Loading...
HomeMy WebLinkAbout45150-Z gtlE t Town of Southold . co°y� 6/29/2021 P.O.Box 1179 o _ 53095 Main Rd y�jpl �ao�. Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 03263 Date: 6/29/2021 THIS CERTIFIES that the building ADDITION/ALTERATION Location of Property: 3950 Stars Rd,East Marion SCTM#: 473889 Sec/Block/Lot: 22.-2-14.1 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 8/19/2020 pursuant to which Building Permit No. 45150 dated 9/1/2020 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: additions and alterations to an existing single family dwelling as applied for. The certificate is issued to Parker,Gary&Sutera,Deborah of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. 45150 1/12/2021 PLUMBERS CERTIFICATION DATED Au ho z Signature l °�SUEFniK TOWN OF SOUTHOLD aye BUILDING DEPARTMENT y x TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 45150 Date: 9/1/2020 Permission is hereby granted to: Parker, Gary PO BOX 401 East Marion, NY 119390401 To: make additions and alterations to an existing single family dwelling as applied for. At premises located at: 3950 Stars Rd, East Marion SCTM #473889 Sec/Block/Lot# 22.-2-14.1 Pursuant to application dated 8/19/2020 and approved by the Building Inspector. To expire on 3/3/2022. Fees: SINGLE FAMILY DWELLING-ADDITION OR ALTERATION $543.20 CO-ADDITION TO DWELLING $50.00 $593.20 Buildin Inspe r Form No.6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: 1. Final survey of property with accurate location of all buildings,property lines, streets,and unusual natural or topographic features. 2. Final Approval from Health Dept. of water supply and sewerage-disposal(S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1%lead. 5. Commercial building,industrial building,multiple residences and similar buildings and installations, a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings (prior to April 9, 1957)non-conforming uses,or buildings and"pre-existing"land uses: 1. Accurate survey of property showing all property lines,streets,building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant.If a Certificate of Occupancy is denied,the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees I. Certificate of Occupancy-New dwelling$50.00,Additions to dwelling$50.00,Alterations to dwelling$50.00, Swimming pool$50.00,Accessory building$50.00,Additions to accessory building$50.00,Businesses $50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy-$.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy-Residential$15.00, Commercial$15.00 Date. New Construction: Old or Pre-existing Building: Q (check ones)( }� Location of Property: 3 SO �I�S \ V"�jAD` to K) House No. Street Hamlet Owner or Owners of Property: A R Suffolk County Tax Map No 1000, Section Block Lot Subdivision l Filed Map. Lot: Permit No. J v Date of Permit. Applicant: Health Dept. Approval: Underwriters Approval: Planning Board Approval: r / q P Request for: Temporary Certificate Final Certificate: '" (check one) Fee Submitted: $ /1 scant Si ature pF SOUj�Ql Town Hall Annex ® Telephone(631)765-1802 54375 Main Road Fax(631)765-9502 P.O.Box 117 ®UiY �Q roger.richerta-town.south old.ny.us Southold,NY 119711-0959 Ql�c® s®9 \ BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICIAL COMPLIANCE SITE LOCATION Issued To. Gary Parker Address: 3950 Stars Rd City: East Marion St. New York Zip: 11939 Budding Permit#. y 5 1 5 0 Section: �� Block. 3t.- Lot 14, 1 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE contractor: DBA: Jim Shaw Electric License No: 33381-ME SITE DETAILS Office Use Only Residential X Indoor X Basement Service Only Commerical Outdoor X 1st Floor X Pool New Renovation 2nd Floor X Hot Tub Addition X Survey Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt 12 Ceding Fixtures HID Fixtures Service 3 ph Hot Water GFCI Recpt 2 Wall Fixtures 1 Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures 12 CO Detectors Sub Panel A/C Blower Range Recpt Fluorescent Fixture Pumps Transformer Appliances Dryer Recpt Emergency Fixtures Time Clocks Disconnect Switches 7 Twist Lock Exit Fixtures 11 TVSS Other Equipment. 3-combination smoke / co detectors Notes Inspector Signature: Date: January 12 2021 81-Cert Electrical Compliance Form As �{ �D �apF SOUT,yo # # TOWN OF SOUTHOLD BUILDING DEPT. 7651802 INSPECTION OUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [. ] INSULATIOWCAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O REMARKS: � •�a mill DATE 7 INSPECTOR - # OF SOUTHOLD BUILDING DEPT. TOWN `ycouety��` 765-1802 INSPECTION [ FOUNDATION 1ST A'Pr> [ `] ROUGH PLBG. [ ] -FOUNDATION 2ND - [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [" ] FIREPLACE & CHIMNEY [ ] •FIRE-SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O REMARKS: DATE INSPECTOR q:5-1 !ro �aOF SOUTyo h� l0 * TOWN OF SOUTHOLD BUILDING DEPT. cou765-1802 INSPECTION [ ] FOUNDATION IST [ ] ROUGH PLBG. [ ] OUNDATION 2ND [ ] INSULATION/CAULKING [/FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY-INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O REMARKS: rP'C`M DATE INSPECTOR laaf so TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 I-NSPECTIO14 FOUNDATION I ST ROUGH PL13G. FOUNDATION 2ND INSULATIOWCAULKING FRAMING/STRAPPING FINAL FIREPLACE & CHIMNEY FIRE SAFETY INSPECTION FIRE RESISTANT CONSTRUCTION FIRE RESISTANT PENETRATION VELECTRICAL (ROUGH) ELECTRICAL (FINAL) I CODE VIOLATION PRE C/O REMARKS: DATE INSPECTOR I soUl�o # TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] UGH PLBG. ry J [ ] FOUNDATION 2ND [ INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL'IFINAL) [ ] CODE VIOLATION [ ] PRE C/O REMA KI S: DATE INSPECTOR ru pF SOGIyo� # TOWN OF SOUTHOLD BUILDING DEPT. ��nurnr ' 765-1802 ISPECTIONN [ ] FOUNDATION 1ST [ ]= ROUGH PL13G. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY-INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION - [ ] ELECTRICAL-(ROUGH) ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O REMARKS:. DATE INSPECTORW sa�lyo —--- h0 6 # # TOWN OF SOUTHOLD BUILDING DEPT. `ycnuxn��' 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] IMQULATIOWCAULKING [ ] FR ING /STRAPPING [ ;/FINAL [ FIREPLACE-&-CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O REMARKS: 091 fov L �H)_ r/opi tod DATE (APIWIV INSPECTOR FIELD INSPECTION REPORT )DATE COXNXENTS q !kA' FOUNDATION(IST) ' t �n FOUNDATION(ZND) 1 '30 NACN.ti � ROUGH FRAMING& y PLUMBING AllINSULATION PEA N.Y. y STATE ENERGY CODE 14, (K FINAL . .I N G" MEIVTS 4 ,� y -7_ o 1 �tl r, y C TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health SOUTHOLD,NY 11971 4 sets of Building Plans TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 �I Survey Southoldtownny.gov PERMIT-NO. l Check Septic Form N.Y.S.D.E.C. Trustees C.O.Application Flood Permit Examined ,20 Single&Separate Truss Identification Form Storm-Water Assessment Form Contact: Approved '20 Mail to: Disapproved a/cam Phone: „ 3, Expiration ,20 f I----. I'K.�� y�-!�; QBnspector - n APPLICATION FOR BUILDING PERMIT " AUG 1 9 2020 - Date , 20 INSTRUCTIONS EMMING D1CP'!T, ,ro,vT-4is ap�rla-e tan UST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 a€ �°aKn sets of plans, accurate plot plan to scale.Fee,according to schedule. b.Plot plan showing location of lot and of buildings`on premises,relationship to adjoining premises or public streets or areas, and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d.Upon,approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues'a Certificate of Occupancy. f.Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize,in writing,the extension of the permit for an addition six months.Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws, Ordinances or Regulations,for the construction of buildings,additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances,building code,housing code, and regulations,and to admit authorized inspectors on premises and in building for necessary inspections. r (Signa—4e of ap scant or name,if a corporation) dr 01� ox Mo l . L- N'�lA�t®1J (Mailing address o�nt) Ary State whether applicant(own:e:r�, ssee, agent, architect, engineer, general contractor, electrician,plumber or builder Name of owner of premises ���C f �� (1( 4 0 J t7 e©�A f <5 �kR-A (As on the tax roll or latest deed) If applicant is a co oration, signature of duly authorized officer (Name Zhd title of corporate officer) Builders License No. Plumbers License No. Electricians License No. Other Trade's License No. 1. Location of land on wiich propose4 work will be done_ W House Number Street .�.,1,.,. Hamlet County Tax Map No. 1000 Section Blbcki�i'rr s ;_,„ Lot Subdivision �. — Filed Map No. Lot 2. State existing use and occupancy of premi es and intended use and occupancy of proposed construction: a. Existing use and occupancy U,S.5 Nor— !b2A I Pk b. Intended use and occupancy ��S k 'AE to l N 3. Nature of work(check which applicable): New Building Addition Alteration Repair Removal Demolition Other Work (Description) 4. Estimated Cost �/S�� Fee (To be paid on filing this application) 5. If dwelling, number of dwelling units Number of dwelling units on each floor A.2,. If garage, number of cars d)A• 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. AM 7. Dimensions of existing structures, if any: Front s Rear Depth ©A Height" Number of Stories Dimensions of same structure with alterations or additions: Front sA M Rear Depth Height Number of Stories _ 8. Dimensions of entire new construction: Front `S Rear Depth l7 Height Number of Stories — : � �t•,, ',, � ,,��� _.. 9. Size of lot: Front / 5 O Rear / 570 Depth Z 10. Date of Purchase Name of Former Owner S f�� Y►�O S Cr V�p 11. Zone or use district in which premises are situated 12. Does proposed construction violate any zoning law, ordinance or regulation? YES N01- 13. Will lot be re-graded? YES NO__)�Will excess fill be removed from premises?YES NOX 14. Names of Owner of premises &-'N SX<E i` -Address 6 `Phone No. Name of Architect Address �p.<7V- V Phone No Naive of Contractor Address 4- Phone No. 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO * IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO__)( * IF YES,D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below,must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES NO \ * IF YES, PROVIDE A COPY. STATE OF NEW YORK) S: COUNTY O f being duly sworn, deposes and says that(s)he is the applicant (Name of indi idual signing contract) above named, (S)He is the - (Contractor,Agent, Corporate Officer,etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be performed in the manner set forth in the application filed therewith. Swornlwbefore met I / t4 day of 24-0 ��fr TRACEY L.DWYER Ry Ptj LIC,STATE OF EW YORK' 'AAM ; Notary P c N NO.01DW6306900 Signa re of Applicant QUALIFIED IN SUFFOLK COUNTY COMMISSION EXPIRES JUNE 30,24XU— s Scott A. Russell °Su m ST(O�1R AM[WA\,� 1E1K SUPERVISOR - h\�4AN.A�(Gr)EI�M11ENT �- SOUTHOLD TOWN HALL-P.O.Box 1179 � 53095 Main Road-SOUTHOLD,NEW YORK 11971 'kjTown of Southold I CHAPTER 236 - STORMWATER MANAGEMENT WORK,SHEET - I ( TO BE COMPLETED BY THE APPLICANT ) ! i DOES THIS PROJECT INVOLVE ANY OF THE FOLLOWI14,G: s (CHECK ALL THAT APPLY) i ! Yes.No j ❑ �A. Clearing, grubbing, grading or stripping of land which affects more I CJthan 5,000 square feet of ground surface. 1 1 I E] B. Excavation or filling involving more than 200-cubic yards of material within any parcel or any contiguous area. i" ❑ C. Site preparation on slopes which exceed 10 feet vertical ri e to 100 feet of horizontal distance. ❑ D. Site preparation within 100 feet of wetlands, beach, bluff or coastal erosion hazard area. ❑[ E. Site preparation within the one-hundred-year floodplain a depicted -on FIRM Map of any watercourse. ❑ F.• Installation of new or resurfaced impervious surfaces of 1,000 square =. feet or more, unless prior approval of a Stormwater Management Control Plan was received by the Town and the proposal i 'cludes in-kind replacement of impervious surfaces. If you answered NO to all of the questions above, STOP! Complete the Applicant section below wiyour Name, Signature, Contact Information, Date & County Tax Map Number! Chapter 236 does not apply to your project. If you answered YES to one or more of the above, please submit Two copies of a Stormwater Management Control Plan ' and a completed Check List Form to the Building Department with your Building Permit Application.j 1 APPLICANT: (Property Owner,Design Professional,Agent,Contractor,Other) S.C.T.M. 1000 Date Dist ict • / `� , j s° NAME Section Block Lot FOR BUILDING DEPARTiti--IENTjUSE ONLY Contact Information 1 .Td.phnK�wmOc+3 Reviewed By: — — — — — — — — — — — — — — — — — — i I Date- j •Property Address/ Location of Construction Work: — — — — — — — — — — — — — — — — 3� (VO d©X�a i ❑ Approved for processing Building Permit. C` — — Stormwater Management Control Plan Not Required. �( b �� ❑ Stormwater Management Control Plan is Required. (Forward to Engineering Department for Review.) I FORM SMCP-TOS MAY 2014 ) I sy Pr, S-L/� `oS%AFFlit,t-`, n - • r•-.� ` BUILDING DLPARTMENT- Electrical Inspector V1 .i i 1,N^ •1 4 ice'y TOWN OF SOUTHOLD o ' 1 v� Towla Hall Annex - 54375 Main Road - PO Box 1,179 C/.) 2020 - Southold, New York 11971-0959 Telephone (631) 765-1802 - FAX (631) 765-9502 Ol �' EXT 1,w + r-o,ger-T(a)-southoldtownn .qov - seand(c&southoldtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (Ali Information Required) Date: Company Name: -7 SkqA) 't-ti T- /(- Name: �� S-4v License No.: 333 WJ- /')�)Z email: Address: I >cyw 6A.A," !,1— AA pi 4 y Phone No.: 631-553-53- Sa y JOB SITE INFORMATION (All Information Required) Name: ,1� Address: 3isnj yw114 L ►,�N Cross Street: Phone No.: Bldg.Permit#: email: Tax Map District: ` 1000 Section: Block: Lot: BRIEF DESCRIPTION OF WORK (Please Print Clearly) Circle All That Apply: Is job ready for inspection?: rG/ NO �ou�hl Final Do you need a Temp Certificate?: YES / �IO� Issued On Temp Information: (All information required) Service Size 1 Ph 3 Ph Size: A # Meters Old Meter# New Service - Fire Reconnect - Flood Reconnect - Service Reconnected - Underground - Overhead # Underground Laterals 1 2 H Frame Pole Work.done on Service? Y N Additional Information: PAYMENT DUE WITH APPLICATION Request I Form.xls q t for Inspection nsp BUILDING DEPARTMENT- Electrical Inspector ~�O� r,- �st > TOWN OF SOUTHOLD o TowpL1 Annex - 54375 Main Road - PO Box 1179 h-1,�1 Southold, New York 11971-0959 y NOV �020Telephone 631 765-1802 - FAX 631 765-9502 southoldtown ny.gov - seand(@,southoldtownny.gov - APPICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All Information Required) Date: Company Name: 73-N 5w4w uatLf__� Ti✓C, , Name: License No.: 333 f()' /h W email: �t',•ns� �(�� � Address: ovv R-C Z�nOy%_� AA 1i 2 y Phone No.: toll-,553- 5 3 y JOB SITE INFORMATION (All Information Required) Name: 1� _ Address: SO y`TA T ,9,\,d/v I Cross Street: Phone No.: BIdg.Perrnit#: S)so . email: Tax Map District: ' 1000 Section: Block: Lot: 'BRIEF DESCRIPTION OF WORK(Please Print Clearly) Circle All That Apply: Is job ready for inspection?: 60/ NO :ou:g h In " Final Do you need a Temp Certificate?: ' YES /C Issued On Temp Information: (All information required) J Service Size 1 Ph 3 Ph Size: A # Meters Old Meter# New Service - Fire Reconnect - Flood Reconnect- Service Reconnected -Underground -Overhead # Underground Laterals 1 2 H Frame Pole Work.done on Service? Y N Additional Information: PAYMENT DUE WITH APPLICATION Request for Inspection Form.xls PERMIT# Address: Switches Outlets G FI's Surface -Sconces •WH's UC Lts Fans Fridge HW - - -. Exhaust Oven Dryer Smokes DW Service Carbon Micro Generator combo Cooktop Transfer AC AH Mini J Special: j Comments: i . o`�suFF04��a Town Hall Annex Telephone(631)765-1802 54375 Main Road Fax(631)765-9502 P.O. Box 1179 u� x Southold, NY 11971-0959 BUILDaNGDEPARTMENT- NOTICE OF UTILIZATION OF TRU.SSTYPE-CONSTRUCTION. PRE-ENOINEERED ` WOOD CONSTRUCTION AND/OR TIMBER CONSTRUCTION Date: f q �- Owner:'. A<;5 Location,of Property: r; b,. A S Pleaset ike notice that the{ctieck'applicablefine): a '' New commercia[ r residdnti`al'structure Addition to.exisfir g commercial-or residential st`r,`uctUre Rehabilitation'tos%an existinmfnmercial or residential:structure ., to be'constructed or performed at the subject property reference above:wi(I°utilise (check applicable•line): a Truss typ .',*construction (TT) Pre-engineered;wood-'construction.(PW) Timber construction in the following location(s) (check applicable line)-' Floor framing, including girders and beams (F) Roof framing (R) Floor.and roof framing,(FR) ; Signature: Name (person submitting this form): �({� Capacity(check applicable line): Owner Owner representative TrussRegl5.docx Effective 1/1/2015 6" DHAMETER REFLECTIVE RED REFLECTIVE WHITE PANTONE #187 I . r /L" The construction type STROKE designation shall be - icilyI LL1177I 6411117' "IV"or L4v77 to indicate the construction classification of the structure under DESIGNAT16N' FOR STRUCTURAL section 602 of the BCNYS COMPONENTS THAT ARE OF TRUSS TYPE CONSTRUCTION ■ "F51 FLOOR,FRAMING, INCLUDING ■ ■ GIRDERS AND BEAMS - -- - -- - -- - - -- - - - -RO-OiF-FRAlMI-N-G- "FR" FLOOR AND ROOF FRAMING STANDARDS AND CODES i SURVEY OF PROPERTY SITUATE EAST MARION TOWN OF SOUTHOLD SUFFOLK COUNTY, NEW YORK S.C. TAX No. 1000-22-02- 14. 1 gs RDAD T SCALE " 1 "=30' STAoWN ROAD) z N/o/F s 1 AUGUST 9, 2019 NoDAR� IS z pYR S NTON o� cWi+ 4'- & MINA 5TRA , m 00 LA zo AREA = 19,834 sq. ft. ao o� 133.37 m2 0.455 ac. E 78'3 6 99DEER FENCE '7 S. �< e °30 o N ° o 0E5s. 1 O d v zn 11 W e d 'a J • cam , m 1 O O 2 Z b m � e ��, 1 Q fr► ee d J d 1 Q o O d W & C Z TFgaO m m �\ 1 ! � U1 6.B' AIR COND to .� 19 3' -C) c> UNR S>° o r M d m I ��� ^ 1 c d e e 9 ���1 6.8 WOOD m V1 % %y d friA e d' . n BIN m PREPARED IN ACCORDANCE WITH THE MINIMUM m 2.0.1 o e GRAVEL c °r ' STONE d STANDARDS FOR TITLE SUR ESTABLISHED 5`Z�4 BY THE L.I.A.L.S. AND OPTED w 427_ FOR SUCH USE B NO O , ' `e _ Q = TITLE ASSOCIATI d d ` GRAVEL DRN �e *J IAF e n e a �' d BRICK Lp V a u WPLKLA z O � � o ern d e �o v 2 m FRPME w - � o m SHED' cn A e 8 1 01 m 1 BL OCK WAIL 67 WALL o GN R�NHOUn, SE 014- C rM�RIC 02's. inz cnr R NC STD�t°E Nn ' O m m N.Y.S. Lic. No. 50467 O in N 19 S. ui n 0 a O '""��-^ GE 37'5 m im = m 1 31UNAUTHORIZED ALTERATION OR ADDITION FEN m o mo TO THIS SURVEY IS A VIOLATION OF FIAST�C FENCE v SECTION 72LA OF THE NEW YORK STATE Nathan Taft Corwin �' EDUCATION LAW. W N o0 G� flin oZ G9 3 Ln N F, COPIES OF THIS SURVEY MAP NOT BEARING m cn m 7$"36 r 1101-F A JR j THE LAND SURVEYOR'S INKED SEAL OR EMBOSSED SEAL SHALL NOT BE CONSIDERED Land Surveyor a o S ANTHONY TO BE A VALID TRUE COPY. eA �' CERTIFICATIONS INDICATED HEREON SHALL RUN e j ONLY TO THE PERSON FOR WHOM THE SURVEY IS PREPARED, AND ON HIS BEHALF TO THE a e• TITLE COMPANY, GOVERNMENTAL AGENCY AND Title Surveys - Subdivisions - Site Plans - Construction Layout d LENDING INSTITUTION LISTED HEREON, AND TO THE ASSIGNEES OF THE LENDING INSTI- TUTION. CERTIFICATIONS ARE NOT TRANSFERABLE. PHONE (631)727-2090 Fax (631)727-1727 OFFICES LOCATED AT MAILING ADDRESS THE EXISTENCE OF RIGHTS OF WAY 1586 Main Road P.O. Box 16 AND/OR EASEMENTS OF RECORD, IF Jamesport, New York 11947 Jamesport, New York 11947 ANY, NOT SHOWN ARE NOT GUARANTEED. 39-223 e-i" L+ Is" l �o 3q605TH- S AZO, ` o � WRT3920WS �o ►�. �-�l EPA Wood Burning Fireplaces Specifications Back Wall of Chase/Enclosure OUTSIDE CHASE Comer Installation IncludinFinishing Malarials,if any Cat.# Model Description C Fireplace, 22-1 " F3557 WITf3920% Black Door I V 1 O J PRODUCT REFERENCE INFORMATION 'Zero Clearanceim, F Z� \> From Back G Weight 215 His Spacer to Wall Height 37-5/8" oIQ Width 32-3/4" ® I'{ l, Depth 22-1/2" ^� Rough Framing-�(U.rmmhed Shown) 19��"� E Firebox W x H x D 19-111"x Top View measured in front 13-1/4"x 12" Chimney WeightASHT*, 6.25lb/ft. DTC**0 6" �1 Combustible materials Chimney Weight AC*0 6" 3.25 Ib/ft. `� can NOT be used in the ve Chimne Wei ht S-2108rx 0 6" 10.8 lb/ft. spacedilace. o no Y 9 � the fireplace.Donal fBl the space above *Available from Security ChimneysO the fireplace with any —Available from DuralientO material(Except the FRAMING DIMENSIONS wood taming) 2 X 3 A 36" 915 mmHeader Min. Total depth is 22-1P1 B 37-3/4" 959 mm inches(572mm)includ- C 31-3/8" 797 mm ing the back spacer D 14-7/8" 378 mm minus 1/2 inch(13mm) for drywall to be flesh E 74-3/8" 1889 mm with the facing. B F 37.1/4" 946 mm 6'$„ G G *22" 559 mm 1 52-5/8" 1337 mml�—A N (2M) B Min. ---,K 8" 203 mm -� Rough Framing Face (dimension include finish �I k�»/s"(797 mm) material inside framing,if an 10.3/4" Optional Combustion Air Kit (273 mm) r, 22-318" (558 mm) @m 0 o®� 36"(915 mm) - ' TopView f--►� . Notes ® Diagrams,illushallonsand photographs are not to scale –conswltinstallagoninstructions.Productdesigns,mate- dais,dimensions,specifications,colors and prices are 37-6" 22ry4/8" v subject to change or discontinuance without notice. (956mm) (569 mm) All haming dimensions calculated for 1R"diy wall at Me Aj ® 13.1/4" 32.12" � � fimplacelace.ltsheathinglhechaseorfinishingwithother (337mm) (826mm) ® thickness materials calculations will need to be made. �mB The rrreplace must not he in contact wiM any insulation To v orlcosefillingmatedal.Coverpreinsulatronwithdrywall panels around Me fireplace. ' 20"(508 mm) (i56 mm) 21-518"(550 mm) ® F ListedtoULC-S610&UL-127 25.7/8"(683 mm) 22,118"(569 mm) 35118^1892 mm) �' US EPA Ceti.No.111-17 25-1/8"(638 mm) 36"(915 mm) Right Side view __j Report No.14-181 Feat V(ew P/N 900881-02 REV.NC 022010 Page 1 of 2 Cyjupertor WRT3920WS EPA Wood-Burning Fireplaces Specifications Rain Cap Roof Support Storm Collar Flashing Collar Attic Radiation Flashing ' � Flashing Shield Floor, Roof Support 2moff �t Attic Radiation Shield wall Must have the same �W Firestop firestopping resistance as adjacent wall. • Must have the same insu- lation as adjacent ceiling. •� Firestop Follow local rules regard- ing framing construction. (990mm) 6181, ® Non-Combustible (2 m) Facing Min. 7' (2.1 m) Min. c i Drywall or Any Rigid ® OCombustibles are not allowed below top spacers Material above the fireplace.Facing in front of fireplace must be non-combustible below this area. '0 2 x 4 Optional Outside 1/2"Plywood Combustion Air Kit CLEARANCE TO COMBUSTIBLES The following clearances meet the minimum requirements for a safe installation; Side wall: 17"(324 mm)measured from the fireplace czside 12"Max. � )Ceiling: 6'8" 2,032 mm measured from the base (305mm) Area where QJ of the fireplace Mantel can be installed d mantel Fireplace enclosure: Bottom: 0" Side: 0"to spacer Back: 0"to spacer Top: Do not fill the space above the fireplace Ei with any material(Except the wood framing) 39" (9gOmm) Chimney: 2"(50mm).Chimney type*: 6 in.diameter, IZ3 Min. certified model ASHT+*,S-2100+*,HT6000+*, QJ 45 Deg. 17"Minn. HT6103+*,DuraTechDTC**,ACor7in.ASHT*, Hearth lon (102mm \�(432mm) HT6103*. I 18" 32ti3/4" Mantel: 39" 990mm measured from the base of (4 �/\�(6 ( ) Min. in. MMin.in. the fireplace. Non-Combustible Material *Available from Security Chimneys® —Available from Dural/bmO Printed in U.S.A.©2018 Innovative Hearth Products P/N 900881-02 REV.NC 02/2018 Page 2 of 2 uperior Central Forced Air Kit NOTES: Rain Cap - Seal the top and NOTE:Not tested under EPA certification. If both sides of the installed, this appliance no longer qualifies roof flashing with waterproof caulk- Flashing Collar for EPA certification. ing. Flashing - The gap between The knock-outs provided on the back and on the vent pipe and the sides of the WRT3920WS fire lace allow a vertical lirestep P shall be sealed with Roof Support the connection of insulated flexible pipe which non-combustible Attic Radiation Shield enables you to heat adjacent rooms up to 50 caulking. feet from the fireplace hot air outlet. The ducting system must be installed as de- scribed below: Firestop A)Remove knock-out plate and cut insulation the adaptor atthe back and/or the side of the fireplace. Fix the adaptor by twist-locking 39"Min. it to the fireplace. You can use more than (990mm) one outlet on the fireplace(see Figure 26). © Non-Combustible I B)Attach the 5"flexible pipe,using the collars Facing + provided. Important: Make sure that the plastic wrapping around the flexible pipe will not be in contact with the fireplace. C)Route the flexible pipeto the chosen location. The ducting system can be installed either in an upper room or in a lower room. D)Attach the flexible pipe to the blower,using the collars(Figure 27). ® ©Combustibles are not allowed below top spacers E) Fix the back draft damper to the blower above the fireplace.Facing in front of fireplace must outlet. be non-combustible below this area. F)Attach aflexible pipe to the fan/flexible pipe Figure 25 adapter(square to round)and stretch it up to the location where the heat is required. G)Atthat point,the flexible pipe can be attached to any air distribution grill. The duct system must be installed respecting 6. Do not connect the hot air ducts to a central H)Install the blower heating and cooling ther- the following: heating system. Malfunction of the heating mostat(HCTW)in that part of the house to system's blower will cause the fireplace to be heated bythe hotairduct.Thethermostat 1. Remove the plates closing up the 8" dia. overheat. A furnace duct is only single wall can be switched to a cooling thermostat and holes on top of the fireplace. Then, cut and not double wall as is required for the installed in the same room as the unit. This the insulation in order to obtain two 8"dia. WRT3920WS fireplace hot air exhaust. thermostatwill turn on the blower when the openings. Fix the adaptors on the fireplace 7. Use only IHP grills and components as openings by turning clockwise(Figures 23 described in this manual. Other grills or room where the fireplace is located becomes and 24). registers,for example,may betoo restrictive too hot. 2. Maintain at least a 2" (50 mm) clearance and may overheat the fireplace or ceiling. between the ducts and any combustible 8. Do not use insulated flexible ducts as they This option requires electricity.Make sure that material;the required hole size is 13" x 13" will overheat. the connections to the blower have been made (330 mm x 330 mm). 9. Do not use tees or any other components according to the local codes and comply with Exception#1: For the grills,the fram- than the ones specifically listed here. their requirements (see instruction provided ing can be 10-3/4"x 10-3/4"(275 mm 1RNever allow the ducting to pitch down as with the thermostat). For more information x 275 mm)torovide the clearance as hotairwill betrapped creating afire hazard. P regarding central forced and ducting, refer required by the integral spacers on the Never route the ducting downwards. to the BISFWK-1 installation sheet provided double outlet duct system. 11.The hotairoutletgrills must be installed with 3. The maximum number of elbows in a run of the louvers pointing downwards in order to with the kit. duct is two. prevent overheating adjacent ceilings. 4. Maintain at least 6-1/2"(160 mm)clearance ! fromthe outletgrill f ramingto acombustible ceiling,side wall,mantel or floor. 5. When traversing a combustible wall orfloor, afirestop must be installed atthewall orfloor penetration.The hole size must be 13"x13" (330 mm x 330 mm) 18 NOTE DIAGRAMS&ILLUSTRATIONS ARE NOT TO SCALE Makea4-1/4"(110 mm)hole in the outsidewall of the house atthe chosen location. From outside, place the outside air register in the hole(open side down)and fasten the registerto the wall with screws as shown(see Figure 28). Slip the pipe into the insulated sleeve. Place the insulated Adaptor pipe over the register tube and over the fireplace's outside air connector (see Figure29).At each end,carefully pull backthe insulation and plastic Insulated ,o cover exposing the flexible pipe. Using the aluminium tape provided, Flex Pipe wrap the tape around the joint between the flexible pipe and the air inlets. Carefully push the insulation and plastic cover back over the pipe. Using aluminium tape,fasten the plastic cover in place. Q 1 Outside Aluminum Tape Intake Figure 26 Plastic Cover I I Insulation Screw Blower i j Flex 5"Diameter Insulation Opening Flexible Pipe Facing Down Aluminum Tape Wall Tightening Collar Figure 28-Outside Connection Aluminum Tape g g Figure 27 Fireplace OUTSIDE AIR KIT Connection It is mandatory to install an outside air connection to the WRT3920WS Aluminum Tape Fireplace fireplace. The following components are required and are included with Plastic the fireplace: Cover • Outside air kit (includes 4 inch flex that goes up to ten(10)feet long) • 4"Adaptor for fireplace connection Insulation Outside Air Installation Flexible Pipe Aluminum Tape The outside air assembly may be installed according to the following requirements: Figure 29-Outside Air Connection To The Fireplace A)Duct length should be kept to a minimum.The maximum length of a 4"interior diameter(100 mm)insulated flexible duct is 20feet(6.1 m). The duct can be extended to a maximum of 40 feet(12 m)using a 6" interior diameter(150 mm)insulated flexible duct(See note below). B)The air intake register must not be installed more than ten(10)feet (3050 mm)above the base of the fireplace. C)The fresh air must come from outside the house. The air intake must not draw air from the attic,basement or garage. L D)The air intake should be installed where it is not likelyto be blocked by snow or exposed to extreme wind and away from automobile exhaust fumes,gas meters and other vents. E)The,duct and register may be installed above or below floor level. NOTE.We recommend not to exceed 20 feet of 4"flexible pipe. If you require a longer length we recommend that you use a 5"diameter flex- ible pipe for the complete run up to 30 feet and a 6"diameter pipe for a run of up to 40 feet 19 NOTE DIAGRAMS&ILLUSTRATIONS ARE NOT TO SCALE DRAFT REQUIREMENTS 8. If the chimney extends higher than five(5)feet(1,500 mm)above its point of contact with the roof,it must be secured using a roof brace. Draft is the force which moves air from the appliance up through the 9• A rain cap must be installed on top of the chimney.Failure to Install chimney.The amount of draft in your chimney depends on the length of a rain cap may cause corrosion problems. the chimney,local geography,nearby obstructions and otherfactors.Too 10. Cut and frame square holes in all floors,ceilings,and roof that the much draft may cause excessive temperatures in the appliance and may chimney will go through to provide a 2"(50 mm)clearance between damagethe catalytic combustor.Inadequate draft may cause backpuffing the chimney and any combustible materials. Do not fill this 2"space into the room and plugging'of the chimney or the catalyst. with insulation or any other combustible material. 11. Portions of the chimneywhich may extend through accessible spaces Inadequate draft will cause the appliance to leak smoke into the room must be enclosed to avoid contact with combustible materials or through appliance and chimney connector joints. damage to the chimney. 12. When offsets are used,the pipe may not penetrate a ceiling or floor An uncontrollable burn or excessive temperature indicates excessive draft. unless it is running vertical(no 300 offsets). THE CHIMNEY SYSTEM Chimney Installation Notes two(2)feet Min. 1. This appliance is equipped with a universal vent collarthatwill require erten(10)feet three(3)feet Min. the first vent section of pipe to be secured with four screws to the =;;3 =collar(equally spaced around circumference). 2. If possible,install an interior chimney as it will provide better perfor- mance. In areas with continuous temperatures below-18°C(0°F), the use of an exterior chimney increases the likelihood of operating problems such as low draft,high rate of creosoting,and poor start-up Figure 30 characteristics. Exterior chimneys are also prone to down-draft and flow reversal. Installations,which are located on lower floors in the house,such as in a basement,in combination with outside chimney, NOTE.•2°clearancetocombustiblesaroundchimneycomponentsrequired. are especially prone to flow reversal. 3. The IHP fireplace model WRT3920WS may be installed only with Se- NOTE.,Blown or fill type insulation materials must not be in contact with eurityChImneys® eysys 6"diameterchImntems*orDuraVentmodels the fireplace orinthe enclosure frameasdescribedin"Enclosure"section. Dura echandDura ech T)TCch nmi ey"syste s*-:'TheWRT392OWS fireplace may also__be installed with a 7" chimney system(ASHT� NOTE:Local codes may not require firestopping at the ceiling levels for or HT6103* using the o tional 6AW7*7 adaptor 7 AC chimne outside chase installations.However,itis recommended for safety and g _P_ p y the reduction of heat loss. ci ns of allowed). -or more information refer to chimney installation manual. " � - 4. A chimney venting a fireplace shall not vent any other appliance. 5. The minimum chimney height is twelve(12)feet(3.7 m).In altitude, add 18"(450 mm)to the chimney for every 2,000 feet(600 m)above sea level. 6. All chimnevM installations must include at least one support. Re- ducing the amount of chimney weight on the fireplace will help avoid the noise created when the fireplace expands. This can be achieved by having the chimney supported by the supports. The maximum chimney length that can be supported by the fireplace is nine(9)feet (2.75 m)for S-2100+/HT6000+,twelve(12)feet(3.7 m)for ASHT+ /HT6103+/DuraTech DTC* and 26 feet-(8 m)for AC chimney. 7. The chimney must extend at leastthree(3)feet(915 mm)above its point of contact with the roof and at least two(2)feet(610 mm)higher than any wall,roof or building within ten(10)feet(3m)of it(Figure 30). �I 1 20 NOTE.DIAGRAMS&ILLUSTRATIONS ARE NOT TO SCALE *Avadable from Security Chimneys' -Available from Duravent® CHIMNEY INSTALLATION INSTRUCTIONS Attic Radiation Shield ASHT/S2100 ' AC Attic Radiation HT6103t/�QQ0+ ' AirCooledPipe* Shield 1. Cut and frame the holes in the ceiling,floor Solid Packed Pipe* o and roof where the chimney will pass(see , Figure 31).Use a plumb-bob to line up the center of the holes. The sizes are indicated ' NVV in Table 2for the floor and ceiling holes and ; Table 3(Page 22)for the roof holes. AAAN MIME CHIMNEY MODEL* SQUARE HOLE 6" SIZE OPENING ' ASHT+/HT6103+* 12-3/8"(314 mm) Firesiop Radiation Shield OuraTech DTC** 12-3/8"(314 mm) Figure 32a Figure 32b S-2100+/HT6000+* (14-1/8"(359 mm) AC* 1' 6(380 mm) NOTE•See Table 3 for Sloped Roof Framing AC CHIMNEY*INSTALLATION Table 2-Flat Roof Framing (AIR COOLED GALVANIZED CHIMNEY) Rain Cap Collar Flashing �J 1 Figure 31 -Roof Framing Attic Radiation 2. From below,install afirestop in each ceiling/ Shield floor separation through which the chimney will pass. At the attic level, install an attic radiation shield from above(Figure 32a). 3. For ASHT+*/HT6103+*/DuraTech DTC* and S2100+*/HT6000+*chimneys place Firestop the first chimney length on the fireplace. Secure ittothe collarwith fourscrews equally spaced around the perimeter. With the AC chimney, you must use a starter section before installing the first chimney length Chimney Outside Universal Support (Figure 33). Continue installing chimney Air Intake lengths making sure to lock each length in (required when place. using AC chimney) 4. Every time the chimney passes through " a ceiling or a wall, install the appropriate O r' firestop.Whenyou reachthedesired height, install the roof support.When installing a support,slightly lift the chimney system so the weight will lie on the support,not on the AC Starter Sectio fireplace to reduce expansion noises(Refer to instructions included with the support). 5. Then,put the roof flashing in place and seal the joint between the roof and the flashing pitch see Figures 34 and 35. Outside Combustion with roofing pi ( ) Air Kit(included For sloping roofs, place the flashing under with fireplace) the upper shingles and on top of the lower shingles. Nail the flashing to the roof,using roofing nails. 6. Placethe spacers and the storm collar overthe ©Combustibles are not allowed below flashing,and tighten it with the bolt supplied. top spacers above the fireplace.Facing in Finally,seal the joint between the storm collar frontof fireplace must be non-combustible and the chimney,using silicone caulking. Figure 33 below this area. 7. Install the chimney cap. Once the chimney cap is in place, the roof flashing can be washed with a solvent or vinegar and then painted with rust-proof paint. 21 *Available from Security ChimneysO **Available from DuraVento After reaching the location requiring the AC elbow,proceed as follows: AirCoo/ed Chimney* imney ASHT+*/HT6103+*/S-2100+*/HT6000+*/ Collar DuraTech DTC*Chimneys Stotlas ing) 1. Install the first elbow;turn it in the required ft iso flashing) i direction. Fasten it to the chimney with the three (3) 1/2" (12 mm) metal screws provided with the elbow. 2. Install the necessary chimney lengths to achievethe required offset.Lockthechimney Flashing lengths together:it is recommended to use three(3)1/2"(12 mm)screws. If the offset length is made of two(2)chimney lengths or more,use an offset or roof support halfway up the offset. If penetrating a wall, install Figure 34 Figure 35 a wall radiation shield(see Figures 38 and 39). 3. Use another elbowto turn the chimneyverti- Roof Down Slope Hole Size tally. Securethe elbow,using three(3)1/2" SLOPE ASHTi*I NT6103+*/DuraTech® S-2100*/HT6=+* AC* (12 mm)screws(provided with the elbow). DTC* 4. Use a plumb-bob to line up the center of Roof Pith 6" 6" 6" the hole.Cut a hole for the chimney in the 0' 128"(314 mm) 14-118"(359 mm) 15"(380 mm) ceiling/floor. Frame this hole as described previously(refer to section Chimney Instal- 2/12 12-9/16"(319 mm) 14-318"(365 mm) 15 318"(390 mm) lation Instructions). 4/12 13"(330 mm) 14-718"(378 mm) Will"(410 mm) 5. From below, install a firestop (See Figure 6/12 13-7/8"(352 mm) 15,3/4"(400 mm) 16 7/8"(430 mm) 32a). 6.Asupport(ST*or SO*)must be used on the 8/12 14-7/8"(378 mm) 17"(432 mm) 181/4" (465 mm) first 15'section(5 m). 10/12 16-1/8"(410 mm) 18 8"(467 mm) 1958"(500 mm) 7• Continue with the regular installation. 12/12 17-1/2"(445 mm) 20"(508 mm) 21318"(545 mm) AC Chimney* 't =Slope Hole Sine Patthechimneycapinfoplace. 1. Install the first elbow.Turn it in the required Wash Meroof flashing wilhasoiuenlorvinegar,Men paid dwith n0pindpaifit direction. To lock it in place,turn 1/8 of a Table turn.Fasten the straps attached to the elbow to the surrounding frame, using nails or OFFSET CHIMNEY INSTALLATION drywall screws(see Figure 37). 2. Install the necessary chimney lengths to ney After reaching the location requiring the elbow,proceed as follows.The minimum chimney height achievet together. If p set. ratingLockwall, use when using elbows is: lengths together. If penetrating a wall, use a wall radiation shield. 3. Use another elbow to turn the chimney Minimum Chimney Height Using Elbows vertically. Lock it to the chimney. Fasten Fireplace Model WRT3920WS the straps attached to the elbow to the p surrounding framing using nails or drywall Chimney Model ASffr*/S2100+*/HT6103+*1HT6000+*/AC*IOuraTech DTC* screws. Vertical installation 12 feet(3.66 m) 4. Use a plumb-bob to line up the center of the hole.Cuta hole forthe chimney in the ceiling. Two(2)elbows 15 feet(4.57 m) Frame this hole as described previously. Four(4)elbows 17 feet(5.18 m) 5 From below, install a firestop (see Figure Table 4 6. Continue with the regular installation. MOTE. When using AC chimney*,an AC6SB* NOTES., startersection must be used before installing •Must return to vertical before penetrating ceiling or floor an elbow. When an offset is needed imme- •A maximum of 2 offsets are allowed. diately off the top of the fireplace,an elbow starter section,AC6SB3&,is available. 22 NOTE.DIAGRAMS&ILLUSTRATIONS ARE NOTTO SCALE. *Available from Security ChimneysO **Available from DuraVent® Offset Dimensions B Total Height �-A Horizontal Offset Chimney Elbow Offset& One Length Between Elbows Two Lengths Between Elbows 6" Height 8" 12" 18" 24" 36" 48" 8"&48" 12"&48" 18"&48" 24"&48" 36"&48" 48"&48" 15" A 33/16" 43/16" 5-7/8" 7-7/16" 10-12" 13-W 15-3/8" 16-7/16" 18" 19-1/2" 22-5/8" 25-3/4" (84mm) (110mm) (149mm) (189mm) (267mm) (346mm) (391mm) (418mm) (457mm) (495mm) (575mm) (654mm) Secwe Temp B 15-11/16" 19-9/16" 25-3/8" 313/16" 423/4" 54-38" 60-15/16" 64-13/16" 70 IT' 763/8" 87" 99-9/16" ASHT* (398mm) (497mm) (645mm) (792mm) (1086mm) (1381mm) (1548mm) (1646mm) (1792mm) (1940mm) (2210mm) (2529mm) Nora 30° A 7-7/16" 9-7/16" 12-7/16" 15.7/16" 21-7/16" 27-7/16" 30-13/16" 32-13/16" 35-13MIT' 38-13/16" 44-13/16" 50-13/16" Temp (189mm) (240mm) (316mm) (392mm) (545mm) (697mm) (783mm) (833mm) (910mm) (986mm) (1138mm) (1291mm) Ht6103+� B 20" 23-1/2" 28-11/16" 33-7/8" 44-1/4" 54-11/16" 60416" 64° 69.1/4" 74-7/16" 84-13/16" 95-1/4" (508mm) (597mm) (729mm) (860mm) (1124mm) (1389mm) (1538mm) (1627mm) (1759mm) (1891mm) (2154mm) (2419mm) DTC' 450 A 103/16" 13-3/16" 173/8" 213/8" 30-1/8" 38-5/8" 43-7/16" 46.1/4" 50-1/2" 54-314" 63-1/4" 71-11/16" (262mm) (335mm) (441mm) (549mm) (765mm) (981mm) (113mm) (1175mm) (1283mm) (1391mm) (1607mm) (1818mm) B 17-13/16" 2038" 24 78" 29-1/8" 3738" 46.18" 50-15/1(1 53-3/4" 58" 62-1/4" 703/4" 79-3/16" (452mm) (524mm) (632mm) (740mm) (956mm) (1172mm) (1294mm) (1365mm) I (1473mm) (1561mm) (1797mm) (2011mm) Chimney Elbow Offset& One Length Between Elbows Two Lengths Between Elbows 6" Height 8" 12" 18" 24" 36" 48" 8"&48" 12"&48" 18"&48" 2V&48" 36"&48" 48"&48" 150 A 33/16" 4-5/16" 5-78" 7-7/16" 10-1/2" 13-W 15-1/2- 16-12" 18-1/16" 19-5/8" 22-314- 25-13116" (84mm) (110mm) (149mm) (189mm) (267mm) (346mm) (394mm) (419mm) (459mm) (498mm) (578mm) (656mm) Secure TempB 16" 19-7/8" 25-11/16" 31-12" 43-11'16" 543/8" 61-7/16" 65-1/4" 71-1/16" 76-7/8" 88-12" 100-1/16" S2109+* (406mm) (505mm) (652mm) (800mm) (1094mm) (1387mm) (1561mm) (1657mm) (1805mm) (1953mm) (2248mm) (2542mm) Nova Temp 301 A 738" 9.3/8" 12-38" 15.38" 21-38" 27-W 30-7/8" 32-78" 355-7/8" 38-7/9' 44-7/8" 50-7/8" Ht (187mm) (238mm) (314mm) (391mm) (543mm) (695mm) (784mm) (835mm) (911mm) (987mm) (1140mm) (1292mm) B 20-11/16" 24-3116" 29-38" 34-9/16" 4415/16" 553116" 61-38" 64-78" 70.1/16" 75-1/4" 35W' 96" _ (525mm) (614mm) (746mm) (878mm) (1141mm) (1405mm) (1559mm) (1648mm) (1780mm) (1911mm) (2175mm) (2438mm) Chimney Elbow Offset& One Length Between Elbows Two Lengths Between Elbows 6" Height _ 12" 18" -- 36" 48" — 12"&48" 18"&48" — 36"&48" 48"&48" A — 4-13/16" 6-1/8" — 11" 14-1/8" — 16-7/8" 18-7/16 — 23" 26-3/16" 15" — (122 mm) (156 mm) — (280 mm) (359 mm) — (429 mm) (468 mm) — (584 mm) (665 mm) B — 27-11/16" 33-1/2" — 50-7/8" 62-12" — 72-5/8" 78-7/16" — 95-3/4" 107-3/8" 6"� — (703 mm) (851 mm) — (1292 mm) (1588 mm) — (1845 mm) (1992 mm) — (2432 mm) (2727 mm) 6 A — 9-3/8" 12-3/8" — 21-318" 27-3/8" — 32-5/8" 35-5/8" — 44-5/8" 50-5/8" 30" — (238 mm) (314 mm) — (543) (695 mm) — (829 mm) (905 mm) — (1134 mm) (1286 mm) B — 25-3/4" 31" 46-1/2" 57" — 66" 71-1/4" — 86-7/8" 97-1/4" (654 mm) (787 mm) — (1181 mm) (1448 mm) — (1676 in (1810 mm) — (2207 mm) (2740 mm) NOTE: With the AC chimney*,a starting length of 6"high must be used on top of the fireplace before installing an elbow. Figure 36 23 NOTE DIAGRAMS&ILLUSTRATIONS ARE NOTTO SCALE *Available from Security ChimneysO **Available from DuraVeniO ANGLED WALL RADIATION SHIELD* OFFSET CHIMNEY INSTALLATION* When traversing a combustible wall with the chimney at a 300 or 45° Chimney AC angle,an angled firestop or wall radiation shield must be installed; Only one is required. NOTE.450 angle for Canada only(RSIVN45*/6DTC-S45**) In cold climate locations(climates where temperatures will fall below 320 SupportACRS F/0"C),we recommend that you use the insulated wall radiation shield since it will maintain the home's thermal barrier. Starter Section Security Chimneys® DuraVenr RSM+ and RSMI30 6DTC-WTI and 60TC-S30 Straps (RSMI45-Canada Only) (60TC-S45-Canada Only) ;�ffis Straps Chimney Model Angle Hole Size NOTE: This illushation is ASHT+#/HT6103+# 301 283 mm x 781 mm(11-1B"x 30-3/4") not to scale. It represents (6"dia).Canada only 45° 28 i mm x 518 mm(11-118"x20-3)8") how the chimney must be DuraTech DTC— 30° 283 mm x 781 mm(11-1/8"x 30-3/4") supported. A 30 degree (6"dia).Canada only ° offset only is allowed in 45 283 mm x 518 mm [11-1/8-x20-3/8") the USA and a 45 degree S-2100+*/HT6000++/ 30° 327 mm x 881 mm(12-7/8"x 34-11/16") maximum offset is allowed AC(6"dia). 30° 380 mm x 972 mm(15"x 381/4") Figure 37 in Canada. Table 5 OFFSET CHIMNEY INSTALLATION WITH WALL PENETRATION* Insulated Wall Rain Cap -- ----- Collar Drywall = - Roof Flashing Offset Support Angel Wall Radiation Figure 39 Shield(Insulated)* Framing 2"x 3" Insulated Wall Radiation Shield 0 NOTE./aco/dareasHis recom- mended to protect the chimney in a insulated chase. " Figure 38 24 NOTE DIAGRAMS&ILLUSTRATIONS ARE NOTTO SCALE. *Available from Secunly Chimneys® **Available from DuraVWD CHIMNEY SUPPORT INSTALLATION Universal Roof Support When installing a support,slightly lift the chimney system so the weight will lie on the support,not on the fireplace to reduce expansion noises. 18"(460 mm) 18"(460 mm) This support has three possible uses: 1. For ASHT+/HT6103+and S-2100+/HT6000+,it must be used on a roof to support the chimney*. 18"(460 mm) 2. It may be used on a floor,ceiling or roof above an offset to support T16" 0 mm) 16"(410 mm) the chimney above the offset. 3. It may be used on a floor,ceiling or roof as a supplementary support. Table 6 gives maximum height of supported chimney. NOTE.,For the AC chimney,a support section must be used every forty (40)feet(12 m)instead of the universal roof support(ST*). Figure 40 For roof support installation,refer to the instructions provided with the support. Universal Offset Supporter CHIMNEY ADAPTOR*(S-2100+/HT6000+)CANADA ONLY This support is used to support the chimney above an offset. When The fireplace is supplied with a chimney adaptor suitable for the ASHT+/ the chimney offset is used to traverse a wall this support may be used HT6103+chimney*. If you wantto install a S-2100+/HT6000+chimney, on the wall to support the chimney. The maximum heights are given in an adaptor is available(6UCA*) (Figure 41). A separate starter section Table 6. For offset support installation,referto the instructions provided will also be required if AC*chimney is installed. with the support. CHIMNEY MODEL MAXIMUM HEIGHT OF SUPPORTED CHIMNEY Chimney Adaptor*- Offset Support Roof support Canada only IR11 ASHT+/HT6103+ (6"dia).* 28 feet(8.54 m) 29 feet(8.84 m)OuraTech DTC (6"dia).** 28 feet(8.54 m) 29 feet(8.84 m) S-2100+/HT6000+ (6"dia).* 18 feet(5.49 m) 20 feet(6.1 m) i I AC (6"dia).* 40 feet(12.19 m) 50 feet(15.20 m) Table 6 CHIMNEY CHASE AND MULTIPLE TERMINATIONS For the purpose of this manual,a chimney chase is considered a part of the chimney system rather than part of a building. The termination must be placed a minimum of 18"(460 mm)above the chase. For installations where more than one chimney is located in the same ° chase or within the same area,we suggest that their terminations be separated by at least 16"(410 mm)horizontally,and 18"(460 mm)verti- cally. This separation is to prevent smoke migrating from one chimney to another(see Figure 40). Figure 41 25 NOTE-DIAGRAMS&ILLUSTRATIONS ARE NOT TO SCALE *Available from SecurdyChimneyO —Available from DuravenlO APPROVED AS NOTE DATEL3 v B.P.# FEEt5 2 BY: NOTIF- BUILDING D�!:PARTMENT AT 765-1802 8 Aid TO 4 Ptv9 FOR THS — FOLLO'rNING INSPECTIONS: � I 1. FOUNDATION - TWO REQUIRED FOR,POURED CONCRETE I J 2. ROUGH - FRAMING &' PLUMBING I J I I I I J 3. INSULATION I J I L 4. FINAL - CONSTRUCTION MUST I BE COMPLETE FOR C.O. I ( J J ALL CONSTRUCTION SHALL ,MEET HEJ REQUIREMENTS OF THE'.CODES OF PJEvI YORK STATE. NOT RESPONSIBLE DR DESIGN OR CONSTRUCTION ERR I ISI I I I I J COMPLYWITH ALL CODE NEM YORK STATE & TOWN 90OFS I - _ - - -I - AS REQUIRED - - - - - - - -- - - - -+ -' FOUNDATION SOUTHOLD TOWN ZB • - - - - —I � - - - - - - - ` - - ` - - i i- -' --"- -' -' �'' j 60" o.c. anchor bolts EQ SOUTHOLD T PLANNING BOARD I J ( _ 8" poured concrete or block walls SO TOWN TRUSTEES I I ( 4"poured concrete slab with water proofing N.Y .DEC I I ( 10"x10"wire mesh ;_ _ 8" x 1'4" P.C. footing w/keyway I Existing 4"poured concrete slab 1 J (on grade)w/block walls J Note:Make flush with I 17'0" EQ. I 12"block First-floor ' top of existing kitchen 8" block on Second floor the floor.OCCUPANCY i — r 22'0" USEI UNLAWFUL EQ WITHOUT CERTIFICATE i I 1_ _ -- _ _ -� 1 . I I J —. ^ ^. ^ .— .— � ——� VERIFY MEASUREMENTS IN FIELD . OF OCCUPANCY 1 L — - - - — — — — — —� I 15'0" EQ FA N�f NE vor4 RET 1 S , CH AP�s�R 236 - ®� w r0 ptJpow l 10 EQ- EQ. EQ- ,, OF ZI;E-COWN OODE. 20'0" ADDITION FOUNDATION PLAN !Deborah suta&Gary Parker !3950 Stars Road East Marion,NY 11939 ` rm#1000-22-02-14.1 LIVINGROOM GARGAGE UTILITY ROOM Remove existing garage door and close opening with new closet wall Align HEADER 1.3E LSL EQ 3 1/2"x 11 1/4" DEMO NON BEARING WALL EQ. NEW GREAT ROOM \ 1T 0" ®� Relocate existing inswing door` 221011 1oo IITCBEN w/r and 1 glass panels EQ, sas 001 Anderson 400 series a�'* �® �� BAT�I - WDH 2846E-2 � ®" I LEGEND EQ.— EQ. EQ. Existing 15'0" Existing to be removed 20'0" '�-��"-'"-'-'•' Existing concrete block j New 2"x 6" @ 16"o.c. I Deborah Sutera&Gary Parker Stars RoadAnDITION ISt FL00� PLAN East Marion,NY 11939 Tm#1000-22-02-14.1 l O O OFFIC STORAGE BATH 0 Remove existing windows and fill with blocking and 1/2"gypsum board to match existing • `1 ME 110 Rafters 13/4"x 117/8" LL i i• T-JI 110 joists 1 3/4"x 117/8"' \ , LEGEND ENLARGED BEDROOM#2 WDH 2846E-2 Existing Existing to be removed -- - Existing concrete block 1 BEDROOM#1 _ BEDROOM#2 ,I New, 2"x 6" @ 16"o.c. HE 17 QVDH 2846E _ � v S LA 10. niz S SlQx� -- -- -------- — --- ------- -- - -- -- -- - -- - ' Deborah Sutera&Gary Parker ADDITION 2nd FLOOR PLAN 3950 Stars Road . 3 East Marion,NY 11939 TNz#1000-22-02-14.1 FLAT ROOF REPLACEMENT .090 EPDM LOWER ROOF AND NEW ROOF see Roof Replacement Notes 1 and 2 Tear off all roofing to sheathing. ' Replace any damaged sheathing- R-49 insulation Install Firestone 1/2"high density insulation board using screws and plates was per specs. CJI 110 Rafters 13/4"x 11 7/8" Install Firestone EPDM rubber roof membrane fully flush with existing rafters. adhered as per Firestone specs. Install heavy duty white aluminum roof edge along perimeter. Install Firestone Quick Seam flashing around entire perimeter. WALLS Install Firestone Quick Seam flashing around all protrusions and penetrations. sill seal NOTE: 1 Cut back stucco siding to properly run rubber up the termite shield side walls. R-21 insulation 2 2"x6" cca sills 2"x6" studs 16"o.c. NOTE:2 Build large cricket in front of existing roof and carry R-21 insulation it across new addition so water drains properly- _ solid bridging on all bearing walls 1/2" gypsum board interior Install new white aluminum 4"round downspouts Finish flush with existing joists 1/2"cdx plywood exterior fur as needed. 15 lb felt with white aluminum leader head. stucco siding "LJI 110 joists 13/4"x 11 7/8" i 12" '-12" R-10 insulation 4" poured concrete reinforced with wire mesh ,�r20, FNE 3'0" //'>. made flush with top of existing kitchen file floor; `811 811 1 Deborah Sutera&Gary Parker ADI�ITIOI�T SECTION A 3950 Stars Road j East Marion,NY 11939 A TM#1000-22-02-14.1 FASTENERT(PE: SPACING: f No.11WOOD-SOLEA! fj1 II t IVM 2M.EMBEDMUT LEMI Na ID WDMMMVS 1 1",% INIMANMORMN 16'OC ENT LEMI 2h.EMBMM GTH 11A1141,Mft IAGSCREW ARMORMH IV OC III,EMBEDMENT L24TH c it Ij AW APA PLYWOOD .1 ,' 'x SHEATHING 74-APA RATED SHEATHING I GRADE PLYWOOD ,I 14-APA RATED SHENTHING GRADE PLYWOO IALTERNATMVE 7/1V0.L&) ( �II ill I !fi 1 �( I j ` 11 f: y I', ,r J� ' � ±Jl �� �� I I j III jl ';� j •i I !j� I Y I FASTENERTYK. SPACING: I f 2X4 Dr#2 N.8 WDOD-SO.EWSTJDS- BASEDANOORWITH 10'oc 11EMBEDI'lefflumm k veNoowDa g I TYPICAL WINDOW OPENING T; WEDAIRMORWITH Lr cc 114.d.LAGSCREW DASEDANDR)IRWITH 1V cc PANEL SPAN EQUAL OR SMALLER 2hEMBEDHENtumm THAN 4 FEET 2h EMBEDMENT LENGTH TYPICAL DOOR OPENING •MULTIPLE PLYWOO D A M I UE S ....... SPACNGt PANEL SPAN GREATER THAN 4 FEET 2-MI)F02STUDICONNECTED AND EQUAL OR SMALLER TOGETHERWrMITAINLESSMEL N.8moDamm THAN 6 FEET ORGALMNIZED DOLTS W/WASHIM BASEDXXMRWM roc ANDNtmarooc. 21%EMBEDMENT LIWGTH TYPICAL MULTIPLE OPENINGS fttQvISASEDANOMWITH roc =D`wtEm N,84BEDMW LENGTH PANEL SPAN GREATER THAN 6 FEET AND EQUAL OR SMALLER asw 1/4h dW.LAM� ANOiDRVM IVOC THAN 8 FEET 21"EMBEDMENT UNM" WIND-BORNE DEBRIS PROTECTION FOR WOOD STRUCTURAL PANEL AS PER SEC. 1609.1.2,2015 IBC: ALTERNATIVE FOR OPENING PROTECTION IF NOT USING IMPACT GLAZIN WINDBORNE DEBRIS PROTECTION FASTENING SCHEDULE FOR WOOD STRUCTURAL PANELS WOOD STRUCTURAL PANELS WITH A MINIMUM THICKNESS OF 7/16" 14EW AND MAXIMUM PANEL SPAN OF 8 FEET SHALL BE PERMITTED FOR OPENING PROTECTION IN ONE-AND TWO-STORY BUILDINGS.PANELS SHALL BE PRECUT TO COVER GLAZED OPENINGS WITH ATTACHMENT HARDWARE PROVIDED.(REFER TO SECTION 1609.1.4,1609.6.5 AND TABLE 1609.1.4 OF N.Y.S.RESIDENTIAL CONSTRUCTION CODE).THIS IS NOT A SUBSTITUTION FOR DESIGN-PRESSURE,ALL OPENINGS MUST HAVE DESIGN-PRESSURE UPGRADES WHERE APPLICABLE. ALL PANELS MUST BE CUT TO SIZE AND READY TO USE ON ANY NEW WINDOWS AND DOORS.SHUTTERS MUST BE MARKED FOR WHAT OPENING IT IS TO COVER, HARDWARE MUST ACCOMPANY SHUTTERS FOR INSTALLATION, tr LIJ 0 05elb 0A F NES ® 9 - v® 02 Deborah Sutera&Gary Parker ADDITION SIDE ELEVATION East Stars Road B East Marion,NY 11939 TM#1000-22-02-14.1 i I JU III [::] El - 1 E , 1 s sat Deborah Sutera&Gary Parker East ADDITION FRONT ELEVATION ' Stars Road ! C 'East Marion,NY 11939 TM#1000-22-02-14.1