HomeMy WebLinkAboutTR-3858Board Of Southoid TOwn Trustees
SOUTHOLD, NEW YORK
PERMIT NO ..... 3.8.5.8 ....................
DATE:
ISSUED TO .............. T.h~m.a.s._.Z,~k~s ..................................................................................
Pursuant to the provisions of Chapter 615 of the Laws of
the State of New York, 1893; and Chapter 404 of the Laws of the
State of New York 1952; and the Southold Town Ordinance en-
titled "REGULATING AND THE PLACING OF OBSTRUCTIONS
IN AND ON TOWN WATERS AND PUBLIC LANDS and the
REMOVAL OF SAND, GRAVEL OR OTHER MATERIALS FROM
LANDS UNDER TOWN WATERS;" and in accordance with the
Resolution of The Board adop'red at a meeting held on .A~g.ust....Z3
19....90.., and in consideration of the sum of $ ............................ paid by
of .......................................................................................... N. Y. and subject to the
Terms and Conditions listed on the reverse side hereof,
of SOuthold Town Trustees authorizes and permits the following:
To construct a timber dock consisting of a 4' X 10' upland
inclined ramp; 4' X 15' fixed elevated (3.5 above grade of
marsh) walk; a 4' X 14' hinged ramp; a 6' X 20' float ~,
b~l (2) 8" diameter pilings.
in accordance with the detailed specifications as pres.en'l'ed in
the originating application.
IN WITNESS WHEREOF, The said Board of Trustees h~ere-
by causes its Corporate Seal to be affixed, and these presents to
be subscribed by a majority of the said Board as of this dat,e.
TRUSTEES
John M. Bredemeyer. III. President
Albert J. Krupski. Jr., Vice President
Henry P. Smith
John B. Tuthill
William G. Albertson
Telephone (516) 765-1892
Fax (516) 765-1823
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
SUPERVISOR
SCOTT L. HARRIS
Town Hall
53095 Main Road
P.O. Box 1179
Southold. New York 11971
August 13, 1993
En-Consu!tants, Inc.
1329 North Sea Road
Southampton, NY 11968
RE: Thomas Zukas
SCTM 91000-76-3-23.1
Dear Mr. Haje:
As discussed, the piles are to be as tight against the bog as
possible and the dock fasten on the side not on the ends of the
float.
Thank you for your cooperation in this matter.
~t~h/, ~rsi~erely' ~
Board of Trustees
HPS: j md
TRUSTEES
John M. Bredemeyer, III, President
Albert J. Krupski, Jr., Vice President
Henry P. Smith
John B. Tuthill
William G. Albertson
Telephone (516) 765-1892
Fax (516) 765-1823
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
SUPERVISOR
SCOTT L. HARRIS
Town Hall
53095 Main Road
P.O. Box 1179
Southold, New York 11971
October 25, 1993
Thomas J. Zukas
84 Pine Edge Drive
East Moriches, NY 11940
RE: SCTM ~1000-76-3-23.1
Dear Mr. Zukas:
The above referenced property was inspected and the dock is
satisfactory.
Please note that the boat and the dock should not extend more
than 1/3 across the total width of the canal.
If-~you have any further questions, please do not hesitate to
contact this office.
Sincerely,
Henry~ P. mber
Board of Trustees
HPS:jmd
THOMAS J. ZUKAS
LICENSED REAL ESTATE BROKER
84 PINE EDGE DRIVE
EAST MORICHES, N.Y. 11940
TEL. 516 878-9473
FAX 5%6 87~324%
SEP 2 9 Fj93
TOWN OF SOUTHOLD
September 28, 1993
Board of Trustees Town of Southold
P.O. box 1179
Southold, NY 11971
Re: SCTM ~1000-76-3-23.1
Dear Sirs:
Work has been completed st my property on Smith Drive South as per
your instructions by letter of August 10, 1993.
Please inspect to see if the dock meets your approval.
TJZ/mz
S i n c e3Ye~y, /-~
Thomas J. Zuk~.~
TRUSTEES
John M. Bredemeyer. III. President
Albert J. Krupski. Jr.. Vice President
Henry P. Smith
John B. Tuthill
William G. Albertson
Telephone (516) 765-1892
Fax (516) 765-1823
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
SUPERVISOR
SCOTT L. HARRIS
Town Hall
53095 Main Road
P.O. Box 1179
Southold. New York 11971
May 4, 1993
Thomas J. Zukas
84 Pine Edge Drive
East Moriches, NY 11940
RE: SCTM ~1000-76-3-23.1
Dear Mr. Zukas:
The following actions were taken by the Southold Town Board of
Trustees on Thursday, April 29, 1993:
RESOLVED that the Southold Town Board of Trustees suspend any
boats being docked at the present dock and gives 90 days for the
dock to be arranged as follows: the piles are to be placed on
the marsh and the float between the piles up against the marsh.
The dock with a boat shall not be more than 1/3 the way across
the canal.
RESOLVED that the Southold Town Board of Trustees table the
request for a waiver to clear property until such time that the
dock has been taken care of.
If you have any questions, please do not hesitate to contact
this office.
Very truly yours,
· Br'
President, Board of :rustees
JMB: j md
BOARD OF TOWN'.. TRUSTEES
TOWN OF SOUTHOLD
Town Hall, $3095 Main Road
P.O. Box 728
Southold, New York 11971
TELEPHONE
(516) 765-1892
APPLICATION IS HEREBY MADE TO THE TOWN TRUSTEES, TOWN OF SOUTHOLD, SUFFOLK
COUNTY, NEW YORK, FOR THE ISSUANCE OF A PERMIT PURSUANT TO THE LAWS,
ORDINANCES AND REGULATIONS GOVERNING THE COASTAL AND INTERIOR WETLANDS,
FLOOD PLAINS AND DRAINAGE AREAS OF SOUTHOLD TOWN, AND THE ISSUANCE .OF
PERMITS PURSUANT TO CHAPTER 32 OF THE CODE OF THE TOWN OF SOUTHOLD.
APPLICATION NO. ~- ~_~0 -7~-~_~3.t DATE June 20, 1990
APPLICANT'S NAME: Thomas Zukas TEL. NO. 726~6546
MAILING ADDRESS: 84 Pine Edge Drive, East Moriches, New York 11940 Roy L. Haje, President
AGENT: En-Consultants, Inc. TEL NO.516-283-6360
AGENT ADDRESS: 1329 North Sea Road, Southampton, New York 11968
PERMIT REQUESTED TO: Construct a timber dock consisting of a 4' x 10' upland
inclined ramp; 4' x 15' fixed elevated (3.5' above grade of.marsh) walk; --
4' x 14' hinged ramp; 6' x 20' float secured by (2) 8" diameter pilings.
Under separate cover, a letter of no jurisdiction has been requested for
construction of a one-family dwellinqr deckr sanitary system~ well, bluest(,ne
driveway as shown on site plan.
LOCATION OF PROPERTY FOR REQUESTED PERMIT:
Smith Drive South, Southold
~-~ ~o ..... 76 3 23.1
HAMLET: -
Southold
TAX MAP NO: 1000- 76-3-23.1
CREEK, BAY OR HARBOR FRONTING PROPERTY: dredged canal off Goose Creek.
SIZE OF PROPOSED WORK:
LENGTH:
See project description
WIDTH:
~,~-~,6-4 ('2/87~Text 12
,,
· 1 PROJECT I.D. NUMBER
SHORT
617.21
Appendix C
State Environmental Quality Review
ENVIRONMENTAL ASSESSMENT
For UNLISTED ACTIONS Only
FORM
SEQR
PART l--PROJECT INFORMATION (To be completed by ApPlicant or Proiect sponsor)
1, APPLICANT/SPONSOR 2. PROJECT NAME
Thomas Zukas by Eh-Consultants, Inc.
3. PROJ~-CT LOCATION:
Municipality Smith Drive South, Southold County Suffolk
4. PRECISE LOCATION (Street address and road intersections, prominent landmarks, etc., or provide map)
5. tS PROPOSED ACTION:
Smith Drive South, Southold
SCTM No. 1000-76-3-23.1
~[New [] Expansion [] Modification~lteration ' ·
6. DESCRIBEPROJECTBRtEF~:Construct a timber dock consisLin~ u£ ~ 4' x I0' upland
inclined ramp; 4' x 15' fixed elevated (3.5' above grade of marsh) walk;
4' x 4'~ hinged ramp; 6' x 20' float secured by (2) 8" diameter pilings.
Under separate cover, a letter of no jurisdiction has been requested for
construct of a one-family dwelling, deck, sanitary system, well, bluestone
7. AMOUNT OF LAND AF~A~T[~} ~
Initially 13,410 sq.~r~s Ultimately 13,410 sq.fta~/
WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS?
[] Yes [] No If No, describe briefly
9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT?
[] Residential ~' !nOustrial [] Commercial [] Agriculture [] Park/Forest/O~en space [] Other
Describe:
t0. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (FEDERAL,
STATE OR LOCAL)?
[~Yes [] No
COE, DOS, Town
if yes, list agency(s) and 'permit/approvals
of Southold
11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL?
[] Yes ~'~o Il yes, list agency name and permit/approval
12. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION?
r']Yes ~4No
Applicant/sponsor
Slgnalure:
I CERTi~ THA~HE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE
name'-Th Zu~s/~y Eh-Consultants, Inc.
'~///// Date: 5/23/90
If the action is in the Coastal Area, and you are a state agency, complete the
Coastal Assessment Form before proceeding with this assessment
OVER
1
COUNTY OF SUFFOLK )
STATE OF NEW YORK )
Roy L. Haje BEING DULY SWORN DEPOSES
AND SAYS THAT HE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMITS, ~
THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS KNOWLEDGE
AND BELIEF, AND THAT WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS
APPLICATION AND AS MAY BE APPROVED BY THE TOWN BOARD OF THE TOWN OF
SOUTHOLD. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN
TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING
UNDER OR BY VIRTUE OF SAID PERMIT, IF GRANTED.
IN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR
AGENT OR REPRESENTATIVE, TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES
IN CONJUNCTION WITH REVIEW OF THIS APPLICATION.
· ' ~ p~icant
EXAMINED BY
APPROVED
DISAPPROVED
CONDITIONS (If any)
SIGNATURE OF CHAIRMAN
COMPUTATION OF FEES
Approved 2/27/85
PART 1--PROJECT INFORMATION
Prepared by Project Sponsor
NoT]cE: This document is designed to assist in determinin§ whether the action proposed may have a significant
on the environment. Please complete the entire form, Parts A through E. Answers to these questions will be cons~
as part of the application for approval and may be subject to further verification and public review. Provide any addi
information you believe will be needed to complete Parts 2 and 3.
It is expected that completion of the full EAF will be dependent on information currently available and will not
new studies, research or investigation. If information requiring such additional work is unavailable, so indicate and
each instance.
NAME OF ACTION
LOCATION OF ACTION (Include Street Address, Municipality ancl County)
Smith Drive South, Southold
NAME OF APPLICANT/SPONSOR
Roy L. Haje, President, En-Consultants, Inc. IBUSINESS TELEPHONE
AODR~$S 61-6 ) 283--6360
1329 North Sea Road
CITY/PO
Southampton t STATE t?JP CODE
' NAME OF OWNER (if different) N. Y. 11968
Thomas Zukas EUSINESS TELEPHONE
ADDRESS 516 ) 726-6546
84 Pine Edge Drive
ClTYIPO
STATE Z]PCODE
East Moriches I ~'Y' 1 11940
OESCRIPTIONOFACTION Construct a timber dock consist±rig of a 4' x '10 upl~d
inclined ramp; 4' x 15' fixed elevated (3.5' above grade of marsh) walk;
4' x 4' hingeG ramp; 6' x 20' float secured by (2) 8" diameter pilings.
Under separate cove~, a letter of no jurisdiction has been requested to
construct one-family dwelling, deck, sanitary system, well, bluestone
driveway as shown on site plan.
Please Complete Each Question--Indicate N.A. if not applicable
A. Site Description
Phy$icaJ setting of overall project, both developed and undeveloped areas.
1. Present land use: ~Urban ~lndustrial I-1Commercial
r'qForest [:]Agriculture I-1Other
2. Total acreage of project area: 13,410 s.q. ~¢/re/~'.
APPROXIMATE ACREAGE
Meadow or Drushtand (Non-agricultural)
Forested
Agricultural {includes orchards, cropland, pasture, etc.)
Wetland IFreshwater or tidal as per Articles 24, 25 of ECL)
Water Surface Area
Unvegetated (Rock, earth or fill)
Roads, buildings and other paved surfaces
Other (Indicate type) T,andscapincj-
3. What is predominant soil type{s) on project site? Sand
a. Soil drainage: l-lWeJl drained 95 o.~ of s. ite
I-;Poorly drained 5 ' % of site
I~.Residential (suburban) [~RuraI (non-f,
· PRESENTLY AFTER COMP '
LET~O'
acres
acre
12,410 sq.f~r~ 61,000 sq. ft.
acre.
acres
acre
l:000 sq. ~e~/ 1~000
acres
acre
acres
~cre
acres 2~100 sq.f~t~
acres 4,310 sq.f%t./~
ImModerately well drained
73 of site
b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the
Land Classification System? ~/A _ acres. (See I NYCRR 370).
4. Are there bedrock outcroppings on project site? I~.'Yes
a. What is depth .to bedrock? Unknown
(in feet)
2
Ap~p~ Pmge Z.
YDS. TO BE EXCAVATED: 0 YDS. TO BE FILLED:
MANNER IN WHICH MATERIAL WILL BE REMOVED OR DEPOSITED:
N/A
WIDTH OF CANAL, CREEK OR BAY FRONTING PROPERTY: 35+'
DEPTH AT LOW TIDE: 2' AVER. RISE IN TIDE: 2'6"
DISTANCE TO NEAREST CHANNEL: 10'+
DISTANCE PROJECT EXTENDS BEYOND SIMILAR PROJECTS IN AREA: 0
AREA ZONING: R-40 IS PROJECT FOR PRIVATE OR BUS. USE:
INTENDED USE OF PROPERTY: One-family dwelling
DESCRIBE KNOWN PRIOR OPERATIONS CONDUCTED ON PREMISES:
floating dock
Private
HAS ANY PRIOR LICENSE OR PERMIT BEEN ISSUED TO ERECT STRUCTURES, DREDGE,
OR DEPOSIT FILL ON SAID PREMISES: See attached
HAS ANY LICENSE OR PERMIT EVER BEEN REVOKED OR SUSPENDED BY A GOVERNMENTAL
AGENCY: No
DESCRIBE FULLY THE REHABILITATION OF PROPERTY:
N/A
DESCRIBE PROPOSED CONDITION OF PROPERTY AFTER WORK IS COMPLETED.
AN ADDITIONAL SURVEY OF PROPERTY SITE IF NECESSARY: N/A
INCLUDE
ARE THERE ANY COVENANTS OR RESTRICTIONS IN YOUR DEED WHICH WOULD PROHIBIT
THIS PROJECT: No
WRITTEN CONSENT OF OWNER IF NOT THE SAME AS 'APPLICANT:
Attached
~. 'A,?proximate percentage of prOpOsed project site with slopes: I-'I0-10% 100 % ~10-15%
..... [2115% or greater %
6. Is ~¥oject substantially contiguous to, or contain a building, site, or district, listed on the State or the Nation
Register.s of Historic Places? I-lYes ]~No
7. l's project substantially contiguous to a site listed on the Register of National Natural Landmarks?
8. What is the depth of the water table? (in feet)
9. Is site located over a primary, principal, or sole source aquifer? I'~Ye$ [2]No
E]Yes 3;E]~
10. Do hunting, fishing or shell fishing opportunities presently exist in the project area? ]x]2lEYes I-~No
11. Does project site contain any species of plant oi' animal life that is identified as threatened or endangerec
f-lYes [2~o According to :Roy T.. Hale
identify each species
12. Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formatio/'
I-lYes ][]No Describe
13. Is the project site presently used by the community or neighborhood as an open space or recreation are~
I-lYes [~No If yes, explain
14. Does the present site incfude scenic views known to be important to the community?
i-lYes :l~No ·
15. Streams within or contiguous to project area:
a. Name of Stream and name of River to which it is tributary
16. Lakes, ponds, wetland areas within or contiguous to project are,~:
a. Name Dredged canal off Goose Creek
. b. Size (In acres) 20
17. Is the site served by ~-=xisting public utilities? I-lYes ~No
a) If Yes, does sufficient capacity exist to allow connection? i~tYes ~No
b) If Yes, will improvements be necessary to allow connection?~Yesi~No
18. Is the site located in an agricultural district certified pursuant to Agriculture and Marke~s Law, Artic!e
Section 303 and 304? ~Yes !2~No '
19. Is the site Iocated in or substantially conti~uous to a Critical Environmental Area designated pursuant to Articie
of the ECL, and 6 NYCRR 6177 :[[]Yes l'-]No
20. Has the site ever been used for the disposal of solid or hazardous wastes? l-lYes
B. Project Description
1. Physical dimensions and scale of project (fill in dimensions as appropriate)
b. Project acreaqe to be developed: q' fat~res ,~i/ally.
c. Project acreage to remain undeve!oped 7000 sq.~_r,es< acres ultimately.
d. Length of project, in miles: N/A {If appropriate)
e. If the prelect is an expans on, indicate percent of expansion proposed
f. Nuniber of off-street parking, spaces ex,sting 0 ' proposed2'
g. ,%laximum vehicular tr,ps generated per hour 4
h. If residential: Number and Wpe et housing, umts: [upon completion of project)?
One Famdy Two Family A, lult~pJe Famdy
Jnit~aib/ I ' Com. Jomimum
i. DJmens~ons('in teet) of largest proposed structure See.p~ojec/ d~.~u£ipt~n
_ hei~,ht; _ . width; length.
J. Linear feet of frontage along a public thoroughfare project w,II OCcupy is? 60 ft.
3
2. How much natural material'(i.e., rock, earth, etc.) will be removed from the site? 0
3. Will disturbed areas be reclaimed? I-IYes UNo
· 'a. If.yes, for what intend,,,: purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation? q-lYes l'"lNo
c. Will upper Subsoil be stockpiled for reclamation? I-IYes l-'INo
4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site? 6500+
; acres.
$. YVill any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?
f-lYes
6. If single phase project: Anticipated period of construction 12
tons/cubic ,yards
7. If multi-phased:
a. Total number of phases anticipated N/A
b. Anticipated date of commencement phase I
Cnumber).
month
months, {including demolition).
year, (includ. ing demolition)
c. Approximate completion date of final phase
d. Is phase 1 functionally dependent on subsequent phases?
8. Will blasting occur during construction? I-'lyes :~:No
9. Number of jobs generated: during construction 12
10. Number of jobs eliminated by this project 0
11. Wi[I project require relocation of any projects or facilities?
12. ls surface liquid waste disposal involved? q-lYes I~1~1o'
month year:
q--lYes E3No"
; after project is complete 0
E:]Yes ~1o If yes, explain
a. If yes, indicate type of waste (sewase, industrial, etc.) and amount
b. Name of water body into which effluent will be discharged
13. Is subsurface liquid waste disposal involved? :]l~Yes ~No Type
'14. Will surface area of an existin8 water body increase or decrease by proposal?
Explain
15. Is prolect or any portion of project located in a 100 year flood Plain.,? I-lYes
Sewage
I-lYes ~No
[~No
16.
Will the project generate solid waste? ]~Yes i'UNo
a. If yes, what is the amount per month .1 tons
b. If yes, will an existing solid waste facility be used? l~5'es l"INo
c. If yes, give name Town Landfill iocatioCnutchogue
d. Will any wastes not go into a sewage disposal system or into a sanitary landfill?
e. If Yes, explain -
FqYes
J~No
17. \Viii the project involve the disposal of solid waste? fqYes
a. If yes, what is the anticipated rate of disposal?
b. If yes, what is the anticipated site life? years.
18. Will project use herbicides or pesticides? l~z'es ~No
tons/month.
19. Will project routinely produce odors (more than one hour per day)? f-lYes ~i~No
20. Will project produce operating noise exceeding the local ambient noise levels? FqYes
21. Will proiect result in an increase in energy use? J~Yes J-lNo
If yes , indicate type(s) Oil and electricity
22. If water supply is from wells, indicate pumping'capacity 2 ~ gallons/minute.
23. Total anticipated water usage per day 300 gallons/day.
24. Does prolect involve Local, State or Federal funding? I~]Yes J~No
If Yes. explain
IKINo
· . 4
25.',..Approvals Required:
City, Town, Village Board I-lYes f-INo
City, Town, Village Planning Board E3Yes [:]No
City, Town Zoning Board [:]Yes [:]No
City, County Health Department :~ffes' I-INo
Other Local Agencies I-lYes
Other Regional Agencies []Yes I'-iNo
State Agencies ::~7( e s [:]No
Federal Agencies :~L~es f"INo
Zoning and Planning Information
Type
Sanitary system/well
DEC TW
COE Section 10 (dock)
Submitt
Date
1. Does proposed action involve a planning or zoning decision? t-lYes :~'No
If Yes, indicate decision required: '~
[]zoning amendment I-'Tzoning variance [::]special use permit f"lsubdivision [:]site plan
t"'~new/revision of master plan [:]resource management plan [::]other
2. What is the zoning classification(s)of the site? R-40
3. What is the maximum potential development of the site if developed as permitted by the present zoning?
(1) one-family dwelling '
4. What is the proposed zoning of the site.~ N/A
· 5. What is the maximum potential development of the site if developed as permitted by the proposed zoning~
N/A -
6. Is the proposed action consistent with the recommended uses in adopted IocaI land use plans? X~Yes
7. What are the predominant land use(s) and zoning classifications within a 5~ mile radius of proposed action.~
1{-40
8. Is the proposed action compatible with adjoining/surrounding land uses within a V~ mile? [~Yes F-
9. If the proposed action is the subdivision of land, how many lots are proposed? N/A
a. What is the minimum lot size proposed.~
10. Will proposed action require any authorization(s) for the formation of sewer or water districts.~ ~Yes :~
11. Will the proposed action create a demand for any community provided services (recreation, education poi
fire protection).~ [:]Yes {:]~o ,
a. If yes, is existing capacity sufficient to handle projected demand? [:]Yes [:]No
12. Will the proposed action result in the generation of traffic significantly above present leveis.~ [:]Yes :~
a. If yes, is the existing road network adequate to handle the additional traffic? l'qYes [:]No
D. Informational Details
Attach any additional information as ma,,, he needed to clarify your project. If there are or rn~ay be any advc
impacts associated with your proposal, 3lease discuss such impacts and the measures which you propose to mitigat~
avoid them.
E. Verification /j7 .
Appiicant/$p°ns°r<~ki/~e~/ /~ , true to the best of my knowledge.
En-Consultants, Inc. Date 6/20/90
Signature ROy~/.~a j~e ~ Title President
If the action is in the Coastal Area, and you are a state agency, complete the Coastal Assessment Form before proceed,
with this assessment.
5
95-20-6 (3/89]-- 25c
DEC PERMIT NUMBER
1-/4738-00172/00001-0
FACILITY.'PROG RAM NUMBER{s)
NEW YORK SI~.TE DEPARTMENI OF ENVIRONMENTAL CONSERVATION
PERMIT
Under the Environmental Conservation law
EFFECTIVE DATE
Aug. 14, 1990
EXPIRATION DATE{s)
Aug. 31, 1992
IArticle 15 Title 3; 6NYCRR 327,
328. 329' Aquatic Pesticides
IArticle 15, Title 5:
Protection of Water
IArticle 15, Title 15:
__ Water Supply
Article 15. Title 15:
__ Water Transport
Article 15. Title 15:
__ Long island Wells
lArticle 15, Title 27:
Wild. Scenic and Recreational
Rivers
----'-] 6NYCRR 608:
Water Quality Certification
Article 17, Titles 7, 8:
SPDES
Article 19:
Air Pollution Control*
------]Article 23, Title 27:
Mined Land Reclamation
------]Article 24:
Freshwater Wetlands
N--New, R--Renewal, M--Modification,
C--Construct (*only), O--Operate (*only)
Article 25:
Tidal Wetlands
Article 27, Title 7; 6NYCRR 360:
Solid Waste Management*
Article 27, Title 9; 6NYCRR 373:
Hazardous Waste Management
Article 34:
Coastal Erosion Management
Article 36:
Floodplain Management
Articles 1, 3, 17, 19, 27, 37:
6NYCRR 380: Radiation Control
PERMIT ISSUED TO
Thomas Zukas
ADDRESS OF PERMITTEE
84 Pine Edge Dr., East Moriches, NY 11940
AGENT FOR PERMITTEEfCONTACT PERSON
Roy Haje, En-Consultants,Inc.
NAME AND ADDRESS OF PROJECT/FACILITY (If different frorr Permittee)
Zukas Property, Smith Drive South
LOCATION OF PRO ECT FACILITY [ COUNTY TOWN'2C:g~I~.3f,~I~
Goose Creek I Suffolk Southold
TELEPHONE NUMBER
(516) 283-6360
UTM COO RDINATFS
DESCRIPTION OF AUTHORIZED ACTIVITY
Construct a single family
dwelling, deck, septic
systeM, open pile dock,
ramp, float
and two pilings. Ail work to be done in accordance to plans prepared by
Roderick VanTuyl and Eh-Consultants dated April 26, 1990 and June 14, 1990 respectively.
GENERAL CONDITIONS
By acceptance of this permit, the permittee agrees that the permit is contingent upon strict compli-
ance with the ECL, all applicable regulations and the conditions specified herein or attached hereto.
The permittee shall file in the office of the approonate regional permit administrator or other office designated in the special conditions a nonce of intention to commence
WOrK at mast 48 hours in advance of the time of commencement and shall also notify him/her oromotlv in writing CT the comoletion of the worx.
2 The permttted work shall be subleCt to inspection by an authorized representative of the Department of Environmental Conservation which may order the work suspended if
the public interest so requires pursuant to ECL §71-O301 and SAPA §401(3].
3 The permittee has accepted exoresslv, by the execution of the application, the full legal responsibility for all damages, direct or indirect, of whatever nature, and b'~ whomever
suffered, arising DUi of the project described herein and has agreed to indemnify and save harmless the State from suits, actions, damages and costs of every name ane descrip-
tion resulting from the said prolect.
4 The Department reserves the right to modify, suspend or revoke this permit at any time after due notice, and, if requested, hold a hearing when:
a) the scope of the project is exceeded or a violation of any condition of the permit or provisions of the ECL and pertinent regulations are found; or
b) the permit was obtained by misrepresentation or failure to disclose relevent facts; or
c) newly discovered information or significant physical changes are discovered since the permit was issued.
5 To maintain a valid permit, the permittee must submit a renewal application, including any forms, fees or supplemental information, which may be required by the
Department, at least 30 days prior to the expiration date of the existing permit (180 days prior for: State pollution discharge elimination system permits (SPDES), Solid
waste management facilities permits (SWMF), or Hazardous waste management facilities permits [HWMF)].
6 This permit shall not be construed as conveying to the applicant any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the'
permitted work or as authorizing the impairment of any rights, title or interest in real or personal property held or vested in a person not a party to the permit.
7 The permittee is responsible for obtaining any other permits, approvals, lands, easements and rights-of-way which may be required f~r this project.
8 Issuance of this permit by the Department does not, unless expressly provided for, modify, supersede or rescind an order on consent or determination by the Commissioner
issued heretofore by the Department or any of the terms, conditions, or requirements contained in such order or determination.
9 Any modification of this perm,t gran~%D~~t be in writing and attached hereto. ~A~T7 ~
/
Aug. 14, 1990 ~ Christine J. Costopoulos I ~to~oo~, ~.~. 1~o~5~
95-2{~6a (118b)-- 25c
ADDITIONAL GENERAL CONDITIONS FOR ARTJ~-' ~S 15 tTitle 5), 24, 25, 3~, 36 and & NYCRR Part 60~ (
10. That if futur~ operations by the State of New York require an al- other environmentally delete, ous
11.
12.
13.
[eratio~ in the position of the structure or work herein authorized, or
if. in the opimon of the Department of Environmental Conservation
it shall cause unreasonable obstruction to the free navigation of said
waters or flood flows or endanger the health, safety or welfare of
the I)eopte of the State. or cause loss or destruction of the natural
resources of the State, the owner may be ordered by the Department to
remove or alter the structural work, obstructions, or hazards caused
thereby without expense to the State, and if, uOon the expiration or
revocation of this permit, the structure, fill, excavation, or other
modification of the watercourse hereby authorized shall not be com-
pleted, the owners, shall, without expense to the State, and to such
extent and in such time and manner as the Department of Environmental
Conservaticm may require, remove ail or any portion of the uncompleted
structure or fill and restore to its former condition the navigable
and flood ca4~city of the watercourse. No claim shall be made against
the State of New York on account of an,/such removal or alteration.
That the State of New York shall in no case be liable for any damage
or iniury to the structure or work herein authorized which may'be caused
by or result from future operations undertaken by the State for the
conservation or improvement of navigation, or for other purposes, and
no claim or right to compensation shall accrue from any such damage.
Granting of this permit does not relieve the applicant of the responsi-
bility of obtaining any other permission, consent or approval from
the U,S. Army Corps of Engineers. U.S. Coast Guard, N~w York State
Office of General Services or local government which may be required.
All necessary precautions shall be taken to preclude contamination
of any wetland or waterway by suspended solids, sediments, fuels,
solvents, lubricants, epoxy coatings, paints, concrete, [eachate or any
materials associated with the
project.
14. Any material dredged in the prosecution of the work herein permitted
shall be removed even[y, without leaving large refuse piles, ridges across
the bed of a waterway or floodplain or deep holes that may have a
tendency to cause damage to navigable channels or to the banks of
a waterway.
15. Thereshall be no unreasonable interference with nawga:ion by thework
'herein authorized.
16. If upon the expiration or revocation of this permit, the project hereby
authorized has not been comoleted, the applicant shall, v,,ithout expense
to the State, and to such extent and in such time and manner as the
Department of Environmental Conservation may require, remove all or
any portion of the uncompleted structure or fill and restore the site
to its former condition. No claim shall be made against the State of
New York on account of any such removal or alteration.
17. If. granted under Article 36, this permit does not signify in any way
that the project will be free from flooding.
18. If granted under 6 NYCRR Part 608, the NYS Department of Environ-
mental Conservation hereby certifies that the subject project will not
contravene effluent limitations or other [imitations or standards under
Sections 301,302, 303, 306 and 307 of the Clean Water Act of 1977
{PL 95-217] provided that all of the conditions listed herein are met.
19. All activities authorized by this permit must be in strict conformance
with the.approved plans submitted by the applicant 6r his agen~ as part
of the permit application.
approved NYSDEC
Such approved plans were I~or~ by
8/9/90
on
SPECIAL CONDITIONS
A 50' wide naturally vegetated buffer zone adjacent to the tidal wetlands boundary
shall remain undisturbed with the exception of a 6' wide path to the open pile dock.
2. Roof runoff shall be directed to drywells.
3. Driveway must be constructed of a pervious material.
4. There shall be no disturbance to tidal wetlands vegetation.
5. No dredging is allowed..
Supplementary Special Conditions (A)
thru (J) attached.
DEC PERMIT NUMBER
1-4738-00172/00001-0
PROGRAM/FACILITY NUMBER 1
· Page 2 of 3
APPLICATION FOR PUBLIC ACCESS TO RECORDS
TOWN OF SOUTHOLD
SECTION i. TO BE COMPLETED BY APPLICANT
INSTRUCTIONS TO APPLICANT: Please complete Section I of this form. Give the form
to the Agency Freedom of Information Officer. The Freedom of Information Officer will
return one copy to you as a response to your request, or as an interim response.
TO: FREEDOM OF' INFORMATION OFFICER I~I~CI~JVEDI
AGENCY NAME:
AGENCY ADDRESS: JUL - 2 gg3
I HEREBY APPLY TO INSPECT THE FOLLOWING. RECORD (PIj~a~s.~s ~(g~i~lr~be. record
sought. If possible, supply a date, a file t~tle and number, a'n~ any other ,nforma-
tion that will help locate the record desired):
Signature of Applicant and Printed Name: ~/J/~~ Cd~-~,~¢,.,_so,,)
Applicant Represents: /,~/,~,-~ ~ ~
Applicant's Mailing Add~ess: ~ ~~ t/~..~.~.~~ ~1~
Date of Application: ~~
SECTION il. FOR USE BY AGENCY FREEDOM OF INFORMATION OFFICER ONLY
[~]. Approved
Denied: (for the reason(s) checked below)
[1
[1
[1
[1
Il
[l
[1
Confidential Disclosure
Part of Investigatory Files
Unwarranted Invasion of Privacy
Record of Which This Agency is Legal Custodian Cannot be Found
Record is Not Maintained by This Agency
Exempted by Statute Other Than the Freedom of Information Act
Other (specify):
Receipt of this request is acknowledged. There will be a delay in suppJying the
requested record until
for the following reason:
Signature: -- Title.-~]~~ L~.P~:Z.L.~ Date:~-/~ ~_~]_~
SECTION Ill. NOTICE TO APPLICANT
YOU HAVE A RIGHT TO A'PPEAL A DENIAL OF THIS APPLICATION IN WRITING WIYH-
IN 30 DAYS OF THE DENIAL. INFORMATION AS TO THE PERSON TO CONTACT IS
SHOWN BELOW. THE CONTACTED PERSON MUST RESPOND TO YOU IN WR~TING
WITHIN SEVEN BUSINESS DAYS OF RECEIPT OF YOUR APPEAL.
Name: Southold Town Board
Business Address: 53095 Main Road Telephone:
Southold, New York 516 765-1800
0
0
D
:* LJ
0
~0
<
eV"],d "*4/
x