HomeMy WebLinkAbout(2) Proposed Landscape Plan.pdf HATCH LEGEND•
I � d
� I
60.1
0
so m D
NEIGHBORING PROPOERTY
\ / NOW OR FORMERLY \ \ \ \ 5HGT1oN of WALL To BE NATURALLY YE.6ETATED
DRUID W B05GOLA# DONNA M.BO5G0LA \ AND FILLED WITH TOP 501L
g \ ��
SECTION OF WALL TO 131=LAND5GAM �
J�
QAND FILLED WITH TOP 501L
Ex`fD
6RAVEL
RAMP 4� 60
_ i
_ II II �
� I SEIE
PR0�05ED P ANTINGS + EEG 13
/ 5EE LANDSCAPE SGHEDULE(THIS DWG)FOR
PLANT SPECIES,SIZE AND 5i'AGIN6 REQUIRED. N78°lppp --� — —
SEE DW6 No 2 FOR PLANTING DETAILS — V I �p n
I \ I N C N O
/ I N ' 6REENFIX}=ROSION CONTROL BLANKET TURF REINFORCEMENT MAT cn
I . i ,�
�� \ PROP05E1D �Dp 1 / T I ' I MODEL: CFG2000 GEOGRID REINFORCED COGONUT Q '
I I o o NATURALLY VEGETATED SECTION OF WALL j E� P I I�' / / W/TURF BLEND FU5ION(BLEND TO BE DETERMINED BY OWI _
\ \ APPROXIMATELY ±370'I LONG, 614.CHAIN LINK FENCE I N N
SHALL FILLWITH TOPSOIL TO ALLOW FOR SEEDING BY LDLIFE (BLACK VINYL) QIN
®� WIBLANKETS TO BE INSTALLED PER MANUFAGTl1RER5 INSTRUCTIONS
` Im
C11 AND E.G.BLANKET DETAILS(TH15 DWG)
.. 0 Q
PROPOSED NATURALLY _ PRop � � � 3�_ EA.EG.gLq T PRop0�aH7 �,�c� ,,, +t+ p + w � � PROP05ED APPROXIMATE BLANKET GROUNDGOVER = ilb,2I8 50.FT.
VEGETATED 5EGTION OF WALL \ � 6 GHgM �� EO,� A S - EV�GREEN RETAINING— X00 ++ t+
APPROXIMATELY ±144' LONG, � �� URIC { y _t t - - ----_DI5711i2gA►(GE WALL SYSTEM TYP + +
BoxI , 8-PR ++ + ELs� i��
SHALL � FILLED WITH TOPSOIL TO
ALLOW FOR 5EEDIN5 BY WILDLIFE LANDWARD ++++ +� +��
j��r ,� .7v + + + �' J p
illi l 1ST '.fit 4 ', 2"r--++�" _� - + + + + + JW �'ryp�p��/
} ® M PRO'�5E0 N WAi2p LbGE O� ?�„ , �mr*".:- - + \ OP L
7k .= O� '." - AMP a
PROPOSED WALL �'� .'� + + OF �y°� 3^'"� w -PR� EXI IN6
k
EROSION CONTROL MEASURE: � - pROp05�b tNALI � � � �� r �- �` `� ' + }+++�+ " + '� � r �
INSTALL EROSION GONTROL BLANKETS IN I STORY y � E ECTRIc
D15TURBED AREAS WHERE SHOWN. r� + ++ + + �9 P s RVICE
USE. 6REENFIX ER0510H CONTROL BLANKET TURF0�05� �P�� METAL BLDG
REINFORCEMENT MAT v .' ® 375
MODEL: CF62000 GEOC97RID REINFORCED COCONUT NU o m o ExISPNc FLOAFINc DGCx
N
J LJ Q
BLEND FUSION(%W TO BE DETERMINED R(oNr�W 4-M 44' 4,,��
1j-
TURF 2 PHOTO OF:
w 7,nr o � WALL JL6T AFTER IN5TALLATION
FOR MORE INFORMATION AND INSTALLATION „_ �, o ,o„�� PRO1,pD m o
REQUIREMENTS 5EE DW6 N0.2 � �mr o
o LANDSCAPED 5EGTION OP WALL I AND PLANTING
8a O , '
W ui 'i�ORTH
� APPROXIMATELY 1157'LONG,
PLANT W/A MIX OF 5M TREES,SHRUBS
/ 7
�� PROPo5E0 I STORY ( AND 6ROUNDGovER,SEE 'LAN05GAFE '�
SCHEDULE',TH15 DYJ6.,REFER TO
54 14-PRBOAT 5TORAOE BUILDING No.l 'RETAINING WALL SHELF - NORTH' a
PROPOSED AREA: 52,500 5F � /� � �� •• �
/
614 CHAIN LINK FENCE , Q , FFEL=10.00 // m
52— - (BLACK VINYL) a N
APPROX.N4 LINPT.
eo— — — +
-T)
6Oz' s
� +� ++ + �� In x
N 2
46- 6-PR + + b aLu
\
U EXISTING FLOATING D ,K �I X Z N O
O
PROPOSED - - � � �+ wa�P
EVERGREEN RETAINING 3TrJ.0'� + \
WALL SYSTEM TYP �: �
44 Qir� + PROP05M ELE E
t est MM
L.ANDSGAPED SECTION OF WALL - WEST
42 + + + APPROXIMATELY ibO'LONG
F + +
PROPOSED 1 +} PLANT W/A MIX OF 5M. TREE5,5HRUB5 AND I
NATURALLY VEGETATED - + 6ROUNDGOVER,SEE 'LAND5GAP'E SCHEDULE',TH15 DWG., /
q-PR ++ t f O
40 SECTION OF WALL _ + +� REFER TO 'RETAINING WALL SHELF WEST' Q PHOTO OF: = O
+ IWALL BEHIND FULL GROWTH VEGETATION N
APPROXIMATELY 1124' LONG, �-, '
SHALL BE FILLED WITH TOP501L TO — t
ALLOW FOR 5EEDIN6 BY LIFE
3 3
— _ -- Q0
s _ oo' v ..
36 �r / LAND526PE 5GHEDULE y
KEY QTY BOTANICAL NAME GOMMON NAME 2M
J ENGINEER:
UPLAND (BEYOND TOP OF WALL):
Q,
LL o a, �o
o EVERGREEN TREE
/ 1z � + W PR TI PINUS RIGIDA PITCH PINE 4'-5'MIN. 13' O.G.
o PROPOSED I STORY l gob,
34 BOAT STORAGE BUILDING No.2 ' � SHRUBS
w a AREA: 44,000 5F 100'FROM �� VA 51 VAGGINIUM AN6U5TIFOLIUM LOWBU5H BLI1EBERRY 5 GAL.CONTAINER 3'O.G.
3z i / / / k FFEL=10.00 WETLANDS I o6RA`a5E5/6ROUND COVER
30 / / - / / / 5 PA 4,245 PANIGUM VIR6ATUM 5WITGH6RA55 16AL. GONTAINER 2'O.G.
i- / , iz q1 +f X32
z6 ' / / - lx� EXI5TING W ��u��� PLANTED AREA
® e� I - ,
24 ' / �� _ I STORY BUILDING
22 i / �;; PR YX7MIX OF VA AND PA
i
20 / Di — — .EFFREY T. OUTLER, P.E.
18
END OF PROPOSED5URROUND I NC SITE a OR ABOUT BUILDING ELEVATION:
30 � � � � Q
74”---- 6'H.GRAIN LINK FENCE .0' EVERGREEN TREE
--- (BLAGK VINYL) / o PR 24 PINUS R1610A PITCH PINE 4'-5'MIN. 60L.
z �ro � T
VACS 14 VACGINIUM AN6U5T1FOLIUM LOWBU5H BLUEBERRY 5 GAL.CONTAINER VOL. v
4Q nye
O
S- Z//
1PR LL
96 O - p
i _k — — ►-1 O z CID Lu
A-.
� 1 � w RETA I NI N6 WALL SHELF - WEST. t80 LI N.FT.: � �1 }� z O
14-VA 1 5M TREE SHRUB W z O n0/
s ` 3 ALL / O clL
3 P TnNK gos, CT MP 12 MYRIGA PEN5YL.VANIGA BAYBERRY 2-3 GAL.CONTAINER MIN. V O.G. < z jL
ZNK 3-i'R c �' r
� RgzF I� RT l RHUS TYPIfINA STAGHORN SUMAC 2-3 GAL.CONTAINER MIN. VOL. Q �
- o / AG T AMELANGHIER CANADEN515 5HADBU5H 2-3 GAL.CONTAINER MIN. 12 O.G. U —
���
9 nm� ” �3 GRA55E5/GROUND COVER
o ZOrW N84 2020�l 3-PR _ — \���� I I �, PV 90 PANIGUM VIR6ATUM 5WITGH6RA% I GAL. CONTAINER 2 O.G. z
4b�t 44 u - —
r-X86°10 20 W � N87°3680 1�! 182 , g't8 qt 42� z � _ 28 _ _��V\�� '� PQ 90 PARTHENOG155U5 QUINQUEFOLIA VIRGINIA GRIPER 1 6AL.CONTAINER 2 O.G. � �O I �
6� 2 4 .l ' N 30— — \ `� ` A5 40 ASGIEPIAS SYRIAGA COMMON MILKLD I GAL.CONTAINER 2'O.G. O Q
r4°2q'S0°W o \ �_� 55 qO BAGGHARI5 HALIMIFOLIA 6ROUND5EL BUSH 1 6AL.CONTAINER 2'O.G. N z — cq
z I 31.25 1 $, ��� Ilk-
LL
\ _' J L y y PLANTED AREA: L N
N
N � + MIX OF MP,,RT,AG,PV,PQ,A5 AND 55' +
_ C) -:
lZiiiiiiiiO
now or formerly
now or formerly I I \ RETAINING WALL SHELF - NORTH, ±15-1 LIN.FT.: Z LL
RusSMi TREE/SHRU
sell Zellner 4 I Anthony J. Demaula 4 Dorothy ./q' a 7 CD
Denise Ze l l ner I A. Demau la B O (3
I I \ MP 20 MYRIGA PEN.5YLVANIGA BAYBERRY 2-3 6AL.CONTAINER MIN. 60-G. (�
RT 13 RHU5 TYPHINA 5TA6HORN 5UMAG 2-3 GAL.CONTAINER MIN. 12' OL.
AG 13 AMELANGHIER GANADEN515 5HAD51J5H 2-3 GAL.CONTAINER MIN. 12' OL.
6RA55E5/6ROUND COVER
PV 165 PANIGUM VIR6ATUM 5WITGHGRA55 16AL. CONTAINER 2'O.G. I A(5 E
PQ 165 PARTHENOG1551.5 QUINQUEFOLIA VIRGINIA CREEPER 16AL.CONTAINER 2'O.G.
L A I Y DLJ- G A P E PLAN A5 165 A5GIEPIA5 5YRIAGA COMMON MILKWEED I GAL.CONTAINER 2'O.G.
55 I65 BAGGHARI5 HALIMIFOLIA 6ROUND5EL BU5H 1 6AL.GONTAINER 2'O.G.
+ + + PLANTED AREA: + + +
40 20 O 40 80 120 160 200 + MIX OF MP,RT,AG,FV,PQ,A5 AND 55L
ORAPHIG SGALE r = 40'-O"
of 2
THE5E DRAWINGS AND A6GOMPANYIN6 SPECIFICATIONS,AS IN5TRI M NTS OF SERVICE,ARE THE EXCLUSIVE PROPERTY OF THE ARCHITECT AND THEIR U5E AND PUBLICATION SHALL BE RESTRICTED TO THE ORIGINAL 517E FOR WHICH THEY WERE PREPARED.REU5E,REPRODUGTION OR PUBLICATION BY ANY METHOD,IN WHOLE OR IN PART, 15 PROHIBITED EXGEPT BY WRITTEN PE 15SION FROM THE ARCHITECT.TITLE:TO THESE PLAN5 SHALL REMAIN WITH VE ARGHITEGT VISUAL CONTACT WITH THEM SHALL CONSTITUTE PRIMA FAGIE EVIDENGE OF ACGEPT'ANCE OF THESE RE5TRIG1`ION5
EROSION CONTROL BLANKETS 4'
s" xxs' � �
onchar trench
\ o �
Berm
mats blankets should i
be instolled vertically
- downslope. -
�l'!w ^•___ SEEP/502 9f4b BED d
REINFORCED RUBBER
y. TOP 501
� '��� DOUBLE STRAW HOSE,2 PIECES
TOP 501E
4b / #D WIRE TWISTED /�✓�✓��/ �0
G3 1 1
12"� r
11 PLANT I NC BED
r INS(NARES)
6'ABOVE 5HRU135
I �
ENmription and Purpose 11 ! �a`�.�e &'LONG CEDAR 5TAKE o S S
Mattings of natural materials are used to cover the sod surface
to reduce erosion from rawf ll impact,hold soil in place,and �, I �°°� 'stfe� MU1tH 6'SAY2R E TE6REEN5 SHALL NAVE THE
absorb and hold mashn�e near the sod surface. �Y, 2* to I
cs�aGbove PIT AND BALL R6WIREMENr5
mattingma be used to stabilize sods�vegetation is 3 overlap I Ir r '� °ce A5 M!"TREES No 5TAKIN6
establis0 / a� oter TOP SOIL REWRED.
WMEN BURLAP
Implementation II � 11 r r � �ger tvbte.-- � ��
AROUND 1RUNK
QleY1Q� CtiWr I _ ��" :o 9 3'MIN
Organic matting materials have been found to be effective where re-Vegetation will be prmided
by re-seeding- The choice of matting should be based on the sire of area,side slopes,surface --Non—woven �'` %�� ��i TOP SOIL
conditions such as hardness,moisture,weed growth,and availability of materials.
ISOMETRIC 1nEw geatexun filter
fabric under (2s%"
'
TYPICAL SLOPE typical treatment. 62`v�MIN 6� REINFORCED RIBBER DouBLESTRAW
SOIL STA 8 L I Z A Tl ON rtx FALL MIN. HOSE 2 PIECES #I2 WRE TK15TED
Er+oaian Cor1<tmI$ture�ceta�uts LIVET SLOPE__LI_I_�C
Biodegradable rolled erosion control products(RECPs)are ty�p COY composed of jute fibers, PLfi�NTI NC PIT m SAUGHR
curled woad fibers,straw,coconut fiber,or a combination of these materials. In order for an NOTES: NTSz
RECP to be considered i00%biodegradable,the netting,sewing or adhesive system that 1. Slope surface shall be free of rocks, clods, sticks 5TREET TREES g LOOSEN BURLAP � 31 MULCH
holds the biodegradable mulch hers together must also be biodegradable. and gross. Mots/blankets shall have good soil contact. �' AROUND TRUNK
f I o Mu
2. Lay blankets loosely and stoke or staple to maintain SPECIFICATIONS FOR TREE PLANTING
GRADE ilii _
Jute is a natural fiber that is made into a yarn that is loosely woven into a biodegradable direct contact with the soil. Do not stretch. iii
mesh. It is designed to be used in conjunction with vegetation and hes loung�ity of I. TREES SHALL BE OF Nu�zY 5TOGK of AN APPROVED 5E
PUE5,6R0M MOM THE �� x z •
3. Install per manufacturer's recommendations SAME GLINATIC CONDITIONS IC111
AS M PARTAR SITE. THEY SHALL BE OF SYM*TRK.AL MIX 25%PEAT Moss ��i ��i��i � � m
app�te�y one 3�. The material is supplied in rolled strips,winch should be 6Rowr++FREE of Cr PEST AHD DISEASE,SUITABLE FOR STREET IRE ISE.
secured to the soil with U-6haped staples or stakes in accordance with manufacturers' TYPICAL INSTALLATION TAIL 2 THE AVB06E TRUNK DIAMETER MEASURED AT AT A I EI6NT OF SIX ABOVE THE ��, TOP SOIL
recommendations. FINIS W 6MW LEVE.SHALL BE A MNMUN OF THREE 0)INCkE5.
3. ALL PLANTING SHALL BE DONE IN CONFORMANCE WITH 6"HORTICULTURAL PRAGTICE
THE FOLL0106 15 DECLARED TO BE 6"NORWLTUR&PRACTICE. N
site InstaUntion on Slopm (U TFE TRUNK 51iALL BE WRAPPED 41H BURLAP OR KRAFT PAPER TREE WRAP AND THE 6" V, MIN. (b r--
TREES BE STAKED 141H TWO(2)CEDAR POLES 5r:rAW To TFE TREE BY MEANS —
■ Proper site preparation is essential to ensure complete contact of the blanket or matting with Mian should be in accordance with the manidimmes reeommendatiaw. In general, (2)ALL TREES SHALL BE TRANSPL TED BgLED AND BURLAPPED,AND THE BALL
the soil. these will be as follows: SHALL BE AT LEAST W AND ONE HALE(2112J FEET IN DIAMETER PL�NTI NC PIT
0)ALL TREE:PITS SNP 1 BE BACKFILLED WITH TOPSOIL.
• CA-ade and shape the area of installation. ■ Begin at the top of the slope and anchor the blanket in a S in.deep by d in.wide trench. 4. ALL TREES LI5TED UNDER(I)HEREOF SHALL BE BRANCHED NOT LONER THAN SIX(6)FEET M I NOR TREES
and tampear&firmly. -WITH AN AVERAGE A36HT OF IO TO 12 FEET WITH A MINIMUM SPREAD OF TOP OF 4 FEET
Backfill trench � LL
■ Remove all racks,clods,vegetation or other obstructions so that the installed blanker or ■ Unroll blanket down sl . X z
mats will have complete,direct contact with the soil. �ui the direction of water flow' O
� moo
• Prepare seedbed by loosening 2 to g in.of topes. ■ [overlap the edges of adjacent parallel rolls 210 3 in.and staple every 3 ft. O W
Laying and Securing � ■ When blankets must be spliced,place blankets and aver end(shingle style)with 6 in
tdng emdap. Staple through amiaPPed�.approximately 12 ill.apart. O
■ Before laying the matting,all check slots should be installed and the friable seedbed made �—+ N NO
free from clods,rocks,and roots The surface should be compacted and finished according ■ Lay blankets loosely and maintain direct contact with the sod. Do not stret& W _
to the requirements of the manufacturees recommendations. m
■ Staple blanks sutfiiciently to anchor blanket and maintain contact with the soil staples �
: Mechanical or manual lay down equipment should be capable of handling full rolls of fabric ���p down the��and staggered with the staples glared along the edges. � ..
and la the fabrics wdhout wrinkles or folds. The equipment should meet the
Ym8 �Y �iwP Steep slopes,x:x(H V)to 2:1(H V),require a minimum of 2 staples/y&. Moderate slopes,
fabric mans recommendations or equivalent standards. 2:1(H:V)to 3:1(H:'V'),require a minimum of 1'Astaples/y&.
Anchoring
a U-shaped wire staples,metal geotextde stare pins,or t ianoar wooden stakes can be used ENGINEER:
to anchor mats and blankets to the ground surface.
■ Wire staples should be made of minimum n gauge steel wire and should be U-shaped with S
in.legs and 2 in.crown
■ Metal stake pins should be oaSS in.diameter steel wiTh a 1.5 in.steel washer at the head of GREENFIX ERO510N GONTROL BLANKET TU* REINFORCEMENT MAT
the pin,and S in.in length. MODEL: GF62000 6E06RID REINFORCED COCONUT
■ Wire Staples and metal sbdm should be driven flush to the soil surface. NV TURF BLEND FU51ON(BLEND TO BE DETERMINED BY OWNER)
BLANKET5 TO BE INSTALLED PER MANUFAGTURER'5 INSTRUCTIONS
AND E.G.BLANKET DETAIL5(THIS DW6)
.TEFF REY T. BUTLER,P.E.
PROP05ED APPROXIMATE BLANKET 6ROUN000VER = ±3,b00 50 FT.
C,
O �
2
LL LIJm
O � D
. . W 0 }
C) Z O
O � z ° o <
< 0 - � <
� z � Q is
C) -V o
z LL Q Ln
� LL c0 O
v O
z Lu
O O <
v Ca
FAG7E
2
of 2
THESE DRANN65 AND A66014PANYIN6 5PEGIFICATION5,A5 IN5TRUHENT5 OF SERVICE,ARE THE EXCLUSIVE PROPERTY OF THE ARCHITECT AND THEIR U5E AND F'UBLIGATION SHALL BE RESTRICTED TO THE ORI6INAL SITE FOR WHICH THEY WERE PREPARED.REUSE,REPRODUCTION OR PUBLICATION BY ANY METHOD,IN WHOLE OR IN PART, 15 PROHIBITED EXCEPT BY WRITTEN PE-RMI55ION FROM THE ARCHITEGT.TITLE TO THE5E PLANS SHALL REMAIN WITH THE ARGHITECT. V15UAL CONTAGT WITH THEM SHALL CON5TITUTE PRIMA FAGIE EVIDENCE OF AGGET'TANCE OF THESE RE5TRIGTION5.