: EXTENT OF NEW SIDING PER OWNER / \ W LL1 ? F- O O Q Lq DRAWING ISSUE 4TCH EXIST JI FJ @ 16"O/C EXIS TJI FJ @ 1 ' O/C NEW BASEMENT 4" P.C. SLAB EXISTING 02.23.21 W/VAPOR BARRIER BASEMENT ISSUE FOR PERMIT a° u Z = UPON 4" CRUSHED STONE a d PeoceEss SET Q y w DRAWING SCALE LuA. OF NEW yO DRAWING NAME NEW FOUNDATION 8 P.C. FOUNDATION WALL ea a a ° ° c". °Q ° a ����P`� nr- � BUILDING SECTION° ° g. a° 92 8'-0"WITH 10"x 18"CONT. FOOTING a * C o' — w Lij 2 DRAWING NO. 12'-0" A kO�E 1 BUILDING SECTION C UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC. 749 OF THE N.Y.S. EDUCATION LAW 302 GALE: -11-01 PROJECT z0U a z AU mC z U � z z�5$ �e �c aw�zQ Ey ZX O w OFFICE GARAGE I-- Q off. r- Z Lu Z Lu Y O0O 00 � MATCH EXIST TA FJ @ 16"O/C MATCH EXIST TJI FJ @ 16"O/C a 0. 0 ARCHITECT ::7 (2) 2X10 BOLTED @ 16" EXISTING GARAGE FOUNDATION WALL O.C. STAGGERED � 4" P.C. SLAB W/VAPOR B RRIERLu O UPON 4"CRUSHED STONE 8" P.C. FOUNDATION YVALL w NEW BASEMENT 6-0"-7-0"WITH 10"x 18"CONT. Z J OROR FOOTING ° a 0 -46 Q N v V V �o G DRAWING ISSUE 3'-0" 4"P.0 SLAB ' W/VAPOR BARRIER UPON 4"CRUSHED STONE 02.23.21 ISSUE FOR PERMIT °G 01.25.21 PROGRESS SET ° o DRAWING SCALE 4� „m 1, d ° l -0, <CD �_6t F NiEw� DRAWING E G ° ��P �w 8 Sys, �.p BUILDING ��9 SECTION r � D Lwu Z QDRAWING NO. l� Ror ss 303 BUILDING SECTION D UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC- 794 OF THE N.Y.S. EDUCATION LAW LE: ��ltp• PROJECT z ME A U W'j RIDGE VENT LOOKOUT FRAMING SIMPSONCS20x24° RIDGE BOARD °19 2 STRAP ON EACH RAFTER ROOF SHEATHING TO BE NAILED3'O.C.ONALLGABLE ❑ m COLLAR TIE RAFTER SEACH OUTRIGGER �U �a ENDS,EDGES AND FIELDwI Bd COMMON NAILS TOP PLATE BLOCKING 4'O.C.FOR(3)BAYS ON ALL GABLE ENDS ICE SHERD UNDERLAYMENT REQUIRED Simpson LSTA30 Ridge MINIMUM 2-0'WOE OVER LIVING SPACE ROOF RAFTER OR HEADER trap at each Rafte Simpson MTS30 Rafter Strap (10)100 NAILS @ EACH END(TYPICAL) N at each Rafter Tail APA RATED PLYWOOD TO EXTEND DOUBLE RAFTER Z RAFTER OP PLAT TOTOP OFTOP PLATE WI(2)ROWS O_ W OF 8d NAILS 3'O.C.STAGGERED SOFFlTVENT ~ W STUD SIMPSON 1-12A O HURRICANE CUP ON EACH Z RAFTER Simpson 1-12A Hurricane Ties � SIMPSON CS20x36'@SIDES OF Lu � Z at each Rafter Tail OPENING FROM JACK STUD TO PLATE Q OR RIM JOISTwl(9)8d NAILS EACH SIDE Q W � J LU < 5 SHEATHING TO BE NAILED 4'O.C.,EDGES AND FIELD. BESLEPTE 0 DOUBLE TOP w a O PLATE a r- N WALL STUDS @16°O.C. ARCHITECT FASCIA BOARD STRAPPING FLOOR PLYWOOD WdLE04'ON EDGES w1(9)Bd NAILS EACH SIDE 8 6°IN FlELD WI Bd COMMON NAILS STU PLYWOOD SHEATHING TO COVER RIM JOIST& W O SILL BOTTOM FLOORJOIST (2)RO OF D.C. RPOW NAILED Yd GABLE OVERHANG DETAIL PLATE (2)ROWS OF Bd NAILS 3° .C.OR PLYWOOD SHEATHING CAN BUTT TOGETHER(X'SPACE) Q WI(2)ROWS OF8DNAILS 3'O.C. N �Q RIM JOIST DOUBLE TOP PLATE ,^ ;^ PLATE W @ to OR Z JLo � 1— O Skmwn ST22 Seep 2 x 6 STUD WALL PLYWOOD SHEATHING H N Typical 2nd Floor V CJ '10 Strapping Detail NTS BLOCKING IN WALLS OVER B'-0' SIMPSON CSM x 36'METAL STRAP @ 1S'O.C.&AT DRAWING ISSUE BOTH SIDES OF EXTERIOR DOORS.WRAP AROUND SILL PLATE USE(4)NAILS INTO SILL PLATE ON INSDE EDGE ANCHOR BOLT ON INSIDE EDGE OF PLATE AND(9)8d NAILS INTO STUDS AND BOX BEAM 02.23.21 ISSUE FOR PERMIT NAIL SHEATHING TO SILL PLATE 01.25.21 USING(2)ROWS OF Bd NAILS @ 3'O.C. PROGRESS SET STAGGERED 01.05.21 7 PROGRESS SET FLOOR JOIST (1)2 x 8 TREATED SILL PLATES _ .--_ DRAWING SLE NTS DR TERMITE SHIELD AND SILL SEAL OF NE W y DRAWING NAME SIMPSON L8TA36 S BLOCKING ���w B ShF` ! CONST. SIMPSOS DTPs P DETAILS .• e DFROM EACH 8.(dJ 3 NEER 2 810;1 BP (2)a1,5 REBAR CONTINUOUS 2°FROM EACH CORNER I-- P Typical Wall and W13"x3'x A'WASHER Z Sill Strapping HOT DIPPED GALVANIZED m OR STAINLESS STEEL Detail DRAWING NO. � A STRAPPING DETAILS BUILDING CROSS SECTION: TYPICAL DETAILS 'O�°�ESSIOt' A CONSTRUCTION DETAILS UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC. 7209 OF THE N.Y.S. EDUCATION LAW 400 C LE: NTS PROJECT z EACH WINDOW TO RECEIVE(1)7116" THICK x SIZE OF WINDOW PLUS 4" W a EA.SIDE CDX PLYWOOD 'm (2)ROWS OF fid NAILS 513116" F T O.C.STAGGERED 0 INSTALL SIMPSONGS20x36°ON SHEATHINGTO ° o EVERY OTHER OVER OPENING N(18)8d NAILS OVERLAP TOP PLATE ° 611 0 T z Z � RIMJOIST TOP PLATE ° ° 6" 8'- " SP N O0 w Lu TOP PLATE o ; a o I— O y HEADER Lu ...i Z ° W INSTALL SIMPSONCS20%24°EACH ° ° ° o fY DOOR OR SIDE OFOPENINGWI(9)BdNAILS o ° LU W LMNDOWAREAS HEADER ° N a O JACK STUDS ° ° - O O = Lo IH o 0-° ° w o0 . O O. � N STUD (2)RO OF 8d NAILS 3"O.C. TAGGERED ARCHITECT o SHEATHING ° 513/16" NAILS AT BOTTOM OF HEADER 3"O.C. PROVIDE#8 WOOD SCREWS @ 12"O.C. J O NAILS AT TOP OF HEADER @ 3"O.C. AROUND PERIMETER OF WINDOW Q J NAILS AT TOP PLATE(2)ROWS @ T O.C.STAGGERED Q CS STRAPS AT OPENINGS SHEATHING NAILING AT OPENINGS HURRICANE SHUTTER DETAIL O O N Ww Z J v7 OQ � Q N � V V 10 DRAWING ISSUE SOLID WOOD SADDLE 5/ " 02.23.21 WITH BEVELED EDGE =� ISSUE FOR PERMIT 01.25.21 WOOD FLOORING - PROGRESS SET WOOD FLOORING 01.05.21 WARMBOARDS OR - PROGRESS SET SIMILAR EXISTING PLYWOOD V F N♦;1e' DRAWING SCALE SUBFLOOR p•�� rV Y NTS Til ��'A�w B`Sys p O�.f DRAWING NTWE CONST. r FLOOR SADDLE DETAIL AT RADIANT FLOOR TRANSITION n DETAILS DRAWING NO. � S A CONSTRUCTION DETAILS UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC. 7209 OF THE N.Y.S. EDUCATION LAW 4O 1 GALE: NTS I • I F PROJECT z W.U z NAILING SCHEDULE(WOOD FRAME CONSTRUCTION MANUAL 2015,PAGES 149 AND 193 o z" oT escnp ion Numberotnails Nail Spacing S e u g D^ Root Framing 0 U u .a Rafter to top plate(Toe Nailed) 38d Per Rafter Ceiling Jost to top plate(Toe Nailed) 3841 Perjoist 0 U Ceiling Joist to Paragel Rafter(Face Najd) 6.164 Each lap O CeOingJoist Laps over Part'd'ars(Face Marled) 6.164 Each lap 0 SIMPSONSPH4 Collar Tie to Rafter(Face Naged) 38d Per Tie U p STRAP Blocidng to Rafter(Toe Nailed) 3-Sd Each end Rim Board to rafter(End Nailed) 2-1641 Each end SIMPSONLSTA9 Wait raming STRAP to Top Plate to Top PW(Face Nailed) 2-16d Per Foot Z i,— Top Top Plate at Intersections(Face Nailed) 4-164 Joints ea.SideO LJ.1 Stud to Stud(Face raged) 2-16:124•ac. v— Header to Header(Face Nailed) 16d 16'o.c.along edges ' F— W Top or Bottom Plate to Std(end Nailed) 2-16d Per 20 Stud ° °ti•. °n •�� 0 �- 3.15d Per bra StW 'a: :° •° Typical Window and Door 4.16d Per N8 Stud Header Straoain(a Detail � � Z Bottom Porte to Floor gist,Bard Joist End Jost or Bladang(Face Na led) 2.1641 a Per Foot Each Comer oor raming SIMPSON POST ANCHOR w Q O Joist to Sit,Top Plate or Girder(Too Nailed) 4841 Per Joist AB O O = Bridging to Job t(Toe Nailed) 2-41 Each End BWddng to Joist(Toe Nated) 2.8d Each End d I.0 Blocldng to Sill or Top Plate(Toe Nailed) 3.16d each blodx 0 0 O Ledger Ship toBeam(Face Naffed) 3-16d earhjoist POST ANCHOR TYP. WINDOW & DOOR STRAPPING a N Joist on Ledger to Beam(Toe Na 38d per joist Bard Joist to Joist(End Raged) 3.1641 I per joist ARCHITECT Band Joist to SRI or Top Plate(Toe Nated) 2-16d per toot Go ea i g SWdwal Panels 6d Diagonal Board Sheahq FEdge/4"Field 1'W or IW 2-8d Per Support UJI 10 19x10'or Wider Mid Per Support _j V e mg 6heatning ezesnroMUM Q I-- Q Gypsum Wallboard 541 coolers T Edge 110°Field � N O 2 Wall ea ng a (� Strudml Panels ad 3"Edge 14*Field W LLI 00 Fiberboard Panels 7116' 6d 3'Edge 16'Field ? J 25137 td 3°Edge I6°Field0 ~ LO Gypsum Wallboard 5d coolers 7°Edge/1D'Feld < N HardBoard td 6'Edge/1Y Field (J () `O Particleboard Panels 6d 6'Edge/1Y Field Diagonal BoardSheaftug D WING ISSUE 1W or 19x6' 28d persupport INID'orwider 38d persupport Floor bheathing Stnztaal Panels 02.23.21 1°arlass ad 3"Edge/4'Fied ISSUE FOR PERMIT greater than l' 10d 3'Edge/4'Fneb 01.25.21 Diagonal Board Sheathing PROGRESS SET 1W or 19x6' 28d persupport 01.05.21 19x10"orwider 38d persuppod PROGRESS SET _'ROOFSHINGLES: HDUI I - HOLDDOWN DRAWING SCALE FASTNERS FOR ALL ROOF SHINGLES SHALL BE GALVANIZED STEEL,STAINLESS STEEL,ALUMINUM NTS OR COPPER ROOFING NAILS MIN.OF 12 GAUGE SHANK WITH A MIN.OF 318"HEAD ATMF1667 OF A TABLE R301.2(1) `,l ;` vvAWLNG NAME LENGTH TO PENETRATE THROUGH THE ROOFING MATERIALS ANDA MIN.OF 3/4°INT0 THE ROOF CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA .' p ONST. SHEATHING,WHERE THE ROOF SHEATHING IS LESS THAN 3/4'THICK THE FASTNER SHALL PENETRATE THROUGH THE ROOF SHEATHING GROUND WIND SEISMIC SUBJECT TO DAMAGE FROM WINTER ICE SHIELD FLOOD 'Al F� AILS R905.26: ASPHALT ROOF SHINGLES SHALL HAVE A MINIMUM OF 6 FASTNERS PER SHINGLE. SNOW SPEED DESIGN WEATHERING FROST LINE TERMITE DECAY DESIGN UNDERLAYMENT HAZARDS LOAD MPH) CATEGORY pTEMP. REQUIRED 20PSF 140 B SEVERE 3-0' M-H S-M 11 YES NONE 1 W _ D I O. DESIGN CRITERIA BEING USED: 2015 INTERNATIONAL RESIDENTIAL BUILDING CODE AND 2016 UNIFORM NEWYORK STATE CODE SUPPLEMENT CONSTRUCTION DETAILS UNAUTHORIZED ALTERATION OR ADDITION TO THIS DRAWING AND RELATED DOCUMENTS IS A VIOLATION OF SEC. 7209 F THE N. . . CA LAW 02 ISCALE; NTS