Loading...
HomeMy WebLinkAboutWickhams's Fruit Farm, LLC James F.King,President O��QF SOUly�l Town Hall Annex Bob Ghosio,Jr.,Vice-President 54375 Main Road O P.O.Box 1179 Dave Bergen Southold,New York 11971-0959 John Bredemeyer G • Q Telephone(631) 765-1892 Michael J.Domino �` Fax(631) 765-6641 OUNT`I,�� BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD September 4, 2013 Thomas Wickham PO Box 928 Cutchogue, NY 11935 RE: WICKHAM'S FRUIT FARM, LLC SCTM#: 102-6-20.2, 110-8-32.4, 110-1-1.3, 1.4&1.5 Dear Mr. Wickham: As per your request, the Administrative Permit Application received on May 31, 2013 for the above referenced properties has been withdrawn. Enclosed is Wickham's Fruit Farm, LLC check#15931 in the amount of$100.00. Thank you. Very Truly Yours, James F. King, President Board of Trustees JFK/eac Enclosure James F King, President �fV SO(/Ty Town Hall Annex Bob Ghosio, Jr, Vice President ,�0� Ol0 54375 Main Road P.O Box 1179 Dave Bergen Southold, New York 11971-0959 John Bredemeyer ® p� Telephone (631) 765-1892 Michael J. Domino '� O Fax (631) 765-6641 00110 BOARD OF TOWN TRUSTEE'S TOWN OF SOUTHOLD Office Use Only _Coastal Erosion Permit Application r Wetland Permit Application _fl Administrative Permit V _Amendment/Transfer/Extension MAY- 3 '1,-'2013 _Received Application: J 3 Received Fee$_J0o _Completed Application ) 3 Southold Town Incomplete____ _ Board Trustees _SEQRA Classification. Type I Type 11 -Unlisted / —Coordination-(date sent) �( LWRP Consistency Assessment Form j 3 FXV ____CAC Referral Sent Date of Inspection %� lJ - �/ C( _ Receipt of CAC RepoFt_ �� Y Lead Agency Determination /� --.Technical Review C-I�i# 1�oj31 ' eAl-11-fl _ Public, I-Icarmg Held Resolution 1 Name of Applicant [� Z 'k L-I'S 0 �`ti�� F,?, L LC- Mailing -CMailing Address 1 Phone Number:( ) 3 / 3 - S Cell: S-8oZ3S_ Suffolk County Tax Map Number- 1000 - L?2- 6 �. Z - I - �J �!� - - 3 2, Property Location. ( )e s 5 'a L ' 4 �) c- Ct k CC_c'q fV'SL- Oe51 CCW I 41J'�_- 1 (provide LILCO Pole#, distance to cross streets, and location) _ III AG�P�'1 C7c,�c1. I os f��z e_k (If applicable) Address: Y • `9. 2 b� I 3 S Phone: I and of Trustees Applicati GENERAL DATA Land Area (in square feet): Vy 00 O00 S q 000 ,X Area Zoning: Previous use of property: Fa-yVH1-,tq ec Intended use of property: Fit Covenants and Restrictions on property? Yes No If"Yes", please provide a copy. es, oP -4 rt 4 sono �4 ��I � Y Will this project require a Building Permit as per Town Code? Yes �/No If"Yes", be advised this application will be reviewed by the Building Dept. prior to a Board of Trustee review and Elevation Plans will be required. Does this project require a variance from the Zoning Board of Appeals? Yes No If"Yes", please provide copy of decision. Will this project require any demolition as per Town Code or as determined by the Building Dept.? Yes l/' No 0 �r Does the structure (s) on property�ve a valid Certificate of Occupancy? Yes No Prior permits/approvals for site improvements: Agency Date Je YCC4,, Vzl`-i I l No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency? VNo Yes If yes, provide explanation: Project Description (use attachments if necessary): Maintenance of full length (approx 4,000 ft) of earthen dike protecting the W side of Wickham Creek from farm runoff and protecting Wickham's Fruit Farm from salt-water flooding, namely: (1) Removal of those trees posing a hazard to the integrity of the dike due to their position on top of the dike (exact number to be determined, ); (2) Filling low spots to a common elevation; (3) Widening the cross-section at eroded locations; (4) Maintaining a wm;t -maintenance path along the top of the dike; and (5) filling muskrat holes. B d of Trustees Application WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations: V W- 4_, .+'q 000P('k ` 4laL ied lei'k Cee- N1 ,VV°cL, o\, f- I('v�ect V'tVil-- ". tax -tA-e � � Ute( s ►��/I Area of wetlands on lot: square feet S ou Percent coverage of lot: < 120 % di Closest distance between neistiat and upland edge of wetlands: Closest distance between arest proposed structure and upland edge of wetlands: feet Does the project involve �filling? No V Yes If yes, how much material will be excavated? cubic yards How much material will be filled? Gt' 2 0o cubic yards Depth of which material will be,-emove deposited: —3 feet (\JaAi Proposed slope throughout the afea Manner in which material will be Femev-ad- deposited: ©�d'e� ram Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attachments if appropriate): i fv- 4z e4�C S ' PROJECT ID NUMBER SEAR APPPENDIENDI X C STATE ENVIRONMENTAL QUALITY REVIEW SHORT ENVIRONMENTAL ASSESSMENT FORM for UNLISTED ACTIONS Only PART 1 -PROJECT INFORMATION (To be completed by Applicant or Project Sponsor) 1 APPLICANT/SPONSOR 2.PROJECT NAME 0L, LL s PVs" 3 PROJECT LOCATION/+� Municipality 5 d C/ T_071/11 County ti dl 4 PRECISE LOCATION- Street Addess an'd(1 Road Intersecbons• Prominent landmarks etc -or provide map Q I e,-_ ,�� l rC%CJ s �°f V � � L'r�l V 2 ✓- i�C °f Q,Ire 5 IS PROPOSED ACTION: ❑ New ❑Expansiondification/alteration 6 DESCRIBE PROJECT BRIEFLY: Maintenance of full length (approx 4,000 ft) of earthen dike protecting the W side of Wickham Creek from farm runoff and protecting Wickham's Fruit Farm from salt-water flooding, namely: (1) Removal of those trees posing a hazard to the integrity of the dike due to their position on top of the dike (exact number to be determined, (2) Filling low spots to i a common elevation; (3) Widening the cross-section at eroded locations; (4) Maintaining a -5=f# maintenance path along the top of the dike; and (5) filling muskrat holes. 7 AMOUNT OF LAND AFFECT D p (pX ��� poo f '/ � �l C�OO1 Initially Z Z acres 21 Ultimately 2 , 3 acres 2f5 8 WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER RESTRICTIONS' Yes ❑ No If no,describe briefly 9 WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT? (Choose as many as apply) ❑Residential ❑Industrial ❑Commercialgnculture ❑Park/Forest/Open Space ❑Other (describe) 10 'DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (Federal, State or Local) (—t,�s ❑No If yes, list agency name and permit / approval t_ OhT—WE—T—=RENTCY 0—ACfCiPERMIT OR APPROVAL ElYes [ If yes, list agency name and permit / approval 12 AS A RESULT OF P OPOSED ACTION WILL EXISTING PERMIT/ APPROVAL REQUIRE MODIFICATION? ❑Yes ❑1 1 CERTI THAT THE INFORMATION , PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE Applicant I Spons Name Iti,-z s. � C r,(�. ( Date Signature If the�ction is a Costal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding with this assessment PART II - IMPACT ASSESSMENT Ti ._ .'com leted by Lead Agency) , A DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR,PART 617.4? If yes,coordinate the review process and use the FULL EAF. Yes ❑✓ No B WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR,PART 617.6? If No,a negative declaration may be superseded by another involved agency. ❑Yes 0✓ No C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED WITH THE FOLLOWING:(Answers may be handwritten,if legible) C1. Existing air quality,surface or groundwater quality or quantity,noise levels,existing traffic pattern,solid waste production or disposal, potential for erosion,drainage or flooding problems? Explain briefly C2. Aesthetic,agricultural,archaeological,historic,or other natural or cultural resources;or community or neighborhood character?Explain briefly: C3. Vegetation or fauna,fish,shellfish or wildlife species,significant habitats,or threatened or endangered species?Explain briefly: C4. A community's existing plans or goals as officially adopted,or a change in use or intensity of use of land or other natural resources?Explain briefly: C5. Growth,subsequent development,or related activities likely to be induced by the proposed action?Explain briefly: C6. Long term,short term,cumulative,or other effects not identified in C1-05? Explain briefly C7. Other impacts(including changes in use of either quantity or type of energy)? Explain briefly- D. rieflyD. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAL ENVIRONMENTAL AREA(CEA)? E] Yes ❑✓ No If Yes,explain briefly- E. rieflyE. IS THERE,OR IS THERE LIKELY TO BE,CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS? Yes 0✓ No If Yes,explain briefly: PART III-DETERMINATION OF SIGNIFICANCE(To be completed by Agency) INSTRUCTIONS: For each adverse effect identified above,determine whether it is substantial,large,important or otherwise significant. Each effect should be assessed in connection with its(a)setting(i.e. urban or rural); (b)probability of occurring; (c)duration; (d) irreversibility; (e) geographic scope; and (f) magnitude. If necessary, add attachments or reference supporting materials. Ensure that explanations contain sufficient detail to show that all relevant adverse impacts have been identified and adequately addressed. If question D of Part 11 was checked yes,the determination of significance must evaluate the potential impact of the proposed action on the environmental characteristics of the CEA. Check this box if you have identified one or more potentially large or significant adverse impacts which MAY occur. Then proceed directly to the FULL EAF and/or prepare a positive declaration. Check this box if you have determined,based on the information and analysis above and any supporting documentation,that the proposed action WI LL NOT result in any significant adverse environmental impacts AND provide,on attachments as necessary,the reasons supporting this determination Board of Trustees Name of Lead Agency Date President Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer Signature of Responsible Officer in Lead Agency Signature of Preparer(If different from responsible officer) msesi h a � > Board of Trustees Application Counly of Suffolk State of New York BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF G NTED. IN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE THE TR EES, THEIR AGENT(S) OR REPRESENTATIVES(S)JO ENTER ONTO MY OPERTY TO INSPECT THE PRE?MISES IN CONJUNCTION WITH REVIEW F THIS PLIC N. Signature of Property Owner SWORN TO BEFORE ME THIS 30 --DAY OF All Notary Public CONNIE C.BUNCH Notary Public,State of New York No.01 BU6185050 Qualified in Suffolk County Commission Expires April 14,2�� f w4 APPLICANT/AGENT/REPRESENTATIVE TRANSACTIONAL DISCLOSURE FORM The Town of Southold's Code of Ethics prohibits conflicts of interest on the part of town officers and employees.The pumose_of this form is to provide information which can alert the town of possible conflicts of interest and allow it to take whatever action is necessary to avoid same. YOUR NAME: (Last name,first name,middle initial,unless you are applying in the name of someone else or other entity,such as a company.If so,indicate the other person's or company's name.) NAME OF APPLICATION: (Check all that apply.) Tax grievance Building Variance Trustee 1/ Change of Zone Coastal Erosion Approval of plat Mooring Exemption from plat or official map Planning Other (If"Other',name the activity.) ' Do you personally(or through your company,spouse,sibling,parent,or child)have a relationship with any officer or employee of the Town of Southold? "Relationship"includes by blood,marriage,or business interest."Business interest"means a business, including a partnership,in which the town officer or employee has even a partial ownership of(or employment by)a corporation in which the town officer or employee owns more than 5%of the shares YES NO If you answered"YES",complete the balance of this form and date and sign where indicated Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicant/agent/representative)and the town officer or employee.Either check the appropriate line A)through D)and/or describe in the space provided The town officer or employee or his or her spouse,sibling, parent,or child is(check all that apply) A)the owner of greater than 5%of the shares of the corporate stock of the applicant (when the applicant is a corporation); B)the legal or beneficial owner of any interest in a non-corporate entity(when the applicant is not a corporation); C)an officer,director,partner,or employee of the applicant;or D)the actual applicant. DESCRIPTION OF RELATIONSHIP Submitted thi S �day -00'�J� Signature Print Name TtV> 0 rc K(-64 Form TS l 1i a9S11�4- Town of Southold ��t� Erosion, Sedimentation & Storm-Water Run-off ASSESSMENT FORM 0.J J PROPERTY LOCATION. S C T M N THE FOLLOWING ACTIONS MAY REQUIRE THE SUBMISSION OF A 0/ yid STORM-WATER GRADING DRAINAGE AND EROSION CONTROL PLAN -B 6 cT sacffon oc —Co—t— CERTIFIED BY A DESIGN PROFESSIONAL IN THE STATE OF NEW YORK. SCOPE OF WORK - PROPOSED CONSTRUCTION ITEM # / WORK ASSESSA Xr Yes No a. What Is the Total Area of the Project Parcels? ( 1 WIII this Project Retain All Storm-Water Run-Off Include rolBl Area of all Parcels located within � the Scope of Work for Proposed Construction) ` Generated by a Two( Inch Rainfall on Sites all / ❑ (s F r Acres) (This Item will include all run-off created by site V b. What Is the Total Area of Land Clearing clearing and/or construction activities as well as all and/or Ground Disturbance for the proposed 00, Site Improvements and the permanent creation of construction activity? IS F 1 Acres impervious surfaces) 2 Does the Situ Plan and/or Survey Show All Proposed PROVIDE IIRIGF I'ROJL'Cr DESCRIPTION (PmvldeAddlUanalPages esNeeded) Drainage Structures Indicating Size 8 Location?This Item shall Include all Proposed Grade Changes and Maintenance o1 full length (approx 4,000 11) o1 Slopes Controlling Surface Water Flow earthen dike protecting (he W Side of Wickham 3 Does the Site Plan and/or Survey describe the erosion Creek l roil farm runoff and protecting Wickham's and sediment control practices that will be used to control site erosion and storm water discharges This Fruit 1"aria train salt-water flooding, namely: item must be maintained throughout the Entire (1) Removal of those trees posing a hazard to the Construction Period integrity or the dike Clue to their position oil top of 4 Will this Project Require any Land Filling,Grading or Excavation where there Is a change to the Natural — tlle dike (exact nUrnber to be determined, but Existing Grade Involving more than 200 Cubic Yards approx 30 trees), (2) i-ailling low spots to a Common of Material within any Parcel? eleval iltn; (:3) Widening the cross-section at eroded 5 Will this Application Require Land DlSturbing Activities — Encompassing an Area In Excess of Five Thousand F locations; (4) Maintaining a 5 It wide maintenance (5,000 S F )Square Feel of Ground Suria(.e'1 (filth along, the lop of the dike, ind (S) filling ,6 Is there a Natural Water Course Hunnmg through the Uskl"at holes. slle9 Is this Project within the 1 nlsteuS junsdlcuorn General OrC SWPPP Roguireme Its, or within One Hundred(100')[eel of,+Welland or — Subrmmuun of a SWPPP is required for all Construction activities involving soil Beach dislurbanu,,of one(1)or rnore arses, including disturbances of less than one acre that 7 Will there be Site preparation on Fxlsting Gracie Slopes aro pail of a turgor unnnuni calm+that will ultimately disturb one or more acres attend, which Exceed Fifteen(15)feel of V(:rbcat Rise to Including Lin:+tnrcllnn arllvllloa Involving sell disturbances of loss than one(1)acre where One Hundred(100')of Horizontal Distance? FZ] the DEC lin%determined that a SPDES permit Is required for storm water discharges (SWPPP's Shall meet the Minimum Requirements of the SPDES General Permit 8 WIII Driveways,Parking Areas or other Impervious ❑ �n for Storm Water Discharges from Construction activity-Permit No.GP-040-001.) Surfaces be Sloped to Direct Storm-Waler Run-Off 1 Iho SWI'I'P shrill bo propared prlor to Iho submlltal of Iho NOI The NUI shell be into and/or in the direction of a Town right-of-way submitted to the Depndmonl prior to the commencement of construction activity 2 The swl,pr,%hall mesrdbn the erosion and sediment control practices and where 9 WIII this Project Require the Placement of Material. Elroquirud,puul conulruclron storm water management practices that will be used and/or Removal of Vegetation and/or the Construction of any conslnu.led to reduce the pollutants In storm water discharges and to assure Item Within the Town Right-of-Way or Road Shoulder ComplWnnu with the terms and conditions of this permit In addltlon,the SWPPP shall Area?(This Item will NOT Include the Installation of Driveway Aprons) identify potuollul snurcos of pollution which may reasonably be expected to affect the qu011ty ei alam+writer(liscllargas NOTE- If Any Answer to Questions One through Nina is Answered with a Check Mark 3 All 3WPI11'r.1h of require the post-eonstructlon storm water management practice in a Box and the construction site disturbance is between 5,000 S F 81 Acre In area, component ihalf be prepared by a qualified Design Professional Licensed In New York a Stone-Water,Grading,Drainage&Erosion Control Plan Is Required by the Town of that Is knowledgeable In lire principles and practices at Storm Water Management Southold and Must be Submitted for Review Prior to issuance of Any Building Permit. (NOTE A Check Mark(4)and/or Answer for each Question is Required for a Complete Application) S'1'A'I'h;OF NEW YORK, Notary Public,State of herr Fork COI iNI'Y 01 SS No.01BU6185063 �—,/ / �1C�,L/� QuailFied in Sufi `t;' 1d �e�a� 9 (, (�/ ,,yy Suffolk l'ial 11..........�.. .......�1...................... ............t.(.4T:..1....being duly sworn,deposes:uul ¢JTi1 4�1q 1r Elf s iPi aitt l r 'enrut, (Name of Individual signing Document) And that he/she is the ....................................... ..................................... .........'r,' .............................................. ...... .................".... . .. .............. . (Owner Contractor,Agent,Corporate Officer,etc) Own(-r;Intl/oi repiesenlallve of the Owner or Owners,and is duly authorized to perform or r e petlol-med fit(-said work mid to make and file this application;that all statements contained In this application are true to the est of heti lunowledge id belief,aild that the work will be perfolmed,in the manner set follti in the application filed herewith Swill n to [)clout' etc dw, ��l �°1 .. .. ........ (1.1y of .... � 1 . ....(v... .�. .".. ,203 Nolaiy Public .. .... . . �' '.1..... ........ (Signature of Appl,can .• ." FORM - 06110 Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS 1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as to its significant beneficial and adverse effects upon the coastal area(which includes all of Southold Town. 3. If any question in Section C on this form is answered "yes" or "no", then the proposed action will affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, each answer must be explained in detail, listinIz both supporting and non- supporting facts. If an action cannot be certified as consistent with the LWRP policy standards and conditions,it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold 's website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# 1v2 - - Z o, 2- PROJECT NAME PROJECTNAME The Application has been submitted to (check appropriate response): Town Board ❑ Planning Board❑ Building Dept. ❑ Board of Trustees LJ 1. Category of Town of Southold agency action (check appropriate response): (a) Action undertaken directly by Town agency(e.g. capital ❑ construction,planning activity, agency regulation, land transaction) ❑ (b) Financial assistance(e.g. grant, loan, subsidy) (c) Permit, approval, license,certification: Nature and extent of action: Maintenance of full length (approx 4,000 ft) of earthen dike protecting the W side of Wickham Creek from farm runoff and protecting Wickham's Fruit Farm from salt-water flooding, namely: (1) Removal of those trees posing a hazard to the integrity of the dike due to their position on top of the dike (exact number to be determined, rees); (2) Filling low spots to- a common elevation; (3) Widening the cross-section at eroded locations; (4) Maintaining a voielip maintenance path along the top of the dike; and (5) filling muskrat holes. Ne S _� Location of action: qPe-uee,a Site acreage: /lephro Ic ��o S 2S x �- o 0- --,Present land use: O lrti���l ��� � ��`-�'�.1 '��� 14 Present zoning classification: 2. If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: 01 o S f-�; �a� L.L L (b) Mailing address: Y leo C t-� 3 (c) Telephone number: Area Code ( ) �2 3 ( 7 31 - (d) Application number, i:d;ertaken, �'� �` e-Y a`c �C i vec 6 V►� o'er e(y p w v-4 Will the action be directly require funding, or ap roval y a state or federal agency? Yes �NoFl If yes, whichto or federal agency? N'f 5 LC C. Evaluate the project to the following po icies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form be returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location,, and minimizes adverse effects of development. See LWRP Section III—Policies; Page 2 for evaluation criteria. Yes No ❑ Not Applicable �s i eL-4 G k se- -O C 6"941 S y (D a.. a Jwt s Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWR�P Section III—Policies Pages 3 through 6 for evaluation criteria I"1 Yes ❑ No ❑ Not Applicable Attach additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III—Policies Pages 6 through 7 for evaluation criteria RYes ❑ No ❑ Not Applicable cC CA-10 C.1)` a V d Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and gatural resources from flooding and erosion. See LWRP Section III—Policies Pages 8 through 16 for evaluation criteria ID-Yes ❑ No ❑ Not Applicable � (,9 s i •tit I` ' � CRS � oC .�L1c0}c, 4 CQ Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III —Policies Pages 16 through 21 for evaluation criteria RKYes ❑ No ❑Not Applicable y L .T i o e L I ti �1-1 0 on ` � c W2 �rTl �o t` ov Attach addition heets if ne essary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III—Policies; Pages 22 through 32 for evaluation criteria. Yes No Not Applicable V_e_ Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. -See LWRP Section III — Policies Pages 32 through 34 for evaluation criteria. ❑ Yes ❑ No 0j-'Not Applicable Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III —Policies; Pages 34 through 38 for evaluation criteria. ❑ Yes ❑ No Not Applicable PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III—Policies; Pages 38 through 46 for evaluation criteria. �Ye,0 No❑ Not Applicable VW r(-ZN I?- r U O � L c LS a w n 0- c L Attach additional sheets if necessary WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III—Policies; Pages 47 through 56 for evaluation criteria. i Yes ❑ No ❑ Not Applicable Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III—Policies; Pages 57 through 62 for evaluation criteria. I u Yes ❑ No ❑ Not Applicable i j Attach additional sheets if necessary i I Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III — Policies; Pages 62 through 65 for evaluation criteria. L-1 Yes ❑ No El Applicable DO i i I Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III—Policies; Pages 65 through 68 for evaluation criteria. ❑ Yes ❑ No UNot Applicable It y ,� ►wceppl u v� Vit i Ut 2S 1 jje/ e -2 i I PREPARED BY "S, L,J C—I� l� TITLE 011� /` DATE 3 WICK AM'S FRUIT FARM P.O. Box 928, Rte. 25, Cutchogue, L.I., N.Y. 11935 Tel. (631) 734-6441, 5454 www.wickhamsfruitfarm.com D E d V E To: Southold Town Trustees MAY 3 1 2013 From: Thomas Wickham Southold Town r Tu e Date: May 30 2013 Re.: Application for maintenance permit for our dikes Attached is my application for a ten-year maintenance permit and permit to restore the dike on Wickham Creek to pre Superstorm Sandy condition. I am pleased to note that the Town of Southold has contracted with USDAs Natural Resource Conservation Service(NRCS) and NYS Dept of Agriculture and Markets for funding to carry out this work. The funding is now in place and today Town-contracted engineers began surveying the dike and surrounding areas to draw up the final specifications for the project. In addition to my farm, I believe there are four more farms covered under this project, including Salt Air Farm also in Cutchogue and three more in East Marion and Orient. The Town and I expect to sign a ten year maintenance easement as part of this project, for which I believe I will need a Trustee permit. For more information on this project you may contact the Town Engineer and the engineer contracted to draw up the specs Chris Dwyer of Maclean Assoc. Please let me know if you need additional information or if the Board would like to meet with me about the work proposed for my farm. �_ AFL C , i 4p v 0 . 21 41 eLe I . r�os� A� d�.- ��� f e u � i S e►�o�P� 6�.� �� �s 43 S t.;, o C4;-,5 a e .. • � � rte' `i (I�- �2 ` I`��/ 6� . Olt V 6bI v- l4)� ��4 �� MAY 31 2013 Southold SO r �� Board of RusigaL IN 2,' --=. ._ � � {fes c�,-Z�� � ` r _. -_`�'��• a,� -��"�;�:.� �- -- --- _.._ f »� I � f 91 I i f teLf l i d i ��� I I ► li i ----- I i c —i—^ -71 i row( 'I Q j .�'' tt ��•� Vis.. � �;�3 3� t - , • -�� c{ _•� " -•�- -''' d" .�. Mai fif,•,. �ia.,� • `�., �� k;"-R " �- •yam;' ..��'yi4 - ��`��'; _ +"r�, �,< • ~ � M� salt. r ,�.` . - � �' � _ ''•>. �' _ � .. . 'Al 1.6 406 r , a ickham Farmland, LLC Route 25, Cutchogue; New Suffolk Road, utchogue;4787 New Suffolk Road, New Suffolk CTM# 102-6-20.2, 110-1-1.3, 1.4& 1.5, 110-8- 2.4 Milk Y f fib.. "d suFFoc,� James F King,President s°� �pG P.O.Box 1179 Bob Ghosio,Jr,Vice-President S Southold,NY 11971 Dave Bergen y Telephone(631 765-1892 John Bredemeyer ,+, FA(631)765-6641 Michael J Domino Southold Town Board of Trustees Field InspectionMlork Session Report Date/Time: WICKHAM FAMRLAND, LLC requests an Administrative Permit for the maintenance of full length (4,000ft.), of earthen dike protecting the west side of Wickham Creek from farm runoff and protecting Wickham's Fruit Farm from salt- water flooding; maintenance to include: removal of those trees posing a hazard to the integrity of the dike due to their position on top of the dike; filling low spots to a common elevation; widening the cross-section at eroded locations; maintaining a maintenance path along top of the dike; and filling muskrat holes. Located: Route 25, Cutchogue; New Suffolk Road, Cutchogue; & 4787 New Suffolk Road, New Suffolk. SCTM#'s 102-6-20.2, 110-1-1.3, 1.4&1.5, & 110-8- 32.4 Type of area to be impacted. Itwater Wetland Freshwater Wetland Sound Bay Distance of proposed work to edge of wetland Part of Town Code proposed work falls under: _Chapt.275 Chapt. 111 other Type of Application: Wetland _Coastal Erosion _Amendment —Administrative—Emergency Pre-Submission Violation Info needed: Modifications: Conditions: Preje_nt Were: ' King -4 Ghosio D. Bergen, J. Bredemeyer Michael Domino D. Dzenkowski other Form filled out in the fieldAy Mailed/Faxed to: Date: