HomeMy WebLinkAbout46863-Z �o�S�FFO( rt Town of Southold 2/2/2022
y� P.O.Box 1179
y z 53095 Main Rd
Way o� Southold,New York 11971
CERTIFICATE OF OCCUPANCY
No: 42736 Date: 2/2/2022
THIS CERTIFIES that the building SOLAR PANEL
Location of Property: 2025 Oaklawn Ave., Southold
SCTM#: 473889 Sec/Block/Lot: 70.-3-22.2
Subdivision: Filed Map No. Lot No.
conforms substantially to the Application for Building Permit heretofore filed in this office dated
9/15/2021 pursuant to which Building Permit No. 46863 dated 9/23/2021
was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for
which this certificate is issued is:
roof mount solar panels to existing single family dwelling as applied for.
The certificate is issued to Dapolito,Andrea&Saccente,Joseph
of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL
ELECTRICAL CERTIFICATE NO. 46863 12/10/2021
PLUMBERS CERTIFICATION DATED
ori ed
ut Signature
��o�SUFeoi,r�oTOWN OF SOUTHOLD
aye BUILDING DEPARTMENT
y TOWN CLERK'S OFFICE
SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 46863 Date: 9/23/2021
Permission is hereby granted to:
Dapolito, Andrea
64 Hudson Rd
Bellrose Village, NY 11001
To: Install roof mount solar panels to existing single family dwelling as applied for.
At premises located at:
2025 Oaklawn Ave., Southold
SCTM #473889
Sec/Block/Lot# 70.-3-22.2
Pursuant to application dated 9/15/2021 and approved by the Building Inspector.
To expire on 3/25/2023.
Fees:
SOLAR PANELS $50.00
ELECTRIC $100.00
CO-ADDITION TO DWELLING $50.00
Total: $200.00
Building Inspector
oF so�ryQl
� o
Town Hall Annex Telephone(631)765-1802
54375 Main Road
P.O.Box 1179 Q sean.deviine-town.southold.nv.us
Southold,NY 11971-0959 'Q
�ycouff '
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
CERTIFICATE OF ELECTRICAL COMPLIANCE
SITE LOCATION
Issued To: Andrea Dapolito
Address: 2025 Oaklawn Ave city: Southold st: NY zip: 11971
Building Permit#: 46863 Section: 70 Block: 3 Lot: 22.2
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: DBA: Trinity Solar License No: 57843ME
SITE DETAILS
Office Use Only
Residential X Indoor X Basement Solar X
Commerical Outdoor X 1st Floor Pool
New X Renovation 2nd Floor Hot Tub
Addition Survey Attic Garage
INVENTORY
Service 1 ph Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan
Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors
Main Panel A/C Condenser Single Recpt Recessed Fixtures CO2 Detectors
Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO
Transformer UC Lights Dryer Recpt Emergency Fixtures Time Clocks
Disconnect Switches 4'LED Exit Fixtures Pump
Other Equipment: 9.86kW Roof Mounted PV Solar Energy System w/ (29) Qpeak Duo BLKG6-340W
Panels , 42A AC Disconnect, PV Rapid Shutdown
Notes: Solar
Inspector Signature: Date:
December 10, 2021
S.Devlin-Cert Electrical Compliance Form
D �o�soUly
AU?
Town Hall A�lei; 1 5 202 l� J� Telephone(631)765.1802
54315 Main Roadm�:ax(631)765=gg5�2
P.O.Sox 1179 G� i� roger.richert(agtown.southo d.ny.us
Southold,NY RUIWiNG DEPT.
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN OF SOUTHOID
APPLICATION FOR ELECTRICAL. INSPECTION.
REQUESTED BY: Date:
Company Name: 1 �
Name:
License.No.;
Address:.
Phone No.: 6\/
JO.BSITE.INFORMATION: (*Indicates required information)'
*Name;. . .
*Address:. - -e . naAlyck �} . .. .` :\.. ..
*Cross.Street:
*Phone'No,.:
Permit No:: :
Tax Map District: 1.000 Se Ian;.O pBlock: b p C> Lot: p 22 Co-1
*BRIEF DESCRIPTION OF WORK (Please Print Clearly)
te1S
(Please Circle All That Apply)
*Is job ready for inspection: YE Rough In Final
*Do you need a Temp Certificate: YE O
Temp Information (If needed)
*Service Size: 1 Phase 3Phase 100 150 200 300 350 40.0 Other
*New Service: Re-connect Underground Number of'Meters Change of Service Overhead
Additional Information: PAYMENT DUE WITH APPLICATION
82-Request for Inspection Form
i°� "l r l
J
0FS0(/TyO� Ll 2_0 Z-5 OP-Pe-L,4 `iV fes'
# # TOWN OF SOUTHOLD BUILDING DEPT.
765-1802
INSPECTION
[ ] FOUNDATION 1ST [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATIOWCAULKING
[ ] FRAMING]STRAPPING [ ] FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION- .
} FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL)
[ ' ] CODE VIOLATION ] PRE C/O
REMARKS: L
DATE 94 INSPECTOR
# TOWN OF SOUTHOL-D BUILDING DEPT.
765-1802
INSPECTION
[ ] FOUNDATION 1ST [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] I ULATIOWCAULKING'-.
[ ] FRAMING/STRAPPING [ FINALP -
-[ ] FIREPLACE & CHIMNEY [ } FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)-
[ ] CODE VIOLATION [ ] PRE C/O
REMARKS:
Ct� - '
DATE 25 ��Z INSPECTOR
o�aUE50UTyo � b��3 l� 0
TOWN-OF SOUTHOLD BUILDING DEPT.
765-1802
.. INSPECTION
[ ] FOUNDATION IST [ ] ROUGH PLBG:
[ ] FOUNDATION 2ND [ ] -.INSULATIOWCAULKING -
[ ] FRAMING /STRAPPING [ ] FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE-RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [M, ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O
REMARKS;
DATE f INSPECTOR •
FIELD INSPECTION REPORT DATE COMiVI .NTS
b
FOUNDATION(IST)
. �
O Ct
FOUNDATION'(2ND) kr1
ROUGH FRAMING:& c 1
PLUMBING'
N
� N
. • r
INSULATION.PER.N.Y. H.
STATE ENERGY CODE
FINAL
r1 •
ADDITIONAL COMMENTS :
CPU-
0
m' l z
� y
r
TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST
BUILDING DEPARTMENT Do you have or need the following,before applying?
TOWN HALL Board of Health
SOUTHOLD,NY 11971 4 sets of Building Plans
TEL: (631)765-1802 Planning Board approval
FAX: (631)765-9502 G/ Survey
SoutholdTown.NorthFork.net PERMIT NO. O(O Check
Septic Form
N.Y.S.D.E.C.
D Trustees
v n C.O.Application
V Flood Permit
Examined ,20 Single&Separate
SEP 1 5 2021 Storm-Water Assessment Form
Contact:
Approved • ��• ,20 BUILDING DEQ• Mail to:
Disapproved a/c TOWN OF SOUTHOLD
Phone: 631-319-7233
Expiration ,20
Building Inspector
APPLICATION FOR BUILDING PERMIT
Date 920
INSTRUCTIONS
a.This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4
sets of plans, accurate plot plan to scale.Fee according to schedule.
b.Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or
areas, and waterways.
c. The work covered by this application may not be commenced before issuance of Building Permit.
d.Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit
shall be kept on the premises available for inspection throughout the work.
e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector
issues a Certificate of Occupancy.
f.Every building permit shall expire if the work authorized has not commenced within 12 months after the date of
issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the
property have been enacted in the interim,the Building Inspector may authorize,in writing,the extension of the permit for an
addition six months.Thereafter,a new permit shall be required.
APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the
Building Zone Ordinance of the Town of Southold, Suffolk County,New York,and other applicable Laws,Ordinances or
Regulations,for the construction of buildings, additions,or alterations or for removal or demolition as herein described.The
applicant agrees to comply with all applicable laws,ordinances,building code, housing code,and regulations,and to admit
authorized inspectors on premises and in building for necessary inspections.
Samuel Maoliaro
(Signature of applicant or name,if a corporation)
21805th Ave-Unit 1A Ronkonkoma NY 11779
(Mailing address of applicant)
State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder
Agent
Name of owner of premises Joseph Saccente
(As on the tax roll or latest deed)
If applicant is a corporation, signature of duly authorized officer
(Name and title of corporate officer)
Builders License No. H-52821
Plumbers License No.
Electricians License No. -
Other Trade's License No.
1. Location of land on which proposed work will be done:
2025 C�aklawn Ave Southold
House Number Street Hamlet
County Tax Map No. 1000 Section 07000 Block 0300 Lot 022002
10 -3 490?,e:�'-
Subdivision Filed Map No. Lot
2. State existing use and occupancy of premises and intended use and occupancy of proposed construction:
a. Existing use and occupancy
b. Intended use and occupancy
3. Nature of work(check which applicable):New Building Addition Alteration
Repair Removal Demolition Other Work
(Description)
4. Estimated Cost $49,3000 Fee
(To be paid on filing this application)
5. If dwelling, number of dwelling units Number of dwelling units on each floor
If garage, number of cars
6. If business, commercial or mixed occupancy, specify nature and extent of each type of use.
7. Dimensions of existing structures, if any: Front Rear Depth
Height Number of Stories
Dimensions of same structure with alterations or additions: Front Rear
Depth Height Number of Stories
8. Dimensions of entire new construction: Front Rear Depth
Height Number of Stories
9. Size of lot:Front Rear Depth
10.Date of Purchase Name of Former Owner
11. Zone or use district in which premises are situated
12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO
13. Will lot be re-graded?YES NO Will excess fill be removed from premises?YES NO
2025 Oaklawn Ave
14.Names of Owner of premises Joseph Saccente Address Southold NY 11971 Phone No. 516-458-8583
Ihor Bo can 21805th Ave-Unit 1A 631-319-7233
Name of Architect J Address Ronkonkoma NY 11779 Phone No
2180 5th Ave-Unit 1A
Name of Contractor Trinity Solar/Samuel Magliaro Address Rnnknnknma NY 1177A Phone No. 631-319-7233
15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES - NO
* IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C. PERMITS MAY BE REQUIRED.
b. Is this property within 300 feet of a tidal wetland? * YES NO
* T YES, D.E.C. PERMITS MAY BE REQUIRED.
16.Provide survey,to scale,with accurate foundation plan and distances to property lines.
17. If elevation at any point on property is at 10 feet or below,must provide topographical data on survey.
18.Are there any covbnants and restrictions with respect to this property? * YES NO
* IF YES, PROVIDE A COPY.
STATE OF NEW YORK)
SS:
COUNTY OF )
Samuel Magliaro being duly sworn, deposes and says that•(s)he is the applicant
(Name of individual signing contract)above named,
(S)He is the Agent
(Contractor,Agent, Corporate Officer, etc.)
of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;
that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be
performed in the manner set forth in the application filed therewith.
Sworn to before me this
day of 20,2f
KRISTINE KRA IM
Yar
N[lQualified
try Public
otary u lic No.01K z�os7z S ature o pplicant
in Suffoik County
omm.Expires Oct.22,2024 1
® D �oFSo�Py
c�p
Town Hall Ash, � 5 202 8 tLG Telephone(631)765-1802
54375 Main Road N � Fax(631)765-9g512
P.O.Boa 1179 { R, ® roger.richert(agown.southo d.nV.us
Southold,NY IMM-, 6N 'DEA PT.
TOWN OF SOUTROLD MUNi`1,��
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
APPLICATION FOR ELECTRICAL INSPECTION
REQUESTED BY: Date:
Company Name: 4
JSO`a r+
&
Name:
License No.: E
Address:
Phone No.: "® MQ o, .' c Cpm
JOBSITE INFORMATION: (*Indicates required information)
*Name: C
*Address: \kcm
*Cross Street:
*Phone No.:
Permit No.:
Tax Map District: 1000 Se Ion: C5 Q OBlock: 63p`, Lot: b 2?__ 06 Z
*BRIEF DESCRIPTION OF WORK (Please Print Clearly) N.y�r1� yea
CCC , k0,T`c� kcs�
(Please Circle All That Apply)
*Is job ready for inspection: YE Rough In Final
*Do you need a Temp Certificate: YE O
Temp Information (If needed)
*Service Size: 1 Phase 3Phase 100 150 200 300 350 400 Other
*New Service: Re-connect Underground Number of Meters Change of Service Overhead
Additional Information: PAYMENT DUE WITH APPLICATION
82-Request for Inspection Form
1
1,07 AREA— 42.813 rq !L
1.ot HUNtf�N t1
LUr fvUMBE>y 13
5 301
u'>
n
h
9
J
{ CY 34 4 3
RT—
Li ba[1LI/a T i
V]
ka l 1 to
I J
z
I i
` fI
N 2J`23'50'W T25.00'
OAKLAWN AVENUE
!*'G E: CFSSFWI, SE'-MC TMX do WATER
SZRV10E L0cAncNs sY oTriERS_
®--22-2002 FINAL SURVEY
++ar a�aawrx of alarr a►wn aND M wiyan�
5-4-2002 LOCATED FDUNOA71ON
ar W=211L r Wr,mor MOM Aff Nor.,^WMM 4-3-2002 REMSED D%*LUNC
W 0"sm Rai miadnoo sKM"own MOW m swaxAm sa M[
p"OpUry MNsa AN pm a mnww ptwcw mm At 4o Nmam An uo1 ro JOB No. 01-617
a"rnsa suc w"w"v rums m� w
wa rua Ia►r,ma FILE No. PECONfC DEWL CORP.
SURAYM FCR DAME) W. & JENNIFER W, OLSF-N
,sr aurnc.-W rQ =KA1 ro >sft siWaY a naAruN or LOT NUMBER 2
racy or mt.cn>a�rrv,<®crwnti+qac
W OF PECONIC DEVELOPMENT CORP. AT %OUTNc)LO
YtrMMctiY's iNYJ[7�3D mmSMll INN akyr M h!R'7Qr7f Pita IRCY ML
as"r n mrwcm wa a>;m rowr m 1A[>ru ocrrvrr.atowrnrm SITUATED AT SOUTH=
aczirr ono tea O mrwm Isim Nem 03 To W mm=aa a W
Gb400 iNUrVQ r ft~"M AM NOT TOVSH MA A aoa"°"&'amum"s
cb ZJRMA2 a o>w M TOWN OF SOUTNOID — SUFFOLK COUNTY N.Y,
COM O n4c"4t7 rat WX KWA M taala=rae 2 toren s[x 04 SCM.E i' o 50' DATE 12-20-2001
CaX4"srx W^L NOT O=MCW"A WAWa"M W".
PLED MNo. 1072.E DATE 12-27-2001
CE:R71F1ED ONLY TC} AF TAX LW No.(ArF ONLY) 1000-70-3-22.2 OISK 5O0
C,1J'0 W. & JE.1JNiFE.4 W, t�LN
sl +;srsF A-R'T-RAcr PIC, HAROLD F. TRANCHON JR. P.C.
�y EA NO SURVEYOR
1666 WA ONC RIVE YORK.
NIOR RD, WADING RIVER,
t NEW
N."Y. LIC. Na. 046992 ORK. 11792
WtROLD F 7RANCNON JR. PENN. LIC. Na. 2115—E 631--929-4695
f
Suffolk County.Dept.of
Labor,Licensing&Consumer Affairs
HOME IMPROVEMENT LICENSE
Name
WILLIAM F.CONDIT
Business Name
This r is certifies licensed
e 'T,RINITY HEATING&AIR INC DBA
bearer is duly licensed _
by the County of suffolk
License Number:H-52821
Fra'^k'N°'deUv Issued: 01/29/2014
Commissioner Expires: 01/01/2022
� J
a Suffolk County Dept.of
r Labor,Licensing&Consumer Affairs
r
MASTER ELECTRICAL LICENSE
Name
j RICHARD GUANERI
Business Name
This Certifies that the
bearer is duly licensed Trinity Solar Inc.
by the County of Suffolk
License Number:ME-57843
Rosalie Drago Issued: 12/15/2016
Commissioner Expires: 12/01/2022
SGCCe�e i ���
ao Cv1 auyc Ave
Mrinitv
SOLAR
�eCQ- a jyy
Permit Application Checklist: Southold
TSEG Forms
own Application (legal paper)
✓ lectrical Application f SM
Application for Certificate of Occupancy/s Vyi
Sets of Plans
,E6 4 PE Letter(s)
l Contractor's Insurances -cYbAr e-cA
Contractor's License Suffolk
Electrician's Suffolk License
MO Filing Fee
+�o,p , ca�f s�,urruey
L7 Copies of Spec S eets, Inverters/ Panels and Racking
ayyrea bQ96c 5 eO 1�t-[-mosso C} X300 ?tea- �1ernwlnc� 3�CQ.P k
SO-Cce(\k
S oa o �ea �o�aC� o
' u3ov
C)-26 U Z
1
(T'�H)n t v
SOLAR
Southold Town, NY December 8, 2021
Town Hall Annex Building54375 Route 25 P.O. Box 1179
Southold, NY 11971
RE: ANDREA DAPOLITO; JOSEPH SACCENTE Trinity Solar No.
2025 Oaklawn Avenue 2021-06-593770
Southold, NY 11971
To the Building Official:
I hereby certify that I am a Licensed Professional Engineer in the State of New York. The solar photo-voltaic (PV)
system installed at the above-referenced location conforms to the manufacturers' requirements/specifications. The PV
system complies with all applicable laws, codes and ordinances as specified by all applicable codes, including 2020
Residential Code of New York State and the 2018 IRC.
Regards,
Thor Bojcun, PE
Structural Engineer-Trinity Solar
,\p� `!\%CtAE4 e0
r� l4 S CL
VP
\�E_SSION}`�
NY License No.095675
Trinity Solar 12180 5th Avenue,Unit 1 1 Ronkonkoma,NY 1(631)319-7233
Date: March 2nd, 2022
Southhold Town, NY
Town Hall Annex Building
54375 Route 25 P.0 Box 1179
Southold, NY 11971
RE: Permit#: 46863
Section: 70
Block: 03
Lot: 22.2
To Whom It May Concern,
The original plans for Joseph Saccente of 77 2025 Oaklawn
Avenue, Southold, NY 11971 have been changed due to panel count decreased
from 32 panels to 29 panels, and panel layout revised on array 2, array 5 and array
6. The As-Built drawings that we are submitting for approval are actual layouts of
the roof and equipment.
If you have any questions or need further assistance, please call our office.
Thank you,
Trinity Solar
Lana Harrinanan: 631.319.7233 (ext. 1326)
1
nTT'lr- i n 'I t V
SOLAR
Southold Town, NY August 26, 2021
Town Hall Annex Building54375 Route 25 P.O. Box 1179
Southold, NY 11971
RE: ANDREA DAPOLITO; JOSEPH SACCENTE Trinity Solar No.
2025 Oaklawn Avenue 2021-06-593770
Southold, NY 11971
To the Building Official:
The following information constitutes a summary of the relevant design criteria and recommendations for the support of a
new photovoltaic[PV] system on the existing roof framing components at the above-referenced location.
Criteria is as follows:
1. Existing roof framing:
Conventional roof framing is 2x8 at 16 o.c.; maximum existing rafter span= 13'0"; (horizontal projection)
2. Roof Loading:
• 4.33psf dead load (pounds per square foot- PV panels, mounting rails & hardware)
• 6.3 psf-existing roof loads (2.3 psf-2x8 framing, 1.5psf roof sheathing, 2.5 psf shingles)
• Ground Snow Load-20psf- per AHJ (Authority Having Jurisdiction)
• Wind criteria- Exposure Category B, 128 mph wind equivalent to 23.09psf wind pressure
3. Existing Roof modification - none required; existing roof framing is acceptable for PV installation.
The installation, described above, is in general conformance with the manufacturers'specifications and complies with all
applicable laws, codes, and ordinances as specified by applicable codes, including the 2020 Residential Code of New
York State.
The spacing of the mounting brackets cannot exceed a maximum of 48"o.c. between mounting brackets and will be
fastened using 5/16"diameter corrosive-resistant steel lag bolts. In order to evenly distribute the load across the roof
rafters,there shall be a minimum of 2 mounting brackets per rafter(4" long lag bolts required)and a minimum 2'/2"
penetration (embedment)of all bracket lag bolts beyond the roofing materials; this is adequate to resist all stated live
loads above—including wind shear. Per NDS Section 11.1.4, pilot holes not to exceed-one-half the diameter of the
shank need to be bored into the primary framing members for the full length of the threaded portion of the screw to
avoid splitting of the framing member. Stainless steel lag bolts are required.
Regards,
Ihor Bojcun, PE pF l��yy
Structural Engineer-Trinity Solare0 r0�
SU a.A CG
0
� 4r
095b75
R"'Es"S 10191"
NY License No.095675
Trinity Solari 2180 5th Avenue,Unit 1 I Ronkonkoma,NY I(631)319-7233
EcoFasten
For Installers By Installers
COMPLETE RAIL-BASED RACKING SYSTEM
ClickFit is one of the fastest installing rail-based systems
in the industry. Thanks to its Click-In rail assembly, the Composition Shingle,
Tile,Metal
rails can be connected to any of EcoFasten's composition
shingle, tile, and metal roof mounts in seconds without
the need for fasteners or tools. The Click Fit system is
made of robust materials such as albminum and coated ::::
Rail-Based
steel, to ensure corrosion-resistance and longevity.
ClickFit conforms to UL 2703 and has been tested in
extreme weather conditions including wind, fire, and snow.
Structural-Attach
FEATURES & BENEFITS Direct-Attach
• Tool-less,fastener-free rail attachment
• Fully integrated bonding
• Click-On Mid&End Clamps
• Compatible with a variety of EcoFasten roof attachments
FAST INSTALLING SYSTEM FEATURING 25 YEAR WARRANTY
CLICK-IN RAIL ASSEMBLY
j t �
rim F
INTERNAL SPLICE
Tool-free bonded internal Splice
installs in seconds.
MLPE MOUNT
Attach Module Level Power
MID CLAMP Electronics to the top of the rail.
Click-on mid clamp features integrated
bonding pins and fits modules 30-50
mm in width.
END CLAMP
Click-on end clamp fits modules END C A P
30-50mm in width.
The slide-on end caps allow the
end clamps to be accurately
positioned on the rail in seconds,
while providing an aesthetically-
pleasing, finished install.
L-FOOT
The ClickFit rail simply clicks
into our proprietary composition
shingle & the L-foot without the
need to use fasteners or tools.
COMPOSITION RHINGI._ -
Combine the versatile ClickFit
L-Foot with the watertight
GF-1 flashing for a fast
installation on composition
shingle roofs.
GF-1 FLASHING&L-FOOT
i ILL GOOFS
Use the adjustable ClickFit Tile
Hook for attaching the ClickFit „
system to tile roofs. Works with
Flat, S, and W tile profiles.
J
CLICKFIT TILE HOOK
STANDING SEAM METAL ROOFS
Combine the ClickFit L-Foot
with SimpleBlock�-U for a
fast installation on standing
seam metal roofs.
SIMPLEBLOCK-LI
PRODUCT PART PART BOX PALLET
IMAGE NUMBER DESCRIPTION QUANTITY QUANTITY
ASSEMBLED WITH(1)OF GROMMET AND INCLUDES(1)5/16-EPDM BONDED WASHER
- GF1M GAL BLK 810 GIFT 8X70"BLK GLV 50
W/2"HL PLCMT
- GF1 GAL BLK 612 GF1 8X12"GALVALUME BLK 50
(LASHING
ALL HARDWARE INCLUDED OO
1500004 CF NO R3WAR ASSY 100 5000
1500005 CF TILE HOOK US 20 480
t 1510045 CF TILE HOOK SUB-FLASHING 20 2160
TILE HOOK FLSH-F ST TILE HOOK FLASH 12 576
FLAT SIERRA TAN
TILE HOOK FLSH W ST TILE HOOK FLASH 12 576
W SIERRA TAN
TILE HOOK FLASH 12 576
TILE HOOK FLSH-S ST S SIERRA TAN
INCLUDES O• :O
SIMPLEBLOCK-U-AL 2"SIMPLEBLOCK SSR-AL 2C 44CC
ALL HARDWARE INCLUDED WITH OO
1500004 CF L-FOOT ASSY 50 5000
NO�AROWARE NEECEE'
1500033 CF RAIL 2T) N/A 108
(-7 FT)
1500034 CF RAIL 4 FT) N/A 108
[-10.4 FT)
1500035 CF RAIL N/A 108
(-13.8 8 FT)FTJ
1008061 CF RAIL SPLICE 100 3200
1510070 CF WIRE MGMT CLIP 1000 TBO
7 MODULE JUMPER,6 IN
1500028 (204MM1 25 25000
1510057 CF MLPE MOUNT 400 17600
PRODUCT PART PART BOX PALLET
IMAGE NUMBER DESCRIPTION QUANTITY QUANTITY
1510041 OF BLK LABELED uu
1510015 OF HO ENOCLAMP J 1AJ
1 30MM,BLK
1510016 OF HO ENOCLAMP 5C 5600
32MM,BLK
1510017 OF HO ENOCLAMP 50 5600
35MM,BLK
1510018 OF HO ENDCLAMP 50 5600
38MM,BLK
1510019 CF HO ENOCLAMP 50 5600
40MM,BLK
1510020 OF HD ENOCLAMP 50 5600
45MM,BLK
1510011 OF HO MIOCLAMP 50 5600
30-40MM,BLK
1510012 OF HO MIOCLAMP 50 5600
40-50MM,BLK
ROCK IT V3 SKIRT A65 ROCK-IT SKIRT V3 a 256
35MM&40MM 65"
ROCK-IT V3 SKIRT A79 ROCK-IT SKIRT V3 8 255
35MM&40MM 79'
ROCK-IT V3 SKIRT A80 ROCK-IT SKIRT V3 8 256
35MM&40MM 80"
ROCK-IT V3 SKIRT 865 ROCK-IT SKIRT V3 8 256
32MM&38MM 65"
ROCK-IT V3 SKIRT 879 ROCK-IT SKIRT 79 8 256
32MM&38MM 79"
ROCK-IT V3 SKIRT 880 ROCK-IT SKIRT V3 8 256
32MM&38MM 80
i11,11 Vill I
1500003 OF UNIVERSAL SKIRT 50 5750
CLAMP BLK
POLY KIT LAG SCREW 4 POLY KIT LAG 50 480
SCREW 4"(50)
SCRW OP 15-13X03 ROOFING SCRW 1000 60000
#15 X 3"DRILL PT
INCLUDES :i
1510001 CONDUITMOUNT-BRKT 50 10350
INCLUDES(1)SS B-18 X 314-TEK SCREW
CONOUITMOUNT-TILE CONDUIT MOUNT-TILE SYSTEM 60 4320
�,:;S_Urt
i
r
■
ECOFASTEN SOLAR
EcoFasten has an established a reputation for being
one of the industry's leading innovators by providing
expert solutions for mounting solar PV on any type
of roof. Our broad portfolio of solutions stem from
the needs of, and direct inputs by solar PV installers.
We take pride in providing the right solution for
every application. We educate our customers, so
they purchase the best, most cost-effective solutions
to fit their needs, and we complement that with on-
site installation training to ensure 100% satisfaction.
We are honest with ourselves, our customers, and
our employees, fostering a culture of idea-sharing,
innovation, and creativity.
N n
ECOFQSte4141 W. VAN BUREN ST, SUITE 2, PHOENIX AZ 85009
w An ESDEC Company 1 - 877 - 859 - 3947 1 INF0@EC0FASTENS0LAR . 00M
Single Phase Inverter Z
• HID-WaveC
with m
for North America PO
SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US /
SE760OH-US / SE10000H-US / SE1140OH-US '..'.'
O X
LA
O O
o •
o •
O solarZ.y:C <<) solarZU"-
• O •
IL -- --
• O
a - - O
0 o O
Optimized installation with HD-Wave technology
/ Specifically designed to work with / UL1741 SA certified,for CPUC Rule 21 grid compliance
power optimizers
/ Record-breaking efficiency / Extremely small
Quick and easy inverter commissioning directly guilt-in module-level monitoring
from a smartphone using the SolarEdge SetApp
/ Fixed voltage inverter for longer strings / Outdoor and indoor installation
/ Integrated arc fault protection and rapid
shutdown for NEC 2014 and 2017, per article / Optional: Revenue grade data,ANSI C12.20
690.11 and 690.12 Class 0.5 (0.5% accuracy)
solaredge.com solar=@ "
Sin le Phase Inverter
Wit HD-Wave Tec n0 ogy for North America
SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US/
SE760OH-US / SE1000OH-US / SE1140OH-US
APPLICABLE TO INVERTERS WITH
PART NUMBER SEXXXXH XXXXXBXX9
OUTPUT
Rated AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA
3300 @ 208V 5000 @ 208V 10000 @ 208V
Maximum AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA
3300 @ 208V 5000 @ 208V 10000 @ 208V
AC Output Voltage Min.-Nom.-Max- ✓ ✓ ✓ ✓ ✓ ✓ ✓ Vac
(211-240-264)
AC Output Voltage Min.-Nom.-Max. ✓ ✓ ✓ Vac
;183-208-229)
AC Frequency;Nominal) 59.3-60-605Hz
Maximum Continuous Output 123 16 21 25 32 42 475 A
Cu,rent @240V
Maximum Continuous Output
Current @2088 6 24 48.5 A
Power Factor 1,adjustable-0.35 to 0.85
GFDIThreshold 1 A
U?ili?y Monitorng,Islanding
Protection,Country Configurable Yes
Thresholds
INPUT
Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 W
Maximum DC Power @208V - 5100 7750 15500 W
Transformer-less,Ungrounded Yes
Maximum Input Voltage 480 Vdc
Nominal DC Input Voltage 380 400 Vdc
Maximum Input Current @240V' 8.5 10.5 13.5 16.5 20 27 30.5 Adc
Maximum Input Current @208V' 9 13.5 - 27 Adc
Max.Input Short Circuit Current 45 Adc
Reverse-Polarity Protection Yes
Ground-Fault Isolation Detection 600ksi Sensitivity
Maximum Inverter Efficiency 99 99.2 %
CEC Weighted Efficiency gg 99 @ 2408 %
98.5 @ 2088
Nighttime Power Consumption <2.5 W
For other regional settings please contact SolarEdge support
A higher current source may be used;the inverter will limit its input current to the values stated
Sin le Phase Inverter
Wit HD-Wave Technology for North America
SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US/
SE760OH-US / SE10000H-US / SE1140OH-US
ADDITIONAL FEATURES
Supported Communication Interfaces RS485,Ethernet,ZigBee(optional),Cellular(optional)
Revenue Grade Data,ANSI C12.20 Optional,
Inverter Commissioning with the SetApp mobile application using built-in Wi-Fi Access Point for local connection
Rapid Shutdown-NEC 2014 and
2017 590 L Automatic Rapid Shutdown upon AC Grid Disconnect
STANDARD COMPLIANCE
Safety UL1741,UL1741 SA,UL16998,CSA C22.2,Canadian AFCI according to TI.L.M-07
Grid Connection Standards IEEE1547,Rule 21,Rule 14(HI)
Emrsions FCC Part 15 Class B
INSTALLATION SPECIFICATIONS
AC Output Conduit Size/AWG
Range 1"Maximum/14-6 AWG P'Maximum/14-4 AWG
DC Input AWG Range 1"Size/#of Strings/ 1"Maximum/1-2 strings/14-6 AWG T'Maximum/1-3 strings/14-6 AWG
9
Dimensions with Safety Switch 17 7 x 14.6 x 6.8 /450 x 370 x 174 21.3 x 14.6 x 7.3/540 x 370 x 185 In/
(HxWxD)
mm
Weight with Safety Switch 22110 25.1/11.4 26.2/11.9 38.8/17.6 Ib/kg
Noise <25 <50 dBA
Cooling Natural Convection
Operating Temperature Range -40 to+140/-40 to+60" T/-C
Protection Rating NEMA 4X(Inverter with Safety Switch)
Revenue grade inverter P/N:SExxxxH-USOOOBNC4
4Full power up to at least 50'C/122'F,for power de-rating information refer to.https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf
O SolarEdge Technologies,Inc.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge in Technologies,Inc All Ro H S
other trademarks mentioned hereare trademarks of their respective owners.Date.5/2019N01/ENG NAM.Subject to change without notice.
powered by
i�
\ TOP BRAND PV
EUNOIE
2019
CICELLS
secuw.v
ouauty rested
ww.VDEM.—
ID.40032587
Q.ANTUM TECHNOLOGY:LOW LEVELISED COST OF ELECTRICITY
Higher yield per surface area,lower BOS costs,higher
power classes,and an efficiency rate of up to 19.5%.
INNOVATIVE ALL-WEATHER TECHNOLOGY
C?, Optimal yields,whatever the weather with excellent
low-light and temperature behaviour.
�- ENDURING HIGH PERFORMANCE
Long-term yield security with Anti LID Technology,Anti PID
Technology',Hot-Spot Protect and Traceable Quality Tra.Qt"'.
EXTREME WEATHER RATING
17) High-tech aluminium alloy frame,certified for
high snow(5400 Pa)and wind loads(4000 Pa).
C A RELIABLE INVESTMENT
Inclusive 12-year product warranty and 25-year
linear performance warranty'.
STATE OF THE ART MODULE TECHNOLOGY
r' Q.ANTUM DUO combines cutting edge cell separation
i
and innovative wiring with Q.ANTUM Technology.
APT test conditions according to IEC/TS 62804-1.2015,method B(-1500V,168h)
See data sheet on rear for further Information,
I(THE IE
THE IDEAL SOLUTION FOR:
"ll/ Rooftop arrays
residential buildings
Engineered in Germany CELLS
MECHANICAL SPECIFICATION
Format 1740mm x 1030mm x 32mm(including frame)
Weight 19.9kg 980 3p0"
Front Cover 3.2 mm thermally pre-stressed glass with
anti-reflection technology
Back Cover Composite film
eel,m�
Frame Black anodised aluminium
Cell 6 x 20 monocrystalline Q.ANTUM solar half cells ® imomm
Junction box 53-101 mm x 32-60 mm x 15-18 mm
Protection class IP67,with bypass diodes ,,,,
Cable 4 mm2 Solar cable;(+)a1150mm,(-)z1150mm
Connector Staubli MC4,Amphenal UTX,Renhe 05-6,Tangling _ ,.GwMnO bx NETAI AI }
TL-Cable01S,JMTHY JM601;IP68 or Friends PV2e;IP67
»I r 31mm DEi4Ls 11 8 i
N.Smm I�TA6,mn
ELECTRICAL CHARACTERISTICS
POWER CLASS 330 336 340 346
MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5 W/-0 W)
Power at MPP' Pv11 [W] 330 335 340 345
Short Circuit Current' Is_, [A] 10.41 10.47 10.52 10.58
EE Open Circuit Voltage' V,,; IV] 40.15 40.41 40.66 40.92
E Current at MPP 1-1 [A] 9.91 9.97 10.02 10.07
E
Voltage atMPP VMS, [V] 33.29 33.62 33.94 34.25
Efficiency' q [%] >-18.4 >_18.7 219.0 119.3
MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT1
Power at MPP PM [W] 247.0 250.7 254.5 258.2
E Short Circuit Current I- [A] 8.39 8.43 8.48 8.52
E Open Circuit Voltage V, [V] 37.86 38.10 38.34 38.59
c
f Current at MPP I- (A] 7.80 7.84 7.89 7.93
Voltage at MPP V.,,__ [V] 31.66 31.97 32.27 32.57
'Measuremen,'olera,,.2s?,,,,,:±3%;I,;:,V 51/a'STC.1333 W/m'.25,2'C,AM 1.53 according to IEC 60904-3. 800 W/m2,NMOT,spectrum AM 13G
0 CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE
------ -___i___--,
v At least 98%of nominal power dur- =
ww 9 Y:.n_._._=s:x.".-__._..._._._. in first ear.Thereafter max.0.54% z
r _ _
degradation per year.At least 93.1%
W of nominal power up!o 10 years.At
W LL
F z e "--"------" least 85%of nominal power up to W
Eg >25 years c a - - -- ------
¢oz , S ---
oAll data within measurement toler-
ances.Full warranties in accordance o
as with the warranty terms of the Q00 �0° i0° AO0 100°
fIRRADIANCE IW/mil
o Q CELLS sales organisation of your
u „ respective country.
YEARS Typical module performance under low irradiance conditions in
comparison to STC conditions(25°C,1000W/m,).
z
TEMPERATURE COEFFICIENTS
Temperature Coefficient oflsc D [%/K] +0.04 Temperature Coefficient ofVcc [%/Kl -0.27
Temperature Coefficient of PM„ y [%/K] -0.36 Normal Module Operating Temperature NMOT [°C] 43±3 0
m
0
PROPERTIES FOR SYSTEM DESIGN
e
Maximum System Voltage Vs IV] 1000 Safety Class II o
M
Maximum Reverse Current Ia [A] 20 Fire Rating C
Max.Design Load,Push/Pull [Pa] 3600/2667 Permitted Module Temperature -40°C-+85°C
Max.Test Load,Push/Pull [Pa] 5400/4000 on Continuous Duty p
0
a
QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION a
VIDE Quality Tested,IEC 61215:2016;IEC 61730:2016,Application Class II; Number of Modules per Pallet 32 W
This data sheet complies with DIN EN 50380. Number of Pellets per Trailer(24t) 28 p
Number of Pellets per 40'HC-Container(26t) 24
DVE C E Pallet Dimensions(L x W x H) 1815 x 1150 x 1190 mm
Pallet Weight 683kg
Note.Installation instructions must be followed.See the installation and operating manual or contact our technical service department for further information on approved installation o
and use of this product.
_o
Hanwha G CELLS GmbH
Sonnenallee 17-21,06766 Bitterfeld-Wolfen,Germany I TEL+49(0)3494 66 99-23444 1 FAX+49(0)3494 66 99-23000 1 EMAIL sales@q-cells.com I WEB www.q-cells.com
Engineered in Germany OCELLS
NOM:
1.1 COMPLIES WITH NEC 2017
2.)REFER TO SHEET PV-3 FOR SITE SPECIFIC VALUES REQUIRED BY NEC 690
3.1 STICKERS,LABELS,AND PLACKARDS SHALL BE OF SUFFICIENT DURRABIUTN TO WITHSTAND THE ENVIROMENT INVOLVED Tr • a
MIAR PV SYSTEM EOUE'PED \/ S
To be located on all Lx function boxes NOR RAPID SHUTDOWN _l -�/
and every 10'on[K conduit -- 7
,• • = SOLAR
NEC 690 3l(G) •�
NEC 690.561g1111A)
DC Junction Box
690 56(C)(3) NEC 690.4(BI
Service Disconnect • •• �-
690.56(C)(3) NEC 6 00 13(BI NEC nW 53
futnd e�x
SOISYSTEM E0IP wily • • •
WrtH RAP D SHUTDOWNY1�0.f'1^"iM10
NEC 690.4(8)
NEC 690.13(111
i
NEC 690.Sfi([)(1)1A)
H System Is eackled Breaker NEC 690.54 NEC 690.53
NEC 705.1218112)
NEC 690-54 uC Di�cuni,rit
Utlllty Meter
Socket
gNll b9U 13161
- -
NEC
6 0.13( NEC 690.54
or NEC 690.13(8)
K r•
DC Conduit Main Service Panel Solar Meter Socket Photovoltaic Load Center Inverter(s) Enphase Envoy Box
AC Disconnect ITo Combine Inverter•)
INSTALLATION OF NEW OAKLAWN AVENUE*
ROOF MOUNTED PVSOLAR SYSTEM 'III'T
HA y0
s �`O f�B
2025 OAKLAWN AVENUE _� rt ., e: r 1 %
Oki
SOUTHOLD., NY 11971 `��$ * •
',, ff- �0 095675
ROFESSIota
ONO
Issued/Revisions
� t al ns awET ]z/a/zwl
Rl
SYSTEM 512E DECREfSE 8/2J/2031
Rl ISSUEDTO TOWNSNIP FOR PERMIT 8/]7/2021
VICINITY MAPSITE NO. DESCRIPTION DATE
SCALE: NTS Project Title:
ANDREA DAPOLITO;JOSEPH
SACCENTE
TRINITY ACCT#:2021-06-593770
Project Address:
2025 OAKLAWN AVENUE
SOUTHOLD,NY 11971
41.057939,-72.427836
GENERAL NOTES GENERAL NOTES CONTINUED GENERAL NOTES CONTINUED ABBREVIATIONS CONTINUED SHEET INDEX
Drawing Title:
1. THE INSTALLATION CONTRACTOR IS 8. THE DC VOLTAGE FROM THE PANELS IS 14. B) CURRENT PREVAILING UTILITY JB JUNCTION BOX PV-1 COVER SHEET W/ SITE INFO & NOTES
RESPONSIBLE FOR INSTALLING ALL ALWAYS PRESENT AT THE DC COMPANY SPECIFICATIONS, kCMIL THOUSAND CIRCULAR MILS
EQUIPMENT AND FOLLOWING ALL DISCONNECT ENCLOSURE AND THE DC STANDARDS,AND REQUIREMENTS kVA KILO-VOLTAMPERE PV-2 ROOF PLAN W/ MODULE LOCATIONS AS BUILT PV SOLAR SYSTEM
DIRECTIONS AND INSTRUCTIONS TERMINALS OF THE INVERTER DURING 15 THIS SET OF PLANS HAVE BEEN kW KILO-WATT
CONTAINED IN THE DRAWING PACKAGE AND DAYLIGHT HOURS.ALL PERSONS PREPARED FOR THE PURPOSE OF kWH KILO-WATT HOUR P V-3 ELECTRICAL 3 LINE DIAGRAM
INFORMATION RECEIVED FROM TRINITY. WORKING ON OR INVOLVED WITH THE MUNICIPAL AND AGENCY REVIEW AND L LINE
2. THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM ARE WARNED APPROVAL.ONCE APPROVED,THE MCB MAIN CIRCUIT BREAKER DrawingInformation
RESPONSIBLE FOR INSTALLING ALL THAT THE SOLAR MODULES ARE INSTALLATION CONTRACTOR IS MDP MAIN DISTRIBUTION PANEL AP APPENDIX
EQUIPMENT AND FOLLOWING ALL ENERGIZED WHENEVER THEY ARE RESPONSIBLE FOR INSTALLING ALL MLO MAIN LUG ONLY DRAWING DATE: 8/17/2021MTD MOUNTED DRAWN BY: IG
DIRECTIONS AND INSTRUCTION CONTAINED EXPOSED TO LIGHT. SYSTEM COMPONENTS AS DESCRIBED IN MTD MOUNTING
IN THE COMPLETE MANUAL. 9. ALL PORTIONS OF THIS SOLAR THE DRAWING PACKAGE. REVISED BY: IMS
3. THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM SHALL BE 16 ALL INFORMATION SHOWN MUST BE N NEUTRAL
RESPONSIBLE FOR READING AND MARKED CLEARLY IN ACCORDANCE WITH CERTIFIED PRIOR TO USE FOR NEC NATIONAL ELECTRICAL CODE
UNDERSTANDING ALL DRAWINGS, THE NATIONAL ELECTRICAL CODE CONSTRUCTION ACTIVITIES. NIC NOT IN CONTRACT System Information:
COMPONENT AND INVERTER MANUALS ARTICLE 690 8 705. NO# NUMBER
PRIOR A OCP OVER CURRENT PROTECTION AC SYSTEM SIZE: lOkW NTS NOT TO SCALE DC SYSTEM SIZE: 11.6kW
INSTALLATION.THE INSTALLATION 10. PRIOR TO THE INSTALLATION OF THIS
CONTRACTOR IS ALSO REQUIRED TO HAVE PHOTOVOLTAIC SYSTEM,THE ABBREVIATIONS P POLE
ALL COMPONENT SWITCHES IN THE OFF INSTALLATION CONTRACTOR SHALL MODULE COUNT: 29
POSITION AND FUSES REMOVED PRIOR TO ATTEND A PRE-INSTALLTION MEETING AMP AMPERE PB PULL BOX
PH O PHASE MODULES USED: HANWHA 400
THE INSTALLATION OF ALL FUSE BEARING FOR THE REVIEW OF THE INSTALLATION AC ALTERNATING CURRENT PVC POLYVINYL CHLORIDE CONDUIT MODULE SPEC#: C.PEAK DUO BLK ML-G1O.a+
-
SYSTEM COMPONENTS. PROCEDURES,SCHEDULES,SAFETY AND AL ALUMINUM 400
4. ONCE THE PHOTOVOLTAIC MODULES ARE COORDINATION. AF AMP.FRAME PWR POWER UTILITY COMPANY: PSEG-LI
MOUNTED,THE INSTALLATION 11. PRIOR TO THE SYSTEM START UP THE AFF ABOVE FINISHED FLOOR QTY QUANTITY
#: 9650107553
CONTRACTOR SHOULD HAVE A MINIMUM OF INSTALLATION CONTRACTOR SHALL AFG ABOVE FINISHED GRADE RGS RIGID GALVANIZED STEEL UTILITY ACCT SOLID NEUTRAL UTILITY METER#: 98347889
ONE ELECTRICIAN WHO HAS ATTENDED A ASSIST IN PERFORMING ALL INITIAL AWG AMERICAN WIRE GAUGE SN SNSWITCHBOARD
SOLAR PHOTOVOLTAIC INSTALLATION HARDWARE CHECKS AND DC WIRING C CONDUIT (GENERIC TERM OF JSWBD DEAL TYPE: SUNNOVA
COURSE ON SITE. CONDUCTIVITY CHECKS. RACEWAY,PROVIDE AS TYP TYPICAL
5. FOR SAFETY,IT IS RECOMMENDED THAT 12. FOR THE PROPER MAINTENANCE AND SPECIFIED) U-0 I. UNLESS OTHERWISE INDICATED
THE INSTALLATION CREW ALWAYS HAVE A ISOLATION OF THE INVERTERS REFER TO CB COMBINER BOX XF WEATHERPROOF
MINIMUM OF TWO PERSONS WORKING THE ISOLATION PROCEDURES IN THE CKT CIRCUIT XFMR TRANSFORMER Rev.No. Sheet
TOGETHER AND THAT EACH OF THE OPERATION MANUAL. CT CURRENT TRANSFORMER +72 MOUNT 72 INCHES TO BOTTOM
INSTALLATION CREW MEMBERS BE TRAINED 13. THE LOCATION OF PROPOSED ELECTRIC CU COPPER OF ABOVE FINISHED FLOOR OR PV
` ,
IN FIRST AID AND CPR. AND TELEPHONE UTILITIES ARE SUBJECT DC DIRECT CURRENT GRADE D {� 17 1y �./V
6. THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO TO FINAL APPROVAL OF THE DISC DISCONNECT SWITCH 1E I I 4`!j 1
BE INSTALLED FOLLOWING THE APPROPRIATE UTILITY COMPANIES AND DWG DRAWING
CONVENTIONS OF THE NATIONAL OWNERS. EC ELECTRICAL SYSTEM INSTALLER
ELECTRICAL CODE. ANY LOCAL CODE 14. ALL MATERIALS,WORKMANSHIP AND EMT ELECTRICAL METALLIC TUBING �j A O AOnA
WHICH MAY SUPERSEDE THE NEC SHALL CONSTRUCTION FOR THE SITE FS FUSIBLE SWITCH " L LL
GOVERN. IMPROVEMENTS SHOWN HEREIN SHALL FU FUSE _
7. ALL SYSTEM COMPONENTS TO BE BE IN ACCORDANCE WITH: GND GROUND
INSTALLED WITH THIS SYSTEM ARE TO BE A) CURRENT PREVAILING MUNICIPAL GFI GROUND FAULT INTERRUPTER BUILDING DEPT
"UL"LISTED.ALL EQUIPMENT WILL BE NEMA AND/OR COUNTY SPECIFICATIONS, HZ FREQUENCY (CYCLES PER TOWN OF SOUTHOLD
3R OUTDOOR RATED UNLESS INDOORS. STANDARDS AND REQUIREMENTS SECOND) Tr i ftayo
GENERAL NOTES SOLAR
IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN"A",PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAILABLITY OF EQUIPMENT. 2211 Ailenwood Road 877-786-7283
Wall,New Jersey 07719 www.Trinity-Solar.com
NOTES:'REFER TO MODULE SPECS FOR MODULE DIMENSIONS
'DEPICTED MODULES MAY BE PORTRAIT OR LANDSCAPE ECOFASTEN CLAMP
NEW PV SOLAR MODULE,TYPICAL -�-�(REFER TO SPEC SHEET FOR DETAILS)
(REFER TO EQUIPMENT SCHEDULE
FOR SPECS AND QUANTITIES) I SOLAR MODULE SOLAR MODULE
♦ _ NEW MOUNTING FOOT/ATTACHMENT
POINTS,TYPICAL (REFER TO ECOFASTEN"L"FOOT ECOFASTEN RAIL
E NGINEERILNS LETTER FOR SPACING y (REFER TO SPEC SHEET FOR DETAILS) (REFER TO SPEC SHEET FOR DETAILS)
-
CID
NEW ECOFASTEN RAIL,TYPICAL ^' _ ,`Q� �"0
TO BE MOUNTED PERPINDICULAR TO �j' `C` (Oc
STRUCTURE REFER TO ECOFASTEN EXISTING ASPHALT SHINGLES ECOFASTEN FLASHING n \\\
( (REFER TO ENGINEERS LETTER FOR SPECS) 'REFER TO SPEC SHEET FOR DETAILS) \� 1
SPECIFICATION/DATA SHEET FOR � * A ll
1
DETAILS) /�!2 r+ �"
NEW END CLIP,TYPICAL S.S.LAG BOLT APOC SEALANT / h 1 , M
(REFER TO ECOFASTEN SPECIFICATION (REFER TO ENGINEERS LETTER FOR SPECS) SOLAR MODULES SHALL NOT TIN W)
—♦ —� �♦' I DATA SHEET FOR DETAILS) EXCEED PEAK HEIGHT. Z
EXISTING RAFTER ./� Z
(REFER TO ENGINEERS LETTER FOR SPECE) ip
NEW MID CLIP,TYPICAL �.
I(REFER TO ECFASTEN DATA SHEET OOR DETAILSECIFICATION SOA 09 675
OFFSSIpp1P
ATTACHMENT&CLIP DETAIL nPV MODULE ATTACHMENT ON ASPHALT SHINGLE ROOF HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF 'T
SCALE:NOT TO SCALE SCALE:NOT TO SCALE SCALE:NOT TO SCALE
ARRAY SCHEDULE Issued/Revisions
BACK
Al AS BUILT 12/8/2021
Rl SYSTEM 512E DEME 8/27/2021
11 ISSUEDTOTOWNSNIPrORPERMIT 8/17/2021
R9 R10 NO. DESCRIPTION DATE
Project Title:
ANDREA DAPOLITO;JOSEPH
R1 SACCENTE
TRINITY ACCT#:2021-06-593770
7DCProject Address:
AC D M L" _ 2025 OAKLAWN AVENUE
XX - ' C PATH• SOUTHOLD,NY 11971
41.057939,-72.427836
1'-6"C AR PATH
F-----7 r F R6 Drawing Title:
R2 AS BUILT PV SOLAR SYSTEM
R3 LU R5 - r " LE•PATH
UDrawing Information
_ 1'-6"C2EAR PATH DRAWING DATE: 8/17/2021
_I I DRAWN BY: IG
/cp
REVISED BY: JMS
ROOF1 � R8 Q System Information:
ORIENTATION:54
MODULES:12
PITCH: DC SYSTEM SIZE: 11.6kW
ROOF 2 AC SYSTEM SIZE: 10kW
MODULES:8
PITCH:23 MODULE COUNT: 29
ORIENTATION:234
ROOF 3 p �j MODULES USED: Q EAK DUO BLK ML-G10.a+
MODULES:0 R 400
MODULE
PITCH:39'
UTILITY COMPANY: PSEG-LI
ORIENTATION:324°
UTILITY ACCT#: 9650107553
ROOF
MODULES:3 NOTES: UTILITY METER#: 98347889
PITCH:27 DEAL TYPE: SUNNOVA
ORIENTATION:235 1.)ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE FRONT
ROOFS WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
MODULES:3 2.)ARRAY BONDING TO COMPLY WITH MANUFACTURER SPECIFICATION.
PITCH:40 3.) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION.
ORIENTATION:144 Rev. No. Sheet
4.) AN AC DISCONNECT SHALL BE GROUPED WITH INVERTER(S) NEC 690.13(E) .
ROOF 6 5.) ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING. !/�
MODULES:3 6) ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY SHALL NOT EXTEND BEYOND THE EXISTING ROOF EDGE. PV L
PITCH:26 A 1
ORIENTATION:55
ROOF 7 SYMBOL LEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE
MODULES:0 QTY SPEC#
ORIENTATION:324° R� INDICATES ROOF DESIGNATION.REFER TO INDICATES NEW UNFUSED PV DISCONNECT TO BE SP INDICATES NEW PV ONLY SUBPANEL
T
ARRAY SCHEDULE FOR MORE INFORMATION U� INSTALLED OUTSIDE (UTILITY ACCESSIBLE) TO BE INSTALLED 29 HANWHA 400(Q.PEAK DUO BILK ML-G10.a+400)
ROOF 8
MODULES:0 INDICATES NEW PV SOLAR MODULE.RED MODULES 1 SE10000H-US0SHBNC4 • •
PITCH:39' Q
ORIENTATION:144° (.4 ) INDICATES EXISTING METER LOCATION ® INDICATE PANELS THAT USE MICRO INVERTERS. pC INDICATES NEW DC DISCONNECT
ROOF 9 REFER TO EQUIPMENT SCHEDULE FOR SPECS.
MODULES:0 ,�, OTHER OBSTRUCTIONS
n Ity
PITCH:AT EP LOCATION: INSIDE EXISTINGINDICATES ELECTRICAL PANEL I p I INSTALLED OUTS DEODUCTION METER TO BE SD _ _ _ SOLAR
ORIENTATION:324° II II INDICATES EXISTING SERVICE DISCONNECT
ROOF 10
MODULES:0 INDICATES NEW INVERTER TO BE
PITCH:40' INDICATES NEW FUSED PV DISCONNECT TO BE 2211 Allenwood Road 877 786-7283
ORIENTATION:144° INSTALLED OUTSIDE(UTILITY ACCESSIBLE) ® INSTALLED OUTSIDE. TS INDICATES EXISTING TRANSFER SWITCH Wall,New Jersey 07719 www.Trinity-Solar.com
A REFER TO EQUIPMENT SCHEDULE FOR SPECS
Engineer/License Holder:
ARRAY CIRCUIT WIRING NOTES
1. LICENSED ELECTRICIAN ASSUMES ALL RESPONSIBILITY
FOR DETERMINING ONSITE CONDITIONS AND
EXECUTING INSTALLATION IN ACCORDANCE WITH SOLAR MODULES MOUNTED TO ROOF ON 5 ARRAYS /� /,-
N EC 2017 29-400W MODULES
ADC/1 SOLAR
PER EDGE
01 PER MODULE � 4�A EI AO
2.)LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON
ASHRAE MINIMUM MEAN EXTREME DRY BULB 8"x8" ---------------------------- I y ZOQ-� e
----- ---------- I Z
15TRING Of 15 MODULES IN SERIES-400 Vmax -------------------
TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO JUNCTION
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT 1 STRING OF 14 MODULES IN SERIES-400 Vmax F BOX * :�
TEMP=-16'C I _r
*2 STRINGS TO BE TERMINATED IN PARALLEL INSIDE INVERTER 1
10 ce
3.)HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED I LLJ
ON ASHRAE HIGHEST MONTH 2%DRY BULB Z Z
TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO I ��
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMP=
33'C �pp X95675`,
4.)2005 ASHRAE FUNDAMENTALS 2%DESIGN 'rO�Ess(O�P�
TEMPERATURES DO NOT EXCEED 47'C IN THE UNITED
STATES(PALM SPRINGS,CA IS 44.1°C). FOR LESS THAN 9
Issued/Revisions
CURRENT-CARRYING CONDUCTORS IN A ROOF-MOUNTED I
SUNLIT CONDUIT AT LEAST 0.5"ABOVE ROOF AND USING
THE OUTDOOR DESIGN TEMPERATURE OF 47'C OR LESS
(ALL OF UNITED STATES) I
Al AS BUILT 12/8/2021
R1 SYSTEM SIZE DECREASE 8/27/2021
5.)PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS I
SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT I
Pi ISSUED TO TOWNSHIP FOR PERMIT 8172021
CONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE WITH I NO. DESCRIPTION DATE
NEC 690.12(A)THROUGH(D) I
I
6.)PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMITTED I Project Title:
TO OPERATE WITH UNGROUNDED PHOTOVOLTAIC I
SOURCE AND OUTPUT CIRCUIT AS PER NEC 690.41(A)(4) I ANDREA DAPOLITO;JOSEPH
SACCENTE
7.)UNGROUNDED
ENTIF ED WITH DHE FOLLOWING OU ER FINISH:C CIRCUIT CONDUCTORS BE
TRINITY ACCT#:2021-06-593770
POSITIVE CONDUCTORS =RED I
NEGATIVE CONDUCTORS=BLACK
NEC 210.5(C)(2) Project Address:
I
8.)ARRAY AND SUB ARRAY CONDUCTORS SHALL BE#10 PV EXISTING 240V 10 NOTE: I 2025 OAKLAW N AVENUE
WIRE TYPE RHW-2 OR EQUIVELANT AND SHALL BE10 120/240V ["'€ 200A MAIN BREAKER INTERNAL REVENUE GRADE MONITORING I
PROTECTED BY CONDUIT WHERE EXPOSED TO DIRECT UTILITY METER 200A BUSBAR CONTAINED WITHIN SOLAR EDGE INVERTER I SOUTHOLD,NY 11971
SUNLIGHT.SUB ARRAY CONDUIT LONGER THAN 24"SHALL SOLAR EDGE PN.RWND-3D-240-MB I 41.057939,-72.427836
CONTAIN S 20 CURRENT CARYING CONDUCTORS AND
WHERE EXPOSED TO DIRECT SUNLIGHT SHALL CONTAIN<_
9 CURRENT CARRYING CONDUCTORS.
[ Drawing Title:
9.)ALL WIRE LENGTHS SHALL BE LESS THAN 100'UNLESS a<
I
OTHERWISE NOTED
AS BUILT PV SOLAR SYSTEM
10.)FLEXIBLE CONDUIT SHALL NOT BE INSTALLED ON ^ LOCKABLE 60A DISCONNECT
ROOFTOP AND SHALL BE LIMITED TO 12"IF USED FUSED W/60A FUSES INVERTER#1 D
OUTDOORS ^ 240V 1 Drawing Information
11.)OVERCURRENT PROTECTION FOR CONDUCTORS �¢¢eNele __- a + DRAWING DATE: 8/17/2021
IG
CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BE ^ .. I DRAWN G .8/
LOCATED WITHIN 10'OF THE POINT OF CONNECTION NEC ^ I
705.31 e e V ) I REVISED BY: JMS
4jtjL - - - - - - --------------- -UT WHET)TWO SOURCES FEED A ER,PV R,ONE A e e e e e e N � r
UTILITY AND THE OTHER AN INVERTER,PV BACKFEED L �WL
I System Information:
BREAKER(S)SHALL BE LOCATED OPPOSITE FROM UTILITY -------- f I DC SYSTEM SIZE: 11.6kW
NEC 705.12(B)(2)(3)(b) I11------J AC SYSTEM SIZE: 10kW
EXISTING MAIN BREAKER LOAD CENTER SQUARE D I I
13.)ALL SOLAR SYSTEM LOAD CENTERS TO CONTAIN ONLY INSULATED LINE TAPS INSTALLED ON PN:D222NRB L----------- MODULE COUNT: 29
GENERATION CIRCUITS AND NO UNUSED POSITIONS OR MAIN FEEDERS MODULES USED: HANWHA400
LOADS NEC 705.12(A) Q.PEAK DUO BLK ML-G10.a+
( ) MODULE SPEC#: 400
14.)ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE UTILITY COMPANY: PSEGAI
A NEMA 311 RATING
UTILITY ACCT#: 9650107553
UTILITY METER#: 98347889
CALCULATIONS FOR CURRENT CARRYING CONDUCTORS
REQUIRED CONDUCTOR AMPACITY PER STRING
DEAL TYPE: SUNNOVA
[NEC 690.8(8)(1)]:(15.00*1.25)1=18.75A
PV MODULE SPECIFICATIONS
AWG#10,DERATED AMPACITY HANWHA400(Q.PEAK DUO BLK ML-G1C.a+400) Rev.No. Sheet
AMBIENT TEMP:33`C,TEMP DERATING FACTOR:.96
RACEWAY DERATING=4 CCC:0.80 Imp 10.77 NOTE:CONDUIT TYPE SHALL BE CHOSEN BY THE INSTALLATION CONTRACTOR
(40*.96)0.80=30.72A Vmp 37.13 TO MEET OR EXCEED NEC AND LOCAL AHJD REQUIREMENTS `
30.72A'_18.75A,THEREFORE WIRE SIZE IS VALID Voc 45.3 A #6 THWN-2 GEC 70 EXISTING GROUND ROD Al PV VJl
TOTAL AC REQUIRED CONDUCTOR AMPACITY Isc 11.14 B 1"CONDUIT W/2-#6 THWN-2,1-#10 THWN-2,1-#10 THWN-2 GROUND
42.00A*1.25=52.50A
C 1"CONDUIT W/4-#10 THWN-2,1410 THWN-2 GROUND
AWG#6,DERATED AMPACITY INVERTER#1-SE1000OH-USOSHBNC4
AMBIENT TEMP:30'C,TEMP DERATING:1.0 D 1"CONDUIT W/4-#10 THWN-2.1-#10 THWN-2 GROUND • •
RACEWAY DERATING`-3 CCC:N/A DC AC
75A*1.0=75A Imp 27 Pout 10000 E 1"CONDUIT W/2-#6 THWN-2,1-#30 THWN-2,1-#10 THWN-2 GROUND
75A'_52.50A,THEREFORE AC WIRE SIZE IS VALID Vmp 400 Imax 42 F #10 PV WIRE(FREE AIR)W/#6 BARE COPPER BOND TO ARRAY
Voc 480 OCPDmin 52.5
tY
CALCULATION FOR PV OVERCURRENT PROTECTION G 1"CONDUIT w/2-#6 rHwN-2,1-#6 rEIwN-z,1-#8 THwN-z GROUND SOLAR
TOTAL INVERTER CURRENT:42.00A I Isc 30 Vnom 240
42.00A*1.25=52.50A 2211 Allenwood Road S - 83
-->60A OVERCURRENT PROTECTION 15 VALID Wall,New Jersey 07719 www.Trinityty-Solar.colaccom
NEW OAKLAWN AVENUE•INSTALLATION OF
ROOF MOUNTED PV SOLAR SYSTEMf*
2025 OAKLAWN AVENUE * r ,� ✓�z
r �
SO UTH O LD NY 11971 ,
J OA 095675
R�FESS IONP�
Issued/Revisions
.t
11 ISSUED TO TDWNSHIP TOR PERMIT 8/17/2021
VICINITY MAP SITE NO. DESCRIPTION DATE
SCALE: NTS Project Title:
ANDREA DAPOLITO;JOSEPH
SACCENTE
TRINITY ACCT#:2021-06-593770
Project Address:
2025 OAKLAWN AVENUE
SOUTHOLD,NY 11971
41.057939,-72.427836
GENERAL NOTES GENERAL NOTES CONTINUED GENERAL NOTES CONTINUED ABBREVIATIONS CONTINUED SHEET INDEX
Drawing Title:
1. THE INSTALLATION CONTRACTOR IS 8. THE DC VOLTAGE FROM THE PANELS IS 14. B) CURRENT PREVAILING UTILITY JB JUNCTION BOX
PV-1 COVER SHEET W/ SITE INFO & NOTES
RESPONSIBLE FOR INSTALLING ALL ALWAYS PRESENT AT THE OC COMPANY SPECIFICATIONS. kCMIL THOUSAND CIRCULAR MILS
EQUIPMENT AND FOLLOWING ALL DISCONNECT ENCLOSURE AND THE DC STANDARDS,AND REQUIREMENTS kVA KILO-VOLT AMPERE PV-2 ROOF PLAN W/ MODULE LOCATIONS PROPOSED PV SOLAR SYSTEM
DIRECTIONS AND INSTRUCTIONS TERMINALS OF THE INVERTER DURING 15 THIS SET OF PLANS HAVE BEEN kW KILO-WATT
CONTAINED IN THE DRAWING PACKAGE AND DAYLIGHT HOURS.ALL PERSONS PREPARED FOR THE PURPOSE OF kWH KILO-WATT HOUR PV-3 ELECTRICAL 3 LINE DIAGRAM
INFORMATION RECEIVED FROM TRINITY. WORKING ON OR INVOLVED WITH THE MUNICIPAL AND AGENCY REVIEW AND L LINE
MCB MA IN CIRCUIT BREAKER
2. THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM ARE WARNED APPROVAL.ONCE APPROVED,THE MDP MAN DISTRIBUTION PANEL AP APPENDIX DrawingInformation
RESPONSIBLE FOR INSTALLING ALL THAT THE SOLAR MODULES ARE INSTALLATION CONTRACTOR IS MLO MAIN LUG ONLY DRAWING DATE: 8/17/2021
EQUIPMENT AND FOLLOWING ALL ENERGIZED WHENEVER THEY ARE RESPONSIBLE FOR INSTALLING ALL MTD MOUNTED
DIRECTIONS AND INSTRUCTION CONTAINED EXPOSED TO LIGHT. SYSTEM COMPONENTS AS DESCRIBED IN DRAWN BY: IG
MTG MOUNTING
IN THE COMPLETE MANUAL. 9. ALL PORTIONS OF THIS SOLAR THE DRAWING PACKAGE. N NEUTRAL REVISED BY:
3. THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM SHALL BE 16 ALL INFORMATION SHOWN MUST BE NEC NATIONAL ELECTRICAL CODE
RESPONSIBLE FOR READING AND MARKED CLEARLY IN ACCORDANCE WITH CERTIFIED PRIOR TO USE FOR NIC NOT IN CONTRACT
UNDERSTANDING ALL DRAWINGS, THE NATIONAL ELECTRICAL CODE CONSTRUCTION ACTIVITIES. NO# NUMBER System Information:
COMPONENT AND INVERTER MANUALS ARTICLE 690 8 705. NTS NOT TO SCALE DC SYSTEM SIZE: 10.88kW
PRIOR TO INSTALLATION.THE INSTALLATION 10. PRIOR TO THE INSTALLATION OF THIS OCP OVER CURRENT PROTECTION
CONTRACTOR IS ALSO REQUIRED TO HAVE PHOTOVOLTAIC SYSTEM,THE ABBREVIATIONS P POLE AC SYSTEM SIZE: 10kW
ALL COMPONENT SWITCHES IN THE OFF INSTALLATION CONTRACTOR SHALL PB PULL BOX MODULE COUNT: 32
POSITION AND FUSES REMOVED PRIOR TO ATTEND A PRE-INSTALLTION MEETING AMP AMPERE PH 0 PHASE
340
THE INSTALLATION OF ALL FUSE BEARING FOR THE REVIEW OF THE INSTALLATION AC ALTERNATING CURRENT MODULES USED: HANWHA PVC POLY-VINYL CHLORIDE CONDUIT MODULE SPEC p: O.PEAK DUOO
BLK-G6+340
SYSTEM COMPONENTS. PROCEDURES,SCHEDULES,SAFETY AND AL ALUMINUM
PWR POWER
4. ONCE THE PHOTOVOLTAIC MODULES ARE COORDINATION. AF AMP.FRAME UTILITY COMPANY: PSEG-LI
MOUNTED,THE INSTALLATION 11. PRIOR TO THE SYSTEM START UP THE AFF ABOVE FINISHED FLOOR QTY QUANTITY
RGS RIGID GALVANIZED STEEL UTILITY ACCT It: 9650107553
CONTRACTOR SHOULD HAVE A MINIMUM OF INSTALLATION CONTRACTOR SHALL AFG ABOVE FINISHED GRADE.
ONE ELECTRICIAN WHO HAS ATTENDED A ASSIST IN PERFORMING ALL INITIAL AWG AMERICAN WIRE GAUGE SOLID NEUTRAL UTILITY METER#: SUNNO89
JS
SOLAR PHOTOVOLTAIC INSTALLATION HARDWARE CHECKS AND DC WIRING C CONDUIT (GENERIC TERM OF WBD SWITCHBOARD DEAL TYPE: UNNOVA
COURSE ON SITE. CONDUCTIVITY CHECKS. RACEWAY,PROVIDE AS TYP TYPICAL
5. FOR SAFETY,IT O RECOMMENDED THAT 12, FOR THE PROPER MAINTENANCE AND SPECIFIED) WPI UNLESS WEATHERPROOF ISE INDICATED nD �h ,.,�
THE INSTALLATION CREW ALWAYS HAVE A ISOLATION OF THE INVERTERS REFER TO CB COMBINER BOX XFMR TRANSFORMER IrLC�/`vim" V
MINIMUM OF TWO PERSONS WORKING THE ISOLATION PROCEDURES IN THE CKT CIRCUIT +72 MOUNT 72 INCHES TO BOTTOM DD Rev.No. Sheet
TOGETHER AND THAT EACH OF THE OPERATION MANUAL. CT CURRENT TRANSFORMER OF ABOVE FINISHED FLOOR OR
INSTALLATION CREW MEMBERS BE TRAINED 13. THE LOCATION OF PROPOSED ELECTRIC CU COPPER ^ w �` ,
IN FIRST AID AND CPR. AND TELEPHONE UTILITIES ARE SUBJECT DC DIRECT CURRENT GRADE ru 1 V
6. THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO TO FINAL APPROVAL OF THE DISC DISCONNECT SWITCH S E P 1 5 2021
BE INSTALLED FOLLOWING THE APPROPRIATE UTILITY COMPANIES AND DWG DRAWING
CONVENTIONS OF THE NATIONAL OWNERS. EC ELECTRICAL SYSTEM INSTALLER
ELECTRICAL CODE. ANY LOCAL CODE 14. ALL MATERIALS,WORKMANSHIP AND EMT ELECTRICAL METALLIC TUBING
WHICH MAY SUPERSEDE THE NEC SHALL CONSTRUCTION FOR THE SITE FS FUSIBLE SWITCH
GOVERN. IMPROVEMENTS SHOWN HEREIN SHALL FU FUSE BUILDING DEPT.
7. ALL SYSTEM COMPONENTS TO BE BE IN ACCORDANCE WITH: GND GROUND
INSTALLED WITH THIS SYSTEM ARE TO BE A) CURRENT PREVAILING MUNICIPAL GFI GROUND FAULT INTERRUPTER TOWN OF SOUTHOLD
"UL"LISTED.ALL EQUIPMENT WILL BE NEMA AND/OR COUNTY SPECIFICATIONS, HZ FREQUENCY (CYCLES PER
3R OUTDOOR RATED UNLESS INDOORS. STANDARDS AND REQUIREMENTS SECOND) TaSOLAR GENERALNOTES S O L A R
IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN"A',PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAILABLITY OF EQUIPMENT.
2211 Allenwood Road 877-786-7283
Wall,New Jersey 07719 www.Trinity-Solar.com
NOTES:'REFER TO MODULE SPECS FOR MODULE DIMENSIONS
'DEPICTED MODULES MAY BE PORTRAIT OR LANDSCAPE ECOFASTEN CLAMP
NEW PV SOLAR MODULE,TYPICAL 'REFER TO SPEC SHEET FOR DETAILS)
(REFER TO EQUIPMENT SCHEDULE
FOR SPECS AND QUANTITIES) SOLAR MODULE SOLAR MODULE
♦ ♦ NEW MOUNTING FOOT/ATTACHMENT
POINTS,TYPICAL (REFER TO ECOFASTEN"L"FOOT ECOFASTEN RAIL
ENGINEERING LETTER FOR SPACING (REFER TO SPEC SHEET FOR DETAILS) (REFER TO SPEC SHEET FOR DETAILS)
AND DETAILS) D7AL nO F N E
NEW ECOFASTEN RAIL,TYPICAL x — Gu kV
To BE MOUNTED PERPINDICULAR TO EXISTING ASPHALT SHINGLES ECOFASTEN FLASHING —n� Q� \CHAEz
STRUCTURE(REFER TO ECOFASTEN e O
SPECIFICATION/DATA SHEET FOR (REFER TO ENGINEERS LETTER FOR SPECS) (REFER TO SPEC SHEET FOR DETAILS) r G O
DETAILS) JA _J ✓
NEW END CLIP,TYPICAL S.S.LAG BOLT- -APOC SEALANT / SZZ
�♦ _ • (REFER TO ECOFASTEN SPECIFICATION (REFER TO ENGINEERS LETTER FOR SPECS) SOLAR MODULES SHALL NOT I
I DATA SHEET FOR DETAILS) EXCEED PEAK HEIGHT. C�
EXISTING RAFTER �
(REFER TO ENGINEERS LETTER FOR SPECS) 171 L
NEW MID CLIP,TYPICAL U
(REFER TO ECOFASTEN SPECIFICATION
I DATA SHEET FOR DETAILS) 0 G ✓ ,°
ATTACHMENT&CLIP DETAIL PV MODULE ATTACHMENT ON ASPHALT SHINGLE ROOF HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF
SCALE:NOT TO SCAt F SCALE:NOT TO SCALE SCALE:NOT TO SCALECE S I O 4l-
ARRAY SCHEDULE
Issued evisions
BACK
PI ISSUED TO TOWNSHIP FOR PERMIT 8/17/2021
R9 R1O NO. DESCRIPTION DATE
Project Title:
ANDREA DAPOLITO;JOSEPH
LR1 SACCENTE
TRINITY ACCT#:2021-06-593770
DC Project Address:
AcFU1 rm'
3- 2 SOUTTHO D,Y 11971 AVENUE025 OAKLAWN
1'- "CLEAR PATH
41.057939,-72.427836
1`-6"CLEAR PATH � / ��'
R6 Drawing Title:
am
4 a R2 LU
_ -_ PROPOSED PV SOLAR SYSTEM
Q Q
R3 w RrJ 1'-6"CLEAR P DrawingInformation
U U I V-6"CLEAR PAT/ DRAWINGDATE: 18/17/2021
to Zc r
DRAWN BY: IG
m REVISED BY:
ROOF 1 J System Information:
MODULES:32 j R7 R8
PIa
ORIENTATION:54
DC SYSTEM SIZE: 10.88k W
ROOF 2 J AC SYSTEM SIZE: 10kW
MODULES:8
PITCH:26 MODULE COUNT: 32
ORIENTATION:234
O � MODULES USED: HANWHA 340
ROOF DULES:0 4
MODULE SPEC N: Q.PEAK DUO BLK-G6+340
PITCH:39'
ORIENTATION:324' UTILITY COMPANY: PSEG-U
UTILITY ACCT IJ: 9650107553
ROOF 4 UTILITY METER#: 98347889
MODULES:5 NOTES:
PITCH:25 DEALTYPE: SUNNOVA
ORIENTATION:235 1.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE F RONT
ROOF 5 WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
MODULES:4 2.) ARRAY BONDING TO COMPLY WITH MANUFACTURER SPECIFICATION.
PITCH:39 3.) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION
ORIENTATION:144 4.) AN AC DISCONNECT SHALL BE GROUPED WITH INVERTER(S) NEC 690.13(E) Rev No. Sheet
ROOF 6 5.) ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING.
MODULES:3 6.) ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY SHALL NOT EXTEND BEYOND THE EXISTING ROOF EDGE.
PITCH:25 _
ORIENTATION:55 PV 2
SYMBOL LEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE
ROOF7
MODULES:0 QTY SPEC#
ORIEN ATION:324° ( INDICATES ROOF DESIGNATION.REFER TO INDICATES NEW UNFUSED PV DISCONNECT TO BE SP INDICATES NEW PV ONLY SUBPANEL
ARRAY SCHEDULE FOR MORE INFORMATION U� INSTALLED OUTSIDE (UTILITY ACCESSIBLE) TO BE INSTALLED 32 HANWHA 340(Q.PEAK DUO BU(-G6+340)
ROOF8
MODULES:0INDICATES NEW PV SOLAR MODULE.RED MODULES 1 SE10000H-US0OOBNC4
PITCH:39'
ORIENTATION:144° INDICATES EXISTING METER LOCATION INDICATE PANELS THAT USE MICRO INVERTERS. DC INDICATES NEW DC DISCONNECT
ROOF9 — - IREFER TOEQUIPMENT SCHEDULE FOR SPECS. - OTHER OBSTRUCTIONS
MODULES:0 Tr
PITCH:40'AT INDICATES LOCATION:INSIDE GELECTRICAL PANEL INDICATES( p I INSTALLED OUTS DEODUCTION METER TO BE SD SOLAR
`
ORIENTATION:324° EP 11 " 11 INDICATES EXISTING SERVICE DISCONNECT J O L A 4R
ROOF10 __ -----
MODULES:0 INDICATES NEW INVERTER TO BE
PITCH:40' INDICATES NEW FUSED PV DISCONNECT TO BE ® 2211 Allenwood Road 877-786-7283
ORIENTATION:144° ED INSTALLED OUTSIDE(UTILITY ACCESSIBLE INSTALLED OUTSIDE. TS INDICATES EXISTING TRANSFER SWITCH
A REFER TO EQUIPMENT SCHEDULE FOR SPECS Wall,New Jersey 07719 www.Trinity-Solar.com
Engineer/License Holder:
ARRAY CIRCUIT WIRING NOTES
1. LICENSED ELECTRICIAN ASSUMES ALL RESPONSIBILITY
FOR DETERMINING ONSITE CONDITIONS AND
EXECUTING INSTALLATION IN ACCORDANCE WITH
SOLAR MODULES MOUNTED TO ROOF ON 5 ARRAYS C tE1
NEC 2017 32-340W MODULES W/1 SOLAR EDGE P401 PER MODULE
2.)LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON 15 ADC MAX PER STRING Al \CHAE(6 j00
ASHRAE MINIMUM MEAN EXTREME DRY BULB 8"x8" --------------------------- ----------
2 STRINGS OF 16 MODULES IN SERIES-400 Vmax --- JUNCTION 01/
TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO --- --'---------------- 1
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT F BOX I * A G
TEMP=-16°C I Z
*2 STRINGS TO BE TERMINATED IN PARALLEL INSIDE INVERTER 1 I _r
3.)HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED [ (7 w
ON ASHRAE HIGHEST MONTH 2%DRY BULB I T't 4a
TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO [ Z Z
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMP= I
33°C �9675 ��C9
4.)2005 ASHRAE FUNDAMENTALS 2%DESIGN
TEMPERATURES DO NOT EXCEED 47°C IN THE UNITED I FfSSIOTA
STATES(PALM SPRINGS,CA IS 44.1°C). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN A ROOF-MOUNTED. Issued/Revisions
SUNLIT CONDUIT AT LEAST 0.5"ABOVE ROOF AND USING
THE OUTDOOR DESIGN TEMPERATURE OF 47°C OR LESS
(ALL OF UNITED STATES)
I
5.)PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS
SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT
ISSUED 8/17/2021CONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE WITH I
NEC 690.12(A)THROUGH(D) NO. DESCRIPTION DATE
6.)PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMITTED
I Project Title:
TO OPERATE WITH UNGROUNDED PHOTOVOLTAIC
SOURCE AND OUTPUT CIRCUIT AS PER NEC 690.41(A)(4) I ANDREA DAPOLITO;JOSEPH
7.)UNGROUNDED DC CIRCUIT CONDUCTORS SHALL BE I SACCENTE
IDENTIFIED WITH THE FOLLOWING OUTER FINISH: TRINITY ACCT#:2021-06-593770
POSITIVE CONDUCTORS =RED
NEGATIVE CONDUCTORS=BLACK
NEC230.5(C)(2) Project Address:
8.)ARRAY AND SUB ARRAY CONDUCTORS SHALL BE#10 PV EXISTING 240V 10 NOTE' I
WIRE TYPE RHW-2 OR EQUIVELANT AND SHALL BE 10 120/240V INTERNAL REVENUE GRADE MONITORING I 2025 OAKLAW N AVENUE
PROTECTED BY CONDUIT WHERE EXPOSED TO DIRECT UTILITY METER 200A MAIN BREAKER CONTAINED WITHIN SOLAR EDGE INVERTER I SOUTHOLD, NY 11971
SUNLIGHT.SUB ARRAY CONDUIT LONGER THAN 24"SHALL 200A BUSBAR SOLAR EDGE PN.RWND-3D-240-MB I 41.057939,-72.427836
CONTAIN15 20 CURRENT CARYING CONDUCTORS AND I
WHERE EXPOSED TO DIRECT SUNLIGHT SHALL
I
CONTAIN<_9 CURRENT CARRYING CONDUCTORS.
Drawing Title:
9.)ALL WIRE LENGTHS SHALL BE LESS THAN 100'UNLESS ^F I
OTHERWISE NOTED I
PROPOSED PV SOLAR SYSTEM
10.)FLEXIBLE CONDUIT SHALL NOT BE INSTALLED ON LOCKABLE 60A DISCONNECT
ROOFTOP AND SHALL BE LIMITED TO 12"IF USED FUSED W/60A FUSES
OUTDOORS 240V 1 INVERTER
Drawin Information
11.)OVERCURRENT PROTECTION FOR CONDUCTORS ¢CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BE DRAWING DATE: 8/17/2021
LOCATED WITHIN 10'OF THE POINT OF CONNECTION NECK_ DRAWN BY: IG
705.31 .... _-- . �� REVISED BY:
12.)WHERE TWO SOURCES FEED A BUSSBAR,ONE A 0- ;0 UTILITY AND THE OTHER AN INVERTER,PV BACKFEED Ll L2 Ne e r` S stem Information:
BREAKER(S)SHALLBELOCATEDOPPOSITEFROMUTILITYeeeeem - - - - - - - --------------- -�----- -----J IDC SYSTEM SIZE: 10.88kW
NEC 705.12(8)(2)(3)(b)
EXISTING MAIN BREAKER LOAD CENTER SQUARED - �----_ _ AC SYSTEM SIZE: lOkW
13.)ALL SOLAR SYSTEM LOAD CENTERS TO CONTAIN ONLY INSULATED LINE TAPS INSTALLED ON PN:D222NRB -----_-
--J MODULE COUNT: 32
GENERATION CIRCUITS AND NO UNUSED POSITIONS OR MAIN FEEDERS
NEC 705.12(A) MODULES HANWHA
340
LOADS
MODULE SPEC#: Q.PEAK DUO BLK-G6+340
14.)ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE UTILITY COMPANY: PSEG-LI
A NEMA 3111 RATING
UTILITY ACCs#: 9650107553
CALCULATIONS FOR CURRENT CARRYING CONDUCTORS UTILITY METER#: 98347889
REQUIRED CONDUCTOR AMPACITY PER STRING DEAL TYPE: SUNNOVA
[NEC 690.8(6)(1)]:(15.00'1.25)1=18.75A
PV MODULE SPECIFICATIONS
AWG#10,DERATED AMPACITY HANWHA 340(Q.PEAK DUO BLK-G6+340)
AMBIENT TEMP:33°C,TEMP DERATING FACTOR:.96 Rev. NO. Sheet
RACEWAY DERATING=4 CCC:0.80 Imp 10.2 NOTE:CONDUIT TYPE SHALL BE CHOSEN BY THE INSTALLATION CONTRACTOR
(40°.96)0.80=30.72A - Vmp 33.94 TO MEET OR EXCEED NEC AND LOCAL AHJD REQUIREMENTS
30.72A'-18.75A,THEREFORE WIRE SIZE 15 VALID Voc 40.66 A #6 THWN-2 GEC TO EXISTING GROUND ROD P1 PV 3
TOTAL AC REQUIRED CONDUCTOR AMPACITY Isc 10.52 B 1"CONDUIT W/246 THWN-2,1410 THWN-2,1410 THWN-2 GROUND
42.00A'1.25=52.50A
C 1"CONDUIT W/4-#10 THWN-2,1410 THWN-2 GROUND
AWG#6,DERATED AMPACITY INVERTER#1-SE10000H-USOOOBNC4
AMBIENT TEMP:30°C,TEMP DERATING:1.0 DC AC D 1"CONDUIT W/4-#lOTHWN-2,1-#10 THWN-2 GROUND Tri •
RACEWAY DERATING`_3 CCC:N/A
75A'1.0=75A mp 27 Pout 10000 E 1"CONDUIT W/2-#6 THWN-2,1-#10THWN-2,1-#10THWN-2 GROUND
75A'-52.50A,THEREFORE AC WIRE SIZE IS VALID Vmp 400 Imax 42 -4
Voc 4AC OCPDmin 52.5 F #10 PV WIRE(FREE AIR)W/#6 BARE COPPER BOND TO ARRAY C
CALCULATION FOR PV OVERCURRENT PROTECTION SOLAR
TOTAL INVERTER CURRENT:42.00A Isc 30 Vnom 240 G 1"CONDUIT W/2-t/6 THWN-2.1-#6 THWN-2,1-#6 THWN-2 GROUND
42.00A"1.25=52.5OA 2211 Allenwood Road 877-786-7283