HomeMy WebLinkAbout1000-83.-2-16 (2) OFFICE LOCATION: o�\\OF SU(/T-,OI MAILING ADDRESS:
Town Hall Annex O P.O. Box 1179
54375 State Route 25 Southold, NY 11971
(cor. Main Rd. &Youngs Ave.) VIA nlc
G Q
Telephone: 631 765-1938
Southold, NY 11971 ! O P
�y
Fax: 631 765-3136 00UNTV I
LOCAL WATERFRONT REVITALIZATION PROGRAM
TOWN OF SOUTHOLD
MEMORANDUM
To: Town of Southold Town Board
From: Mark Terry, Assistant Town Planning Director
Date: September 5, 2018
Re: Proposed Purchase of a Development Rights Easement on Property Owned by Richard
James McBride and James Michael McBride.
SCTM #1000-83.-2-16 Location: 10725 Oregon Road in Cutchogue
The Town of Southold is considering the acquisition of development rights on part of a property
consisting of approximately of 24.5±acres (subject to survey) of the 31± acre parcel. The
property is located in the Agricultural-Conservation (A-C) Zoning District and is situated on the
northerly side of Oregon Road approximately 1200 feet west of Cox's Lane in Cutchogue, New
York.
The action have been reviewed to Chapter 130 Environmental Quality Review of the Southold
Town Code and the New York State Department of Environmental Conservation regulation
6NYCCRR Part 617 State Environmental Quality Review and it is my recommendation that the
Town Board, as lead agency, issue a Negative Declaration for this Unlisted Action pursuant to 6
NYCRR Part 617, Section 617.7 of the State Environmental Quality Review Act (SEQRA).
A Short Environmental Assessment Form is attached.
Please contact me at (631) 765-1938 if you have any questions regarding the above
recommendation.
Attach:
Cc: William Duffy,Town Attorney
Melissa Spiro, Land Preservation Coordinator
Short Environmental Assessment Form
Part I -Project Information
Instructions for Completing
Part 1-Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses
become part of the application for approval or funding,are subject to public review,and may be subject to further verification.
Complete Part I based on information currently available. If additional research or investigation would be needed to fully
respond to any item,please answer as thoroughly as possible based on current information.
Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful
to the lead agency;attach additional pages as necessary to supplement any item.
Part 1-Project,and Sponsor Information �����,��,�'. ('t1�,F,;;��{ i..
10,th C U �,&Sf op 'Otv•Z M k`s _,y%yr t
Name of Action or Project:
C'_1;r%0E
Project Location(describe,and attach a location map):
/Pop - 63 -2 - 1Z
Brief Description of Proposed Action:
A4,S" at6-5 04 '25I+ acts
Name of Applicant or Sponsor: Telephone:
7 E-Mail:
Address:
005 Zak 25
City/PO: State: Zip Code:
SD vG N•` , 11971
1.Does the proposed action only involve the legislative adoption of a plan,local law,ordinance, NO YES
administrative rule,or regulation?
If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that F]
may be affected in the municipality and proceed to Part 2. If no,continue to question 2.
2. Does the proposed action require a permit,approval or funding from any other governmental Agency? NO YES
If Yes,list agency(s)name and permit or approval: ❑
3.a.Total acreage of the site of the proposed action? a Y.5 acres
b.Total acreage to be physically disturbed? 92 acres
c.Total acreage(project site and any contiguous properties)owned -tom
or controlled by the applicant or project sponsor? 3) acres
4. Check all]and uses th,at occur on,adjoining and near the proposed action.
E]Urban
,at
(non-agriculture) .7 Industrial ❑Commercial Residential (suburban)
❑Forest Agriculture ❑Aquatic ❑Other(specify):
❑Parkland
Pagel of 3
5. Is the proposed action, NO YES N/A
a.A permitted use under the zoning regulations? ❑ [21 ❑
b.Consistent with the adopted comprehensive plan? ❑ ❑
6. Is the proposed action consistent with the predominant character of the existing built or natural NO YES
landscape? ❑ Z
7. Is the site of the proposed action located in,or does it adjoin,a state listed Critical Environmental Area? NO YES
If Yes,identify: [71 ❑
8. a.Will the proposed action result in a substantial increase in traffic above present levels? NO YES
21— El
b.Are public transportation service(s)available at or near the site of the proposed action? 0 ❑
c.Are any pedestrian accommodations or bicycle routes available on or near site of the proposed action? ❑ 0
9.Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements,describe design features and technologies: A ❑
10. Will the proposed action connect to an existing public/private water supply? NO YES
If No,describe method for providing potable water: /'1 ❑ tj
11.Will the proposed action connect to existing wastewater utilities? NO YES a
If No,describe method for providing wastewater treatment: [�J' ❑ Nfl
12. a.Does the site contain a structure that is listed on either the State or National Register of Historic NO YES
Places? ❑
b.Is the proposed action located in an archeological sensitive area? ❑
13.a.Does any portion of the site of the proposed action,or lands adjoining the proposed action,contain NO YES
wetlands or other waterbodies regulated by a federal,state or local agency? ❑
b.Would the proposed action physically alter,or encroach into,any existing wetland or waterbody? ❑
If Yes,identify the wetland or waterbody and extent of alterations in square feet or acres:
14. Identify the Typical habitat types that occur q 'or are likely to be found on the project site. Check all that apply:
El Shoreline ❑Forest d Agricultural/grasslands ❑Early mid-successional
❑ Wetland ❑Urban ❑Suburban
15.Does the site of the proposed action contain any species of animal,or associated habitats,listed NO YES
by the State or Federal government as threatened or endangered? ❑
16.Is the project site located in the 100 year flood plain? NO YES
17.Will the proposed action create storm water discharge,either from point or non-point sources? NO YES
If Yes, ❑
a.Will storm water discharges flow to adjacent properties? ❑NO DYES
b.Will storm water discharges be directed to established conveyance systems(runoff and storm drains)?
If Yes,briefly describe: ❑NO DYES
Page 2 of 3
18.Does the proposed action include construction or other activities that result in the impoundment of NO YES
water or other liquids(e.g.retention pond,waste lagoon,dam)?
If Yes,explain purpose and size: ❑
19.Has the site of the proposed action or an adjoining property been the location of an active or closed NO YES
solid waste management facility?
If Yes,describe: ,/ F
20.Has the site of the proposed action or an adjoining property been the subject of remediation(ongoing or NO YES
completed)for hazardous waste? ❑
If Yes,describe:
I AFFIRM THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY
KNOWLEDGE
Applicant/sponsor name: MS v « Date: ZQ d\
Signature:
PRINT FORM Page 3 of 3
Agency Use Only IIf applicable]
Project
Date:
Short Environmental Assessment Form
Part 2 -Impact Assessment
Part 2 is to be completed by the Lead Agency.
Answer all of the following questions in Part 2 using the information contained in Part 1 and other materials submitted by
the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by
the concept"Have my responses been reasonable considering the scale and context of the proposed action?"
No,or Moderate
small to large
impact impact
may may
occur occur
1. Will the proposed action create a material conflict with an adopted land use plan or zoning ❑
regulations?
2. Will the proposed action result in a change in the use or intensity of use of land? E?f ❑
3. Will the proposed action impair the character or quality of the existing community? ❑
4. Will the proposed action have an impact on the environmental characteristics that caused the ❑
establishment of a Critical Environmental Area(CEA)?
5. Will the proposed action result in an adverse change in the existing level of traffic or n( ❑
affect existing infrastructure for mass transit,biking or walkway?
6. Will the proposed action cause an increase in the use of energy and it fails to incorporate r;,( ❑
reasonably available energy conservation or renewable energy opportunities? �J
7. Will the proposed action impact existing: ❑
a.public/private water supplies?
b.public/private wastewater treatment utilities? ❑
8. Will the proposed action impair the character or quality of important historic,archaeological, ❑
architectural or aesthetic resources?
9. Will the proposed action result in an adverse change to natural resources(e.g.,wetlands, ❑
waterbodies,groundwater, air quality,flora and fauna)?
10. Will the proposed action result in an increase in the potential for erosion,flooding or drainage ❑
problems?
11. Will the proposed action create a hazard to environmental resources or human health? �/ ❑
PRINT FORM Page 1 of
Agency Use Only[If applicable]
Project
Date:
Short Environmental Assessment Form
Part 3 Determination of Significance
For every question in Part 2 that was answered"moderate to large impact may occur",or if there is a need to explain why a
particular element of the proposed action may or will not result in a significant adverse environmental impact,please
complete Part 3.Part 3 should,in sufficient detail,identify the impact,including any measures or design elements that
have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency
determined that the impact may or will not be significant.Each potential impact should be assessed considering its setting,
probability of occurring,duration,irreversibility,geographic scope and magnitude. Also consider the potential for short-
term,long-term and cumulative impacts.
1:1Check this box if you have determined,based on the information and analysis above,and any supporting documentation,
th t the proposed action may result in one or more potentially large or significant adverse impacts and an
nvironmental impact statement is required.
Check this box if you have determined,based on the information and analysis above,and any supporting documentation,
that the proposed action will not result in any significant\\adverse environmental impacts.
10-J.r\ �
Name of Lead Agency Date
Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer
Signature of Responsible Officer in Lead Agency Signature of Prep er(if different fr R onsible Officer)
PRINT FORM Page 2 oft