Loading...
HomeMy WebLinkAboutRoad Treatments June 23, 2022 Corazzini Paving Products PO Box 1744 Southold,NY 11971 Dear Sirs: Congratulations. At the regular Town Board meeting held on June 21, 2022, the Town Board accepted the bid of Corazzini Paving Products for Item#8, Road Treatment. A certified copy of the resolution is enclosed. The bid deposit is being returned to you. Thank you for your bid. Very truly yours, Lynda M Rudder Deputy Town Clerk Ens. ®N®of -'® DENIS NONCARROW �� G� Town Hall, 53095 Main Road TOWN CLERK ® P.O.Box 1179 Southold,New York 11971 REGISTRAR,OF VITAL STATISTICS B � Fax(631)765-6145 MARRIAGE OFFICER °® ®� Telephone(631)765-1800 RECORDS MANAGEMENT OFFICER r www.southoldtownny.gov FREEDOM OF INFORMATION OFFICER OFFICE OF THE TOWN CLERK TOWN OF SOUTHOLD June 23, 2022 Corazzini Asphalt PO Box 1281 Cutchogue,NY 11935 Dear Sirs: Congratulations. At the regular Town Board meeting held on June 21, 2022, the Town Board accepted the bid of Corazzini Asphalt for Item 46, Road Treatment. A certified copy of the resolution is enclosed. The bid deposit is being returned to you. Thank you for your bid. Very truly yours C�Y� Lynda M Rudder Deputy Town Clerk Ens. FN DENIS NONCARROW �� ®�� Town Hall,53095 Main Road TOWN CLERK P.O.Box 1179 Southold,New York 11971 REGISTRAR OF VITAL STATISTICS %95 r ` Fax(631)765-6145 MARRIAGE OFFICER ��® ®�' Telephone(631)765-1800 RECORDS MANAGEMENT OFFICER d www.southoldtownny.gov FREEDOM OF INFORMATION OFFICER OFFICE OF THE TOWN CLERK TOWN OF SOUTHOLD June 23, 2022 Corazzini Asphalt PO Box 1281 Cutchogue,NY 11935 Dear Sirs: Congratulations. At the regular Town Board meeting held on June 21, 2022) the Town Board accepted the bid of Corazzini Asphalt for Item#5, Road Treatment. A certified copy of the resolution is enclosed. The bid deposit is being returned to you. Thank you for your bid. Very truly yours, Lynda M Rudder Deputy Town Clerk Ens. � RESOLU'T'ION 2022-549 ADOPTED DOC ID: 18214 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 2022-549 WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON JUNE 21, 2022: RESOLVED that the Town Board of the Town of Southold hereby accepts the following bid for Item #8, Type 6 Asphalt, to be picked up by the Town: Corazzini Paving Products $ 110.00 ton Denis Noncarrow Southold Town Clerk RESULT: ADOPTED [UNANIMOUS] MOVER: Louisa P. Evans, Justice SECONDER:Brian O. Mealy, Councilman AYES: Nappa, Doroski, Mealy, Doherty, Evans, Russell 3�gUFFO(* RESOLUTION 2022-548 i �yf�aaF ADOPTED DOC ID: 18213 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 2022-548 WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON JUNE 21, 2022: RESOLVED that the Town Board of the Town of Southold hereby accepts the following bids for Item#6 Hot Mix Asphalt Concrete-Base Coat Corazzini Asphalt Town Fishers Island 30% RAP 0-100 tons $ 145,00 $ 570.00 100-250 ton 135.00 545.00 250-500 ton 130.00 465.00 500-1000 Ton 120.00 425.00 over 1000 Ton 110.00 410.00 Bid# 2 $ 5.75 $ 16.00 Denis Noncarrow Southold Town Clerk RESULT: ADOPTED [UNANIMOUS] MOVER: Jill Doherty, Councilwoman SECONDER:Brian O. Mealy, Councilman AYES: Nappa, Doroski, Mealy, Doherty, Evans, Russell RESOLUTION 2022-547 Baa ADOPTED DOC ID: 18212 1 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 2022-547 WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON JUNE 21, 2022: RESOLVED that the Town Board of the Town of Southold hereby accepts the following bid for Item#5, Type 6 Asphalt Road Treatment: Corazzini Asphalt 30% RAP Southold Fishers Island 0-100 tons $ 149.00 $ 575.00 100-250 ton 138.00 550.00 250-500 ton 131.00 470.00 500-1000 Ton 121.00 430.00 over 1000 Ton 114.00 415.00 Bid # 2 $ 5.75.; $ 16.00. Bid # 3 $ 18.00 $ 24.00 Bid # 4 $ 2.25 $ 14.00 Bid # 5 $ 138.00 per square yard Denis Noncarrow Southold Town Clerk RESULT: ADOPTED [UNANIMOUS] ..MOVER: -Sarah E. Nappa, Councilwoman _ SECONDER:Brian O. Mealy, Councilman. AYES: N.appa, Doroski, Mealy, Doherty, Evans, Russell "Ida Wtisphalt I Concrete Item # 8 "Type 6 Top" -Furnish only Year 2022-23 ITEM NO. 8 SPECIFICATIONS FOR THE FURNISHING OF ASPHALT ROAD MATERIALS INTO TOWN HIGHWAY TRUCKS HOT MIX ASPHALT CONCRETE "Type 6 Top" INSTRUCTIONS TO BIDDERS A. PROPOSALS Proposals must be made in strict accordance with the "Proposal Form" provided. The Proposal form shall not be detached from the bid package. Failure to comply with this requirement will constitute grounds for rejection of the bid subject to the digression of the Highway Superintendent. Any and all exceptions to the specifications shall be listed on a separate sheet bearing the designation: 'Exceptions to the Specifications", and attached to the Bid Form. Each proposal must be signed in writing with the full name and address of bidder. The bidders shall write in ink, both in words &numerals,the price for which he proposed to furnish all materials &to perform all labor and services necessary for the proper completion of the work, and subject at all times to the approval of the Highway Superintendent. Proposals,together with the entire bid package, shall be delivered enclosed in an opaque sealed envelope and shall be addressed as indicated on Invitation to Bid. The envelope shall be marked "Proposal" bearing the title of work and the Bidders Name. Bidders may bid on one or any combination of items listed on the proposal sheet. No proposal shall be considered which has not been received by the Southold Town Clerk prior to the hour and date stated. B. PROPOSAL GUARANTY A proposal will not be accepted or considered unless accompanied by a guaranty in the form of a bid bond or certified check in the amount of one hundred ($100) dollars payable to the Town of Southold. 1 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" - Furnish only Year 2022-23 As soon as the proposal prices have been compared,the Owner shall return the bidder's bond or the certified checks accompanying such proposals as, in his judgment, would not likely be involved in making the award. All other proposal quantities will be held until the contract and contract bond have been executed after which they will be released or returned to the respective bidders whose proposals they accor0panied. C. OMISSIONS AND DISCREPANCIES Bidders should carefully examine the specifications and fully inform .themselves of all conditions and matters which can in any way affect the work or the cost thereof. Should a bidder find discrepancies in or omissions from the specifications, or other documents or should he be in doubt as to their meaning, he should at once notify the Highway Superintendent who may issue a written instruction to all bidders. D. PUBLIC OPENING OF PROPOSALS Proposals will be opened and read publicly at the time and place indicated in the Invitation for Bids. Bidders, authorized agents, and other interested parties are invited to be present. E. AWARD OF CONTRACT Award of contract will be made as soon as practical. The Superintendent of Highways reserves the right to make awards by items, or as a whole, or not at all, whichever the Superintendent deems to be in the best interest of the Town. A contract may be awarded to a responsible bidder other than the lowest money bidder, if it is in the best interest of the Town.No bid may be withdrawn after scheduled closing time for receipt of bids for a period of 45 days pending execution of a contract by successful bidder. The competency and responsibility of the bidder and his sub-contractors will be considered in making, the award. The Town reserves the right to waive any technical error, to accept any bid, or to reject any or all bids. The contract form will be a Standard form of Agreement between Owner and Contractor. The Town will either award the project or reject all proposals received within forty-five (45) days after formal opening of proposals. Acceptance of a proposal will be a written notice signed by the Town Clerk & no other act shall constitute the acceptance of a proposal. F. WITHDRAWALS OF PROPOSALS Any bidder upon his or her authorized representative's written request presented not later than the hour set for the opening thereof, will be given permission to withdraw his proposal. At the time of opening the proposals, when such proposals are reached, it will be returned to him unread. G. REJECTION OF PROPOSALS The Town reserves the right to waive any technical error and to reject any and/or all proposals. Without limiting the generality of the foregoing, any proposal which in incomplete, obscure, or irregular may be rejected; any proposal accompanied by an insufficient or irregular certified check or bidder's bond bay be rejected, any proposal having interlineations, erasure or corrections may be rejected. The Town also reserves the fight to reject any bid if the evidence submitted in the qualification statement or an investigation of such bidder fails to satisfy the Town that such bidder is property qualified to carry out the 2 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. H. PLANT &EQUIPMENT The bidder shall State in his bid that be has available or under his control,plant and equipment of the character and in the amount required to complete the proposed work within the specific time. I TIME FOR EXECUTION OF CONTRACT Any bidder whose proposal shall be accepted will be required to appear before the Town in person; or if a firm or corporation, a duly authorized representative shall so appear, and execute six (6) copies of the Contract and furnish satisfactory Performance and Payment Bond within ten(10) days after notice that the Contract has been awarded to him. Failure to execute Contract shall constitute a breach of the agreement effected by the acceptance of the Proposal The damages to the Town for such breach will include loss from interference with his construction program and other items,the accurate amount of which it will be difficult or impossible to compute. The amount of the certified check or bidder's bond accompanying the Proposal of such bidder shall be retained by the Town, not as a penalty, but as liquidated damages for such breach. In the event any bidder whose proposal shall, be accepted shall fail or refuse to execute the Contract as herein before provided,the Town may, at there option, determine that such bidder has abandoned the Contract, and thereupon, his proposal and acceptance thereof shall be null and void, and the Town shall be entitled to liquidated damages as above provided. J. PREVAILING WAGE RATES The New York State Department of Labor's Prevailing Wage Rate Schedules are part of this Contract. The Contractor is responsible for being familiar with the latest available schedules. INSURANCE REQUIREMENTS The Contractor shall not commence any work until he has obtained, and had approved by the Town of Southold, all of the insurance that is required under this contract which has been enumerated herein: COMPENSATION INSURANCE: Public Liability and Property Damage Insurance Contractor's Protective Liability and Property Damage Insurance Owner's Protective Public Liability and Property Damage Insurance The Contractor shall not permit any subcontractor to commence any operation of the site until satisfactory proof of carriage of the above required insurance has been posted with and approved by the Owner. Compensation Insurance: The Contractor shall take out and maintain during the life of this Contract, Workmen's Compensation Insurance for all his employees employed at the site of the project, and in case of any of the work being sublet, the Contractor shall require all subcontractors similarly to provide Workmen's 3 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" - Furnish only Year 2022-23 Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by'the Contractor. Public Liability and Property Damage Insurance: The Contractor shall take out and maintain during the life of this Contract such Public Liability and Property Damage Insurance as shall protect him and any subcontractor performing work covered by this Contract from claims for damages four personal injury including accidental death as well as from claims for property damage which may arise from operations under this Contract, whether such operations be by himself or by any subcontractor, to by anyone directly or indirectly employed by either of them, and the amounts of such insurance shall be as follows: Public Liability Insurance in an amount of not less than One Million Dollars ($1,000,000.00) for bodily injuries, including wrongful death to each person and subject to the same limit for each person in an amount not less that One Million Dollars. ($1,000,000.00) on account of each accident. PropertyDamage Insurance in an amount not less than One Million Dollars ($1,000,000.00) for damages on account of each accident and in an amount of not less than One Million Dollars ($1,000,000.00) for damages on account of all accidents. Liability and Property Damage Insurance: The above policies for Public Liability and Property Damage Insurance must be so written to include Contractor's Protective Liability and Property Damage insurance to protect the Contractor against claims arising from the operations of a subcontractor. The policies shall also name the Town of Southold as an additional insured. Owner's Protective Public Liability and Property Damage Insurance: The Contractor shall furnish to the Owner, with respect to the operations he or any of his subcontractors perform a regular Protective Public Liability Insurance Policy for, and in behalf of the Owner,providing for a limit of not less than One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, one person and subject to that limit for each person, a total limit of One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, two or more persons in any one accident; and regular Protective Property Damage Insurance providing for a limit of not less than One Million Dollars ($1,000,000.00) for damages arising out of injury to, or destruction of, property in any one accident and subject to that limit per accident, a total (or aggregate limit of Two Million Dollars ($ 2,000,000.00) for all damages arising out of injury to, or destruction of, property during the policy period. This insurance must fully cover the legal liability of the Owner. The coverage provided under his policy must not be affected if the Owner performs work in connection with the project either for or in cooperation with the Contractor or as an aid thereto whether the same be a part of the Contract or separate therefrom, by means of its own employees or agents or if the Owner directs or supervises the work to be performed by the Contractor. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with certificates of each insurer insuring the Contractor of any subcontractor under this Contract except with respect to part D. As listed above. In respect to this paragraph, the Contractor shall furnish the Owner with the original insurance policy. Both certificates, as furnished, and the insurance policy, as required, shall bear the policy numbers, the expiration date of the policy and the limits of liability there under. Both the certificates and the policy shall be endorsed to provide the Owner with any notice of cancellation or non-renewal. 4 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 PROPOSAL FORM DATE: NAME OF BIDDER: l_,0) ,A�— A �' p�y' 1 PmjvC S �o fox 1-14q Sou+ho(d N� ((r-71 TO: SOUTHOLD TOWN BOARD NOTE: All items listed herein must TOWN HALL be bid. Failure to bid any PO BOX 1179 item will be grounds for 53095 MAIN ROAD disqualification. SOUTHOLD,NEW YORK 11971 MEMBERS OF THE BOARD: The undersigned as bidder, declares that the only persons, company, or parties interested in this proposal as principals are named below; that this proposal is made without any connection, directly or indirectly with any other bidder for the same work; that it is in all respects fair and without collusion or fraud, and that no person acting for or employed by the aforementioned owner is or will be interested directly or indirectly, in the performance of the contract, or the supplies relating to it, or in any portion of the profit thereof;that he has carefully examined all project requirements, including bidding requirements, contract, general and special conditions, specifications, and addenda, if any (Note: acknowledgment of addenda and their dates must be included as indicated on bottom page); that he has satisfied himself by personal examination of the proposed work, and by such other means as he may have chosen, as to the conditions and requirements of the work; and he proposed and agrees that if his proposal be accepted he will contract to furnish all materials not provided by the Town (See Specifications) and to perform all the work required to construct, perform and complete the specified work; and that he will start the work as directed by the Town,he will accept, in full payment thereof as listed below: BID ON ASPHALT ROAD MATERIALS, HOT Mix ASPHALT CONCRETE, "Type 6 Top", IN ACCORDANCE WITH THE PROJECT REQUIREMENTS. THE ABOVE REFERENCED ACTIVITIES WILL BE COMPLETED FOR THE STIPULATED CUMULATIVE "UNIT PRICE" OF: BID #1 SUPPLY LABOR AND MATERIAL TO FURNISH "Type 6 Top" INTO SOUTHOLD TOWN HIGHWAY TRUCKS MADE WITH AN ALLOTMENT OF (30% OF RAP ) RECYCLED ASPHALT PRODUCT INCLUDED IN THE MIXTURE I//D 00 e hvml-ed fieri c(ol (Ors (written in words) Per Ton (written in numbers words)Per Ton 5 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" - Furnish only Year 2022-23 And he further agrees that if this proposal shall be accepted by the Town and that if he shall refuse, fail or neglect to enter into a Contract pursuant to such proposal and to the requirements of the Town, shall have been deposited in the mail addressed to him at the address given in the proposal, that he shall be considered to have abandoned the contract. We the undersigned, further agree that this proposal shall be reviewed by the Town to correct any deficiencies in the proposed scope of work and, if no corrections are necessary, further agree that this proposal is a formal bid and shall remain in effect for a period of forty-five (45) days,the Town will accept or reject this proposal or by mutual agreemen ay extend this time period. Signature of Bidder: Business Address: PO 60X1 (7 q y L�0O ( Telephone Number: (O3 ( —73L( 5�oo b Date: 50 r�_+2 l cp a(D a� 6 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 1. DESCRIPTION Bids are requested for the supply of labor and material to furnish N.Y.S. Type 6 Top Coat into Southold Town Highway Trucks. The materials shall meet the specifications to/for Item 403.1701 in the New York Department of Transportation Specifications. The materials shall be constructed in accordance to section 400 in the New York State Department of Transportation Specifications. Material shall be measured by ton. Payment for this item shall be made by the unit price multiplied by the number tons. 2. MATERIALS Bituminous Asphalt concrete pavement shall be equal to NYSDOT - Type 6 meet or exceed the following requirements: ASPHALT CONCRETE PAVEMENT Screen General limits Job Mix Sizes %Passing Total % 1" 100 -- 1/2" 95-100 -- 1/4" 65-85 +/- 7 1/8" 36-65 +/- 7 No. 20 15-39 +/- 7 No. 40 8-27 +/- 7 No. 80 4-16 +/- 4 No. 200 2-6 +/- 2 Asphalt Content, % 5.8-7.0 +/- 4 5. TESTING The Town shall have the absolute right to make tests before and after delivery and placement of asphalt material to determine conformity to Specifications, quality and standards of excellence. The Contractor agrees to bear the cost and pay for all tests which are deemed to be necessary in the opinion of the Town. The Contractor shall repair or replace at no additional cost to the Town, any materials found to not meet the Specifications and quality intended. The work shall be executed in the best and most workmanlike manner. 6. SAMPLES The town at its discretion can request samples of asphalt material provided by winning bidder to have periodic testing of the mix at a DOT approved facility at the vendor's expense to help insure that the mix provided is to our specification. 7. MEASUREMENT& PAYMENT The prices quoted in this bid, and subsequently awarded, are to be used in establishing prices for actual materials furnished and placed within Town of Southold Highway Trucks from the date of award up to and 7 Hot Mix Asphalt Concrete Item # 8 "Type 6 Top" -Furnish only Year 2022-23 including one (1) year thereafter. The contract period may be extended for up to one (1) additional year upon mutual written agreement of the Town and the Contractor. Payment shall be made to the contractor at the unit price(s) submitted in the Proposal. The asphalt concrete will be measured by the number of tons. The unit price per ton shall include the cost of furnishing all materials, equipment, labor and incidentals necessary to complete the work. NOTE: The winning bidder will supply the Highway Department with daily mix reports showing the composition of the asphalt mix that day, and endeavor to submit them to us along with the invoices submitted for payment. END OF SPECIFICATION: 8 Hot Mix Asphalt Concrete Item # 8 "Type 6 Top" - Furnish only Year 2022-23 STATEMENT OF NON-COLLUSION (To be completed by each Bidder) In accordance with Section 103-d General Municipal Law, effective September 1, 1966, every bid or proposal hereafter made to a political subdivision of the State of any public department, agency, or official thereof or to a fore district or any agency or official thereof for work or services performed or to be performed or goods sold or to be sold, shall contain the following statement subscribed to by the bidder and affirmed by such bidder as true under the penalties of perjury; non-collusive bidding certification. A. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury,that to the best of knowledge and belief: (1) The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or any competitor. (2) Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly, to any other bidder or to any competitor. (3) No attempt has been made or will be made by the bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition. B. The person signing this bid or proposal certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the bidder, as well as the person signing in its behalf. C. That attached hereto (if a corporate bidder) is a certified copy of resolution authorizing the execution of this certificate by the signature of this bid or proposal on behalf of the corporate bidder. RESOQ`LUTION Resolved that �" V-J ra Zen of the (Name of signatory) CoraZ2, Eauie-),Tf VCdJ Be authorized to sign and submit the bid (Name of Corpor 'on) 9 Hot Mix Asphalt Concrete Item # 8 "Type 6 Top" - Furnish only Year 2022-23 Or proposal of this corporation for the following Project: Item# 8 Furnish into Town Highway Trucks "Type 6 Top" Peconic Lane, Peconic,New York 11958 and to include in such bid or proposal the certificate as to non-collusion required by section one-hundred-three- d (103-d) of the General Municipal Law as the act and deed of such corporation, and for any inaccuracies or miss-statements in such certificate this corporate bidder shall be liable under the penalties of perjury. The foregoing is true and correct copy of the resolution adopted by ion at a meeting of the Board of Directors,held on the d CO day of 2 U rU2- , 20 ?17— (SEAL OF THE CORPORATION) Laws of New York, 1965 Ch. 751, Sec. 103-d, as amended & effective on September 1, 1965. Sign re 10 ` Hot Mix Asphalt Concrete Item # 6 "Base Coat" Year 2022-23 ITEM NO. 6 SPECIFICATIONS FOR THE PURCHASE & APPLICATION OF ASPHALT ROAD MATERIALS HOT MIX ASPHALT CONCRETE "Base Coat NOTE: THE TOWN OF SOUTHOLD WILL ALSO REQUIRE +/- 305000 5 QUARE YARDS (more or less as may be needed) OF PAVEMENT TO BE APPLIED ON FISHERS ISLAND. THE CONTRACTOR SHALL BE REQURIED TO NOTIFY EACH RESIDENT AT LEAST 24 HOURS PRIOR TO ANY WORK ON TOWN ROADS. RESIDENTS MUST BE RE-NOTIFIED AFTER DELAYS DUE . TO INCLEMENT WEATHER OR JOB OPERATIONS. 1 Hot Mix Asphalt Concrete Item # 6 "Base Coat" Year 2022-23 INSTRUCTIONS TO BIDDERS A. PROPOSALS Proposals must be made in strict accordance with the "Proposal Form" provided. The Proposal form shall not be detached from the bid package. Failure to comply with this requirement will constitute grounds for rejection of the bid subject to the digression of the Highway Superintendent. Any and all exceptions to the specifications shall be listed on a separate sheet bearing the designation: 'Exceptions to the Specifications", and attached to the Bid Form. Each proposal must be signed in writing with the full name and address of bidder. The bidders shall write in ink,both in words &numerals,the price for which he proposed to furnish all materials,plant, equipment, tools, shoring or bracing, or other facilities, &to perform all labor and services necessary for the proper completion of the work in strict accordance with the plans and specifications, and subject at all times to the approval of the Highway Superintendent. . Proposals, together with the entire bid package, shall be delivered enclosed in an opaque sealed envelope and shall be addressed as indicated on Invitation to Bid. The envelope shall be marked "Proposal" bearing the title of work and the Bidders Name. Bidders may bid on one or any combination of items listed on the proposal sheet. No proposal shall be considered which has not been received by the Southold Town Clerk prior to the hour and date stated. B. PROPOSAL GUARANTY A proposal will not be accepted or considered unless accompanied by a,guaranty in the form of a bid bond or certified check in the amount of one hundred ($ 100) dollars payable to the Town of Southold. As soon as the proposal prices have been compared, the Owner shall return the bidder's bond or the certified checks accompanying such proposals as, in his judgment,would not likely be involved in making the award. All other proposal quantities will be held until the contract and contract bond have been executed after which they will be released or returned to the respective bidders whose proposals they accor0panied. C. OMISSIONS AND DISCREPANCIES Bidders should carefully examine the specifications and fully inform .themselves of all conditions and matters which can in any way affect the work or the cost thereof. Should a bidder find discrepancies in or omissions from the specifications, or other documents or should he be in doubt as to their meaning, he should at once notify the Highway Superintendent who may issue a written instruction to all bidders. D. PUBLIC OPENING OF PROPOSALS Proposals will be opened and read publicly at the time and place indicated in the Invitation for Bids. Bidders, authorized agents, and other interested parties are invited to be present. 2 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 E. AWARD OF CONTRACT Award of contract will be made as soon as practical. The Superintendent of Highways reserves the right to make awards by items, or as a whole, or not at all, whichever the Superintendent deems to be in the best interest of the Town. A contract may be awarded to a responsible bidder other than the lowest money bidder, if it is in the best interest of the Town.No bid may be withdrawn after scheduled closing time for receipt of bids for a period of 45 days pending execution of a contract by successful bidder. The competency and responsibility of the bidder and his sub-contractors will be considered in making, the award. The Town reserves the right to waive any technical error,to accept any bid, or to reject any or all bids. The contract form will be a Standard form of Agreement between Owner and Contractor. The Town will either award the project or reject all proposals received within forty-five (45) days after formal opening of proposals. Acceptance of a proposal will be a written notice signed by the Town Clerk & no other act shall constitute the acceptance of a proposal. F. WITHDRAWALS OF PROPOSALS Any bidder upon his or her authorized representative's written request presented not later than the hour set for the opening thereof, will be given permission to withdraw his proposal. At the time of opening the proposals, when such proposals are reached, it will be returned to him unread. G. REJECTION OF PROPOSALS The Town reserves the right to waive any technical error and to reject any and/or all proposals. Without limiting the generality of the foregoing, any proposal which in incomplete, obscure, or irregular may be rejected; any proposal accompanied by an insufficient or irregular certified check or bidder's bond bay be rejected, any proposal having interlineations, erasure or corrections may be rejected. The Town also reserves the fight to reject any bid if the evidence submitted in the qualification statement or an investigation of such bidder fails to satisfy the Town that such bidder is property qualified to carry out the obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. H. PLANT & EQUIPMENT The bidder shall State in his bid that be has available or under his control,plant and equipment of the character and in the amount required to complete the proposed work within the specific time. I TIME FOR EXECUTION OF CONTRACT Any bidder whose proposal shall be accepted will be required to appear before the Town in person; or if a firm or corporation, a duly authorized representative shall so appear, and execute six (6) copies of the Contract and furnish satisfactory Performance and Payment Bond within ten (10) days after notice that the Contract has been awarded to him. Failure to execute Contract shall constitute a breach of the agreement effected by the acceptance of the Proposal 3 Hot Mix Asphalt Concrete Item 4 6 "Base Coat" Year 2022-23 The damages to the Town for such breach will include loss from interference with his construction program and other items,the accurate amount of which it will be difficult or impossible to compute. The amount of the certified check or bidder's bond accompanying the Proposal of such bidder shall be retained by the Town, not as a penalty, but as liquidated damages for such breach. In the event any bidder whose proposal shall,be accepted shall fail or refuse to execute the Contract as herein before provided, the Town may, at there option, determine that such bidder has abandoned the Contract, and thereupon, his proposal and acceptance thereof shall be null and void, and the Town shall be entitled to liquidated damages as above provided. J. PREVAILING WAGE RATES The New York State Department of Labor's Prevailing Wage Rate Schedules are part of this Contract. The Contractor is responsible for being familiar with the latest available schedules. INSURANCE REQUIREMENTS The Contractor shall not commence any work until he has obtained, and had approved by the Town of Southold, all of the insurance that is required under this contract which has been enumerated herein: COMPENSATION INSURANCE: Public Liability and Property Damage Insurance Contractor's Protective Liability and Property Damage Insurance Owner's Protective Public Liability and Property Damage Insurance The Contractor shall not permit any subcontractor to commence any operation of the site until satisfactory proof of carriage of the above required insurance has been posted with and approved by the Owner. Compensation Insurance: The Contractor shall take out and maintain during the life of this Contract, Workmen's Compensation Insurance for all his employees employed at the site of the project, and in case of any of the work being sublet,the Contractor shall require all subcontractors similarly to provide Workmen's Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Contractor. Public Liability and Property Damage Insurance: The Contractor shall take out and maintain during the life of this Contract such Public Liability and Property Damage Insurance as shall protect him and any subcontractor performing work covered by this Contract from claims for damages four personal injury including accidental death as well as from claims for property damage which may arise from operations under this Contract, whether such operations be by himself or by any subcontractor, to by anyone directly or indirectly employed by either of them, and the amounts of such insurance shall be as follows: Public Liability Insurance in an amount of not less than One Million Dollars ($1,000,000.00) for bodily injuries, including wrongful death to each person and subject to the same limit for each person in an amount not less that One Million Dollars. ($1,000,000.00) on account of each accident. 4 Hot Mix Asphalt Concrete Item# 6 "Base Coat Year 2022-23 Property Damage Insurance in an amount not less than One Million Dollars ($1,000,000.00) for damages on account of each accident and in an amount of not less than One Million Dollars ($1,000,000.00) for damages on account of all accidents. Liability and Property Damage Insurance: The above policies for Public Liability and Property Damage Insurance must be so written to include Contractor's Protective Liability and Property Damage insurance to protect the Contractor against claims arising from the operations of a subcontractor. The policies shall also name the Town of Southold as an additional insured. Owner's Protective Public Liability and Property Damage Insurance: The Contractor shall furnish to the Owner, with respect to the operations he or any of his subcontractors perform a regular Protective Public Liability Insurance Policy for, and in behalf of the Owner,providing for a limit of not less than One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, one person and subject to that limit for each person, a total limit of One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, two or more persons in any one accident; and regular Protective Property Damage Insurance providing for a limit of not less than One Million Dollars ($1,000,000.00) for damages arising out of injury to, or destruction of, property in any one accident and subject to that limit per accident, a total (or aggregate limit of Two Million Dollars ($ 2,000,000.00) for all damages arising out of injury to, or destruction of, property during the policy period. This insurance must fully cover the legal liability of the Owner. The coverage provided under his policy must not be affected if the Owner performs work in connection with the project either for or in cooperation with the Contractor or as an aid thereto whether the same be a part of the Contract or separate therefrom, by means of its own employees or agents or if the Owner directs or supervises the work to be performed by the Contractor. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with certificates of each insurer insuring the Contractor of any subcontractor under this Contract except with respect to part D. As listed above. In respect to this paragraph, the Contractor shall furnish the Owner with the original insurance policy. Both certificates, as furnished, and the insurance policy, as required, shall bear the policy numbers, the expiration date of the policy and the limits of liability there under. Both the certificates and the policy shall be endorsed to provide the Owner with any notice of cancellation or non-renewal. 5 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 PROPOSAL FORM DATE: ��he— NAME OF BIDDER: Co PO 3ox 1 1 Cr AlZ ll9�s TO: SOUTHOLD TOWN BOARD NOTE: All items listed herein must TOWN HALL be bid. Failure to bid any PO BOX 1179 item will be grounds for 53095 MAIN ROAD disqualification. SOUTHOLD,NEW YORK 11971 MEMBERS OF THE BOARD: The undersigned as bidder, declares that the only persons, company, or parties interested in this proposal as principals are named below;that this proposal is made without any connection, directly or indirectly with any other bidder for the same work;that it is in all respects fair and without collusion or fraud, and that no person acting for or employed by the aforementioned owner is or will be interested directly or indirectly, in the performance of the contract, or the supplies relating to it, or in any portion of the profit thereof; that he has carefully examined all project requirements, including bidding requirements, contract, general and special conditions, specifications, and addenda, if any (Note: acknowledgment of addenda and their dates must be included as indicated on bottom page); that he has satisfied himself by personal examination of the proposed work, and by such other means as he may have chosen, as to the conditions and requirements of the work; and he proposed and agrees that if his proposal be accepted he will contract to furnish all materials not provided by the Town(See Specifications) and to perform all the work required to construct, perform and complete the specified work; and that he will start the work as directed by the Town, he will accept, in full payment thereof as listed below: BID ON ASPHALT ROAD MATERIALS, HOT Mix ASPHALT CONCRETE, "Base Coat", IN ACCORDANCE WITH THE PROJECT REQUIREMENTS. THE ABOVE REFERENCED ACTIVITIES WILL BE COMPLETED FOR THE STIPULATED CUMULATIVE"UNIT PRICE" OF: 6 Hot Mix Asphalt Concrete Item # 6 "Base Coat" Year 2022-23 BID #1 FURNISH AND PLACE THE FOLLOWING WITHIN HOT Mix ASPHALT CONCRETE MADE WITH AN ALLOTMENT OF (30% OF RAP) RECYCLED ASPHALT PRODUCT INCLUDED IN THE MIXTURE 0— 100 Tons SOUTHOLD TOWN: FISHERS ISLAND: hUnclre-d -6y4Ave- dvlkvs �i'v�. hvnckec' Se�e�t (written in words)Per Ton (written in words)Per Ton -45 1Lf �-. 0,0 C �7o, © 6, (written in numbers) Per Ton (written in numbers)Per Ton 100—250 Tons SOUTHOLD TOWN: FISHERS ISLAND: 6ohundred ��-�� . 'ye-d6� m Fg,y Avndi^ec� 1i {1v uG�a� (written in words) Per Ton �J -- (written in words) Per Ton 50�� (written in numbers) Per Ton (written in numbers) Per Ton 250—500 Tons SOUTHOLD TOWN: FISHERS ISLAND: Ne-e_ hun d +�ed h, o1d(ays -rev,- h v►2c� �ec� S� j �' ���(u�� (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton 500— 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: /' O n L. hu nA reJ � G�y�ays- s civ v- kU�a ►---cj ,%°.iT -hW, dd(tk�,f (written in words) Per Ton (written in words) Per Ton ov (written in numbers) Per Ton (written in numbers) Per Ton 7 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 Over 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: one, h,)dtyd fien d Gl ars v,� �n J&d (written in words) Per Ton (written in words) Per Ton oil 0 (written in numbers) Per Ton (written in numbers) Per Ton BID #2 COLD MILLING & REMOVAL SOUTHOLD TOWN: FISHERS ISLAND: 6ve o[Da G�✓S and Segvi+ Owe SI K deer, Ao V( 6L✓S (written in words) Per Sq Yd C 11 t7 (written in words)Per Sq Yd � -7 "-- /6 00 (written in numbers) Per Sq Yd (written in numbers) Per Sq Yd And he further agrees that if this proposal shall be accepted by the Town and that if he shall refuse, fail or neglect to enter into a Contract pursuant to such proposal and to the requirements of the Town, shall have been deposited in the mail addressed to him at the address given in the proposal,that he shall be considered to have abandoned the contract. We the undersigned, further agree that this proposal shall be reviewed by the Town to correct any deficiencies in the proposed scope of work and, if no corrections are necessary, further agree that this proposal is a formal bid and shall remain in effect for a period of forty-five (45) days,the Town will accept or reject this proposal or by mutual agreement may extend this time period. Signature of Bidder: Business Address: p� U OLX /Q8/ AJV ll X135 Telephone Number: l 3 Date: Tune- 8 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 1. DESCRIPTION Bids are requested for the purchase and placement of Asphalt Concrete Pavement, Type 6, for the use in repair& maintenance of the Town Highways and related parking facilities for a period of one (1)year beginning on the date that the contract was executed. All Asphalt Concrete shall be delivered and machine spread upon the surface of roads, driveways,parking fields, street intersections or any other areas requiring pavement within Town right-of-ways or any other areas under the jurisdiction of the Commission of Public Works where and as required. 2. MATERIALS SEE PAGES 13-14 FOR DETAILS NOTE: At No Time Will any Recycled Material (RAP)be used without the permission of the Superintendent of Highways 3. WEATHER LIMITATIONS The material shall be placed only when: 1. The road surface and atmospheric temperatures are at least 45 degrees F 2. The weather is not foggy or raining. 3. There is no forecast of temperatures below 32 degrees F within 48 hours from the time of placement of the Asphalt Concrete Material. 4. EQUIPMENT, DELIVERY & APPLICATION All asphalt concrete pavement materials shall be delivered and placed in select quantities at a time,place and thickness as specified by the Southold Town Highway Superintendent.No materials will be delivered on Saturdays, Sundays or Holidays except in the case of an emergency. Asphalt Plants must have adequate capacity and sufficient storage for the items to be furnished. All work shall commence within five (5) Calendar days after receipt of written order. Any reason for delay in work shall be submitted to the Town in writing explaining the delay. If the reason is not acceptable to the Town, work must continue without any further delay. Bituminous pavers shall be self-powered units,provided with an activated screed or strike-off assembly. The machine shall be capable of spreading and finishing courses of bituminous plant mix material in lane widths up to twelve (12') feet or thickness up to four(4") inches as may be specified by the Highway Superintendent. After placement, the Asphalt Concrete Material shall be thoroughly and uniformly compacted with an approved vibrator type or static steel wheel roller conforming to section 401-3.12 of the NYSDOT construction manual to obtain a thoroughly compacted pavement. All manholes, catch basins, curbs and other structures shall be protected against the application of asphalt concrete material. 9 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 5. TESTING The Town shall have the absolute right to make tests before and after delivery and placement of asphalt material to determine conformity to Specifications, quality and standards of excellence. The Contractor agrees to bear the cost and pay for all tests which are deemed to be necessary in the opinion of the Town. The Contractor shall repair or replace at no additional cost to the Town, any materials found to not meet the Specifications and quality intended. The work shall be executed in the best and most workmanlike manner. 6. SAMPLES The town at its discretion can request samples of asphalt material provided by winning bidder to have periodic testing of the mix at a DOT approved facility at the vendor's expense to help insure that the mix provided is to our specification. 7. BIDDER QUALIFICATIONS The bidder will be required to show,to the satisfaction of the Superintendent of Highways,that he is a responsible contractor experienced in the kind of work to be performed; that he is financially able to execute the contract; and that he has adequate equipment and fixed storage facilities to satisfactorily and efficiently perform the work as directed within the specified time limits. The bidder must state exact location of his Plant Facilities. 8. MEASUREMENT& PAYMENT The prices quoted in this bid, and subsequently awarded, are to be used in establishing prices for actual materials furnished and placed within the Town of Southold from the date of award up to and including one (1)year thereafter. The contract period may be extended for up to one (1) additional year upon mutual written agreement of the Town and the Contractor. Payment shall be made to the contractor at the unit price(s) submitted in the Proposal. The asphalt concrete will be measured by the number of tons of compacted material in place. The unit price per ton shall include the cost of furnishing all materials, equipment, labor and incidentals necessary to complete the work. 9. TRAFFIC MAINTENANCE The contractor shall be responsible for providing maintenance and protection of vehicular and pedestrian traffic associated with this work. Opening to traffic does not constitute acceptance of the work. The contractor shall also be responsible for providing all signage and traffic control during this work. NOTE: The winning bidder will supply the Highway Department with daily mix reports showing the composition of the asphalt mix that day, and endeavor to submit them to us along with the invoices submitted for payment. END OF SPECIFICATION 10 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 STATEMENT OF NON-COLLUSION (To be completed by each Bidder) In accordance with Section 103-d General Municipal Law, effective September 1, 1966, every bid or proposal hereafter made to a political subdivision of the State of any public department, agency, or official thereof or to a fore district or any agency or official thereof for work or services performed or to be performed or goods sold or to be sold, shall contain the following statement subscribed to by the bidder and affirmed by such bidder as true under the penalties of perjury; non-collusive bidding certification. A. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury,that to the best of knowledge and belief: (1) The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or any competitor. (2) Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly,to any other bidder or to any competitor. (3) No attempt has been made or will be made by the bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition. B. The person signing this bid or proposal certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the bidder, as well as the person signing in its behalf. C. That attached hereto (if a corporate bidder) is a certified copy of resolution authorizing the execution of this certificate by the signature of this bid or proposal on behalf of the corporate bidder. RESOLUTION Resolved that ! a co r oaju 0, of the (Name of signatory) CWa2� (nL Be authorized to sign and submit the bid (Name of Corporation) 11 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 Or proposal of this corporation for the following Project: Item# 6 Hot Mix Asphalt Concrete "Base Coat" Peconic Lane, Peconic,New York 11958 and to include in such bid or proposal the certificate as to non-collusion required by section one-hundred-three- d (103-d) of the General Municipal Law as the act and deed of such corporation, and for any inaccuracies or miss-statements in such certificate this corporate bidder shall be liable under the penalties of perjury. The foregoing is true and correct copy of the resolution adopted by Coy-a2.:/ , Ay!� `orporation at a meeting of the Board of Directors, held on the day of Iq rq— , 20&� (SEAL OF THE CORPORATION) Laws of New York, 1965 Ch. 751, Sec. 103-d, as amended & effective odSeptember 1, 1965. Si ature 12 i 6 ` Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 ITEM NO. 5 SPECIFICATIONS FOR THE PURCHASE & APPLICATION OF ASPHALT ROAD MATERIALS HOT MIX ASPHALT CONCRETE "Type 6 Top NOTE: THE TOWN OF SOUTHOLD WILL ALSO REQUIRE +/- 309000 SQUARE YARDS (more or less as may be needed) OF PAVEMENT TO BE APPLIED ON FISHERS ISLAND. THE CONTRACTOR SHALL BE REQURIED TO NOTIFY EACH RESIDENT AT LEAST 24 HOURS PRIOR TO ANY WORK ON TOWN ROADS. RESIDENTS MUST BE RE-NOTIFIED AFTER DELAYS DUE TO INCLEMENT WEATHER OR JOB OPERATIONS. 1 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 INSTRUCTIONS TO BIDDERS A. PROPOSALS Proposals must be made in strict accordance with the "Proposal Form" provided. The Proposal form shall not be detached from the bid package. Failure to comply with this requirement will constitute grounds for rejection of the bid subject to the digression of the Highway Superintendent. Any and all exceptions to the specifications shall be listed on a separate sheet bearing the designation: 'Exceptions to the Specifications", and attached to the Bid Form. Each proposal must be signed in writing with the full name and address of bidder. The bidders shall write in ink, both in words &numerals, the price for which he proposed to furnish all materials,plant, equipment, tools, shoring or bracing, or other facilities, &to perform all labor and services necessary for the proper completion of the work in strict accordance with the plans and specifications, and subject at all times to the approval of the Highway Superintendent. Proposals,together with the entire bid package, shall be delivered enclosed in an opaque sealed envelope and shall be addressed as indicated on Invitation to Bid. The envelope shall be marked "Proposal" bearing the title of work and the Bidders Name. Bidders may bid on one or any combination of items listed on the proposal sheet. No proposal shall be considered which has not been received by the Southold Town Clerk prior to the hour and date stated. B. PROPOSAL GUARANTY A proposal will not be accepted or considered unless accompanied by a guaranty in the form of a bid bond or certified check in the amount of one hundred ($ 100) dollars payable to the Town of Southold. As soon as the proposal prices have been compared, the Owner shall return the bidder's bond or the certified checks accompanying such proposals as, in his judgment, would not likely be involved in making the award. All other proposal quantities will be held until the contract and contract bond have been executed after which they will be released or returned to the respective bidders whose proposals they accor0panied. C. OMISSIONS AND DISCREPANCIES Bidders should carefully examine the specifications and fully inform .themselves of all conditions and matters which can in any way affect the work or the cost thereof. Should a bidder find discrepancies in or omissions from the specifications, or other documents or should he be in doubt as to their meaning, he should at once notify the Highway Superintendent who may issue a written instruction to all bidders. D. PUBLIC OPENING OF PROPOSALS Proposals will be opened and read publicly at the time and place indicated in the Invitation for Bids. Bidders, authorized agents, and other interested parties are invited to be present. 2 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 E. AWARD OF CONTRACT Award of contract will be made as soon as practical. The Superintendent of Highways reserves the right to make awards by items, or as a whole, or not at all, whichever the Superintendent deems to be in the best interest of the Town. A contract may be awarded to a responsible bidder other than the lowest money bidder, if it is in the best interest of the Town.No bid may be withdrawn after scheduled closing time for receipt of bids for a period of 45 days pending execution of a contract by successful bidder. The competency and responsibility of the bidder and his sub-contractors will be considered in making,the award. The Town reserves the right to waive any technical error,to accept any bid, or to reject any or all bids. The contract form will be a Standard form of Agreement between Owner and Contractor. The Town will either award the project or reject all proposals received within forty-five (45) days after formal opening of proposals. Acceptance of a proposal will be a written notice signed by the Town Clerk& no other act shall constitute the acceptance of a proposal. F. WITHDRAWALS OF PROPOSALS Any bidder upon his or her authorized representative's written request presented not later than the hour set for the opening thereof, will be given permission to withdraw his proposal. At the time of opening the proposals,when such proposals are reached, it will be returned to him unread. G. REJECTION OF PROPOSALS The Town reserves the right to waive any technical error and to reject any and/or all proposals. Without limiting the generality of the foregoing, any proposal which in incomplete, obscure, or irregular may be rejected; any proposal accompanied by an insufficient or irregular certified check or bidder's bond bay be rejected, any proposal having interlineations, erasure or corrections may be rejected. The Town also reserves the fight to reject any bid if the evidence submitted in the qualification statement or an investigation of such bidder fails to satisfy the Town that such bidder is property qualified to carry out the obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. H. PLANT&EQUIPMENT The bidder shall State in his bid that be has available or under his control, plant and equipment of the character and in the amount required to complete the proposed work within the specific time. I TIME FOR EXECUTION OF CONTRACT Any bidder whose proposal shall be accepted will be required to appear before the Town in person; or if a firm or corporation, a duly authorized representative shall so appear, and execute six (6) copies of the Contract and furnish satisfactory Performance and Payment Bond within ten (10) days after notice that the Contract has been awarded to him. Failure to execute Contract shall constitute a breach of the agreement effected by the acceptance of the Proposal 3 Hot Mix Asphalt Concrete Item # 5 "Type 6 Top" Year 2022-23 The damages to the Town for such breach will include loss from interference with his construction program and other items,the accurate amount of which it will be difficult or impossible to compute. The amount of the certified check or bidder's bond accompanying the Proposal of such bidder shall be retained by the Town, not as a penalty,but as liquidated damages for such breach. In the event any bidder whose proposal shall, be accepted shall fail or refuse to execute the Contract as herein before provided,the Town may, at there option, determine that such bidder has abandoned the Contract, and thereupon,his proposal and acceptance thereof shall be null and void, and the Town shall be entitled to liquidated damages as above provided. J. PREVAILING WAGE RATES The New York State Department of Labor's Prevailing Wage Rate Schedules are part of this Contract. The Contractor is responsible for being familiar with the latest available schedules. INSURANCE REQUIREMENTS The Contractor shall not commence any work until he has obtained, and had approved by the Town of Southold, all of the insurance that is required under this contract which has been enumerated herein: COMPENSATION INSURANCE: Public Liability and Property Damage Insurance Contractor's Protective Liability and Property Damage Insurance Owner's Protective Public Liability and Property Damage Insurance The Contractor shall not permit any subcontractor to commence any operation of the site until satisfactory proof of carriage of the above required insurance has been posted with and approved by the Owner. Compensation Insurance: The Contractor shall take out and maintain during the life of this Contract, Workmen's Compensation Insurance for all his employees employed at the site of the project, and in case of any of the work being sublet,the Contractor shall require all subcontractors similarly to provide Workmen's Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Contractor. Public Liability and Propelly Damage Insurance: The Contractor shall take out and maintain during the life of this Contract such Public Liability and Property Damage Insurance as shall protect him and any subcontractor performing work covered by this Contract from claims for damages four personal injury including accidental death as well as from claims for property damage which may arise from operations under this Contract, whether such operations be by himself or by any subcontractor, to by anyone directly or indirectly employed by either of them, and the amounts of such insurance shall be as follows: Public Liability Insurance in an amount of not less than One Million Dollars ($1,000,000.00) for bodily injuries, including wrongful death to each person and subject to the same limit for each person in an amount not less that One Million Dollars. ($1,000,000.00) on account of each accident. 4 Nr Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 Property Damage Insurance in an amount not less than One Million Dollars ($1,000,000.00) for damages on account of each accident and in an amount of not less than One Million Dollars ($1,000,000.00) for damages on account of all accidents. Liability and Property Damage Insurance: The above policies for Public Liability and Property Damage Insurance must be so written to include Contractor's Protective Liability and Property Damage insurance to protect the Contractor against claims arising from the operations of a subcontractor. The policies shall also name the Town of Southold as an additional insured. Owner's Protective Public Liability and Properly Damage Insurance: The Contractor shall furnish to the Owner, with respect to the operations he or any of his subcontractors perform a regular Protective Public Liability Insurance Policy for, and in behalf of the Owner,providing for a limit of not less than One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, one person and subject to that limit for each person, a total limit of One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of,two or more persons in any one accident; and regular Protective Property Damage Insurance providing for a limit of not less than One Million Dollars ($1,000,000.00) for damages arising out of injury to, or destruction of, property in any one accident and subject to that limit per accident, a total (or aggregate limit of Two Million Dollars ($ 2,000,000.00) for all damages arising out of injury to, or destruction of,property during the policy period. This insurance must fully cover the legal liability of the Owner. The coverage provided under his policy must not be affected if the Owner performs work in connection with the project either for or in cooperation with the Contractor or as an aid thereto whether the same be a part of the Contract or separate therefrom, by means of its own employees or agents or if the Owner directs or supervises the work to be performed by the Contractor. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with certificates of each insurer insuring the Contractor of any subcontractor under this Contract except with respect to part D. As listed above. In respect to this paragraph, the Contractor shall furnish the Owner with the original insurance policy. Both certificates, as furnished, and the insurance policy, as required, shall bear the policy numbers, the expiration date of the policy and the limits of liability there under. Both the certificates and the policy shall be endorsed to provide the Owner with any notice of cancellation or non-renewal. 5 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 '�' PROPOSAL FORM DATE: y r�z, (f Ic go)--D— NAME OF BIDDER: co >'O,-2,-Zi n I SCJ�6 l nC PO 'esbx TO: SOUTHOLD TOWN BOARD NOTE: All items listed herein must TOWN HALL be bid. Failure to bid any PO BOX 1179 item will be grounds for 53095 MAIN ROAD disqualification. SOUTHOLD,NEW YORK 11971 MEMBERS OF THE BOARD: The undersigned as bidder, declares that the only persons, company, or parties interested in this proposal as principals are named below; that this proposal is made without any connection, directly or indirectly with any other bidder for the same work; that it is in all respects fair and without collusion or fraud, and that no person acting for or employed by the aforementioned owner is or will be interested directly or indirectly, in the performance of the contract, or the supplies relating to it, or in any portion of the profit thereof, that he has carefully examined all project requirements, including bidding requirements, contract, general and special conditions, specifications, and addenda, if any (Note: acknowledgment of addenda and their dates must be included as indicated on bottom page); that he has satisfied himself by personal examination of the proposed work, and by such other means as he may have chosen, as to the conditions and requirements of the work;-and lie proposed and agrees that-if his proposdl be"accepted--he"will contract to furnish alh- materials not provided by the Town (See Specifications) and to perform all the work required to construct, perform and complete the specified work; and that he will start the work as directed by the Town, he will accept, in full payment thereof as listed below: BID ON ASPHALT ROAD MATERIALS, HOT Mix ASPHALT CONCRETE, "Type 6 Top", IN ACCORDANCE WITH THE PROJECT REQUIREMENTS. THE ABOVE REFERENCED ACTIVITIES WILL BE COMPLETED FOR THE STIPULATED CUMULATIVE"UNIT PRICE" OF: 6 Hot Mix Asphalt Concrete Item # 5 "Type 6 Top" Year 2022-23 BID #1 FURNISH AND PLACE THE FOLLOWING WITHIN HOT Mix ASPHALT CONCRETE "Type 6 Top" which includes Tack Coat and seam seal joint all new joints MADE WITH AN ALLOTMENT OF (30% OF RAP) RECYCLED ASPHALT PRODUCT INCLUDED IN THE MIXTURE 0— 100 Tons SOUTHOLD TOWN: FISHERS ISLAND: O n e K-)v-)A rid L n e do[`ays Pi v e- kvvndv-e-d s eo-P-1 r' -Pve c40Ua�f (written in words) Per Ton (written in words) Per Ton IbI49 Do X75 . 0a (written in numbers)Per Ton (written in numbers) Per Ton 100—250 Tons SOUTHOLD TOWN: FISHERS ISLAND: 0 e. k u n d e +k,rt- � t f &WoT �vc /fund ted' i- do t (c (written in words) Per Ton (written in words) Per Ton -%'t3 8. 00 550 , 0L (written in numbers) Per Ton (written in numbers) Per Ton 250—500 Tons SOUTHOLD TOWN: FISHERS ISLAND: 0yxe lAL)nA reJ 4Wy+ oy,, Aallaa Fou,,- Inuod i-ed c( D Ia�s (written in words)Per Ton (written in words) Per Ton t 13t . () 6 % L� ']() , ()° (written in numbers) Per Ton (written in numbers) Per Ton 7 Hot Mix Asphalt Concrete Item # 5 "Type 6 Top" Year 2022-23 500— 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: On e hondC fCf ,hjyCt-)e ddfa6 Tour 6MVrJ %�fti doUa� (written in words) Per Ton (written in words) Per Ton f lel , 0 0 '�' L/ 3d , 00 (written in numbers) Per Ton (written in numbers) Per Ton Over 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words)Per Ton (written in words) Per Ton �• 11q. 00 `a q /s' , 00 (written in numbers) Per Ton (written in numbers) Per Ton BID #2 COLD MILLING & REMOVAL SOUTHOLD TOWN: FISHERS ISLAND: c1oL1 a�� a ._ - e cent S) xe.n c�alXav's (written in words)Per Sq Yd (written in words) Per Sq Yd t 5 , -75 It , oa (written in numbers) Per Sq Yd (written in numbers) Per Sq Yd BID #3 PAVEMENT KEY CUT SOUTHOLD TOWN: FISHERS ISLAND: Ft ti eV` &O�GsS Twe�rn� TOvr aoWLVy (writte •n words) Per Linear Foot (written in w rds) Per Linear Foot g 19 a() g Q �A , 00 (written in numbers) Per Linear Foot (written in numbers) Per Linear Foot JEJ<X:k�C Y•.�CT�%�%k�CX�J�C:�XXX�%yC:E JCC>C}X JC*X�CX J��C k�%F%F k k�i�X��'F�����x:E%�C�C��T��J�X*����•Jti�>Ci�����"�X 8 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 BID #4 HOT RUBBERIZED CRACK SEALING SOUTHOLD TOWN: FISHERS ISLAND: fwo Fov4fki d o (a�S (written in words) Per Linear Foot (written in words)Per Linear Foot F �, a,< EIq, oa (written in numbers) Per Linear Foot (written in numbers) Per Linear Foot BID #5 SITE PREPARATION—COST PER SQUARE YARD. Site Preparation shall include the excavation of existing soil to a maximum depth of twelve (12") inches in depth as directed by the Town. Sub-soil shall be compacted and aTour(4") inch lift of Recycled Concrete Aggregate meeting State DOT Specification shall be place, graded and compacted in preparation for the placement of asphalt pavement. GY l� C, B . Cost Per Square Yard ($) 0 n Q ho h d re- �rfy (:�q. 1 351 y a written in words J�U((�qy�' written in numbers And he further agrees that if this proposal shall be accepted by the Town and that if he shall refuse, fail or neglect to enter into a Contract pursuant to such proposal and to the requirements of the Town, shall have been deposited in the mail addressed to him at the address given in the proposal, that he shall be considered to have abandoned the contract. We the undersigned, further agree that this proposal shall be reviewed by the Town to correct any deficiencies in the proposed scope of work and, if no corrections are necessary, further agree that this proposal is a formal bid and shall remain in effect for a period of forty-five (45) days, the Town will accept or reject this proposal or by mutual agreement may extend this time period. Signature of Bidder: Business Address: Telephone Number: 3 'J�goO Date: J�' 9 Hot Mix Asphalt Concrete Item # 5 "Type 6 Top" Year 2022-23 1. DESCRIPTION Bids are requested for the purchase and placement of Asphalt Concrete Pavement, Type 6, for the use in repair&maintenance of the Town Highways and related parking facilities for a period of one (1)year beginning on the date that the contract was executed. All Asphalt Concrete shall be delivered and machine spread upon the surface of roads, driveways, parking fields, street intersections or any other areas requiring pavement within Town right-of-ways or any other areas under the jurisdiction of the Commission of Public Works where and as required. 2. MATERIALS Bituminous Asphalt concrete pavement shall be equal to NYSDOT - Type 6 meet or exceed the following requirements: ASPHALT CONCRETE PAVEMENT Screen General limits Job Mix Sizes %Passing Total % 1" 100 -- 1/2" 95-100 -- 1/4" 65-85 +/- 7 1/8" 36-65 +/- 7 No. 20 15-39 +/- 7 No. 40 8-27 +/- 7 No. 80 4-16 +/- 4 No. 200 2 -6 +/- 2 Asphalt Content, % 5.8-7.0 +/-4 Mixing & Placing Temperature Range - degrees F 250-325 NOTE: At No Time Will any Recycled Material (RAP)be used without the permission of the Superintendent of Highways 3. WEATHER LIMITATIONS The material shall be placed only when: 1. The road surface and atmospheric temperatures are at least 45 degrees F 2. The weather is not foggy or raining. 3. There is no forecast of temperatures below 32 degrees F within 48 hours from the time of placement of the Asphalt Concrete Material. 10 Hot Mix Asphalt Concrete Item # 5 "Type 6 Top" Year 2022-23 4. EQUIPMENT, DELIVERY &APPLICATION All asphalt concrete pavement materials shall be delivered and placed in select quantities at a time, place and thickness as specified by the Southold Town Highway Superintendent. No materials will be delivered on Saturdays, Sundays or Holidays except in the case of an emergency. Asphalt Plants must have adequate capacity and sufficient storage for the items to be furnished. All work shall commence within five (5) Calendar days after receipt of written order. Any reason for delay in work shall be submitted to the Town in writing explaining the delay. If the reason is not acceptable to the Town, work must continue without any further delay. Bituminous pavers shall be self-powered units, provided with an activated screed or strike-off assembly. The machine shall be capable of spreading and finishing courses of bituminous plant mix material in lane widths up to twelve (12') feet or thickness up to four(4") inches as may be specified by the Highway Superintendent. After placement, the Asphalt Concrete Material shall be thoroughly and uniformly compacted with an approved vibrator type or static steel wheel roller conforming to section 401-3.12 of the NYSDOT construction manual to obtain a thoroughly compacted pavement. All manholes, catch basins, curbs and other structures shall be protected against the application of asphalt concrete material. 5. TESTING The Town shall have the absolute right to make tests before and after delivery and placement of asphalt material to determine conformity to Specifications, quality and standards of excellence. The Contractor agrees to bear the cost and pay for all tests which are deemed to be necessary in the opinion of the Town. The Contractor shall repair or replace at no additional cost to the Town, any materials found to not meet the Specifications and quality intended. The work shall be executed in the best and most workmanlike manner. 6. SAMPLES The town at its discretion can request samples of asphalt material provided by winning bidder to have periodic testing of the mix at a DOT approved facility at the vendor's expense to help insure that the mix provided is to our specification. 7. BIDDER QUALIFICATIONS The bidder will be required to show, to the satisfaction of the Superintendent of Highways,that he is a responsible contractor experienced in the kind of work to be performed; that he is financially able to execute the contract; and that he has adequate equipment and fixed storage facilities to satisfactorily and efficiently perform the work as directed within the specified time limits. The bidder must state exact location of his Plant Facilities. 11 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 8. MEASUREMENT &PAYMENT The prices quoted in this bid, and subsequently awarded, are to be used in establishing prices for actual materials furnished and placed within the Town of Southold from the date of award up to and including one (1)year thereafter. The contract period may be extended for up to one (1) additional year upon mutual written agreement of the Town and the Contractor. Payment shall be made to the contractor at the unit price(s) submitted in the Proposal. The asphalt concrete will be measured by the number of tons of compacted material in place. The unit price per ton shall include the cost of furnishing all materials, equipment, labor and incidentals necessary to complete the work. 9. TRAFFIC MAINTENANCE The contractor shall be responsible for providing maintenance and protection of vehicular and pedestrian traffic associated with this work. Opening to traffic does not constitute acceptance of the work. The contractor shall also be responsible for providing all signage and traffic control during this work. NOTE: The winning bidder will supply the Highway Department with daily mix reports showing the composition of the asphalt mix that day, and endeavor to submit them to us along with the invoices submitted for payment. END OF SPECIFICATION 12 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 STATEMENT OF NON-COLLU1 ION (To be completed by each Bidder) In accordance with Section 103-d General Municipal Law, effective September 1, 1966, every bid or proposal hereafter made to a political subdivision of the State of any public department, agency, or official thereof or to a fore district or any agency or official thereof for work or services performed or to be performed or goods sold or to be sold, shall contain the following statement subscribed to by the bidder and affirmed by such bidder as true under the penalties of perjury; non-collusive bidding certification. A. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each parry thereto certifies as to,its own organization, under penalty of perjury,that to the best of knowledge and belief: (1) The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or any competitor. (2) Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly, to any other bidder or to any competitor. (3) No attempt has been made or will be made by the bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition. B. The person signing this bid or proposal certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the bidder, as well as the person signing in its behalf. C. That attached hereto (if a corporate bidder) is a certified.copy of resolution authorizing the execution of this certificate by the signature of this bid or proposal on behalf of the corporate bidder. RESOLUTION Resolved that Ti CL r-1 GQ-1A-1A n` of the (Name of signatory) 0(Z, �%6JV-N a& V L Be authorized to sign and submit the bid (Name of Corporation) 13 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 Or proposal of this corporation for the following Project: Item# 5 Hot Mix Asphalt Concrete "Type 6 Top" Peconic Lane, Peconic,New York 11958 and to include in such bid or proposal the certificate as to non-collusion required by section one-hundred-three- d (103-d) of the General Municipal Law as the act and deed of such corporation, and for any inaccuracies or miss-statements in such certificate this corporate bidder shall be liable under the penalties of perjury. The foregoing is true and correct copy of the resolution adopted by c�Ca7�7.cn _corporation at a meeting of the Board of Directors, held on the , day of TVY -v— , 20 ZZ (SEAL OF THE CORPORATION) Laws of New York, 1965 Ch. 751, Sec. 103-d, as amended & j&2=:�tL-1 effective on September 1, 1965. Signa re 14 i r. I i I e4eOeff2-18bb-4ef5-96b3-3876726c6b1b lynda.rudder@town.southold.ny.us AFFIDAVIT OF PUBLICATION The Suffolk Times State of New York, i County of,Suffolk, The undersigned is the authorized designee of The Suffolk Times,a Weekly Newspaper published in Suffolk County, New York. I certify that the public notice,a printed copy of which is attached hereto, was printed and published in this newspaper on the following dates: June 09,2022 This newspaper has been designated by the County Clerk of Suffolk County,as a newspaper of record in this county,and as such, is eligible to publish such notices. l Signature Eliot T. Putnam i Printed Name Subscribed and sworn to before me, This 09 day of June 2022 Notary Signat e 100 GjAS .' OF NEW 1'ORK'• Notary Public Stamp - NOTARYPUBLIC. _ -� • AL[3ANl' � O a n '• 01RE6398443 .' p �`''��Ui u u s u►eN,�� I SOUTHOLD TOWN CLERK j • i i r r " I e4eOeff2-18bb-4ef5-96b3-3876726c6b1b lynda.rudder@town.south old.ny.us AFFIDAVIT OF PUBLICATION The Suffolk Times LEGAL NOTICE NOTICE TO BIDDERS NOTICE IS HEREBY GIVEN, in i accordance with the provisions of Section 103 of the General Municipal Law, that sealed bids are sought and requested for furnishing and placing within the Town of Southold,the following road treatments: 5. Type 6 Top—Hot Mix Asphalt Concrete 6. Base Coat 8. Type 6 Asphalt(town pick up) Specifications may be obtained at the Office of the Town Clerk, Town of Southold,via email or will be available for download on the Town website. Copies can be mailed by calling the Town Clerks office 631-765-1800. The sealed bids,together with a Non-Collusive Bid Certificate, and bank draft,certified check,or bid bond in the amount of$100.00, will be received by the Town Clerk of the Town of Southold at the Southold Town Hall, PO Box 1179, 53095 Main Road,Southold, New York, until 2:00 P.M.,Thursday, June 16,2022 at which time they will be opened and read aloud in public. The Town Board of the Town of Southold reserves the right to reject any and all bids and waive any and all informalities in any bid should it be deemed in the best interest of the Town of Southold to do so. All bids must be signed and sealed in envelopes plainly marked with the type of road treatment and item#being bid on, and submitted to the Office of the Town Clerk. t The bid price shall not include any I i i SOUTHOLD TOWN CLERK 2 `1 e4eOeff2-18bb-4efS-96b3-3876726c6blb lynda.rudder@town.southold.ny.us r AFFIDAVIT OF PUBLICATION The Suffolk Times tax,federal, state, or local,from which the Town of Southold is exempt. Dated: May 24,2022 DENIS NONCARROW SOUTHOLD TOWN CLERK i i i SOUTHOLD TOWN CLERK 3 i I Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 ITEM NO. 5 SPECIFICATIONS FOR THE PURCHASE & APPLICATION OF ASPHALT ROAD MATERIALS HOT MIX ASPHALT CONCRETE "Type 6 Top" NOTE: THE TOWN OF SOUTHOLD WILL ALSO REQUIRE +/- 3 0,000 SQUARE YARDS (more or less as may be needed) OF PAVEMENT TO BE APPLIED ON FISHERS ISLAND. THE CONTRACTOR SHALL BE REQURIED TO NOTIFY EACH RESIDENT AT LEAST 24 HOURS PRIOR TO ANY WORK ON TOWN ROADS. RESIDENTS MUST BE RE-NOTIFIED AFTER DELAYS DUE TO INCLEMENT WEATHER OR JOB OPERATIONS. 1 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 INSTRUCTIONS TO BIDDERS A. PROPOSALS Proposals must be made in strict accordance with the "Proposal Form" provided. The Proposal form shall not be detached from the bid package. Failure to comply with this requirement will constitute grounds for rejection of the bid subject to the digression of the Highway Superintendent. Any and all exceptions to the specifications shall be listed on a separate sheet bearing the designation: 'Exceptions to the Specifications", and attached to the Bid Form. Each proposal must be signed in writing with the full name and address of bidder. The bidders shall write in ink,both in words &numerals, the price for which he proposed to furnish all materials,plant, equipment, tools, shoring or bracing, or other facilities, &to perform all labor and services necessary for the proper completion of the work in strict accordance with the plans and specifications, and subject at all times to the approval of the Highway Superintendent. Proposals, together with the entire bid package, shall be delivered enclosed in an opaque sealed envelope and shall be addressed as indicated on Invitation to Bid. The envelope shall be marked "Proposal" bearing the title of work and the Bidders Name. Bidders may bid on one or any combination of items listed on the proposal sheet. No proposal shall be considered which has not been received by the Southold Town Clerk prior to the hour and date stated. B. PROPOSAL GUARANTY A proposal will not be accepted or considered unless accompanied by a guaranty in the form of a bid bond or certified check in the amount of one hundred ($ 100) dollars payable to the Town of Southold. As soon as the proposal prices have been compared, the Owner shall return the bidder's bond or the certified checks accompanying such proposals as, in his judgment, would not likely be involved in making the award. All other proposal quantities will be held until the contract and contract bond have been executed after which they will be released or returned to the respective bidders whose proposals they accor0panied. C. OMISSIONS AND DISCREPANCIES Bidders should carefully examine the specifications and fully inform .themselves of all conditions and matters which can in any way affect the work or the cost thereof. Should a bidder find discrepancies in or omissions from the specifications, or other documents or should he be in doubt as to their meaning, he should at once notify the Highway Superintendent who may issue a written instruction to all bidders. D. PUBLIC OPENING OF PROPOSALS Proposals will be opened and read publicly at the time and place indicated in the Invitation for Bids. Bidders, authorized agents, and other interested parties are invited to be present. 2 t Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 E. AWARD OF CONTRACT Award of contract will be made as soon as practical. The Superintendent of Highways reserves the right to make awards by items, or as a whole, or not at all, whichever the Superintendent deems to be in the best interest of the Town. A contract may be awarded to a responsible bidder other than the lowest money bidder, if it is in the best interest of the Town.No bid may be withdrawn after scheduled closing time for receipt of bids for a period of 45 days pending execution of a contract by successful bidder. The competency and responsibility of the bidder and his sub-contractors will be considered in making, the award. The Town reserves the right to waive any technical error,to accept any bid, or to reject any or all bids. The contract form will be a Standard form of Agreement between Owner and Contractor. The Town will either award the project or reject all proposals received within forty-five (45) days after formal opening of proposals. Acceptance of a proposal will be a written notice signed by the Town Clerk& no other act shall constitute the acceptance of a proposal.' F. WITHDRAWALS OF PROPOSALS Any bidder upon his or her authorized representative's written request presented not later than the hour set for the opening thereof, will be given permission to withdraw his proposal. At the time of opening the proposals, when such proposals are reached, it will be returned to him unread. G. REJECTION OF PROPOSALS The Town reserves the right to waive any technical error and to reject any and/or all proposals. Without limiting the generality of the foregoing, any proposal which in incomplete, obscure, or irregular may be rejected; any proposal accompanied by an insufficient or irregular certified check or bidder's bond bay be rejected, any proposal having interlineations, erasure or corrections may be rejected. The Town also reserves the fight to reject any bid if the evidence submitted in the qualification statement or an investigation of such bidder fails to satisfy the Town that such bidder is property qualified to carry out the obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. H. PLANT&EQUIPMENT The bidder shall State in his bid that be has available or under his control,plant and equipment of the character and in the amount required to complete the proposed work within the specific time. 1 TIME FOR EXECUTION OF CONTRACT Any bidder whose proposal shall be accepted will be required to appear before the Town in person; or if a firm or corporation, a duly authorized representative shall so appear, and execute six (6) copies of the Contract and furnish satisfactory Performance and Payment Bond within ten (10) days after notice that the Contract has been awarded to him. Failure to execute Contract shall constitute a breach of the agreement effected by the acceptance of the Proposal 3 Hot Mix Asphalt Concrete Item # 5 "Type 6'Top" Year 2022-23 The damages to the Town for such breach will include loss from interference with his construction program and other items,the accurate amount of which it will be difficult or impossible to compute. The amount of the certified check or bidder's bond accompanying the Proposal of such bidder shall be retained by the Town,not as a penalty, but as liquidated damages for such breach. In the event any bidder whose proposal shall,be accepted shall fail or refuse to execute the Contract as herein before provided,the Town may, at where option, determine that such bidder has abandoned the Contract, and thereupon,his proposal and acceptance thereof shall be null and void, and the Town shall be entitled to liquidated damages as above provided. J. PREVAILING WAGE RATES The New York State Department of Labor's Prevailing Wage Rate Schedules are part of this Contract. The Contractor is responsible for being familiar with the latest available schedules. INSURANCE REQUIREMENTS The Contractor shall not commence any work until he has obtained, and had approved by the Town of Southold, all of the insurance that is required under this contract which has been enumerated herein: COMPENSATION INSURANCE: Public Liability and Property Damage Insurance Contractor's Protective Liability and Property Damage Insurance Owner's Protective Public Liability and Property Damage Insurance The Contractor shall not permit any subcontractor to commence any operation of the site until satisfactory proof of carriage of the above required insurance has been posted with and approved by the Owner. Compensation Insurance: The Contractor shall take out and maintain during the life of this Contract, Workmen's Compensation Insurance for all his employees employed at the site of the project, and in case of any of the work being sublet, the Contractor shall require all subcontractors similarly to provide Workmen's Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Contractor. Public Liability and Propertyamage Insurance: The Contractor shall take out and maintain during the life of this Contract such Public Liability and Property Damage Insurance as shall protect him and any subcontractor performing work covered by this Contract from claims for damages four personal injury including accidental death as well as from claims for property damage which may arise from operations under this Contract, whether such operations be by himself or by any subcontractor, to by anyone directly or indirectly employed by either of them, and the amounts of such insurance shall be as follows: Public Liability Insurance in an amount of not less than One Million Dollars ($1,000,000.00) for bodily injuries, including wrongful death to each person and subject to the same limit for each person in an amount not less that One Million Dollars. ($1,000,000.00) on account of each accident. 4 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 Property Damage Insurance in an amount not less than One Million Dollars ($1,000,000.00) for damages on account of each accident and in an amount of not less than One Million Dollars ($1,000,000.00) for damages on account of all accidents. Liability and Property Damage Insurance: The above policies for Public Liability and Property Damage Insurance must be so written to include Contractor's Protective Liability and Property Damage insurance to protect the Contractor against claims arising from the operations of a subcontractor. The policies shall also name the Town of Southold as an additional insured. Owner's Protective Public Liability and Property Damage Insurance: The. Contractor shall furnish to the Owner,with respect to the operations he or any of his subcontractors perform a regular Protective Public Liability Insurance Policy for, and in behalf of the Owner,providing for a limit of not less than One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, one person and subject to that limit for each person, a total limit of One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of,two or more persons in any one accident; and regular Protective Property Damage Insurance providing for a limit of not less than One Million Dollars.($1,000,000.00) for damages arising out of injury to, or destruction of, property in any one accident and subject to that limit per accident, a total (or aggregate limit of Two Million Dollars ($ 2,000,000.00) for all damages arising out of injury to, or destruction of,property during the policy period. This insurance must fully cover the legal liability of the Owner. The coverage provided under his policy must not be affected if the Owner performs work in connection with the project either for or in cooperation with the Contractor or as an aid thereto whether the same be a part of the Contract or separate therefrom,by means of its own employees or agents or if the Owner directs or supervises the work to be performed by the Contractor. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with certificates of each insurer insuring the Contractor of any subcontractor under this Contract except with respect to part D. As listed above. In respect to this paragraph, the Contractor shall furnish the Owner with the original insurance policy. Both-certificates, as furnished, and the insurance policy, as required, shall bear the policy numbers,the expiration date of the policy and the limits of liability there under. Both the certificates and the policy shall be endorsed to provide the Owner with any notice of cancellation or non-renewal. 5 Hot Mix Asphalt Concrete Item # 5 "Type 6 Top" Year 2022-23 PROPOSAL FORM DATE: NAME OF BIDDER: TO: SOUTHOLD TOWN BOARD NOTE: All items listed herein must TOWN HALL be bid. Failure to bid any PO BOX 1179 item will be grounds for 53095 MAIN ROAD disqualification. SOUTHOLD,NEW YORK 11971 MEMBERS OF THE BOARD: The undersigned as bidder, declares that the only persons, company, or parties interested in this proposal as principals are named below; that this proposal is made without any connection, directly or indirectly with any other bidder for the same work; that it is in all respects fair and without collusion or fraud, and that no person acting for or employed by the aforementioned owner is or will be interested directly or indirectly, in the performance of the contract, or the supplies relating to it, or in any portion of the profit thereof, that he has carefully examined all project requirements, including bidding requirements, contract, general and special conditions, specifications, and addenda, if any (Note: acknowledgment of addenda and their dates must be included as indicated on bottom page); that he has satisfied himself by personal examination of the proposed work, and by such other means as he may have chosen, as to the conditions and requirements of -���-� the-work;and lie proposed-arid agrees that if"his proposal"be accepfedlie will contract to furnish all-- materials not provided by the Town (See Specifications) and to perform all the work required to construct, perform and complete the specified work; and that he will start the work as directed by the Town, he will accept, in full payment thereof as listed below: BID ON ASPHALT ROAD MATERIALS, HOT Mix ASPHALT CONCRETE, "Type 6 Top", IN ACCORDANCE WITH THE PROJECT REQUIREMENTS. THE ABOVE REFERENCED ACTIVITIES WILL BE COMPLETED FOR THE STIPULATED CUMULATIVE"UNIT PRICE" OF: 6 • Hot Mix Asphalt Concrete Item # 5 "Type 6 Top" Year 2022-23 BID #1 FURNISH AND PLACE THE FOLLOWING WITHIN HOT Mix ASPHALT CONCRETE "Type 6 Top" which includes Tack Coat and seam seal joint all new joints MADE WITH AN ALLOTMENT OF (30% OF RAP) RECYCLED ASPHALT PRODUCT INCLUDED IN THE MIXTURE 0— 100 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers)Per Ton 100—250 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton 250—500 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton 7 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 500— 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton Over 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton BID #2 COLD MILLING & REMOVAL SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Sq Yd (written in words)-Per Sq Yd (written in numbers) Per Sq Yd (written in numbers) Per Sq Yd BID #3 PAVEMENT KEY CUT SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Linear Foot (written in words) Per Linear Foot (written in numbers) Per Linear Foot (written in numbers) Per Linear Foot 8 Hot Mix Asphalt Concrete Item # 5 "Type 6 Top" Year 2022-23 BID #4 HOT RUBBERIZED CRACK SEALING SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Linear Foot (written in words) Per Linear Foot (written in numbers) Per Linear Foot (written in numbers)Per Linear Foot BID #5 SITE PREPARATION—COST PER SQUARE YARD. Site Preparation shall include the excavation of existing soil to a maximum depth of twelve (12") inches in depth as directed by the Town. Sub-soil shall be compacted and a four(4") inch lift of Recycled Concrete Aggregate meeting State DOT Specification shall be place, graded and compacted in preparation for the placement of asphalt pavement. Cost Per Square Yard ($) written in words written in numbers And he further agrees that if this proposal shall be accepted by the Town and that if he shall refuse,fail or neglect to enter into a Contract pursuant to such proposal and to the requirements of the Town, shall have been deposited in the mail addressed to him at the address given in the proposal,that he shall be considered to have abandoned the contract. We the undersigned, further agree that this proposal shall be reviewed by the Town to correct any deficiencies in the proposed scope of work and, if no corrections are necessary, further agree that this proposal is a formal bid and shall remain in effect for a period of forty-five (45) days,the Town will accept or reject this proposal or by mutual agreement may extend this time period. Signature of Bidder: Business Address: Telephone Number: Date: 9 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 1. DESCRIPTION Bids are requested for the purchase and placement of Asphalt Concrete Pavement, Type 6, for the use in repair& maintenance of the Town Highways and related parking facilities for a period of one (1) year beginning on the date that the contract was executed. All Asphalt Concrete shall be delivered and machine spread upon the surface of roads, driveways,parking fields, street intersections or any other areas requiring pavement within Town right-of-ways or any other areas under the jurisdiction of the Commission of Public Works where and as required. 2. MATERIALS Bituminous Asphalt concrete pavement shall be equal to NYSDOT - Type 6 meet or exceed the following requirements: ASPHALT CONCRETE PAVEMENT Screen General limits Job Mix Sizes %Passing Total % 1" 100 -- 1/2" 95-100 -- 1/4" 65-85 +/- 7 1/8" 36-65 +/- 7 No. 20 15-39 +/- 7 No. 40 8-27 +/- 7 No. 80 4-16 +/-4 No. 200 2-6 +/-2 Asphalt Content, % 5.8-7.0 +/-4 Mixing &Placing Temperature Range - degrees F 250-325 NOTE: At No Time Will any Recycled Material (RAP)be used without the permission of the Superintendent of Highways 3. WEATHER LIMITATIONS The material shall be placed only when: 1. The road surface and atmospheric temperatures are at least 45 degrees F 2. The weather is not foggy or raining. 3. There is no forecast of temperatures below 32 degrees F within 48 hours from the time of placement of the Asphalt Concrete Material. 10 Hot Mix Asphalt Concrete Item # 5 "Type 6 Top" Year 2022-23 4. EQUIPMENT, DELIVERY &APPLICATION All asphalt concrete pavement materials shall be delivered and placed in select quantities at a time, place and thickness as specified by the Southold Town Highway Superintendent. No materials will be delivered on Saturdays, Sundays or Holidays except in the case of an emergency. Asphalt Plants must have adequate capacity and sufficient storage for the items to be furnished. All work shall commence within five (5) Calendar days after receipt of written order. Any reason for delay in work shall be submitted to the Town in writing explaining the delay. If the reason is not acceptable to the Town,work must continue without any further delay. Bituminous pavers shall be self-powered units, provided with an activated screed or strike-off assembly. The machine shall be capable of spreading and finishing courses of bituminous plant mix material in lane widths up to twelve (12') feet or thickness up to four (4") inches as may be specified by the Highway Superintendent. After placement, the Asphalt Concrete Material shall be thoroughly and uniformly compacted with an approved vibrator type or static steel wheel roller conforming to section 401-3.12 of the NYSDOT construction manual to obtain a thoroughly compacted pavement. All manholes, catch basins, curbs and other structures shall be protected against the application of asphalt concrete material. 5. TESTING The Town shall have the absolute right to make tests before and after delivery and placement of asphalt material to determine conformity to Specifications, quality and standards of excellence. The Contractor agrees to bear the cost and pay for all tests which are deemed to be necessary in the opinion of the Town. The Contractor shall repair or replace at no additional cost to the Town, any materials found to not meet the Specifications and quality intended. The work shall be executed in the best and most workmanlike manner. 6. SAMPLES The town at its discretion can request samples of asphalt material provided by winning bidder to have periodic testing of the mix at a DOT approved facility at the vendor's expense to help insure that the mix provided is to our specification. 7. BIDDER QUALIFICATIONS The bidder will be required to show, to the satisfaction of the Superintendent of Highways, that he is a responsible contractor experienced in the kind of work to be performed; that he is financially able to execute the contract; and that he has adequate equipment and fixed storage facilities to satisfactorily and efficiently perform the work as directed within the specified time limits. The bidder must state exact location of his Plant Facilities. 11 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 8. MEASUREMENT &PAYMENT The prices quoted in this bid, and subsequently awarded, are to be used in establishing prices for actual materials furnished and placed within the Town of Southold from the date of award up to and including one (1)year thereafter. The contract period may be extended for up to one (1) additional year upon mutual written agreement of the Town and the Contractor. Payment shall be made to the contractor at the unit price(s) submitted in the Proposal. The asphalt concrete will be measured by the number of tons of compacted material in place. The unit price per ton shall include the cost of furnishing all materials, equipment, labor and incidentals necessary to complete the work. 9. TRAFFIC MAINTENANCE The contractor shall be responsible for providing maintenance and protection of vehicular and pedestrian traffic associated with this work. Opening to traffic does not constitute acceptance of the work. The contractor shall also be responsible for providing all signage and traffic control during this work. NOTE: The winning bidder will supply the Highway Department with daily mix reports showing the composition of the asphalt mix that day, and endeavor to submit them to us along with the invoices submitted for payment. END OF SPECIFICATION 12 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 STATEMENT OF NON-COLLUSION (To be completed by each Bidder) In accordance with Section 103-d General Municipal Law, effective September 1, 1966, every bid or proposal hereafter made to a political subdivision of the State of any public department, agency, or official thereof or to a fore district or any agency or official thereof for work or services performed or to be performed or goods sold or to be sold, shall contain the following statement subscribed to by the bidder and affirmed by such bidder as true under the penalties of perjury; non-collusive bidding certification. A. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury,that to the best of knowledge and belief: (1) The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or any competitor. (2) Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly,to any other bidder or to any competitor. (3) No attempt has been made or-will be made by the bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition. B. The person signing this bid or proposal certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the bidder, as well as the person signing in its behalf. C. That attached hereto (if a corporate bidder) is a certified copy of resolution authorizing the execution of this certificate by the signature of this bid or proposal on behalf of the corporate bidder. RESOLUTION Resolved that of the (Name of signatory) Be authorized to sign and submit the bid (Name of Corporation) 13 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 Or proposal of this corporation for the following Project: Item# 5 Hot Mix Asphalt Concrete "Type 6 Top" Peconic Lane, Peconic,New York 11958 and to include in such bid or proposal the certificate as to non-collusion required by section one-hundred-three- d (103-d) of the General Municipal Law as the act and deed of such corporation, and for any inaccuracies or miss-statements in such certificate this corporate bidder shall be liable under the penalties of perjury. The foregoing is true and correct copy of the resolution adopted by _corporation at a meeting of the Board of Directors, held on the day of 220 (SEAL OF THE CORPORATION) Laws of New York, 1965 Ch. 751, Sec. 103-d, as amended & effective on September 1, 1965. Signature 14 Hot Mix Asphalt Concrete Item # 6 "Base Coat" Year 2022-23 ITEM NO. 6 SPECIFICATIONS FOR THE PURCHASE & APPLICATION OF ASPHALT ROAD MATERIALS HOT MIX ASPHALT CONCRETE "Base Coat" NOTE: THE TOWN OF SOUTHOLD WILL ALSO REQUIRE +/- 30,000 SQUARE YARDS (more or less as may be needed) OF PAVEMENT TO BE APPLIED ON FISHERS ISLAND. THE CONTRACTOR SHALL BE REQURIED TO NOTIFY EACH RESIDENT AT LEAST 24 HOURS PRIOR TO ANY WORK ON TOWN ROADS. RESIDENTS MUST BE RE-NOTIFIED AFTER DELAYS DUE TO INCLEMENT WEATHER OR JOB OPERATIONS. 1 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 INSTRUCTIONS TO BIDDERS A. PROPOSALS Proposals must be made in strict accordance with the "Proposal Form" provided. The Proposal form shall not be detached from the bid.package. Failure to comply with this requirement will constitute grounds for rejection of the bid subject to the digression of the Highway Superintendent. Any and all exceptions to the specifications shall be listed on a separate sheet bearing the designation: 'Exceptions to the Specifications", and attached to the Bid Form. Each proposal must be signed in writing with the full name and address of bidder. The bidders shall write in ink,both in words &numerals, the price for which he proposed to furnish all materials,plant, equipment, tools, shoring or bracing, or other facilities, &to perform all labor and services necessary for the proper completion of the work in strict accordance with the plans and specifications, and subject at all times to the approval of the Highway Superintendent. Proposals,together with the entire bid package, shall be delivered enclosed in an opaque sealed envelope and shall be addressed as indicated on Invitation to Bid. The envelope shall be marked "Proposal" bearing the title of work and the Bidders Name. Bidders may bid on one or any combination of items listed on the proposal sheet. No proposal shall be considered which has!not been received by the Southold Town Clerk prior to the hour and date stated. B. PROPOSAL GUARANTY A proposal will not be accepted or considered unless accompanied by a guaranty in the form of a bid bond or certified check in the amount of one hundred ($ 100) dollars payable to the Town of Southold. As soon as the proposal prices have been compared, the Owner shall return the bidder's bond or the certified checks accompanying such proposals as, in his judgment,would not likely be involved in making the award. All other proposal quantities will be held until the contract and contract bond have been executed after which they will be released or returned to the respective bidders whose proposals they accor0panied. C. OMISSIONS AND DISCREPANCIES Bidders should carefully examine the specifications and fully inform .themselves of all conditions'and matters which can in any way affect the work or the cost thereof. Should a bidder find discrepancies in or omissions from the specifications, or other;documents or should he be in doubt as to their meaning, he should at once notify the Highway Superintendent who may issue a written instruction to all bidders. D. PUBLIC OPENING OF PROPOSALS Proposals will be opened and read publicly at the time and place indicated in the Invitation for Bids. Bidders, authorized agents, and other interested parties are invited to be present. 2 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 E. AWARD OF CONTRACT Award of contract will be made as soon as practical. The Superintendent of Highways reserves the right to make awards by items, or as a whole, or not at all, whichever the Superintendent deems to be in the best interest of the Town. A contract may be awarded to a responsible bidder other than the lowest money bidder,if it is in the best interest of the Town. No bid may be withdrawn after scheduled closing time for receipt of bids for a period of 45 days pending execution of a contract by successful bidder. The competency and responsibility of the bidder and his sub-contractors will be considered in making, the award. The Town reserves the right to waive any technical error, to accept any bid, or to reject any or all bids. The contract form will be a Standard form of Agreement between Owner and Contractor. The Town will either award the project or reject all proposals received within forty-five (45) days after formal opening of proposals. Acceptance of a proposal will be a written notice signed by the Town Clerk & no other act shall constitute the acceptance of a proposal. F. WITHDRAWALS OF PROPOSALS Any bidder upon his or her authorized representative's written request presented not later than the hour set for the opening thereof, will be given permission to withdraw his proposal. At the time of opening the proposals, when such proposals are reached, it will be returned to him unread. G. REJECTION OF PROPOSALS The Town reserves the right to waive any technical error and to reject any and/or all proposals. Without limiting the generality of the foregoing, any proposal which in incomplete, obscure, or irregular may be rejected; any proposal accompanied by an'insufficient or irregular certified check or bidder's bond bay be rejected, any proposal having interlineations, erasure or corrections may be rejected. The Town also reserves the fight to reject any bid if the evidence submitted in the qualification statement or an investigation of such bidder fails to satisfy the Town that such bidder is property qualified to carry out the obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. H. PLANT & EQUIPMENT The bidder shall State in his bid that be has available or under his control, plant and equipment of the character and in the amount required to complete the proposed work within the specific time. I TIME FOR EXECUTION OF CONTRACT Any bidder whose proposal shall be accepted will be required to appear before the Town in person; or if a firm or corporation, a duly authorized representative shall so appear, and execute six (6) copies of the Contract and furnish satisfactory Performance and Payment Bond within ten (10) days after notice that the Contract has been awarded to him. Failure to execute Contract shall constitute a breach of the agreement effected by the acceptance of the Proposal 3 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 The damages to the Town for such breach will include loss from interference with his construction program and other items, the accurate amount of which it will be difficult or impossible to compute. The amount of the certified check or bidder's bond accompanying the Proposal of such bidder shall be retained by the Town, not as a penalty, but as liquidated damages for such breach. In the event any bidder whose proposal shall,be accepted shall fail or refuse to execute the Contract as herein before provided,the Town may, at there option, determine that such bidder has abandoned the Contract, and thereupon, his proposal and acceptance thereof shall be null and void, and the Town shall be entitled to liquidated damages as above provided. J. PREVAILING WAGE RATES The New York State Department of Labor's Prevailing Wage Rate Schedules are part of this Contract. The Contractor is responsible for being familiar with the latest available schedules. INSURANCE REQUIREMENTS The Contractor shall not commence any work until he has obtained, and had approved by the Town of Southold, all of the insurance that is required under this contract which has been enumerated herein: COMPENSATION INSURANCE: Public Liability and Property Damage Insurance Contractor's Protective Liability and Property Damage Insurance Owner's Protective Public Liability and Property Damage Insurance The Contractor shall not permit any subcontractor to commence any operation of the site until satisfactory proof of carriage of the above required insurance has been posted with and approved by the Owner. Compensation Insurance: The Contractor shall take out and maintain during the life of this Contract, Workmen's Compensation Insurance for all his employees employed at the site of the project, and in case of any of the work being sublet,the Contractor shall require all subcontractors similarly to provide Workmen's Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Contractor. Public Liability and Property Damage Insurance: The Contractor shall take out and maintain during the life of this Contract such Public Liability and Property Damage Insurance as shall protect him and any subcontractor performing work covered by this Contract from claims for damages four personal injury including accidental death as well as from claims for property damage which may arise from operations under this Contract, whether such operations be by himself or by any subcontractor, to by anyone directly or indirectly employed by either of them, and the amounts of such insurance shall be as follows: Public Liability Insurance in an amount of not less than One Million Dollars ($1,000,000.00) for bodily injuries, including wrongful death to each person and subject to the same limit for each person in an amount not less that One Million Dollars. ($1,000,000.00) on account of each accident. 4 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 Property Damage Insurance in an amount not less than One Million Dollars ($1,000,000.00) for damages on account of each accident and in an amount of not less than One Million Dollars ($1;000,000.00) for damages on account of all accidents. Liability and Property Damage Insurance: The above policies for Public Liability and Property Damage Insurance must be so written to include Contractor's Protective Liability and Property Damage insurance to protect the Contractor against claims arising from the operations of a subcontractor. The policies shall also name the Town of Southold as an additional insured. Owner's Protective Public Liability and Property Damage Insurance: The Contractor shall furnish to the Owner, with respect to the operations he or any of his subcontractors perform a regular Protective Public Liability Insurance Policy for, and in behalf of the Owner,providing for a limit of not less than One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, one person and subject to that limit for each person, a total limit of One Million Dollars ($1,000,000.00)for all damages arising out of bodily injuries to, or death of,two or more persons in any one accident; and regular Protective Properly Damage Insurance providing for a limit of not less than One Million Dollars ($1,000,000.00) for damages arising out of injury to, or destruction of, property in any one accident and subject to that limit per accident, a total (or aggregate limit of Two'Million Dollars ($ 2,000,000.00) for all damages arising out of injury to, or destruction of,property duringthe policy period. This insurance must fully cover the legal liability of the Owner. The coverage provided under his policy must not be affected if the Owner performs work in connection with the project either for or in cooperation with the Contractor or as an aid thereto whether the same be a part of the Contractor separate therefrom,by means of its own employees or agents or if the Owner directs or supervises the work to be performed by the Contractor. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with certificates of each insurer insuring the Contractor of any subcontractor under this Contract except with respect to part D. As listed above. In respect to this paragraph, the Contractor shall furnish the Owner with the original insurance policy. Both certificates, as furnished, and the insurance policy, as required, shall bear the policy numbers,the expiration date of the policy and the limits;of liability there under. Both the certificates and the policy shall be endorsed to provide the Owner with any notice of cancellation or non-renewal. i 5 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 PROPOSAL FORM DATE: NAME OF BIDDER: TO: SOUTHOLD TOWN BOARD NOTE: All items listed herein must TOWN HALL be bid. Failure to bid any PO BOX 1179 item will be grounds for 53095 MAIN ROAD disqualification. SOUTHOLD,NEW YORK 11971 MEMBERS OF THE BOARD: The undersigned as bidder, declares that the only persons, company, or parties interested in this proposal as principals are named below; that this proposal is made without any connection, directly or indirectly with any other bidder for the same work; that it is in all respects fair and without collusion or fraud, and that no person acting for or employed by the aforementioned owner is or will be interested directly or indirectly, in the performance of the contract, or the supplies relating to it, or in any portion of the profit thereof;that he has carefully examined all project requirements, including bidding requirements, contract, general and special conditions, specifications, and addenda, if any (Note: acknowledgment of addenda and their dates must be included as indicated on bottom page); that he has satisfied himself by personal examination of the proposed work, and by such other means as he may have chosen, as to the conditions and requirements of the work; and he proposed and agrees that if his proposal be accepted he will contract to furnish all materials not provided by the Town(See Specifications) and to perform all the work required to construct, perform and complete the specified work; and that he will start the work as directed by the Town, he will accept, in full payment thereof as listed below: BID ON ASPHALT ROAD MATERIALS, HOT Mix ASPHALT CONCRETE, 'Base Coat", IN ACCORDANCE WITH THE PROJECT REQUIREMENTS. THE ABOVE REFERENCED ACTIVITIES WILL BE COMPLETED FOR THE STIPULATED CUMULATIVE"UNIT PRICE" OF: 6 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 BID #1 FURNISH AND PLACE THE FOLLOWING WITHIN HOT Mix ASPHALT CONCRETE MADE WITH AN ALLOTMENT OF (30% OF RAP) RECYCLED ASPHALT PRODUCT INCLUDED IN THE MIXTURE 0— 100 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton 100—250 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words)Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers)Per Ton 250—500 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers)Per Ton (written in numbers) Per Ton 500— 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton 7 Hot Mix Asphalt Concrete Item # 6 "Base Coat" Year 2022-23 Over 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words)Per Ton (written in numbers) Per Ton (written in numbers) Per Ton BID #2 COLD MILLING & REMOVAL SOUTHOLD TOWN: FISHERS ISLAND: (written in words)Per Sq Yd (written in words) Per Sq Yd (written in numbers) Per Sq Yd (written in numbers) Per Sq Yd And he further agrees that if this proposal shall be accepted by the Town and that if he shall refuse, fail or neglect to enter into a Contract pursuant to such proposal and to the requirements of the Town, shall have been deposited in the mail addressed to him at the address given in the proposal,that he shall be considered to have abandoned the contract. We the undersigned, further agree that this proposal shall be reviewed by the Town to correct any deficiencies in the proposed scope of work and, if no corrections are necessary, further agree that this proposal is a formal bid and shall remain in effect for a period of forty-five (45) days, the Town will accept or reject this proposal or by mutual agreement may extend this time period. Signature of Bidder: Business Address: Telephone Number: Date: 8 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 1. DESCRIPTION Bids are requested for the purchase and placement of Asphalt Concrete Pavement, Type 6, for the use in repair & maintenance of the Town Highways and related parking facilities for a period of one (1)year beginning on the date that the contract was executed. All Asphalt Concrete shall be delivered and machine spread upon the surface of roads, driveways,parking fields, street intersections or any other areas requiring pavement within Town right-of-ways or any other areas under the jurisdiction of the Commission of Public Works where and as required. 2. MATERIALS SEE PAGES 13-14 FOR DETAILS NOTE: At No Time Will any Recycled Material (RAP) be used without the permission of the Superintendent of Highways 3. WEATHER LIMITATIONS The material shall be placed only when: 1. The road surface and atmospheric temperatures are at least 45 degrees F 2. The weather is not foggy or raining. 3. There is no forecast of temperatures below 32 degrees F within 48 hours from the time of placement of the Asphalt Concrete Material. 4. EQUIPMENT, DELIVERY & APPLICATION All asphalt concrete pavement materials shall be delivered and placed in select quantities at a time, place and thickness as specified by the Southold Town Highway Superintendent.No materials will be delivered on Saturdays, Sundays or Holidays except in the case of an emergency. Asphalt Plants must have adequate capacity and sufficient storage for the items to be furnished. All work shall commence within five (5) Calendar days after receipt of written order. Any reason for delay in work shall be submitted to the Town in writing explaining the delay. If the reason is not acceptable to the Town, work must continue without any further delay. Bituminous pavers shall be self-powered units,provided with an activated screed or strike-off assembly. The machine shall be capable of spreading and finishing courses of bituminous plant mix material in lane widths up to twelve (12') feet or thickness up to four (4") inches as may be specified by the Highway Superintendent. After placement, the Asphalt Concrete Material shall be thoroughly and uniformly compacted with an approved vibrator type or static steel wheel roller conforming to section 401-3.12 of the NYSDOT construction manual to obtain a thoroughly compacted pavement. All manholes, catch basins, curbs and other structures shall be protected against the application of asphalt concrete material. 9 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year.2022-23 5. TESTING The Town shall have the absolute right to make tests before and after delivery and placement of asphalt material to determine conformity to Specifications, quality and standards of excellence. The Contractor agrees to bear the cost and pay for all tests which are deemed to be necessary in the opinion of the Town. The Contractor shall repair or replace at no additional cost to the Town, any materials found to not meet the Specifications and quality intended. The work shall be executed in the best and most workmanlike manner. 6. SAMPLES The town at its discretion can request samples of asphalt material provided by winning bidder to have periodic testing of the mix at a DOT approved facility at the vendor's expense to help insure that the mix provided is to our specification. 7. BIDDER QUALIFICATIONS The bidder will be required to show, to the satisfaction of the Superintendent of Highways,that he is a responsible contractor experienced in the kind of work to be performed; that he is financially able to execute the contract; and that he has adequate equipment and fixed storage facilities to satisfactorily and efficiently perform the work as directed within the specified time limits. The bidder must state exact location of his Plant Facilities. 8. MEASUREMENT & PAYMENT The prices quoted in this bid, and subsequently awarded, are to be used in establishing prices for actual materials furnished and placed within the Town of Southold from the date of award up to and including one (1)year thereafter. The contract period may be extended for up to one (1) additional year upon mutual written agreement of the Town and the Contractor. Payment shall be made to the contractor at the unit price(s) submitted in the Proposal. The asphalt concrete will be measured by the number of tons of compacted material in place. The unit price per ton shall include the cost of furnishing all materials, equipment, labor and incidentals necessary to complete the work. 9. TRAFFIC MAINTENANCE The contractor shall be responsible for providing maintenance and protection of vehicular and pedestrian traffic associated with this work. Opening to traffic does not constitute acceptance of the work. The contractor shall also be responsible for providing all signage and traffic control during this work. NOTE: The winning bidder will supply the Highway Department with daily mix reports showing the composition of the asphalt mix that day, and endeavor to submit them to us along with the invoices submitted for payment. END OF SPECIFICATION 10 r Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 STATEMENT OF NON-COLLUSION (To be completed by each Bidder) In accordance with Section 103-d General Municipal Law, effective September 1, 1966, every bid or proposal hereafter made to a political subdivision of the State of any public department, agency, or official thereof or to a fore district or any agency or official thereof for work or services performed or to be performed or goods sold or to be sold, shall contain the following statement subscribed to by the bidder and affirmed by such bidder as true under the penalties of perjury; non-collusive bidding certification. A. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury, that to the best of knowledge and belief: (1) The prices in this bid have been arrived at independently without collusion, consultation,. communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or any competitor. (2) Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly,to any other bidder or to any competitor. (3) No attempt has been made or will be made by the bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition. B. The person signing this bid or proposal certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the bidder, as well as the person signing in its behalf. C. That attached hereto (if a corporate bidder) is a certified copy of resolution authorizing the execution of this certificate by the signature of this bid or proposal on behalf of the corporate bidder. RESOLUTION Resolved that of the (Name of signatory) Be authorized to sign and submit the bid (Name of Corporation) 11 r Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 Or proposal of this corporation for the following Project: Item# 6 Hot Mix Asphalt Concrete "Base Coat" Peconic Lane, Peconic,New York 11958 and to include in such bid or proposal the certificate as to non-collusion required by section one-hundred-three- d (103-d) of the General Municipal Law as the act and deed of such corporation, and for any inaccuracies or miss-statements in such certificate this corporate bidder shall be liable under the penalties of perjury. The foregoing is true and correct copy of the resolution adopted by _corporation at a meeting of the Board of Directors, held on the day of , 20 (SEAL OF THE CORPORATION) Laws of New York, 1965 Ch. 751, Sec. 103-d, as amended & effective on September 1, 1965. Signature 12 Hot Mix Asphalt Concrete Item # 8 "Type 6 Top" -Furnish only Year 2022-23 ITEM NO. 8 SPECIFICATIONS FOR THE FURNISHING OF ASPHALT ROAD MATERIALS INTO TOWN HIGHWAY TRUCKS HOT MIX ASPHALT CONCRETE "Type 6 Top" INSTRUCTIONS TO BIDDERS A. PROPOSALS Proposals must be made in strict accordance with the "Proposal Form" provided. The Proposal form shall not be detached from the bid package. Failure to comply with this requirement will constitute grounds for rejection of the bid subject to the digression of the Highway Superintendent. Any and all exceptions to the specifications shall be listed on a separate sheet bearing the designation: 'Exceptions to the Specifications", and attached to the Bid Form. Each proposal must be signed in writing with the full name and address of bidder. The bidders shall write in ink, both in words &numerals,the price for which he proposed to furnish all materials &to perform all labor and services necessary for the proper completion of the work, and subject at all times to the approval of the Highway Superintendent. Proposals,together with the entire bid package, shall be delivered enclosed in an opaque sealed envelope and shall be addressed as indicated on Invitation to Bid. The envelope shall be marked "Proposal" bearing the title of work and the Bidders Name. Bidders may bid on one or any combination of items listed on the proposal sheet. No proposal shall be considered which has not been received by the Southold Town Clerk prior to the hour and date stated. B. PROPOSAL GUARANTY A proposal will not be accepted or considered unless accompanied by a guaranty in the form of a bid bond or certified check in the amount of one hundred ($100) dollars payable to the Town of Southold. 1 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 As soon as the proposal prices have been compared, the Owner shall return the bidder's bond or the certified checks accompanying such proposals as, in his judgment, would not likely be involved in making the award. All other proposal quantities will be held until the contract and contract bond have been executed after which they will be released or returned to the respective bidders whose proposals they accor0panied. C. OMISSIONS AND DISCREPANCIES Bidders should carefully examine the specifications and fully inform .themselves of all conditions and matters which can in any way affect the work or the cost thereof. Should a bidder find discrepancies in or omissions from the specifications, or other documents or should he be in doubt as to their meaning,he should at once notify the Highway Superintendent who may issue a written instruction to all bidders. D. PUBLIC OPENING OF PROPOSALS Proposals will be opened and read publicly at the time and place indicated in the Invitation for Bids. Bidders, authorized agents, and other interested parties are invited to be present. E. AWARD OF CONTRACT Award of contract will be made as soon as practical. The Superintendent of Highways reserves the right to make awards by items, or as a whole, or not at all, whichever the Superintendent deems to be in the best interest of the Town. A contract may be awarded to a responsible bidder other than the lowest money bidder, if it is in the best interest of the Town.No bid may be withdrawn after scheduled closing time for receipt of bids for a period of 45 days pending execution of a contract by successful bidder. The competency and responsibility of the bidder and his sub-contractors will be considered in making, the award. The Town reserves the right to waive any technical error,to accept any bid, or to reject any or all bids. The contract form will be a Standard form of Agreement between Owner and Contractor. The Town will either award the project or reject all proposals received within forty-five (45) days after formal opening of proposals. Acceptance of a proposal will be a written notice signed by the Town Clerk & no other act shall constitute the acceptance of a proposal. F. WITHDRAWALS OF PROPOSALS Any bidder upon his or her authorized representative's written request presented not later than the hour set for the opening thereof, will be given permission to withdraw his proposal. At the time of opening the proposals, when such proposals are reached, it will be returned to him unread. G. REJECTION OF PROPOSALS The Town reserves the right to waive any technical error and to reject any and/or all proposals. Without limiting the generality of the foregoing, any proposal which in incomplete, obscure, or irregular may be rejected; any proposal accompanied by an insufficient or irregular certified check or bidder's bond bay be rejected, any proposal having interlineations, erasure or corrections may be rejected. The Town also reserves the fight to reject any bid if the evidence submitted in the qualification statement or an investigation of such bidder fails to satisfy the Town that such bidder is property qualified to carry out the 2 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" - Furnish only Year 2022-23 obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. H. PLANT &EQUIPMENT The bidder shall State in his bid that be has available or under his control,plant and equipment of the character and in the amount required to complete the proposed work within the specific time. I TIME FOR EXECUTION OF CONTRACT Any bidder whose proposal shall be accepted will be required to appear before the Town in person; or if a firm or corporation, a duly authorized representative shall so appear, and execute six (6) copies of the Contract and furnish satisfactory Performance and Payment Bond within ten (10) days after notice that the Contract has been awarded to him. Failure to execute Contract shall constitute a breach of the agreement effected by the acceptance of the Proposal The damages to the Town for such breach will include loss from interference with his construction program and other items,the accurate amount of which it will be difficult or impossible to compute. The amount of the certified check or bidder's bond accompanying the Proposal of such bidder shall be retained by the Town, not as a penalty, but as liquidated damages for such breach. In the event any bidder whose proposal shall, be accepted shall fail or refuse to execute the Contract as herein before provided, the Town may, at there option, determine that such bidder has abandoned the Contract, and thereupon, his proposal and acceptance thereof shall be null and void, and the Town shall be entitled to liquidated damages as above provided. J. PREVAILING WAGE RATES The New York State Department of Labor's Prevailing Wage Rate Schedules are part of this Contract. The Contractor is responsible for being familiar with the latest available schedules. INSURANCE REQUIREMENTS The Contractor shall not commence any work until he has obtained, and had approved by the Town of Southold, all of the insurance that is required under this contract which has been enumerated herein: COMPENSATION INSURANCE: Public Liability and Property Damage Insurance Contractor's Protective Liability and Property Damage Insurance Owner's Protective Public Liability and Property Damage Insurance The Contractor shall not permit any subcontractor to commence any operation of the site until satisfactory proof of carriage of the above required insurance has been posted with and approved by the Owner. Compensation Insurance: The Contractor shall take out and maintain during the life of this Contract, Workmen's Compensation Insurance for all his employees employed at the site of the project, and in case of any of the work being sublet, the Contractor shall require all subcontractors similarly to provide Workmen's 3 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" - Furnish only Year 2022-23 Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Contractor. Public Liability and Property Damage Insurance: The Contractor shall take out and maintain during the life of this Contract such Public Liability and Property Damage Insurance as shall protect him and any subcontractor performing work covered by this Contract from claims for damages four personal injury including accidental death as well as from claims for property damage which may arise from operations under this Contract, whether such operations be by himself or by any subcontractor, to by anyone directly or indirectly employed by either of them, and the amounts of such insurance shall be as follows: Public Liability Insurance in an amount of not less than One Million Dollars ($1,000,000.0.0) for bodily injuries, including wrongful death to each person and subject to the same limit for each person in an amount not less that One Million Dollars. ($1,000,000.00) on account of each accident. Propertyage Insurance in an amount not less than One Million Dollars ($1,000,000.00) for damages on account of each accident and in an amount of not less than One Million Dollars ($1,000,000..00) for damages on account of all accidents. Liabilily and Propei1y Damage Insurance: The above policies for Public Liability and Property Damage Insurance must be so written to include Contractor's Protective Liability and Property Damage insurance to protect the Contractor against claims arising from the operations of a subcontractor. The policies shall also name the Town of Southold as an additional insured. Owner's Protective Public Liability and Propegy Damage Insurance: The Contractor shall furnish to the Owner, with respect to the operations he or any of his subcontractors perform a regular Protective Public Liability Insurance Policy for, and in behalf of the Owner, providing for a limit of not less than One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, one person and subject to that limit for each person, a total limit of One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, two or more persons in any one accident; and regular Protective Property Damage Insurance providing for a limit of not less than One Million Dollars ($1,000,000.00) for damages arising out of injury to, or destruction of, property in any one accident and subject to that limit per accident, a total (or aggregate limit of Two Million Dollars ($ 2,000,000.00) for all damages arising out of injury to, or destruction of, property during the policy period. This insurance must fully cover the legal liability of the Owner. The coverage provided under his policy must not be affected if the Owner performs work in connection with the project either for or in cooperation with the Contractor or as an aid thereto whether the same be a part of the Contract or separate therefrom, by means of its own employees or agents or if the Owner directs or supervises the work to be performed by the Contractor. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with certificates of each insurer insuring the Contractor of any subcontractor under this Contract except with respect to part D. As listed above. In respect to this!paragraph, the Contractor shall furnish the Owner with the original insurance policy. Both certificates, as furnished, and the insurance policy, as required, shall bear the policy numbers, the expiration date of the policy and the limits of liability there under. Both the certificates and the policy shall be endorsed to provide the Owner with any notice of cancellation or non-renewal. 4 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 PROPOSAL FORM DATE: NAME OF BIDDER: TO: SOUTHOLD TOWN BOARD NOTE: All items listed herein must TOWN HALL be bid. Failure to bid any PO BOX 1179 item will be grounds for 53095 MAIN ROAD disqualification. SOUTHOLD,NEW YORK 11971 MEMBERS OF THE BOARD: The undersigned as bidder, declares that the only persons, company, or parties interested in this proposal as principals are named below; that this proposal is made without any connection, directly or indirectly with any other bidder for the same work; that it is in all respects fair and without collusion or fraud, and that no person acting for or employed by the aforementioned owner is or will be interested directly or indirectly, in the performance of the contract, or the supplies relating to it, or in any portion of the profit thereof; that he has carefully examined all project requirements, including bidding requirements, contract, general and special conditions, specifications, and addenda, if any (Note: acknowledgment of addenda and their dates must be included as indicated on bottom page); that he has satisfied himself by personal examination of the proposed work, and by such other means as he may have chosen, as to the conditions and requirements of the work; and he proposed and agrees that if his proposal be accepted he will contract to furnish all materials not provided by the Town (See Specifications) and to perform all the work required to construct, perform and complete the specified work; and that he will start the work as directed by the Town, he will accept, in full payment thereof as listed below: BID ON ASPHALT ROAD MATERIALS, HOT Mix ASPHALT CONCRETE, "Type 6 Top", IN ACCORDANCE WITH THE PROJECT REQUIREMENTS. THE ABOVE REFERENCED ACTIVITIES WILL BE COMPLETED FOR THE STIPULATED CUMULATIVE"UNIT PRICE" OF: BID #1 SUPPLY LABOR AND MATERIAL TO FURNISH "Type 6 Top" INTO SOUTHOLD TOWN HIGHWAY TRUCKS MADE WITH AN ALLOTMENT OF (30% OF RAP ) RECYCLED ASPHALT PRODUCT INCLUDED IN THE MIXTURE (written in words) Per Ton (written in numbers words) Per Ton 5 Hot Mix Asphalt Concrete Item # 8 "Type 6 Top" - Furnish only Year 2022-23 And he further agrees that if this proposal shall be accepted by the Town and that if he shall refuse, fail or neglect to enter into a Contract pursuant to such proposal and to the requirements of the Town, shall have been deposited in the mail addressed to him at the address given in the proposal, that he shall be considered to have abandoned the contract. We the undersigned, further agree that this proposal shall be reviewed by the Town to correct any deficiencies in the proposed scope of work and, if no corrections are necessary, further agree that this proposal is a formal bid and shall remain in effect for a period of forty-five (45) days, the Town will accept or reject this proposal or by mutual agreement may extend this time period. Signature of Bidder: Business Address: Telephone Number: Date: 6 • Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 1. DESCRIPTION Bids are requested for the supply of labor and material to furnish N.Y.S. Type 6 Top Coat into Southold Town Highway Trucks. The materials shall meet the specifications to/for Item 403.1701 in the New York Department of Transportation Specifications. The materials shall be constructed in accordance to section 400 in the New York State Department of Transportation Specifications. Material shall be measured by ton. Payment for this item shall be made by the unit price multiplied by the number tons. 2. MATERIALS Bituminous Asphalt concrete pavement shall be equal to NYSDOT-Type 6 meet or exceed the following requirements: ASPHALT CONCRETE PAVEMENT Screen General limits Job Mix Sizes %Passing. Total % 1" 100 -- 1/2" 95-100 -- 1/4" 65-85 +/- 7 1/8" 36-65 +/- 7 No. 20 15-39 +/- 7 No. 40 8-27 +/- 7 No. 80 4-16 +/- 4 No. 200 2-6 +/- 2 Asphalt Content, % 5.8-7.0 +/-4 5. TESTING The Town shall have the absolute right to make tests before and after delivery and placement of asphalt material to determine conformity to Specifications, quality and standards of excellence. The Contractor agrees to bear the cost and pay for all tests which are deemed to be necessary in the opinion of the Town. The Contractor shall repair or replace at no additional cost to the Town, any materials found to not meet the Specifications and quality intended. The work shall be executed in the best and most workmanlike manner. 6. SAMPLES The town at its discretion can request samples of asphalt material provided by winning bidder to have periodic testing of the mix at a DOT approved facility at the vendor's expense to help insure that the mix provided is to our specification. 7. MEASUREMENT& PAYMENT The prices quoted in this bid, and subsequently awarded, are to be used in establishing prices for actual materials furnished and placed within Town of Southold Highway Trucks from the date of award up to and 7 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 including one (1)year thereafter. The contract period may be extended for up to one (1) additional year upon mutual written agreement of the Town and the Contractor. Payment shall be made to the contractor at the unit price(s) submitted in the Proposal. The asphalt concrete will be measured by the number of tons. The unit price per ton shall include the cost of furnishing all materials, equipment, labor and incidentals necessary to complete the work. NOTE: The winning bidder will supply the Highway Department with daily mix reports showing the composition of the asphalt mix that day, and endeavor to submit them to us along with the invoices submitted for payment. END OF SPECIFICATION: 8 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" - Furnish only Year 2022-23 STATEMENT OF NON-COLLUSION (To be completed by each Bidder) In accordance with Section 103-d General Municipal Law, effective September 1, 1966, every bid or proposal hereafter made to a political subdivision of the State of any public department, agency, or official thereof or to a fore district or any agency or official thereof for work or services performed or to be performed or goods sold or to be sold, shall contain the following statement subscribed to by the bidder and affirmed by such bidder as true under the penalties of perjury; non-collusive bidding certification. A. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury,that to the best of knowledge and belief. (1) The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or any competitor. (2) Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly,to any other bidder or to any competitor. (3) No attempt has been made or will be made by the bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition. B. The person signing this bid or proposal certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the bidder, as well as the person signing in its behalf. C. That attached hereto (if a corporate bidder) is a certified copy of resolution authorizing the execution of this certificate by the signature of this bid or proposal on behalf of the corporate bidder. RESOLUTION Resolved that of the (Name of signatory) Be authorized to sign and submit the bid (Name of Corporation) 9 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 Or proposal of this corporation for the following Project: Item# 8 Furnish into Town Highway Trucks "Type 6 Top" Peconic Lane, Peconic,New York 11958 and to include in such bid or proposal the certificate as to non-collusion required by section one-hundred-three- d (103-d) of the General Municipal Law as the act and deed of such corporation, and for any inaccuracies or miss-statements in such certificate this corporate bidder shall be liable under the penalties of perjury. The foregoing is true and correct copy of the resolution adopted by corporation at a meeting of the Board of Directors,held on the day of 520 (SEAL OF THE CORPORATION) Laws of New York, 1965 Ch. 751, Sec. 103 A, as amended & effective on September 1, 1965. Signature 10 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 ITEM NO. 5 SPECIFICATIONS FOR THE PURCHASE & APPLICATION OF ASPHALT ROAD MATERIALS HOT MIX ASPHALT CONCRETE "Type 6 Top" NOTE: THE TOWN OF SOUTHOLD WILL ALSO REQUIRE +/- 3 0,000 SQUARE YARDS (more or less as may be needed) OF PAVEMENT TO BE APPLIED ON FISHERS ISLAND. THE CONTRACTOR SHALL BE REQURIED TO NOTIFY EACH RESIDENT AT LEAST 24 HOURS PRIOR TO ANY WORK ON TOWN ROADS. RESIDENTS MUST BE RE-NOTIFIED AFTER DELAYS DUE TO INCLEMENT WEATHER OR JOB OPERATIONS. 1 Hot Mix Asphalt Concrete Item # 5 "Type 6 Top" Year 2022-23 INSTRUCTIONS TO BIDDERS A. PROPOSALS Proposals must be made in strict accordance with the "Proposal Form" provided. The Proposal form shall not be detached from the bid package. Failure to comply with this requirement will constitute grounds for rejection of the bid subject to the digression of the Highway Superintendent. Any and all exceptions to the specifications shall be listed on a separate sheet bearing the designation: 'Exceptions to the Specifications", and attached to the Bid Form. Each proposal must be signed in writing with the full name and address of bidder. The bidders shall write in ink, both in words & numerals, the price for which he proposed to furnish all materials,plant, equipment, tools, shoring or bracing, or other facilities, &to perform all labor and services necessary for the proper completion of the work in strict accordance with the plans and specifications, and subject at all times to the approval of the Highway Superintendent. Proposals,together with the entire bid package, shall be delivered enclosed in an opaque sealed envelope and shall be addressed as indicated on Invitation to Bid. The envelope shall be marked "Proposal" bearing the title of work and the Bidders Name. Bidders may bid on one or any combination of items listed on the proposal sheet. No proposal shall be considered which has not been received by the Southold Town Clerk prior to the hour and date stated. B. PROPOSAL GUARANTY A proposal will not be accepted or considered unless accompanied by a guaranty in the form of a bid bond or certified check in the amount of one hundred ($ 10 0) dollars payable to the Town of Southold. As soon as the proposal prices have been compared, the Owner shall return the bidder's bond or the certified checks accompanying such proposals as, in his judgment, would not likely be involved in making the award. All other proposal quantities will be held until the contract and contract bond have been executed after which they will be released or returned to the respective bidders whose proposals they accor0panied. C. OMISSIONS AND DISCREPANCIES Bidders should carefully examine the specifications and fully inform .themselves of all conditions and matters which can in any way affect the work or the cost thereof. Should a bidder find discrepancies in or omissions from the specifications, or other documents or should he be in doubt as to their meaning, he should at once notify the Highway Superintendent who may issue a written instruction to all bidders. D. PUBLIC OPENING OF PROPOSALS Proposals will be opened and read publicly at the time and place indicated in the Invitation for Bids. Bidders, authorized agents, and other interested parties are invited to be present. 2 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 E. AWARD OF CONTRACT Award of contract will be made as soon as practical. The Superintendent of Highways reserves the right to make awards by items, or as a whole, or not at all, whichever the Superintendent deems to be in the best interest of the Town. A contract may be awarded to a responsible bidder other than the lowest money bidder, if it is in the best interest of the Town.No bid may be withdrawn after scheduled closing time for receipt of bids for a period of 45 days pending execution of a contract by successful bidder. The competency and responsibility of the bidder and his sub-contractors will be considered in making, the award. The Town reserves the right to waive any technical error, to accept any bid, or to reject any or all bids. The contract form will be a Standard form of Agreement between Owner and Contractor. The Town will either award the project or reject all proposals received within forty-five (45) days after formal opening of proposals. Acceptance of a proposal will be a written notice signed by the Town Clerk& no other act shall constitute the acceptance of a proposal. F. WITHDRAWALS OF PROPOSALS Any bidder upon his or her authorized representative's written request presented not later than the hour set for the opening thereof, will be given permission to withdraw his proposal. At the time of opening the proposals, when such proposals are reached, it will be returned to him unread. G. REJECTION OF PROPOSALS The Town reserves the right to waive any technical error and to reject any and/or all proposals. Without limiting the generality of the foregoing, any proposal which in incomplete, obscure, or irregular may be rejected; any proposal accompanied by an insufficient or irregular certified check or bidder's bond bay be rejected, any proposal having interlineations, erasure or corrections may be rejected. The Town also reserves the fight to reject any bid if the evidence submitted in the qualification statement or an investigation of such bidder fails to satisfy the Town that such bidder is property qualified to carry out the obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. H. PLANT&EQUIPMENT The bidder shall State in his bid that be has available or under his control, plant and equipment of the character and in the amount required to complete the proposed work within the specific time. I TIME FOR EXECUTION OF CONTRACT Any bidder whose proposal shall be accepted will be required to appear before the Town in person; or if a firm or corporation, a duly authorized representative shall so appear, and execute six (6) copies of the Contract and furnish satisfactory Performance and Payment Bond within ten (10) days after notice that the Contract has been awarded to him. Failure to execute Contract shall constitute a breach of the agreement effected by the acceptance of the Proposal 3 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 The damages to the Town for such breach will include loss from interference with his construction program and other items, the accurate amount of which it will be difficult or impossible to compute. The amount of the certified check or bidder's bond accompanying the Proposal of such bidder shall be retained by the Town,not as a penalty, but as liquidated damages for such breach. In the event any bidder whose proposal shall, be accepted shall fail or refuse to execute the Contract as herein before provided, the Town may, at there option, determine that such bidder has abandoned the Contract, and thereupon, his proposal and acceptance thereof shall be null and void, and the Town shall be entitled to liquidated damages as above provided. J. PREVAILING WAGE RATES The New York State Department of Labor's Prevailing Wage Rate Schedules are part of this Contract. The Contractor is responsible for being familiar with the latest available schedules. INSURANCE REQUIREMENTS The Contractor shall not commence any work until he has obtained, and had approved by the Town of Southold, all of the insurance that is required under this contract which has been enumerated herein: COMPENSATION INSURANCE: Public Liability and Property Damage Insurance Contractor's Protective Liability and Property Damage Insurance Owner's Protective Public Liability and Property Damage Insurance The Contractor shall not permit any subcontractor to commence any operation of the site until satisfactory proof of carriage of the above required insurance has been posted with and approved by the Owner. Compensation Insurance: The Contractor shall take out and maintain during the life of this Contract, Workmen's Compensation Insurance for all his employees employed at the site of the project, and in case of any of the work being sublet, the Contractor shall require all subcontractors similarly to provide Workmen's Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Contractor. Public Liability and Propelly Damage Insurance: The Contractor shall take out and maintain during the life of this Contract such Public Liability and Property Damage Insurance as shall protect him and any subcontractor performing work covered by this Contract from claims for damages four personal injury including accidental death as well as from claims for property damage which may arise from operations under this Contract, whether such operations be by himself or by any subcontractor, to by anyone directly or indirectly employed by either of them, and the amounts of such insurance shall be as follows: Public Liability Insurance in an amount of not less than One Million Dollars ($1,000,000.00) for bodily injuries, including wrongful death to each person and subject to the same limit for each person in an amount not less that One Million Dollars. ($1,000,000.00) on account of each accident. 4 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 Property Damage Insurance in an amount not less than One Million Dollars ($1,000,000.00) for damages on account of each accident and in an amount of not less than One Million Dollars ($1,000,000.00) for damages on account of all accidents. Liability and Property Damage Insurance: The above policies for Public Liability and Property Damage Insurance must be so written to include Contractor's Protective Liability and Property Damage insurance to protect the Contractor against claims arising from the operations of a subcontractor. The policies shall also name the Town of Southold as an additional insured. Owner's Protective Public Liability and Propelly Damage Insurance: The Contractor shall furnish to the Owner, with respect to the operations he or any of his subcontractors perform a regular Protective Public Liability Insurance Policy for, and in behalf of the Owner, providing for a limit of not less than One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, one person and subject to that limit for each person, a total limit of One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of,two or more persons in any one accident; and regular Protective Propelly Damage Insurance providing for a limit of not less than One Million Dollars ($1,000,000.00) for damages arising out of injury to, or destruction of, property in any one accident and subject to that limit per accident, a total (or aggregate limit of Two Million Dollars ($ 2,000,000.00) for all damages arising out of injury to, or destruction of,property during the policy period. This insurance must fully cover the legal liability of the Owner. The coverage provided under his policy must not be affected if the Owner performs work in connection with the project either for or in cooperation with the Contractor or as an aid thereto whether the same be a part of the Contract or separate therefrom, by means of its own employees or agents or if the Owner directs or supervises the work to be performed by the Contractor. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with certificates of each insurer insuring the Contractor of any subcontractor under this Contract except with respect to part D. As listed above. In respect to this paragraph, the Contractor shall furnish the Owner with the original insurance policy. Both certificates, as furnished, and the insurance policy, as required, shall bear the policy numbers,the expiration date of the policy and the limits of liability there under. Both the certificates and the policy shall be endorsed to provide the Owner with any notice of cancellation or non-renewal. 5 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 PROPOSAL FORM DATE: NAME OF BIDDER: TO: SOUTHOLD TOWN BOARD NOTE: All items listed herein must TOWN HALL be bid. Failure to bid any PO BOX 1179 item will be grounds for 53095 MAIN ROAD disqualification. SOUTHOLD,NEW YORK 11971 MEMBERS OF THE BOARD: The undersigned as bidder, declares that the only persons, company, or parties interested in this proposal as principals are named below; that this proposal is made without any connection, directly or indirectly with any other bidder for the same work; that it is in all respects fair and without collusion or fraud, and that no person acting for or employed by the aforementioned owner is or will be interested directly or indirectly, in the performance of the contract, or the supplies relating to it, or in any portion of the profit thereof; that he has carefully examined all project requirements, including bidding requirements, contract, general and special conditions, specifications, and addenda, if any (Note: acknowledgment of addenda and their dates must be included as indicated on bottom page); that he has satisfied himself by personal examination of the proposed work, and by such other means as he may have chosen, as to the conditions and requirements of the work; and he proposed and agrees that if his proposal be accepted he will contract to furnish all materials not provided by the Town (See Specifications) and to perform all the work required to construct, perform and complete the specified work; and that he will start the work as directed by the Town, he will accept, in full payment thereof as listed below: BID ON ASPHALT ROAD MATERIALS, HOT Mix ASPHALT CONCRETE, "Type 6 Top", IN ACCORDANCE WITH THE PROJECT REQUIREMENTS. THE ABOVE REFERENCED ACTIVITIES WILL BE COMPLETED FOR THE STIPULATED CUMULATIVE"UNIT PRICE" OF: 6 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 BID #1 FURNISH AND PLACE THE FOLLOWING WITHIN HOT Mix ASPHALT CONCRETE "Type 6 Top" which includes Tack Coat and seam seal joint all new joints MADE WITH AN ALLOTMENT OF (30% OF RAP) RECYCLED ASPHALT PRODUCT INCLUDED IN THE MIXTURE 0— 100 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton 100—250 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton 250—500 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton 7 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 500— 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton Over 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words)Per Ton (written in numbers) Per Ton (written in numbers)Per Ton BID #2 COLD MILLING & REMOVAL SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Sq Yd (written in words)�Per Sq Yd (written in numbers) Per Sq Yd (written in numbers) Per Sq Yd BID #3 PAVEMENT KEY CUT SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Linear Foot (written in words) Per Linear Foot (written in numbers) Per Linear Foot (written in numbers) Per Linear Foot 8 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 BID #4 HOT RUBBERIZED CRACK SEALING SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Linear Foot (written in words) Per Linear Foot (written in numbers) Per Linear Foot (written in numbers) Per Linear Foot BID #5 SITE PREPARATION—COST PER SQUARE YARD. Site Preparation shall include the excavation of existing soil to a maximum depth of twelve (12") inches in depth as directed by the Town. Sub-soil shall be compacted and a four(4") inch lift of Recycled Concrete Aggregate meeting State DOT Specification shall be place, graded and compacted in preparation for the placement of asphalt pavement. Cost Per Square Yard ($) written in words written in numbers And he further agrees that if this proposal shall be accepted by the Town and that if he shall refuse, fail or neglect to enter into a Contract pursuant to such proposal and to the requirements of the Town, shall have been deposited in the mail addressed to him at the address given in the proposal, that he shall be considered to have abandoned the contract. We the undersigned, further agree that this proposal shall be reviewed by the Town to correct any deficiencies in the proposed scope of work and, if no corrections are necessary, further agree that this proposal is a formal bid and shall remain in effect for a period of forty-five (45) days, the Town will accept or reject this proposal or by mutual agreement may extend this time period. Signature of Bidder: Business Address: Telephone Number: Date: 9 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 1. DESCRIPTION Bids are requested for the purchase and placement of Asphalt Concrete Pavement, Type 6, for the use in repair& maintenance of the Town Highways and related parking facilities for a period of one (1)year beginning on the date that the contract was executed. All Asphalt Concrete shall be delivered and machine spread upon the surface of roads, driveways,parking fields, street intersections or any other areas requiring pavement within Town right-of-ways or any other areas under the jurisdiction of the Commission of Public Works where and as required. 2. MATERIALS Bituminous Asphalt concrete pavement shall be equal to NYSDOT-Type 6 meet or exceed the following requirements: ASPHALT CONCRETE PAVEMENT Screen General limits Job Mix Sizes %Passing Total % 1" 100 -- 1/2" 95-100 -- 1/4" 65-85 +/- 7 1/8" 36-65 +/- 7 No. 20 15-39 +/- 7 No. 40 8-27 +/- 7 No. 80 4-16 +/- 4 No. 200 2-6 +/- 2 Asphalt Content, % 5.8-7.0 +/- 4 Mixing & Placing Temperature Range - degrees F 250-325 NOTE: At No Time Will any Recycled Material (RAP) be used without the permission of the Superintendent of Highways 3. WEATHER LIMITATIONS The material shall be placed only when: 1. The road surface and atmospheric temperatures are at least 45 degrees F 2. The weather is not foggy or raining. 3. There is no forecast of temperatures below 32 degrees F within 48 hours from the time of placement of the Asphalt Concrete Material. 10 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 4. EQUIPMENT, DELIVERY &APPLICATION All asphalt concrete pavement materials shall be delivered and placed in select quantities at a time,place and thickness as specified by the Southold Town Highway Superintendent. No materials will be delivered on Saturdays, Sundays or Holidays except in the case of an emergency. Asphalt Plants must have adequate capacity and sufficient storage for the items to be furnished. All work shall commence within five (5) Calendar days after receipt of written order. Any reason for delay in work shall be submitted to the Town in writing explaining the delay. If the reason is not acceptable to the Town, work must continue without any further delay. Bituminous pavers shall be self-powered units, provided with an activated screed or strike-off assembly. The machine shall be capable of spreading and finishing courses of bituminous plant mix material in lane widths up to twelve (12') feet or thickness up to four(4") inches as may be specified by the Highway Superintendent. After placement, the Asphalt Concrete Material shall be thoroughly and uniformly compacted with an approved vibrator type or static steel wheel roller conforming to section 401-3.12 of the NYSDOT construction manual to obtain a thoroughly compacted pavement. All manholes, catch basins, curbs and other structures shall be protected against the application of asphalt concrete material. 5. TESTING The Town shall have the absolute right to make tests before and after delivery and placement of asphalt material to determine conformity to Specifications, quality and standards of excellence. The Contractor agrees to bear the cost and pay for all tests which are deemed to be necessary in the opinion of the Town. The Contractor shall repair or replace at no additional cost to the Town, any materials found to not meet the Specifications and quality intended. The work shall be executed in the best and most workmanlike manner. 6. SAMPLES The town at its discretion can request samples of asphalt material provided by winning bidder to have periodic testing of the mix at a DOT approved facility at the vendor's expense to help insure that the mix provided is to our specification. 7. BIDDER QUALIFICATIONS The bidder will be required to show, to the satisfaction of the Superintendent of Highways, that he is a responsible contractor experienced in the kind of work to be performed; that he is financially able to execute the contract; and that he has adequate equipment and fixed storage facilities to satisfactorily and efficiently perform the work as directed within the specified time limits. The bidder must state exact location of his Plant Facilities. 11 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 8. MEASUREMENT & PAYMENT The prices quoted in this bid, and subsequently awarded, are to be used in establishing prices for actual materials furnished and placed within the Town of Southold from the date of award up to and including one (1)year thereafter. The contract period may be extended for up to one (1) additional year upon mutual written agreement of the Town and the Contractor. Payment shall be made to the contractor at the unit price(s) submitted in the Proposal. The asphalt concrete will be measured by the number of tons of compacted material in place. The unit price per ton shall include the cost of furnishing all materials, equipment, labor and incidentals necessary to complete the work. 9. TRAFFIC MAINTENANCE The contractor shall be responsible for providing maintenance and protection of vehicular and pedestrian traffic associated with this work. Opening to traffic does not constitute acceptance of the work. The contractor shall also be responsible for providing all signage and traffic control during this work. NOTE: The winning bidder will supply the Highway Department with daily mix reports showing the composition of the asphalt mix that day, and endeavor to submit them to us along with the invoices submitted for payment. END OF SPECIFICATION 12 Hot Mix Asphalt Concrete Item # 5 "Type 6 Top" Year 2022-23 STATEMENT OF NON-COLLUSION (To be completed by each Bidder) In accordance with Section 103-d General Municipal Law, effective September 1, 1966, every bid or proposal hereafter made to a political subdivision of the State of any public department, agency, or official thereof or to a fore district or any agency or official thereof for work or services performed or to be performed or goods sold or to be sold, shall contain the following statement subscribed to by the bidder and affirmed by such bidder as true under the penalties of perjury; non-collusive bidding certification. A. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury, that to the best of knowledge and belief: (1) The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or any competitor. (2) Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly, to any other bidder or to any competitor. (3) No attempt has been made or will be made by the bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition. B. The person signing this bid or proposal certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the bidder, as well as the person signing in its behalf. C. That attached hereto (if a corporate bidder) is a certified copy of resolution authorizing the execution of this certificate by the signature of this bid or proposal on behalf of the corporate bidder. RESOLUTION Resolved that of the (Name of signatory) Be authorized to sign and submit the bid (Name of Corporation) 13 Hot Mix Asphalt Concrete Item# 5 "Type 6 Top" Year 2022-23 Or proposal of this corporation for the following Project: Item# 5 Hot Mix Asphalt Concrete "Type 6 Top" Peconic Lane, Peconic,New York 11958 and to include in such bid or proposal the certificate as to non-collusion required by section one-hundred-three- d (103-d) of the General Municipal Law as the act and deed of such corporation, and for any inaccuracies or miss-statements in such certificate this corporate bidder shall be liable under the penalties of perjury. The foregoing is true and correct copy of the resolution adopted by corporation at a meeting of the Board of Directors, held on the day of , 20 (SEAL OF THE CORPORATION) Laws of New York, 1965 Ch. 751, Sec. 103-d, as amended & effective on September 1, 1965. Signature 14 Hot Mix Asphalt Concrete Item # 8 "Type 6 Top" - Furnish only Year 2022-23 ITEM NO. 8 SPECIFICATIONS FOR THE FURNISHING OF ASPHALT ROAD MATERIALS INTO TOWN HIGHWAY TRUCKS HOT MIX ASPHALT CONCRETE "Type 6 Top" INSTRUCTIONS TO BIDDERS A. PROPOSALS Proposals must be made in strict accordance with the "Proposal Form" provided. The Proposal form shall not be detached from the bid package. Failure to comply with this requirement will constitute grounds for rejection of the bid subject to the digression of the Highway Superintendent. Any and all exceptions to the specifications shall be listed on a separate sheet bearing the designation: 'Exceptions to the Specifications", and attached to the Bid Form. Each proposal must be signed in writing with the full name and address of bidder. The bidders shall write in ink, both in words &numerals, the price for which he proposed to furnish all materials & to perform all labor and services necessary for the proper completion of the work, and subject at all times to the approval of the Highway Superintendent. Proposals, together with the entire bid package, shall be delivered enclosed in an opaque sealed envelope and shall be addressed as indicated on Invitation to Bid. The envelope shall be marked "Proposal" bearing the title of work and the Bidders Name. Bidders may bid on one or any combination of items listed on the proposal sheet. No proposal shall be considered which has not been received by the Southold Town Clerk prior to the hour and date stated. B. PROPOSAL GUARANTY A proposal will not be accepted or considered unless accompanied by a guaranty in the form of a bid bond or certified check in the amount of one hundred ($100) dollars payable to the Town of Southold. 1 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" - Furnish only Year 2022-23 As soon as the proposal prices have been compared,the Owner shall return the bidder's bond or the certified checks accompanying such proposals as, in his judgment, would not likely be involved in making the award. All other proposal quantities will be held until the contract and contract bond have been executed after which they will be released or returned to the respective bidders whose proposals they accor0panied. C. OMISSIONS AND DISCREPANCIES Bidders should carefully examine the specifications and fully inform .themselves of all conditions and matters which can in any way affect the work or the cost thereof. Should a bidder find discrepancies in or omissions from the specifications, or other documents or should he be in doubt as to their meaning, he should at once notify the Highway Superintendent who may issue a written instruction to all bidders. D. PUBLIC OPENING OF PROPOSALS Proposals will be opened and read publicly at the time and place indicated in the Invitation for Bids. Bidders, authorized agents, and other interested parties are invited to be present. E. AWARD OF CONTRACT Award of contract will be made as soon as practical. The Superintendent of Highways reserves the right to make awards by items, or as a whole, or not at all, whichever the Superintendent deems to be in the best interest of the Town. A contract may be awarded to a responsible bidder other than the lowest money bidder, if it is in the best interest of the Town.No bid may be withdrawn after scheduled closing time for receipt of bids for a period of 45 days pending execution of a contract by successful bidder. The competency and responsibility of the bidder and his sub-contractors will be considered in making,the award. The Town reserves the right to waive any technical error, to accept any bid, or to reject any or all bids. The contract form will be a Standard form of Agreement between Owner and Contractor. The Town will either award the project or reject all proposals received within forty-five (45) days after formal opening of proposals. Acceptance of a proposal will be a written notice signed by the Town Clerk& no other act shall constitute the acceptance of a proposal. F. WITHDRAWALS OF PROPOSALS Any bidder upon his or her authorized representative's written request presented not later than the hour set for the opening thereof, will be given permission to withdraw his proposal. At the time of opening the proposals, when such proposals are reached, it will be returned to him unread. G. REJECTION OF PROPOSALS The Town reserves the right to waive any technical error and to reject any and/or all proposals. Without limiting the generality of the foregoing, any proposal which in incomplete, obscure, or irregular may be rejected; any proposal accompanied by an insufficient or irregular certified check or bidder's bond bay be rejected, any proposal having interlineations, erasure or corrections may be rejected. The Town also reserves the fight to reject any bid if the evidence submitted in the qualification statement or an investigation of such bidder fails to satisfy the Town that such bidder is property qualified to carry out the 2 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. H. PLANT&EQUIPMENT The bidder shall State in his bid that be has available or under his control, plant and equipment of the character and in the amount required to complete the proposed work within the specific time. I TIME FOR EXECUTION OF CONTRACT Any bidder whose proposal shall be accepted will be required to appear before the Town in person; or if a firm or corporation, a duly authorized representative shall so appear, and execute six (6) copies of the Contract and furnish satisfactory Performance and Payment Bond within ten(10) days after notice that the Contract has been awarded to him. Failure to execute Contract shall constitute a breach of the agreement effected by the acceptance of the Proposal The damages to the Town for such breach will include loss from interference with his construction program and other items,the accurate amount of which it will be difficult or impossible to compute. The amount of the certified check or bidder's bond accompanying the Proposal of such bidder shall be retained by the Town, not as a penalty, but as liquidated damages for such breach. In the event any bidder whose proposal shall, be accepted shall fail or refuse to execute the Contract as herein before provided, the Town may, at there option, determine that such bidder has abandoned the Contract, and thereupon, his proposal and acceptance thereof shall be null and void, and the Town shall be entitled to liquidated damages as above provided. J. PREVAILING WAGE RATES The New York State Department of Labor's Prevailing Wage Rate Schedules are part of this Contract. The Contractor is responsible for being familiar with the latest available schedules. INSURANCE REQUIREMENTS The Contractor shall not commence any work until he has obtained, and had approved by the Town of Southold, all of the insurance that is required under this contract which has been enumerated herein: COMPENSATION INSURANCE: Public Liability and Property Damage Insurance Contractor's Protective Liability and Property Damage Insurance Owner's Protective Public Liability and Property Damage Insurance The Contractor shall not permit any subcontractor to commence any operation of the site until satisfactory proof of carriage of the above required insurance has been posted with and approved by the Owner. Compensation Insurance: The Contractor shall take out and maintain during the life of this Contract, Workmen's Compensation Insurance for all his employees employed at the site of the project, and in case of any of the work being sublet, the Contractor shall require all subcontractors similarly to provide Workmen's 3 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" - Furnish only Year 2022-23 Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Contractor. Public Liability and Property Damage Insurance: The Contractor shall take out and maintain during the life of this Contract such Public Liability and Property Damage Insurance as shall protect him and any subcontractor performing work covered by this Contract from claims for damages four personal injury including accidental death as well as from claims for property damage which may arise from operations under this Contract, whether such operations be by himself or by any subcontractor,to by anyone directly or indirectly employed by either of them, and the amounts of such insurance shall be as follows: Public Liabilily Insurance in an amount of not less than One Million Dollars ($1,000,000.00) for bodily injuries, including wrongful death to each person and subject to the same limit for each person in an amount not less that One Million Dollars. ($1,000,000.00) on account of each accident. Property Damage Insurance in an amount not less than One Million Dollars ($1,000,000.00) for damages on account of each accident and in an amount of not less than One Million Dollars ($1,000,000.00) for damages on account of all accidents. Liability and Propelty Damage Insurance: The above policies for Public Liability and Property Damage Insurance must be so written to include Contractor's Protective Liability and Property Damage insurance to protect the Contractor against claims arising from the operations of a subcontractor. The policies shall also name the Town of Southold as an additional insured. Owner's Protective Public Liability and Property Damage Insurance: The Contractor shall furnish to the Owner, with respect to the operations he or any of his subcontractors perform a regular Protective Public Liability Insurance Policy for, and in behalf of the Owner,providing for a limit of not less than One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, one person and subject to that limit for each person, a total limit of One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, two or more persons in any one accident; and regular Protective Property Damage Insurance providing for a limit of not less than One Million Dollars ($1,000,000.00) for damages arising out of injury to, or destruction of, property in any one accident and subject to that limit per accident, a total (or aggregate limit of Two Million Dollars ($ 2,000,000.00) for all damages arising out of injury to, or destruction of, property during the policy period. This insurance must fully cover the legal liability of the Owner. The coverage provided under his policy must not be affected if the Owner performs work in connection with the project either for or in cooperation with the Contractor or as an aid thereto whether the same be a part of the Contract or separate therefrom, by means of its own employees or agents or if the Owner directs or supervises the work to be performed by the Contractor. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with certificates of each insurer insuring the Contractor of any subcontractor under this Contract except with respect to part D. As listed above. In respect to this paragraph, the Contractor shall furnish the Owner with the original insurance policy. Both certificates, as furnished, and the insurance policy, as required, shall bear the policy numbers,the expiration date of the policy and the limits of liability there under. Both the certificates and the policy shall be endorsed to provide the Owner with any notice of cancellation or non-renewal. 4 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 PROPOSAL FORM DATE: NAME OF BIDDER: TO: SOUTHOLD TOWN BOARD NOTE: All items listed herein must TOWN HALL be bid. Failure to bid any PO BOX 1179 item will be grounds for 53095 MAIN ROAD disqualification. SOUTHOLD,NEW YORK 11971 MEMBERS OF THE BOARD: The undersigned as bidder, declares that the only persons, company, or parties interested in this proposal as principals are named below; that this proposal is made without any connection, directly or indirectly with any other bidder for the same work; that it is in all respects fair and without collusion or fraud, and that no person acting for or employed by the aforementioned owner is or will be interested directly or indirectly, in the performance of the contract, or the supplies relating to it, or in any portion of the profit thereof, that he has carefully examined all project requirements, including bidding requirements, contract, general and special conditions, specifications, and addenda, if any (Note: acknowledgment of addenda and their dates must be included as indicated on bottom page); that he has satisfied himself by personal examination of the proposed work, and by such other means as he may have chosen, as to the conditions and requirements of the work; and he proposed and agrees that if his proposal be accepted he will contract to furnish all materials not provided by the Town (See Specifications) and to perform all the work required to construct, perform and complete the specified work; and that he will start the work as directed by the Town, he will accept, in full payment thereof as listed below: BID ON ASPHALT ROAD MATERIALS, HOT Mix ASPHALT CONCRETE, "Type 6 Top", IN ACCORDANCE WITH THE PROJECT REQUIREMENTS. THE ABOVE REFERENCED ACTIVITIES WILL BE COMPLETED FOR THE STIPULATED CUMULATIVE "UNIT PRICE" OF: BID #1 SUPPLY LABOR AND MATERIAL TO FURNISH "Type 6 Top" INTO SOUTHOLD TOWN HIGHWAY TRUCKS MADE WITH AN ALLOTMENT OF (30% OF RAP ) RECYCLED ASPHALT PRODUCT INCLUDED IN THE MIXTURE (written in words) Per Ton (written in numbers words)Per Ton 5 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" - Furnish only Year 2022-23 And he further agrees that if this proposal shall be accepted by the Town and that if he shall refuse, fail or neglect to enter into a Contract pursuant to such proposal and to the requirements of the Town, shall have been deposited in the mail addressed to him at the address given in the proposal,that he shall be considered to have abandoned the contract. We the undersigned, further agree that this proposal shall be reviewed by the Town to correct any deficiencies in the proposed scope of work and, if no corrections are necessary, further agree that this proposal is a formal bid and shall remain in effect for a period of forty-five (45) days,the Town will accept or reject this proposal or by mutual agreement may extend this time period. Signature of Bidder: Business Address: Telephone Number: Date: 6 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 1. DESCRIPTION Bids are requested for the supply of labor and material to furnish N.Y.S. Type 6 Top Coat into Southold Town Highway Trucks. The materials shall meet the specifications to/for Item 403.1701 in the New York Department of Transportation Specifications. The materials shall be constructed in accordance to section 400 in the New York State Department of Transportation Specifications. Material shall be measured by ton. Payment for this item shall be made by the unit price multiplied by the number tons. 2. MATERIALS Bituminous Asphalt concrete pavement shall be equal to NYSDOT- Type 6 meet or exceed the following requirements: ASPHALT CONCRETE PAVEMENT Screen General limits Job Mix Sizes %Passing Total % 1" 100 -- 1/2" 95-100 -- 1/4" 65-85 +/- 7 1/8" 36-65 +/- 7 No. 20 15-39 +/- 7 No. 40 8-27 +/- 7 No. 80 4-16 +/- 4 No. 200 2-6 +/- 2 Asphalt Content, % 5.8-7.0 +/- 4 5. TESTING The Town shall have the absolute right to make tests before and after delivery and placement of asphalt material to determine conformity to Specifications, quality and standards of excellence. The Contractor agrees to bear the cost and pay for all tests which are deemed to be necessary in the opinion of the Town. The Contractor shall repair or replace at no additional cost to the Town, any materials found to not meet the Specifications and quality intended. The work shall be executed in the best and most workmanlike manner. 6. SAMPLES The town at its discretion can request samples of asphalt material provided by winning bidder to have periodic testing of the mix at a DOT approved facility at the vendor's expense to help insure that the mix provided is to our specification. 7. MEASUREMENT & PAYMENT The prices quoted in this bid, and subsequently awarded, are to be used in establishing prices for actual materials furnished and placed within Town of Southold Highway Trucks from the date of award up to and 7 Hot Mix Asphalt Concrete Item # 8 "Type 6 Top" -Furnish only Year 2022-23 including one (1) year thereafter. The contract period may be extended for up to one (1) additional year upon mutual written agreement of the Town and the Contractor. Payment shall be made to the contractor at the unit price(s) submitted in the Proposal. The asphalt concrete will be measured by the number of tons. The unit price per ton shall include the cost of furnishing all materials, equipment, labor and incidentals necessary to complete the work. NOTE: The winning bidder will supply the Highway Department with daily mix reports showing the composition of the asphalt mix that day, and endeavor to submit them to us along with the invoices submitted for payment. END OF SPECIFICATION: 8 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" - Furnish only Year 2022-23 STATEMENT OF NON-COL.L,USION (To be completed by each Bidder) In accordance with Section 103-d General Municipal Law, effective September 1, 1966, every bid or proposal hereafter made to a political subdivision of the State of any public department, agency, or official thereof or to a fore district or any agency or official thereof for work or services performed or to be performed or goods sold or to be sold, shall contain the following statement subscribed to by the bidder and affirmed by such bidder as true under the penalties of perjury; non-collusive bidding certification. A. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury,that to the best of knowledge and belief: (1) The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or any competitor. (2) Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly, to any other bidder or to any competitor. (3) No attempt has been made or will be made by the bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition. B. The person signing this bid or proposal certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the bidder, as well as the person signing in its behalf. C. That attached hereto (if a corporate bidder) is a certified copy of resolution authorizing the execution of this certificate by the signature of this bid or proposal on behalf of the corporate bidder. RESOLUTION Resolved that of the (Name of signatory) Be authorized to sign and submit the bid (Name of Corporation) 9 Hot Mix Asphalt Concrete Item# 8 "Type 6 Top" -Furnish only Year 2022-23 Or proposal of this corporation for the following Project: Item# 8 Furnish into Town Highway Trucks "Type 6 Top" Peconic Lane, Peconic,New York 11958 and to include in such bid or proposal the certificate as to non-collusion required by section one-hundred-three- d (103-d) of the General Municipal Law as the act and deed of such corporation, and for any inaccuracies or miss-statements in such certificate this corporate bidder shall be liable under the penalties of perjury. The foregoing is true and correct copy of the resolution adopted by corporation at a meeting of the Board of Directors,held on the day of , 20 (SEAL OF THE CORPORATION) Laws of New York, 1965 Ch. 751, Sec. 103-d, as amended & effective on September 1, 1965. Signature 10 Hot Mix Asphalt Concrete Item # 6 "Base Coat" Year 2022-23 ITEM NO. 6 SPECIFICATIONS FOR THE PURCHASE & APPLICATION OF ASPHALT ROAD MATERIALS HOT MIX ASPHALT CONCRETE "Base Coat" NOTE: THE TOWN OF SOUTHOLD WILL ALSO REQUIRE +/- 3 0,000 SQUARE YARDS (more or less as may be needed) OF PAVEMENT TO BE APPLIED ON FISHERS ISLAND. THE CONTRACTOR SHALL BE REQURIED TO NOTIFY EACH RESIDENT AT LEAST 24 HOURS PRIOR TO ANY WORK ON TOWN ROADS. RESIDENTS MUST BE RE-NOTIFIED AFTER DELAYS DUE TO INCLEMENT WEATHER OR JOB OPERATIONS. 1 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 INSTRUCTIONS TO BIDDERS A. PROPOSALS Proposals must be made in strict accordance with the "Proposal Form" provided. The Proposal form shall not be detached from the bid package. Failure to comply with this requirement will constitute grounds for rejection of the bid subject to the digression of the Highway Superintendent. Any and all exceptions to the specifications shall be listed on a separate sheet bearing the designation: 'Exceptions to the Specifications", and attached to the Bid Form. Each proposal must be signed in writing with the full name and address of bidder. The bidders shall write in ink, both in words &numerals, the price for which he proposed to furnish all materials,plant, equipment, tools, shoring or bracing, or other facilities, &to perform all labor and services necessary for the proper completion of the work in strict accordance with the plans and specifications, and subject at all times to the approval of the Highway Superintendent. Proposals, together with the entire bid package, shall be delivered enclosed in an opaque sealed envelope and shall be addressed as indicated on Invitation to Bid. The envelope shall be marked "Proposal" bearing the title of work and the Bidders Name. Bidders may bid on one or any combination of items listed on the proposal sheet. No proposal shall be considered which has not been received by the Southold Town Clerk prior to the hour and date stated. B. PROPOSAL GUARANTY A proposal will not be accepted or considered unless accompanied by a guaranty in the form of a bid bond or certified check in the amount of one hundred ($ 100) dollars payable to the Town of Southold. As soon as the proposal prices have been compared, the Owner shall return the bidder's bond or the certified checks accompanying such proposals as, in his judgment, would not likely be involved in making the award. All other proposal quantities will be held until the contract and contract bond have been executed after which they will be released or returned to the respective bidders whose proposals they accor0panied. C. OMISSIONS AND DISCREPANCIES Bidders should carefully examine the specifications and fully inform .themselves of all conditions and matters which can in any way affect the work or the cost thereof. Should a bidder find discrepancies in or omissions from the specifications, or other documents or should he be in doubt as to their meaning, he should at once notify the Highway Superintendent who may issue a written instruction to all bidders. D. PUBLIC OPENING OF PROPOSALS Proposals will be opened and read publicly at the time and place indicated in the Invitation for Bids. Bidders, authorized agents, and other interested parties are invited to be present. 2 Hot Mix Asphalt Concrete Item # 6 "Base Coat" Year 2022-23 E. AWARD OF CONTRACT Award of contract will be made as soon as practical. The Superintendent of Highways reserves the right to make awards by items, or as a whole, or not at all, whichever the Superintendent deems to be in the best interest of the Town. A contract may be awarded to a responsible bidder other than the lowest money bidder, if it is in the best interest of the Town.No bid may be withdrawn after scheduled closing time for receipt of bids for a period of 45 days pending execution of a contract by successful bidder. The competency and responsibility of the bidder and his sub-contractors will be considered in making, the award. The Town reserves the right to waive any technical error, to accept any bid, or to reject any or all bids. The contract form will be a Standard form of Agreement between Owner and Contractor. The Town will either award the project or reject all proposals received within forty-five (45) days after formal opening of proposals. Acceptance of a proposal will be a written notice signed by the Town Clerk & no other act shall constitute the acceptance of a proposal. F. WITHDRAWALS OF PROPOSALS Any bidder upon his or her authorized representative's written request presented not later than the hour set for the opening thereof, will be given permission to withdraw his proposal. At the time of opening the proposals, when such proposals are reached, it will be returned to him unread. G. REJECTION OF PROPOSALS The Town reserves the right to waive any technical error and to reject any and/or all proposals. Without limiting the generality of the foregoing, any proposal which in incomplete, obscure, or irregular may be rejected; any proposal accompanied by an insufficient or irregular certified check or bidder's bond bay be rejected, any proposal having interlineations, erasure or corrections may be rejected. The Town also reserves the fight to reject any bid if the evidence submitted in the qualification statement or an investigation of such bidder fails to satisfy the Town that such bidder is property qualified to carry out the obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. H. PLANT & EQUIPMENT The bidder shall State in his bid that be has available or under his control, plant and equipment of the character and in the amount required to complete the proposed work within the specific time. I TIME FOR EXECUTION OF CONTRACT Any bidder whose proposal shall be accepted will be required to appear before the Town in person; or if a firm or corporation, a duly authorized representative shall so appear, and execute six (6) copies of the Contract and furnish satisfactoiy Performance and Payment Bond within ten (10) days after notice that the Contract has been awarded to him. Failure to execute Contract shall constitute a breach of the agreement effected by the acceptance of the Proposal 3 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 The damages to the Town for such breach will include loss from interference with his construction program and other items, the accurate amount of which it will be difficult or impossible to compute. The amount of the certified check or bidder's bond accompanying the Proposal of such bidder shall be retained by the Town, not as a penalty, but as liquidated damages for such breach. In the event any bidder whose proposal shall, be accepted shall fail or refuse to execute the Contract as herein before provided, the Town may, at there option, determine that such bidder has abandoned the Contract, and thereupon, his proposal and acceptance thereof shall be null and void, and the Town shall be entitled to liquidated damages as above provided. J. PREVAILING WAGE RATES The New York State Department of Labor's Prevailing Wage Rate Schedules are part of this Contract. The Contractor is responsible for being familiar with the latest available schedules. INSURANCE REQUIREMENTS The Contractor shall not commence any work until he has obtained, and had approved by the Town of Southold, all of the insurance that is required under this contract which has been enumerated herein: COMPENSATION INSURANCE: Public Liability and Property Damage Insurance Contractor's Protective Liability and Property Damage Insurance Owner's Protective Public Liability and Property Damage Insurance The Contractor shall not permit any subcontractor to commence any operation of the site until satisfactory proof of carriage of the above required insurance has been posted with and approved by the Owner. Compensation Insurance: The Contractor shall take out and maintain during the life of this Contract, Workmen's Compensation Insurance for all his employees employed at the site of the project, and in case of any of the work being sublet, the Contractor shall require all subcontractors similarly to provide Workmen's Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Contractor. Public Liability and Property Damage Insurance: The Contractor shall take out and maintain during the life of this Contract such Public Liability and Property Damage Insurance as shall protect him and any subcontractor performing work covered by this Contract fiom claims for damages four personal injury including accidental death as well as from claims for property damage which may arise from operations under this Contract, whether such operations be by himself or by any subcontractor, to by anyone directly or indirectly employed by either of them, and the amounts of such insurance shall be as follows: Public Liability Insurance in an amount of not less than One Million Dollars ($1,000,000.00) for bodily injuries, including wrongful death to each person and subject to the same limit for each person in an amount not less that One Million Dollars. ($1,000,000.00) on account of each accident. 4 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 Property Damage Insurance in an amount not less than One Million Dollars ($1,000,000.00) for damages on account of each accident and in an amount of not less than One Million Dollars ($1,000,000.00) for damages on account of all accidents. Liability and PropeLty Damage Insurance: The above policies for Public Liability and Property Damage Insurance must be so written to include Contractor's Protective Liability and Property Damage insurance to protect the Contractor against claims arising from the operations of a subcontractor. The policies shall also name the Town of Southold as an additional insured. Owner's Protective Public Liability and PropeVy Damage Insurance: The Contractor shall furnish to the Owner, with respect to the operations he or any of his subcontractors perform a regular Protective Public Liability Insurance Policy for, and in behalf of the Owner,providing for a limit of not less than One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, one person and subject to that limit for each person, a total limit of One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to, or death of, two or more persons in any one accident; and regular Protective Property Damage Insurance providing for a limit of not less than One Million Dollars ($1,000,000.00) for damages arising out of injury to, or destruction of, property in any one accident and subject to that limit per accident, a total (or aggregate limit of Two Million Dollars ($ 2,000,000.00) for all damages arising out of injury to, or destruction of,property during the policy period. This insurance must fully cover the legal liability of the Owner. The coverage provided under his policy must not be affected if the Owner performs work in connection with the project either for or in cooperation with the Contractor or as an aid thereto whether the same be a part of the Contract or separate therefrom, by means of its own employees or agents or if the Owner directs or supervises the work to be performed by the Contractor. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with certificates of each insurer insuring the Contractor of any subcontractor under this Contract except with respect to part D. As listed above. In respect to this paragraph, the Contractor shall furnish the Owner with the original insurance policy. Both certificates, as furnished, and the insurance policy, as required, shall bear the policy numbers, the expiration date of the policy and the limits of liability there under. Both the certificates and the policy shall be endorsed to provide the Owner with any notice of cancellation or non-renewal. 5 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 PROPOSAL FORM DATE: NAME OF BIDDER: TO: SOUTHOLD TOWN BOARD NOTE: All items listed herein must TOWN HALL be bid. Failure to bid any PO BOX 1179 item will be grounds for 53095 MAIN ROAD disqualification. SOUTHOLD,NEW YORK 11971 MEMBERS OF THE BOARD: The undersigned as bidder, declares that the only persons, company, or parties interested in this proposal as principals are named below; that this proposal is made without any connection, directly or indirectly with any other bidder for the same work; that it is in all respects fair and without collusion or fraud, and that no person acting for or employed by the aforementioned owner is or will be interested directly or indirectly, in the performance of the contract, or the supplies relating to it, or in any portion of the profit thereof, that he has carefully examined all project requirements, including bidding requirements, contract, general and special conditions, specifications, and addenda, if any (Note: acknowledgment of addenda and their dates must be included as indicated on bottom page);that he has satisfied himself by personal examination of the proposed work, and by such other means as he may have chosen, as to the conditions and requirements of the work; and he proposed and agrees that if his proposal be accepted he will contract to furnish all materials not provided by the Town (See Specifications) and to perform all the work required to construct, perform and complete the specified work; and that he will start the work as directed by the Town, he will accept, in full payment thereof as listed below: BID ON ASPHALT ROAD MATERIALS, HOT Mix ASPHALT CONCRETE, "Base Coat", IN ACCORDANCE WITH THE PROJECT REQUIREMENTS. THE ABOVE REFERENCED ACTIVITIES WILL BE COMPLETED FOR THE STIPULATED CUMULATIVE"UNIT PRICE" OF: 6 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 BID #1 FURNISH AND PLACE THE FOLLOWING WITHIN HOT Mix ASPHALT CONCRETE MADE WITH AN ALLOTMENT OF (30% OF RAP) RECYCLED ASPHALT PRODUCT INCLUDED IN THE MIXTURE �•kik*�k�k��k�k•k��k�k�k�k>k�k�k��k�*��k>::k**�c���=k=k*�k%k��*��k�=k>k�%k-k�k��k��>k�k:����kx��k�k�k%kik**��k�k�k���k�� 0— 100 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton 100—250 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words)Per Ton (written in words) Per Ton (written in numbers)Per Ton (written in numbers) Per Ton 250—500 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton 500— 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton 7 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 Over 1,000 Tons SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Ton (written in words) Per Ton (written in numbers) Per Ton (written in numbers) Per Ton BID #2 COLD MILLING & REMOVAL SOUTHOLD TOWN: FISHERS ISLAND: (written in words) Per Sq Yd (written in words) Per Sq Yd (written in numbers)Per Sq Yd (written in numbers) Per Sq Yd And he further agrees that if this proposal shall be accepted by the Town and that if he shall refuse, fail or neglect to enter into a Contract pursuant to such proposal and to the requirements of the Town, shall have been deposited in the mail addressed to him at the address given in the proposal,that he shall be considered to have abandoned the contract. We the undersigned, further agree that this proposal shall be reviewed by the Town to correct any deficiencies in the proposed scope of work and, if no corrections are necessary, further agree that this proposal is a formal bid and shall remain in effect for a period of forty-five (45) days, the Town will accept or reject this proposal or by mutual agreement may extend this time period. Signature of Bidder: Business Address: Telephone Number: Date: - 8 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 1. DESCRIPTION Bids are requested for the purchase and placement of Asphalt Concrete Pavement, Type 6, for the use in repair& maintenance of the Town Highways and related parking facilities for a period of one (1) year beginning on the date that the contract was executed. All Asphalt Concrete shall be delivered and machine spread upon the surface of roads, driveways,parking fields, street intersections or any other areas requiring pavement within Town right-of-ways or any other areas under the jurisdiction of the Commission of Public Works where and as required. 2. MATERIALS SEE PAGES 13-14 FOR DETAILS NOTE: At No Time Will any Recycled Material (RAP) be used without the permission of the Superintendent of Highways 3. WEATHER LIMITATIONS The material shall be placed only when: 1. The road surface and atmospheric temperatures are at least 45 degrees F 2. The weather is not foggy or raining. 3. There is no forecast of temperatures below 32 degrees F within 48 hours from the time of placement of the Asphalt Concrete Material. 4. EQUIPMENT, DELIVERY & APPLICATION All asphalt concrete pavement materials shall be delivered and placed in select quantities at a time,place and thickness as specified by the Southold Town Highway Superintendent.No materials will be delivered on Saturdays, Sundays or Holidays except in the case of an emergency. Asphalt Plants must have adequate capacity and sufficient storage for the items to be furnished. All work shall commence within five (5) Calendar days after receipt of written order. Any reason for delay in work shall be submitted to the Town in writing explaining the delay. If the reason is not acceptable to the Town, work must continue without any further delay. Bituminous pavers shall be self-powered units, provided with an activated screed or strike-off assembly. The machine shall be capable of spreading and finishing courses of bituminous plant mix material in lane widths up to twelve (12') feet or thickness up to four(4") inches as may be specified by the Highway Superintendent. After placement, the Asphalt Concrete Material shall be thoroughly and uniformly compacted with an approved vibrator type or static steel wheel roller conforming to section 401-3.12 of the NYSDOT construction manual to obtain a thoroughly compacted pavement. All manholes, catch basins, curbs and other structures shall be protected against the application of asphalt concrete material. 9 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 5. TESTING The Town shall have the absolute right to make tests before and after delivery and placement of asphalt material to determine conformity to Specifications, quality and standards of excellence. The Contractor agrees to bear the cost and pay for all tests which are deemed to be necessary in the opinion of the Town. The Contractor shall repair or replace at no additional cost to the Town, any materials found to not meet the Specifications and quality intended. The work shall be executed in the best and most workmanlike manner. 6. SAMPLES The town at its discretion can request samples of asphalt material provided by winning bidder to have periodic testing of the mix at a DOT approved facility at the vendor's expense to help insure that the mix provided is to our specification. 7. BIDDER QUALIFICATIONS The bidder will be required to show, to the satisfaction of the Superintendent of Highways, that he is a responsible contractor experienced in the kind of work to be performed; that he is financially able to execute the contract; and that he has adequate equipment and fixed storage facilities to satisfactorily and efficiently perform the work as directed within the specified time limits. The bidder must state exact location of his Plant Facilities. 8. MEASUREMENT &PAYMENT The prices quoted in this bid, and subsequently awarded, are to be used in establishing prices for actual materials furnished and placed within the Town of Southold from the date of award up to and including one (1) year thereafter. The contract period may be extended for up to one (1) additional year upon mutual written agreement of the Town and the Contractor. Payment shall be made to the contractor at the unit price(s) submitted in the Proposal. The asphalt concrete will be measured by the number of tons of compacted material in place. The unit price per ton shall include the cost of furnishing all materials, equipment, labor and incidentals necessary to complete the work. 9. TRAFFIC MAINTENANCE The contractor shall be responsible for providing maintenance and protection of vehicular and pedestrian traffic associated with this work. Opening to traffic does not constitute acceptance of the work. The contractor shall also be responsible for providing all signage and traffic control during this work. NOTE: The winning bidder will supply the Highway Department with daily mix reports showing the composition of the asphalt mix that day, and endeavor to submit them to us along with the invoices submitted for payment. END OF SPECIFICATION 10 Hot Mix Asphalt Concrete Item # 6 "Base Coat" Year 2022-23 STATEMENT OF NON-COLLUSION (To be completed by each Bidder) In accordance with Section 103-d General Municipal Law, effective September 1, 1966, every bid or proposal hereafter made to a political subdivision of the State of any public department, agency, or official thereof or to a fore district or any agency or official thereof for work or services performed or to be performed or goods sold or to be sold, shall contain the following statement subscribed to by the bidder and affirmed by such bidder as true under the penalties of perjury; non-collusive bidding certification. A. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury,that to the best of knowledge and belief: (1) The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or any competitor. (2) Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly, to any other bidder or to any competitor. (3) No attempt has been made or will be made by the bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition. B. The person signing this bid or proposal certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the bidder, as well as the person signing in its behalf. C. That attached hereto (if a corporate bidder) is a certified copy of resolution authorizing the execution of this certificate by the signature of this bid or proposal on behalf of the corporate bidder. RESOLUTION Resolved that of the (Name of signatory) Be authorized to sign and submit the bid (Name of Corporation) 11 Hot Mix Asphalt Concrete Item# 6 "Base Coat" Year 2022-23 Or proposal of this corporation for the following Project: Item# 6 Hot Mix Asphalt Concrete "Base Coat" Peconic Lane, Peconic,New York 11958 and to include in such bid or proposal the certificate as to non-collusion required by section one-hundred-three- d (103-d) of the General Municipal Law as the act and deed of such corporation, and for any inaccuracies or miss-statements in such certificate this corporate bidder shall be liable under the penalties of perjury. The foregoing is true and correct copy of the resolution adopted by _corporation at a meeting of the Board of Directors, held on the day of , 20 (SEAL OF THE CORPORATION) Laws of New York, 1965 Ch. 751, Sec. 103-d, as amended & effective on September 1, 1965. Signature 12 LEGAL NOTICE NOTICE TO BIDDERS NOTICE IS HEREBY GIVEN, in accordance with the provisions of Section 103 of the General Municipal Law, that sealed bids are sought and requested for furnishing and placing within the Town of Southold, the following road treatments: 5. Type 6 Top—Hot Mix Asphalt Concrete 6. Base Coat 8. Type 6 Asphalt(town pick up) Specifications may be obtained at the Office of the Town Clerk, Town of Southold, via email or will be available for download on the Town website. Copies can be mailed by calling the Town Clerks office 631-765-1800. The sealed bids, together with a Non-Collusive Bid Certificate, and bank draft, certified check, or bid bond in the amount of$100.00, will be received by the Town Clerk of the Town of Southold at the Southold Town Hall, PO Box 1179, 53095 Main Road, Southold,New York, until 2:00 P.M., Thursday, June 16, 2022 at which time they will be opened and read aloud in public. The Town Board of the Town of Southold reserves the right to reject any and all bids and waive any and all informalities in any bid should it be deemed in the best interest of the Town of Southold to do so. All bids must be signed and sealed in envelopes plainly marked with the type of road treatment and item # being bid on, and submitted to the Office of the Town Clerk. The bid price shall not include any tax, federal, state, or local, from which the Town of Southold is exempt. Dated: May 24, 2022 DENIS NONCARROW SOUTHOLD TOWN CLERK PLEASE PUBLISH ON JUNE 9,2022, AND FORWARD ONE (1) AFFIDAVIT OF PUBLICATION TO DENIS NONCARROW, TOWN CLERK, TOWN HALL, PO BOX 1179, SOUTHOLD,NY 11971 Copies to the following: Suffolk Times Town Board Members Town Attorney Superintendent of Highways Town Clerk's Bulletin Board STATE OF NEW YORK) SS: COUNTY OF SUFFOLK) Denis Noncarrow, Town Clerk of the Town of Southold,New York being duly sworn, says that on the 27th day of May , 2022, a notice of which the annexed printed notice is a true copy was affixed, in a proper and substantial manner, in a most public place in the Town of Southold, Suffolk County, New York, to wit: Town Clerk's Bulletin Board, 53095 Main Road, Southold, New York and the Southold Town website, www.southoldtownny.gov . Road Treatment Bids Denis Noncarrow Southold Town Clerk Sworn before me this 27 day of 2022. (1r1. Notary Public LYNDA M. RUDDER Notary Public,State of Newyork No.04 RU6020932 Qualified in Suffolk County Commission Expires March 8,20e w Times Review Media Group Invoice #: e4e0eff2 { The Suffolk Times Date: 05/27/2022 # i i Bill To Customer Email SOUTHOLD TOWN CLERKlynda.rudder@town.southold.ny.us t Affidavits will be mailed or emailed (as ordered) 7 days AFTER THE LAST INSERTION DATE. E Description Publish Date -Amount: ! f PUBLIC 06/09/2022 $37.88 i I Affidavit(eMail) 1 $25.00 Affidavit(Mail) 0 $0.00 I Total: $62.88 Please remit checks payable to: balance: Times Review Media Group $62'88 PO Box 1500 i Mattituck, NY 11952 The invoice number MUST be included on your check to ensure that your payment is I applied correctly. LEGAL NOTICE NOTICE TO BIDDERS NOTICE IS HEREBY GIVEN, in accordance with the provisions of Section 103 of the General Municipal Law, that sealed bids are sought and requested for furnishing and placing within the Town of Southold, the following road treatments: 5. Type 6 Top — Hot Mix Asphalt Concrete 6. Base Coat 8. Type 6 Asphalt (town pick up) Specifications may be obtained at the Office of the Town Clerk, Town of Southold, via email or will be available for download on the Town website. Copies can be mailed by calling the Town Clerks office 631-765-1800. The sealed bids, together with a Non-Collusive Bid Certificate, and bank draft, certified check, or bid bond in the amount of$100.00, will be received by the Town Clerk of the Town of Southold at the Southold Town Hall, PO Box 1179, 53095 Main Road, Southold, New York, until 2:00 P.M., Thursday, June 16, 2022 at which time they will be opened and read aloud in public. The Town Board of the Town of Southold reserves the right to reject any and all bids and waive any and all informalities in any bid should it be deemed in the best interest of the Town of Southold to do so. All bids must be signed and sealed in envelopes plainly marked with the type of road treatment and item # being bid on, and submitted to the Office of the Town Clerk. The bid price shall not include any tax, federal, state, or local, from which the Town of Southold is exempt. Dated: May 24, 2022 DENIS NONCARROW SOUTHOLD TOWN CLERK STATE OF NEW YORK) SS: COUNTY OF SUFFOLK) Denis Noncarrow,Town Clerk of the Town of Southold, New York being duly sworn, says that on the 1st day of June , 2022, a notice of which the annexed printed notice is a true copy was affixed, in a proper and substantial manner, in a most public place in the Town of Southold, Suffolk County,New York,to wit: Town Clerk's Bulletin Board, 53095 Main Road, Southold, New York and the Southold Town website, www.southoldtownny.gov . 2022 Road Treatment Bids Denis oncarrow Southold Town Clerk Sworn before me this 1St ay of June , 2022. Notary Public LYNDA M. RUDDER Notary Public, State of New York No.01 RU6020932 Qualified in Suffolk county Commission Expires March 8,20� Southold Town Board -Letter Board Meeting of May 24, 2022 RESOLUTION 2022-455 Item# 5.37 �S^�`O5 COO ADOPTED DOC ID: 18123 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 2022-455 WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON MAY 24,2022: Resolved that the Town Board of the Town of Southold hereby authorizes and directs the Town Clerk's office to advertise for various asphalt surface treatment bids for the calendar year 2022- 2023 Denis Nonearrow Southold Town Clerk RESULT: ADOPTED [UNANIMOUS] MOVER: Louisa P. Evans, Justice SECONDER:Greg Doroski, Councilman AYES: Nappa,Doroski, Mealy, Doherty, Evans, Russell Generated May 25, 2022 Page 54