HomeMy WebLinkAbout46909-Z �O�os�FFBLk py Town of Southold 2/9/2022
P.O.Box 1179
y 53095 Main Rd
Southold,New York 11971
CERTIFICATE OF OCCUPANCY
No: 42768 Date: 2/9/2022
THIS CERTIFIES that the building AS BUILT DECK
Location of Property: 1245 Old Woods Path, Southold
SCTM#: 473889 Sec/Block/Lot: 87.-1-23.7
Subdivision: Filed Map No. Lot No.
conforms substantially to the Application for Building Permit heretofore filed in this office dated
9/10/2021 pursuant to which Building Permit No. 46909 dated 10/1/2021
was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for
which this certificate is issued is:
"as built"deck addition to existing single-family dwelling as applied for.
The certificate is issued to Pearson, Stephen&Natalie
of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL
ELECTRICAL CERTIFICATE NO.
PLUMBERS CERTIFICATION DATED
? ( U
ut orize ignature
TOWN OF,SOUT,HOLD
BUILDING DEPARTMENT
z TOWN CLERK'S OFFICE
Woy . SOUTHOLD, NY
dol � Sao.
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 46909 Date: 10/1/2021
Permission is hereby granted to:
Pearson, Stephen
1245 Old Wood Path
Southold, NY 11971
To: legalize "as built" deck addition to existing single-family dwelling as applied for.
Additional certification may be required.
At premises located at:
1245 Old Woods Path, Southold
SCTM #473889
Sec/Block/Lot# 87.-1-23.7
Pursuant to application dated 9/10/2021 and approved by the Building Inspector.
To expire on 4/2/2023.
Fees:
AS BUILT- SINGLE FAMILY ADDITION/ALTERATION $1,028.80
CO-ADDITION TO DWELLING $50.00
Total: $1,078.80
4
Buil ' g Inspector
®��pF SO�Iy®l
Town HallAnnex ~ ® Telephone(631)765-1802
54375 Main Road Fax(631)765-9502
P.O.Box 1179 COM-
Q sean.devlinl�town.Southold.ny.us
Southold,NY 11971-0959 _ %'
®�y�DUNT`I,��
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
CERTIFICATE OF ELECTRICAL COMPLIANCE
SITE LOCATION
Issued To: Stephen Pearson
Address: 1245 Old Woods Path City,Southold st: NY zip: 11971
Building Permit#: 46909 Section: $7 Block: 1 Lot: 23.7
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: DBA: AS BUILT License No:
SITE DETAILS
Office Use Only
Residential X Indoor X Basement Deck X
Commerical Outdoor X 1st Floor Pool
New Renovation 2nd Floor Hot Tub
Addition Survey X Attic Garage
INVENTORY
Service 1 ph Heat Duplec Recpt Ceiling Fixtures 2 Bath Exhaust Fan
Service 3 ph Hot Water GFCI Recpt 2 Wall Fixtures 2 Smoke Detectors
Main Panel A/C Condenser Single Recpt Recessed Fixtures CO2 Detectors
Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO
Transformer 300W UC Lights Step Lights 4 Emergency Fixtures Time Clocks
Disconnect Switches 3 V LED 15 Exit Fixtures 11 Pump
Other Equipment:
Notes: " AS BUILT NO VISUAL DEFECTS " Rear Deck Lighting
Inspector Signature: Date: November 30, 2021
S.Devlin-Cert Electrical Compliance Form
aIV soolyO -- _
# TOWN_OF SOUTHOLD BUILDING DEPT.
765-1802
I N"SPECTION
[ ] FOUNDATION 1ST f ] ROUGH PLBG.
] FOUNDATION 2ND [ ] NS ULATION/C�AULKING
[ ] FRAMING /STRAPPING [ ] FINAL LAM
[ ] FIREPLACE & CHIMNEY [" ] FIRE SAFETY--INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ` ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O
REMARKS:
_ _ .
C/ Ucv
0
DATE 10Y W,A INSPECTOR
J —
Of SO(/lyo
# #
TOWN OF SOUTHOLD BUILDING DEPT. ,
765-1802
:INSPECTION
[ ] FOUNDATION 1ST [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ :.] INSULATION/CAULKING
] FRAMING/STRAPPING [ ] FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL)
[ ] CODE VIOLATION PI PRE C/O
REMARKS: uC/ y 'C vl72J
DATE INSPECTOR
Greybar � � � � � �
Architecture PLLC
' DEC 10 2021
12/2/2021
Southold Department of Buildings
54375 NY-25
Southold, NY 11971
Project: 1245 Old Wood Path,Southold, NY 11971
Job#: 210123
RE: Deck Footing Certification
To Whom It May Concern:
Per the inspectors recent request, I am writing this letter to certify that the footings for the as built deck at
1245 Old Wood Path,Southold, NY 11971 has been completed in accordance with the 2020
Residential Code of New York State. If you have any questions, please feel free to contact me.
Sincerely,
Nicholas M.Wilder, RA
Cell: 646-588-1326
nw@greybararchitecture.com
Lic#037812
cSD AAC
M.
clys
LU
�°
TF
OF NES
CC: :G:\h1y c.•e\2.123::_2''_15 0ld Wood Path_Natalie\Greybar_Lettt;r cerifying footi:g.docx
Greybar Architecture PLLC,244 Fifth Avenue,Suite W230,New York,N.Y.10001
greyba rarch itectu re.com
Page 1 of 1
FIELD INSPECTION REPORT D.ATE COMMENTS
. b
FOUNDATION(IST) C>
H .
FOUNDATION(2ND)
O
N
U
ROUGH FRAMING& H
PLUMBING''
INSULATION.PER N.Y. ►=].
STATE ENERGY CODE
FINAL
J
ADDITIONAL COMMENTS
0
,
� .
. Z
• m
y
O��gOfFOl, coG TOWN OF SOUTHOLD—BUILDING DEPARTMENT
y2
y Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959
mom Telephone (631) 765-1802 Fax (631) 765-9502 https://www.southoldtoyLna.gov
Date Received
APPLICATION FOR BUILDING PERMIT
7176q r
For Office Use Only 1
Cab I
PERMIT NO. Building Inspector: ;
S E P 1 0 2021
Applications and forms must be filled out in their entirety,,Incomplete
applications,will not be accepted `Where`the A001i t isnot the owner,an Btil7 li G ;,
Owner's,Authorization form(Pagi,ll shall'be completed:,
Date: O
OWNER SJ OF PROPE TY f
Name: SCTM#1000-
Project Address: m -7
Phone#: 11-7.- mail: b)_LL-
Mailing Address: e `
CONTACT PERSON
4 1
Name:
Mailing Address: Sax
Phone#: Email:
- — -
'DESIGN PROFESSIONALINFORMATION ` r
Name: - -- - - `J�' '
Mailing Address: -------`^ — _ -- - - ----___.-_�_-
Phone#: _ ^ V---4-1- -- Email: - -w -- -e—soya
- - - --
CONTRACTORINFORMATION
Name:
o-VhTf_ -_
Mailing Address:
5 _
Phone#: Email:
DESCRIPTIROPOSED C
ONSTRU
ON OF PCTION
❑New Structure ❑Addition ❑Alteration ❑Repair El Demolition Estimated Cost of Project:
XOther� _ $o�
Will the lot be re-graded? ❑YesgNo Will excess fill be removed from premises? ❑Yes�<No
1
PROPERTY INFORMATION
Existing use of property: Intended use of property:
Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to
�� _ this property? ❑YesfNo IF YES, PROVIDE A COPY.
Check B_ox After Reading The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by
p
, _ n g p _� •- g p the Building Zone;.
Cha ter 236 ofthe Town-Code.-APPLICATION IS HEREBY MADE to the Buildin De artment forthe issuance'of a Buildm Permit pursuant to
Ordinance of the Town of southoid,Suffolk,County;New York and other applicable Laws,Ordinances or Regulations;for the.constri ction of'buildings;. ;
additions;alterations`or for•removal or demolition}as herein,described.The applicant agrees to'comply`with all applicable laws,ordinances,building code;
housing code and regulations and to admif`authorized-inspectors on`premises and m 6uilding(s)for necessaryinspections:False statements made hereimare
punishableas a Class A misdemeanor pursuant o Section 210.45 of the New York State_Penal
Application Submitted By i ame): p� j}�� ❑Authorized Agent Owner .
Signature of Applicant: _ �� Dat __,5� IU,�
CONNIE D.BUNCH '` —
Notary Public,State of New York
STATE OF NEW YORK) No. 01BU6185050
SS: Qualified in Suffolk County a
COUNTY OF ) Commission Expires April 14,2 ®a°3
being duly sworn, deposes and says that(s)he is the applicant
(Name of individual signing contract) above named,
(S)he is the
(Contractor,Agent, Corporate Officer,etc.)
of said owner or owners, and is duly authorized to perform or have,performed the said work and to make and file this
application;that all statements contained in this application are true to the best of his/her knowledge and belief; and
that the work will be performed in the manner set forth in the application file therewith.
Sworn before me this
day of � 20� °
Notary Public
PROPERTY OWNER AUTHORIZATION
(Where the applicant is not the owner)
I, residing at
do hereby authorize to apply on
my behalf to the Town of Southold Building Department for approval as described herein.
Owner's Signature Date
Print Owner's Name
2
v a
t
yr
ul
FF
9,
AS
'0 ;�F
,1�•: ruNDNOWORwwsttxtroF
IONNIE SOW
f&&rt0'OO°F i 109.ff `
-- M O NOW OR FOVIRIYOF
UNDAG SAFMOW — —
t �
LAND NOW OR FOOMY OF
MICNAFI M.SNIR
AREA=185,914 SQ.FT. -
4.27 ACRES
- i3
S86-OS30"W a .�
203.80 ACIN89°l09SW imn
QFCIC poi ',.` ACL28.76' WOF
,
6V WAW
T ' (AhD MO{90RFOAd1FRD'm
,' WUN&RU411tl UBIIW UA87UlYCONDANI'
'o
c ,
1
� may' •
Survey of Property
Southold
ro,vrn of Southold
Suffolk sIr' York
MIntovIIIe®aol.com% i(3X ',gyp
tiarch S. 2017 Scale 1"= 40,
C IRlPHIr SCALE
t. .
A. General Notes on Responsibilities: RM
1. The notes included in this package are designed to clarify the roles and responsibilities of the
parties involved. It is the responsibility of the Owner and the Contractor to thoroughly review all the 17.Size of wood members on plans, building elevations and sections are shown as nominal in size.
notes and the drawings to ensure each party understands their obligations. If a party does not agree 18.Coordination of all work under this contract shall be maintained to insure the quality and timely
with an item, it is to be brought up in writing to the Owner prior to the issuance of the AIA contract. completion of the work/project.
2.The individual referred to as the Owner shall mean Stephen and Natalie Pearson.The organization 19. Concealed spaces, except shafts and sprinklered spaces,within partitions,walls,floors, stairs,
referred to as the Architect shall mean NATALIE REBUCK ARCHITECTURE PLLC. furring, pipe spaces,etc.that would permit passage of flame smoke, fumes, or from one concealed
• 3.The term"Verify in Field"or"VIF"shall mean that the Contractor is to verify the conditions of the space to another or from one floor to another shall be filled with non-combustible material.
existing construction to remain prior to the installation of new work, and coordinate the existing 20.All wood blocking shall be fire-resistant in accordance with code.
conditions to ensure they are compatible with the new work. 21.All work shall be executed in accordance with the best recommended trade practices and as per
4. The Architect will be providing Construction Administration services for this project.All manufacturer recommendations.
communication during construction shall be between the Architect with a copy to the Owner.This
includes but is not limited to Requests for Information, Submittal request or review, Owner requested B. Code and Building Department Notes:
design changes, Change Order reviews, and punch list.
5.The Architect is not responsible for the mechanical, electrical, plumbing or structural engineering of The following notes shall apply throughout:
the project and they are not under the umbrella of the Architect. It is the responsibility of the Contractor
to install all MEP work per the New York State code. 1.Work shall be executed in full compliance with the applicable provisions of all laws, by-laws, statutes,
6.At the completion of each day, the Contractor is to secure the building site to ensure individuals ordinances, codes, rules, regulations and lawful orders of public authorities bearing on the performance
other than those with keys cannot enter. Construction materials are to be kept in a secure location. and execution of the work. The contractor shall promptly notify the architect of any portions of work, in
Temporary construction to ensure the security of the site is to be borne at the cost of the Contractor. the contract documents that are at variance with the above.
7.The cost of defective or ill-timed work shall be borne by the Contractor.The cost to repair any work, 2.The Contractor is to abide by the requirements of the 2020 New York State Building Code. These
materials,fixtures, etc. that are damaged during construction by the Contractor shall be borne by the documents do not represent complete construction documentation and therefore,the Contractor must
Contractor. familiarize himself with the applicable codes and ensure that the work performed is in compliance with
8.This work is an alteration. The existing structure including foundations, bearing walls, floor its requirements. Specific applicable portions of the code have been highlighted in the notes, but this
construction and roof construction will remain in place. Under no conditions is the existing structure to does not fully define the scope of the project and the Contractor must refer to the entirety of the code as CONSTRUCTION DOCUMENTS
be affected unless noted otherwise on the drawings. is applicable to his work.
9. If the Contractor has questions about the drawings,this shall be brought to the attention of the 3.The design drawings were prepared in compliance with the 2020 New York State Building Code Natalie Rebuck Architecture
Architect in the form of an RFI. requirements. PLLC
10. Extreme caution shall be exercised and protection shall be provided to prevent bodily injury and/or 4.All new work shall comply with New York State Energy Code 1245 OLD WOOD PATH
property damages to persons using spaces adjacent to the work to be demolished. Maintain 5. There is no change of use SOUTHOLD, NY 11971
temporary protective measures required including dust and noise control. 6. All materials, assemblies, forms, and methods of construction and service equipment shall comply www.redesignarchitects.com
11. It shall be the responsibility of the contractor to examine and thoroughly inspect the building and with the 2020 New York State Building Code. Rebuck@redesignarchitects.com
contract documents in order to verify actual conditions and full scope of the demolition and removal of 917.670.4704
work required.The contractor shall make allowances for discrepancies between drawings and notify
the owner of any such discrepancies prior to proceeding with any work.
12.The Contractor is to supply all appropriate certificates of insurance as required from the building
management prior to commencing any work.
13.All plumbing and electrical work must be performed by New York State licensed Contractors. OCCUPANCY OR < 1A D
14. Contractor shall have no less than $2 million dollars of general liability insurance. p,4nAYr stir
15.The Contractor shall perform work within the standard of care as agreed to with the Owner. The USE UNLAWFUL Additional
Architect shall inform the Contractor if work is progressing without meeting this level of quality, and the { Cert fiCat on
Contractor shall fix work not to the agreed upon level of quality. WITHOUT RT ATI z x
16.The Contractor is to coordinate floor finishes with new doors, thresholds,wall base, existing walls, May Be Required.
and adjacent finishes. OF OCCUPANCY
eta
AAPPRDASNO E® C®MPLY �tPE�►RS®N RES1®ENCS
DATEB.P.# CP MH ALL C®DES ®FNEVI/ YORK STATE & TOWN CODES
FEE: g�f: AS REQUIRED AND CONDITIONS OF 1245 OLD WOOD PATH
SOUTHOLD, NY 11971
NOTIFY 6UILDING CF^=,.RTNfENT AT ^
r� FIT'J_ PI T I I�^ 11 IV� I
765-1802, 8AM TO 4 � R/i OR THE ���� i=/
FOLLOWING INS- TWO NS: Th'n�n TO'NN NNING BOARD rn GENERAL NOTES
rg
1. FOUNDATION - TWO REQUIRED SEP 2 4 202
FOR POURED CONCRETE UTNOLD NTRUSTEES O
2. ROUGH - FRAMING & PLUMBING DECBUILD jc
3. INSULATION TOWN OF SO20 FEBRUARY 2020 N
UTHOLu
4. FINAL - CONSTRI Ic"10MMUST G=1
® � ®�
BE COMPLETE I_.. ��
- .0,
ALL CONSTRUCTION SHALL MEET THE
REQUIREMENTS OF THE CODES OF NEW
YORK STATE. NOT RESPONSIBLE FOR
DESIGN OR CONSTRUCTION ERRORS.
65'-5 3/4" V
i
THIS PANEL TO BE HINGED GATE;
WOOD STEPS
�i NEW TREX PEBBLE GRAY PRE-GROOVED COMPOSITE DECKING
o
- - - - - - - -- - -- --- - -
_ ONSTRUCTION DOCUMENTS
Co = - - _ - - - °' Natalie Rebuck Architecture
-- -- - --------- - -
- --- - ------- -- - ------ ------
- -- - -- --- -- - - - - - - - --
PLLC---- --- - --- - - -
;- 1245 OLD WOOD PATH
SOUTHOLD, NY 11971
- - -
www.redesignarchitects.com
Rebuck@redesignarchitects.com
- - 917.670.4704 <
xx
P
- - A�"%A L Q
&,1AYNF
O EXISTING
DECK
TO REMAIN �►,9r� ���� ,�Q�
O ® m
0
7EARSON RESIDENCE
1245 OLD WOOD PATH
UP SOUTHOLD, NY 11971
UP
® SITE PLAN
i 3/16" = 1'-0" O
20 FEBRUARY 2020 N
SITE L. 1 00 - 00
1 3/16" = 1'-0"
2"X 4" CEDAR RAILING
/ 36"WIDE 3/4" DIA IRON BALUSTER
0
0
0
0
O
4" 4 x 4 CEDAR POST
0
CONSTRUCTION DOCUMENTS
0
Natalie Rebuck Architecture
PLLC
o EDGE OF NEW TREX PEBBLE 1245 OLD WOOD PATH
GRAY PRE-GROOVED SOUTHOLD, NY 11971
COMPOSITE DECKING www.redesignarchitects.com
Rebuck@redesignarchitects.com
917.670.4704 11
NOTCH TREX DECKING FOR 7F
POST ED
BOLT TO WOOD JOIST
STRUCTURE BELOW n
2"x 12" CCA GIRDERS BOLTED ON TO THE POSTS
USING LEDGER LOCK TIESO/� E1IN�
2"x 8" CCA JOISTS EVERY 16"WITH TICOS PER TOWN CODE
PEARSON RESIDENCE
4"x 4" CCA VERTICAL POSTS
1245 OLD WOOD PATH
SOUTHOLD, NY 11971
ODECKING/ RAILING DECKING/ RAILING
1 1/2" = 1'-0" O
' 36" DEEP CONCRETE POST/ 1 1/2"= 1'-0" N
PADS EVERY 8'-0"WITH WET 20 FEBRUARY 2020
POST HOLDERS TO SET INTO
THE CONCERETE AS PER LA. 01
m O O
TOWN CODE