Loading...
HomeMy WebLinkAboutC&D Removal ELIZABETH A.NEVILLE,MMC ��® �� Town Hall,53095 Main Road TOWN CLERK P.O.Box 1179 � g Southold,New York 11971 REGISTRAR OF VITAL STATISTICS ® Fax(631)765-6145 MARRIAGE OFFICER a®� Telephone(631)765-1800 RECORDS MANAGEMENT OFFICER ®� �► www.southoldtownny.gov FREEDOM OF INFORMATION OFFICER OFFICE OF THE TOWN CLERK TOWN OF SOUTHOLD August 3, 2021 Mr. John DiVello Peconic Recycling and Transfer Corp. 560 Commerce Drive Cutchogue, NY 11935 Dear Mr. DiVello: Congratulations. At the regular Town Board meeting held on July 13, 2021, the Town Board accepted the bid of Peconic Recycling and Transfer Corp. for hauling and disposing of construction and demolition debris. A certified copy of the resolution is enclosed. Thank you for your bid. Very truly yours, V,dam \t r , ,A Lynda M Rudder Deputy Town Clerk Ens. Southold Town Board - Letter Board Meeting of July 13. 2021 RESOLUTION 2021-585 Item # 5 28 ADOPTED DOC ID: 17234 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 2021-585 WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON JULY 13, 2021: RESOLVED that the Town Board of the Town of Southold hereby authorizes and directs Supervisor Scott A. Russell to accept the proposal of Mattituck Environmental Services; Inc for the removal and disposal of construction and demolition debris (C&D) from the Cutchogue Transfer Station; dated May 26, 2021, and to enter into a contract related to the same; subject to the approval of the Town Attorney and funded from budget lines authorizations SR 8160.4.400.810 (C&D Disposal) and SR 8160.4.400.817 (C&D Trucking). Elizabeth A. Neville Southold Town Clerk -- RESULT: ADOPTED JUNANIMOUSI MOVER: Robert Ghosio; Councilman SECONDER:Jill Doherty, Councilwoman AYES: Nappa; Dmizio Jr, Doherty; Ghosio; Russell ABSENT: Louisa P. Evans Giciler,iied Illy 1 4_ �O'1 I',1 42 g�}t f04"'ee' RFP: Hauling and Disposal of Construction and Demolition Waste iaE: � t Southold Town Solid Waste Management District Date: April 29, 2021 APPENDIX 1 QUALIFICATION STATEMENT FOR HAULING AND DISPOSAL OF CONSTRUCTION AND DEMOLITION WASTE TOWN OF SOUTHOLD, NY Proposal for Hauling and Disposal Service: Name of Contractor:. .C� n1�. .............. -t. Years in Business: . .. . . . . . . . ... ................. . , ..... A. Fees Hauling and Disposal operations (including all personnel, equipment, fuel, disposal and any other related costs, fees or charges associated with this contract). The Contractor shall complete the work in accordance with the required sections of the Request of Proposal for a fee of: 1. and`Dejbolit16d Waste H40_rjn&arad Disposal C&D Waste Hauling grid Disposa pe Ton": B. Subcontractors and Disposal Facility Identification Contractor shall identify all Subcontractors and Disposal facilities. List all Subcontractors, contact information, and identify proposed service(s): 1, Disposal Facility (List name, location, operator, ermit holder, and permit number),:' ir C. List the following information for ac 'any three a all Subcontractors). contracts of this nature � completed or currently hold (to be .completed by Contractor and 1. Contract:-V�� 0%% GV....:..................:....�(' .....................`i3�-C -ll®- Name,Address&Tefephon . of Contact: °�` Page 8of10 Request for Proposal Hauling and Disposal of construction and Demolition Waste Southold Town Solid Waste Management District ` q��g�FFOt cpG RFP: Hauling and Disposal of Construction and Demolition Waste a" , Southold Town Solid Waste Management District o` Date: April 29, 2021 �j��, 2. Contract: Go Name,Address&Telephone of Contact:-------- ------ --------�-----__ �__ -- -�QOCL j 3. Contract: Name,Address&Telephone'of Contact: _ = 4 D. Have you ever failed to complete work awarded to you? If so, state where and why (to be completed by Contractor and for all Subcontractors)�P E. Have you ever performed similar work under the direction of a Local Government? If so, list the two (2) most recent entities, giving a name, address, telephone number and the name of the project(to be completed by Contractor and all Subcontractors): 1. Local Government: . ...... ... . ...._ . �.. .�.............. Address&Tele hone of Contac'N " Name, N 2. 'Local Government:.............................................. ........... . ...- ,.. .............., ...........................:......... , .. . . . Name, Address & Telephone of Contact: _ F. Comments or Clarifications (attach additional pages if necessary),; Page q.f 10 Request for Proposal Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District ^ y , 11F Ol' -R- RFP: Hauling and Disposal of Construction and Demolition Waste . • s Southold Town Solid Waste Management District Date: April 29, 2021a�� ' G. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the Town in verification of the recitals comprising this statement of 4 Contractor's qualifications. l H. State the true, exact, correct and complete name of the partnership, corporation, or trade name under which you do business and the address of the place of business. (If a corporation, state the name of the President and Secretary. If a partnership, state the names of all partners. If a trade name, state the names of the individuals who do business under the trade name. It is absolutely necessary that this information be furnished.) ' n Legal NameofContractor: Type of Business (Corporation, Partnership, Individual): State of Incorporation (if applicable): Q � -- Principal Address of Business: " Phone Number:..�,Q•�\=.Z�- -c'1&8.. �� .................... . ... ........._................,................... N mesof Corporate Officers, Partners,orindividuals: Authorized Signatur t Printed Name Above:.-Ir -....6V\ \ ...... Title: Date: 1 Witness (Signature): Panted Name Above _. -, �(��` .............. Title: ' Date �, Page 10 of 10 Request for Proposal Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District E i 1 ^T'y"'"` t ih r` ''w •'4 ;rr ,ry,P�:�l+ y.`61s,. e're" `, -kq,�.X. .^ 'tn3 ,6eti�P' /61,%*�,�2 'RTk,,. fv u 'p n+.. , ; 9v4,«r V'; 9 ""d myW;,k "�d4�, �*r" '.t s y.b� k FF��J" ell" EICYCLING T , May 26, 2021 TOWN OF SOUTHOLD SOLID WASTE TRANSFER STATION 6155 COX LANE, SOUTHOLD NY 11935 APPENDIX 1., SECTION G. a) LETTER OF INTRODUCTION- Peconic Recycling&Transfer(PRT)shall provide hauling&disposal of construction waste from the town transfer station to our facility located at 560 Commerce Rd.,Cutchogue. b) DESCRIPTION OF FIRM-WE are located at 560 Commerce Rd, Cutchogue. This is our only facility. We employ 21 people. WE have been open since 2013 and do not plan on closing. We process 100 tons per day of demolition and do not have a liner system as we are a recycling center not a landfill. We are approximately 1 mile from the town transfer center. c) CONTRACTOR QUALIICATIONS-We are qualified to complete the scope of work as we are a transfer station and also a hauling company. Currently we are hauling&.disposing of the mixed paper& recyclables from the Southold Town transfer center. REFERENCES: DIAMOND BUILDERS 631.727.5500 HERBERT ISRAEL RIVERHEAD BUILDING SUPPLY 631.727.1400 KEVIN GOODALE ZUHOSKI CUSTOM BUILDERS 631.678.8647 MICHAEL ZUHOSKI d) PROJECT APPROACH-We offer hauling&disposal of construction and demolition debris. We have employees to operator equipment needed to haul & dispose of construction and demolition debris. Sincerely, Divello Managing Member Peconic Recycling&Transfer—560 Commerce Rd., Cutchogue NY 11935—631.298.8888 STATEMENT OF NON-COLLUSION (To be completed by each Bidder) In accordance with Section 103-d General Municipal Law, effective September 1, 1966, every bid or proposal hereafter made to a political subdivision of the State of any public department, agency, or official thereof or to a fore district or any agency or official thereof for work or services performed or to be performed or goods sold or to be sold, shall contain the following statement subscribed to by the bidder and affirmed by such bidder as true under the penalties of perjury; non-collusive bidding certification. A. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury, that to the best of knowledge and belief: (1) The prices in this bid have been arrived at independently without collusion, consultation,, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or any competitor. (2) Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly, to any other bidder or to any competitor. (3) No attempt has been made or will be made by the bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition. B. The person signing this bid or proposal certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the bidder,as well as the person signing in its behalf. C. That attached hereto (if a corporate bidder)is a certified copy of resolution authorizing the execution of this certificate by the signature of this bid or proposal on behalf of the corporate bidder. RESOL'UUTTION� 'n Resolved that �� o�L� ,i�' y _of the (Name of signatory)' L ` � )e authorized to sign and submit the bid (Name of C iporation) Or proposq of this corporation for the following P oject: and to include m such id or proposal the certificate as to non-collusion required by section one-hundred-three- d (103-d) of the General Municipal Law as the act and deed of such corporation, and for any inaccuracies or miss-statements in such certificate this corporate bidder shall be liable under the penalties of perjury. The foregoing is true and correct copy of the resolution adopted by ���C corporation at a meeting of the Board of Directors,held on the �QS1 �)c day Of ,20� (SEAL OF THE CORPORATION) Laws of New York, 1965 Ch. 751, Sec. 103-d,as amended& effective on September 1, 1965. Signature 1 ®�®gVFF0 ELIZABETH A.NEVILLE,MMC may. Gy Town Hall,53095 Main Road TOWN CLERK ® P.O.Box 1179 y Z Southold,New York 11971 REGISTRAR,OF VITAL STATISTICS 5 • Fax(631)765-6145 MARRIAGE OFFICER Ot` Telephone(631)765-1800 RECORDS MANAGEMENT OFFICER �0,� �a FREEDOM OF INFORMATION OFFICER www.southoldtownny.gov OFFICE OF THE TOWN CLERK TOWN OF SOUTHOLD BID OPENING 2021 C & D Hauling Services May 27, 2021 @ 2:00 PM One (1) bid received Total Peconic Recycling & Transfer $95.00 /ton 1 1 cal505la-d562-4106-a226-255056615dee lynda.rudder@town.southold.ny.us AFFIDAVIT OF PUBLICATION The Suffolk Times State of New York, County of Suffolk, The undersigned is the authorized designee of Andrew Olsen,the publisher of The Suffolk Times, a Daily Newspaper published in Suffolk County,New York. I certify that the public notice, a printed copy of which is attached hereto,was printed and published in this newspaper on the following dates: April 29,2021 This newspaper has been designated by the County Clerk of Suffolk County, as a newspaper of record in this county, and as such, is eligible to publish such notices. Signature Eliot T. Putnam Printed Name Subscribed and sworn to before me, This 06 day of May 2021 N tary 16atur ```e, �.aZp ,ASoa ®O STATE OF NEW YORK''. - :NOTARY PUBLIC: = Notary Public Stamp - o' ALRANY OIRE6399443 p lee 110,"I'll SION EX4�R�0.``��` SOUTHOLD TOWN BOARD 211 J cal505la-d562-4106-a226-255056615dee lynda.rudder@town.southold.ny.us AFFIDAVIT OF PUBLICATION The Suffolk Times LEGAL NOTICENOTICE IS HEREBY GIVEN THAT SEALED PROPOSALS ARE SOUGHT AND REQUESTED FOR THE FOLLOWING: Hauling and Disposal ofConstruction and Demolition Waste Definite specifications may be obtained at the Southold Town Clerk's Office beginning April 29, 2021 PLACE OF OPENINGS: SOUTHOLD TOWN CLERKS OFFICE 53095 MAIN ROADSOUTHOLD,NY 11971 DATE/TIME OF OPENING: May 27, 2021 2:00 PM CONTACT PERSON: James Bunchuck Town of Southold, 631-734- 7685 VENDORS MUST SUBMIT PROPOSALS IN SEALED ENVELOPES. PLEASE PRINT ON THE FACE OF ENVELOPE: 1)NAME&ADDRESS OF BIDDER2)PROPOSAL NAME It is the bidder's responsibility to read the attached Specifications,Instructions to Bidders, and General Conditions,which outline bidding rules of the Town of Southold. Upon submission of bid,it is understood that the bidder has read, fully understands and will comply with said GENERAL CONDITIONS and specification requirements. The Town of Southold requires that this document be returned intact and that it be filled out completely. Please do not remove any pages from this bid package and make a copy of the bid document for your records. The Town of Southold welcomes and encourages minority and women-owned businesses to participate in the bidding process.Dated: April 6, 2021 ELIZABETH A.NEVILLESOUTHOLD TOWN CLERK SOUTHOLD TOWN BOARD 212 ,� S1�fF01,�C IN- SOUTHOLD TOWN SOLID WASTE MANAGEMENT DISTRICT REQUEST FOR PROPOSAL Hauling and Disposal of Construction and Demolition Waste Date: April 29, 2021 The Town of Southold (herein referred to as "Town") hereby requests proposals (Proposal) from companies (Contractor) to provide Construction and Demolition Waste (C&D Waste) hauling and ; disposal services. The services include, but are not limited to, a) hauling approximately three thousand five hundred (3,500) tons of C&D Waste annually from the Southold Town Solid Waste Transfer Station (SWTS) located at 6155 Cox Lane, Cutchogue, NY 11935 to a permitted and regulatory compliant disposal facility (Disposal Facility), and b) disposing the waste at such Facility. Hours of Operation, SWTS is open to the public and commercial haulers seven (7) days a week from 7:00 am — 5:100 pm, except holidays which are as follows: TABLE 1 HOLIDAY ;Il CLOSED DATE " ,New Years Day January 'l Martin Luther King, Jr., Day Varies Presidents Day Varies,- Easter Sunday , Varies Memorial Day Varies _Independence Day July 4 Labor Day_ Varies Columbus Day Varies Election Day Varies Veterans Day _ November 1' Thanksqivinq Eve (Closes Varies 12 NOON Thanksgiving Day Varies Christmas Eve (Closes 12 December 24 NOON Christmas Day December 25 i New Year's Eve (Closes 12 December 3' NOON) Request for Proposal Page 1 of 10 Hauling and Disposal of construction and Demolition Waste Southold Town Solid Waste Management District l �o�aSUFfOj'k�OG, RFP: Hauling and Disposal of Construction and Demolition Waste y+ a;, Southold Town Solid Waste Management District Date: April 29, 2021 of $Ao',W 1.0 SCOPE OF SERVICES AND CONTRACT : ' Ili AEVle, TS. A. The Town desires a Contractor that can provide C&D Waste hauling and disposal services. The proposed term of this agreement is five (5) years, with a mutual option for two (2) additional years, renewable individually. The term begins on or around August 6, 2021, and concludes on or around August 5, 2026 (unless an option year is enacted). I ; B. The contract may contain a provision providing for defaults in the service of the contract. A thirty day (30-day) notice will be given to cure all defaults in the service of the contract or an option of termination will be used. C. Proposals received pursuant to this RFP should specify any price adjustments on an annual basis in accordance with the Consumer Price Index or other such adjustment. ; D. Contractor will provide an adequate number of trailers or containers to contain and store the C&D ; Waste designated for transportation during the working day, or to otherwise store the C&D Waste at SWTS pending transportation. Drivers will be required to inspect their trailers prior to leaving SWTS and report any trailer damage to onsite SWTS representatives before leaving SWTS with the respective trailer. The Town will not accept responsibility for unreported trailer damage once the trailer leaves SWTS. E. The Town will provide a vehicle to move trailers only (empty and full) between the designated loading and storage areas at SWTS. Trailer hookups or attachments shall be consistent with the vehicle provided by the Town. 'Prbuosals, received in response io :thii .RFP thatJhcfude,use of roll off containers must include provisions for moving such containers on-the-SWWTS,-site.as the Town does not own any-vehicle calpable of=movind_roll=off contalraers, F. Contractor shall take title to and ownership of the C&D Waste upon connection of the Contractor's ' tractor to the loaded trailer at SWTS, The Contractor is solely responsible for: a) any cleanup costs for spillage, b) litter control, c) liabilities arising out of accidents, and, d) any fees or fines connected with operations, transport, or unloading. Further, the Contractor shall take litle to and ownership of the C&D Waste upon its delivery to the Disposal Facility and is solely responsible for: a) its disposal after that time, b) any future closure and post closure costs, c) liabilities arising out of accidents, releases, or remediation activities, and d) any fees or fines connected with the Disposal Facility's operations. G. Contractor will abide and adhere to the SWTS Solid Waste Ordinance and the Solid Waste Operation Plans when applicable. H. Contractor and any of their subcontractors must comply with all rules and regulations established by local, state and federal laws. The Contractor shall be responsible for all permits required to provide this service. I. The Town reserves the right to close SWTS during extreme adverse weather conditions or . emergency situations. Request for Proposal Page 2 of IO Hauling and Disposal of construction and Demolition Waste Southold Town Solid Waste Management District J RFP: Hauling and Disposal of Construction and Demolition Waste N m Southold Town Solid Waste Management District $ Date: April 29, 2021 - J. Contractor shall designate a contact person or persons and provide to ephone number where the designated contact(s) can be reached at all times, including holidays and •weekends. The designated contact(s) must have the capability and authority to review the weekly progress, to provide extra trailers on busy waste days, and to resolve or report any type of complaint. All communications must be conducted with courtesy and respect. . K. Contractor must be equipped and ready to initiate the C&D Waste hauling and disposal activities upon execution of the contract with the Town. L. Contractor shall not sublet or assign this contract in whole or part withcut the written authorization by the Town. M.A sixty (60) day notice shall be given to the Town prior to any change in the Disposal Facility used for final disposal. 0. The Disposal Facility used under this contract must be and remain in ccmpliance with all state and federal laws, and regulatory agencies. P. Contractor shall not discriminate against any person because of race, sax, sexual orientation, age, , color, religion, or national origin. Q. Contractor will indemnify, save harmless, and exempt the Town of Southold, its officers, agents, and employees from and against any and all suits, actions, legal proceedings, claims, demands, costs, expenses, and attorney's fees incident to any work done in the performance of the contract arising out of a willful or negligent act or omission of the Contractor, its officers, agents, and employees; provided, however, that the Contractor shall not be liable for any suits, actions, legal proceedings, claims, demands, damages, costs, expenses, and attorney's fees arising out of a willful or negligent act or omission of the Town, its officers, agents and employees. R. Contractor shall obtain and maintain all licenses and permits (other than any licensees or permits granted by the contract) and promptly pay all taxes, fees and other documents required by the State of New York or Suffolk County. S. Contractor shall at all times during the contract maintain in full force and effect Workers Compensation including Employers Liability, Commercial General Liability including products and completed operations, specific contractual coverage to this agreement, Commercial Automobile Liability all through insurance carriers licensed in the State of New York, with an AM Best financial rating of A-10 or better. Before commencement of work hereunder, the contractor agrees to furnish the County certificates of insurance on the current standard ACCORD Certificate of Insurance Form listing the County as an additional insured, and with the notification of cancellation provision to be amended to read "shall provide 30 days written notice should coverage be cancelled or having sustained a material change in coverage . For purpose of the contract, the Contractor shall carry the following types of insurance at a minimum of the limits specified below: a. Workers Compensation - Coverage A - Statutory Limits/ Coverage B - Employer's Liability $1,000,000/1,000,000 Aggregate b. Commercial General Liability - Bodily Injury $1,000,000 each occurrence/ $3,000,000/ Annual Page 3 of 10 Request for Proposal Hauling and Disposal of construction and Demolition Waste Southold Town Solid Waste Management District RFP: Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District Date: April 29, 2021 Aggregate /Property Damage $1,000,000 each occurrence/$3,000,000 Annual Aggregate c. Commercial Automobile Liability - Bodily Injury $1,000,000 each person/$3,000,000 each occurrence /Property Damage $1,000,000 each occurrence d. Excess/Umbrella Liability - following form minimum coverage $3,000,000 each occurrence The above coverage may be provided by the Contractor's parent corporation. 2.0 SELECTION PROCESS 2.1. EVALUATION j A. All prospective contractors to visit the SWTS prior to the Proposal due date. 8. Town personnel will have the central responsibility for reviewing and evaluating all Proposals submitted in response to this document. The Town, in its sole discretion, may utilize outside personnel and expertise to review the Proposals or contract and make recommendations . C. A Proposal may be eliminated from consideration for failure to comply completely with one or more of the requirements, depending on their critical nature. The Town reserves the right to reject any or all Proposals, to waive irregularities and/or informalities in any Proposal, and to make an award in any manner, consistent with law, or deemed to be in the best interest of the residents of the Town of Southold. All Proposals become the property of the Town and will not be returned. D. In evaluating Proposals, the Town will consider the qualifications and experience of the contractors. In addition, the Town will consider whether or not the Proposals comply with the prescribed Proposal requirements and such data as may be requested. E. The Town may conduct such investigations as necessary to establish the responsibility, qualifications and financial ability of the Contractor, or any proposed subcontractors, to perform the work in accordance with the contract documents. 2.2 FACTORS OF EVALUATION A. The following criteria will be used to evaluate the Proposals: a. Completeness of information requested ' b. References and reputation of Contractor c. Quality and capability of organization d. Project approach e. Suitability of disposal facility (as applicable) f. Cost g. Contract terms and conditions Please note: The above order of criteria does not imply an order of importance; Request for Proposal Page 4 of 10 Hauling and Disposal of construction and Demolition Waste Southold Town Solid Waste Management District r RFP: Hauling and Disposal of Construction and Demolition Waste te Tn Southold Town Solid Waste Management District Al Date: April 29, 2021 ` � 'p.1 The Town may select two or more Contractors on the basis of the aforementioned factors and request interviews to discuss in detail the project approach and services to be provided prior to making an award pursuant to this RFP. The interview and the information obtained at that time will become as binding as the information in the Proposal and shall be used to make the final determination of the Contractor. 3.0 FINAL AWARD t A.The Town reserves the right to reject any or all offers and discontinue the proposal process without i obligation or liability to any potential Contractor, or reject any or all Proposals, including without ; limitation, nonconforming, non-responsive, unbalanced, or conditional Proposals. The Town further reserves the right to reject the Proposal of any Contractor whom it finds, after reasonable inquiry and t evaluation, to lack the capabilities to adequately provide the services regt,ested. The Town may also reject the Proposal of any Contractor if the Town believes it would not be in the best interest of the residents of Southold Town to make an award to the Contractor, The Town also reserves the right to waive all informalities, including price or approach, and to negotiate contract terms with the Contractor deemed to be most suitable for the work required, If the contract is to be awarded, the Town will award the contract to the Contractor with the greatest overall benefit to the Town. B.The Town reserves the right to accept a Proposal other than the lowest price offered, or award the contract on the basis of initial offers received, without discussions or requests for best and final offers, 4.0 INSTRUCTIONS TO BIDDERS A. Please complete Appendix A and submit it to: r Elizabeth A. Neville Southold Town Clerk PO Box 1179 53095 Main Road Southold, NY 22971 Proposals are-d'ue no later than•2:00.'pm_on,May,27, 2021 at which time they will be opened f and read aloud in public. Proposals received after this due date and time will be considered late and non-responsive. The Town anticipates awarding the contract during a regularly scheduled Town Board meeting in June, 2021. B. All Proposals shall be sealed. The envelope containing the Proposal will be clearly marked and identified as: "Proposal for C&D Waste Hauling and Disposal." C. All Proposals shall contain explicit assurance that all Scope of Services and Contract Requirements contained within this RFP will be met (see Section 1.0). Request for Proposal Page 5 of 10 Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District � ��S�rrutKC�l RFP: Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District Date: April 29, 2021 D. Contractor will provide a rate, as in ,price per ton", to transport approximately three thousand five hundred (3,500) tons of C&D Waste per year from SWTS (see Figure 1) to a permitted and regulatory compliant Disposal Facility, and dispose of the waste at the Disposal Facility. E. Upon selection by the Town of Southold as the winning bidder, Contractor will be responsible to provide a performance bond equal to the estimated costs of performance to the Town for a seven (7) year period. Said performance bond may be reduced by a value of one year's estimated costs of performance. If the Contractor cannot complete the project in the timeframe agreed upon at ccntract signing or is otherwise it ; material breach of the specification or agreement terms, Contractor agrees to either forfeit performance bond or allow the Town of Southold to select an alternate contractor to del ver the services set forth in the bid. F. Any exemptions to the conditions or specifications required-by this RFP shall be explicitly listed in Appendix 1, Section F. ' G. Contractor's Proposal shall contain the following items ("a" through "a") in the order presented , herein. Items "a" through "e" are the minimum qualifications that a response must fulfill. However, k exceptions to any conditions may be submitted as alternatives to the base Proposal. a. Letter Iof Introduction: The letter of introduction shall briefly describe the services that the Contractor is proposing and any special exceptions or additions to the program as described. The letter should be signed by a representative capable of binding the company to a contractual obligation.• b. Description of Firm: This section should describe the company including (at a minimum) its location, number of officft corporately, length of time in business (both corporately and for the actual office which will complete the work), corporate structure, r umber of employees, and relationship to a parent company, if a subsidiary. If any subcontractors are to be used, the _ same information should be provided for all subcontractors. The description of the disposal facility should be included here and include (at a minimum) the name of facility, operator, permit number, date facility began operations, estimated date of closure, tons per day received, brief description of the liner system, and one way distance from the Town. c. Contractor Qualifications: This section should provide description3 of the firm's qualifications to complete the work as proposed. At a minimum, this section should include a description of why this firm is uniquely qualified to complete the work and descriptions of at least three (3) projects for which the firm is providing similar services. Long Island references are preferred, but not mandatory. The descriptions should provide information on the type of project, equipment and personnel required; location and contact; contract amount; and, any unusual services provided to the customer that may be of interest to the Town. In addition, at least three (3) references should be provided with project name, contact person, phone number, address and relationship to the firm. If any subcontractors are tc be used, they must also provide information on their qualifications in similar detail. Page 6 of 10 Request for Proposal Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District RFP: Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District Date: April 29, 2021 d. Project Approach: This section should provide a description of the services offered and the personnel and equipment requirements. e. Contractor's Qualification Statement: The Contractor shall complete the form provided in Appendix 1. Appendix 1 shall also be completed for each subcontractor. `i Page 7 of 10 Request for Proposal Hauling and Disposal of construction and Demolition Waste Southold Town Solid Waste Management District o�OS�FFo K�Via, yt� 0 co � O� ® �� �o� goo SOUTHOLD TOWN SOLID WASTE MANAGEMENT DISTRICT REQUEST FOR PROPOSAL Hauling and Disposal of Construction and Demolition Waste Date: April 29, 2021 The Town of Southold (herein referred to as "Town") hereby requests proposals (Proposal) from companies (Contractor) to provide Construction and Demolition Waste (C&D Waste) hauling and disposal services. The services include, but are not limited to, a) hauling approximately three thousand five hundred (3,500) tons of C&D Waste annually from the Southold Town Solid Waste Transfer Station (SWTS) located at 6155 Cox Lane, Cutchogue, NY 11935 to a permitted and regulatory compliant disposal facility (Disposal Facility), and b) disposing the waste at such Facility. Hours of Operation SWTS is open to the public and commercial haulers seven (7) days a week from 7:00 am — 5:00 pm, except holidays which are as follows: TABLE 1 HOLIDAY CLOSED DATE New Years Day January 1 Martin Luther King, Jr., Day Varies Presidents Day Varies Easter Sunday Varies Memorial Day Varies Independence Day July 4 Labor Day Varies Columbus Day Varies Election Day Varies Veterans Day November 1 ' Thanksqivinq Eve (Closes Varies 12 NOON Thanksgiving Day Varies Christmas Eve (Closes 12 December 24 NOON Christmas Day December 25 New Year's Eve (Closes 12 December 3' NOON Request for Proposal Page 1 of 10 Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District RFP: Hauling and Disposal of Construction and Demolition Waste o Southold Town Solid Waste Management District co Date: April 29, 2021y�io� Sao 1.0 SCOPE OF SERVICES AND CONTRACT REQUIREMENTS A. The Town desires a Contractor that can provide C&D Waste hauling and disposal services. The proposed term of this agreement is five (5) years, with a mutual option for two (2) additional years, renewable individually. The term begins on or around August 6, 2021, and concludes on or around August 5, 2026 (unless an option year is enacted). B. The contract may contain a provision providing for defaults in the service of the contract. A thirty day (30-day) notice will be given to cure all defaults in the service of the contract or an option of termination will be used. C. Proposals received pursuant to this RFP should specify any price adjustments on an annual basis in accordance with the Consumer Price Index or other such adjustment. D. Contractor will provide an adequate number of trailers or containers to contain and store the C&D Waste designated for transportation during the working day, or to otherwise store the C&D Waste at SWTS pending transportation. Drivers will be required to inspect their trailers prior to leaving SWTS and report any trailer damage to onsite SWTS representatives before leaving SWTS with the respective trailer. The Town will not accept responsibility for unreported trailer damage once the trailer leaves SWTS. E. The Town will provide a vehicle to move trailers only (empty and full) between the designated loading and storage areas at SWTS. Trailer hookups or attachments shall be consistent with the vehicle provided by the Town. Proposals received in response to this RFP that include use of roll-off containers must include provisions for moving such containers on the SWTS site as the Town does not own any vehicle capable of moving roll-off containers. F. Contractor shall take title to and ownership of the C&D Waste upon connection of the Contractor's tractor to the loaded trailer at SWTS. The Contractor is solely responsible for: a) any cleanup costs for spillage, b) litter control, c) liabilities arising out of accidents, and, d) any fees or fines connected with operations, transport, or unloading. Further, the Contractor shall take title to and ownership of the C&D Waste upon its delivery to the Disposal Facility and is solely responsible for: a) its disposal after that time, b) any future closure and post closure costs, c) liabilities arising out of accidents, releases, or remediation activities, and d) any fees or fines connected with the Disposal Facility's operations. G. Contractor will abide and adhere to the SWTS Solid Waste Ordinance and the Solid Waste Operation Plans when applicable. H. Contractor and any of their subcontractors must comply with all rules and regulations established by local, state and federal laws. The Contractor shall be responsible for all permits required to provide this service. I. The Town reserves the right to close SWTS during extreme adverse weather conditions or emergency situations. Request for Proposal Page 2 of 10 Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District RFP: Hauling and Disposal of Construction and Demolition Waste N Southold Town Solid Waste Management District °y o�� Date: April 29, 2021 � �� J. Contractor shall designate a contact person or persons and provide to ephone number where the designated contact(s) can be reached at all times, including holidays and weekends. The designated contact(s) must have the capability and authority to review the weekly progress, to provide extra trailers on busy waste days, and to resolve or report any type of complain?. All communications must be conducted with courtesy and respect. K. Contractor must be equipped and ready to initiate the C&D Waste hauling and disposal activities upon execution of the contract with the Town. L. Contractor shall not sublet or assign this contract in whole or part withcut the written authorization by the Town. M. A sixty (60) day notice shall be given to the Town prior to any change in the Disposal Facility used for final disposal. 0. The Disposal Facility used under this contract must be and remain in ccmpliance with all state and federal laws, and regulatory agencies. P. Contractor shall not discriminate against any person because of race, six, sexual orientation, age, color, religion, or national origin. Q. Contractor will indemnify, save harmless, and exempt the Town of Southold, its officers, agents, and employees from and against any and all suits, actions, legal proceedings, claims, demands, costs, expenses, and attorney's fees incident to any work done in the performance of the contract arising out of a willful or negligent act or omission of the Contractor, its officers, agents, and employees; provided, however, that the Contractor shall not be liable for any suits, actions, legal proceedings, claims, demands, damages, costs, expenses, and attorney's fees arising out of a willful or negligent act or omission of the Town, its officers, agents and employees. R. Contractor shall obtain and maintain all licenses and permits (other than any licensees or permits granted by the contract) and promptly pay all taxes, fees and other documents required by the State of New York or Suffolk County. S. Contractor shall at all times during the contract maintain in full force and effect Workers Compensation including Employers Liability, Commercial General Liability including products and completed operations, specific contractual coverage to this agreement, Commercial Automobile Liability all through insurance carriers licensed in the State of New York, with an AM Best financial rating of A-10 or better. Before commencement of work hereunder, the contractor agrees to furnish the County certificates of insurance on the current standard ACCORD Certificate of Insurance Form listing the County as an additional insured, and with the notification of cancellation provision to be amended to read "shall provide 30 days written notice should coverage be cancelled or having sustained a material change in coverage ." For purpose of the contract, the Contractor shall carry the following types of insurance at a minimum of the limits specified below: a. Workers Compensation - Coverage A - Statutory Limits/ Coverage B - Employer's Liability $1,000,000/1,000,000 Aggregate b. Commercial General Liability - Bodily Injury $1,000,000 each occurrence/ $3,000,000/ Annual Request for Proposal Page 3 of 10 Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District a`\VSRUrj� 1�A O� RFP: Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District Date: April 29, 2021 Aggregate /Property Damage $1,000,000 each occurrence/$3,000,0170 Annual Aggregate c. Commercial Automobile Liability - Bodily Injury $1,000,000 each person/$3,000,000 each occurrence /Property Damage $1,000,000 each occurrence d. Excess/Umbrella Liability - following form minimum coverage $3,000,000 each occurrence The above coverage may be provided by the Contractor's parent corporation. 2.0 SELECTION PROCESS 2.1. EVALUATION A. All prospective contractors to visit the SWTS prior to the Proposal due date. 8. Town personnel will have the central responsibility for reviewing and evaluating all Proposals submitted in response to this document. The Town, in its sole discretion, may utilize outside personnel and expertise to review the Proposals or contract and make recommendations . C. A Proposal may be eliminated from consideration for failure to comply completely with one or more of the requirements, depending on their critical nature. The Town reserves the right to reject any or all Proposals, to waive irregularities and/or informalities in any Proposal, and to make an award in any manner, consistent with law, or deemed to be in the best interest of the residents of the Town of Southold. All Proposals become the property of the Town and will not be returned. D. In evaluating Proposals, the Town will consider the qualifications and experience of the contractors. In addition, the Town will consider whether or not the Proposals comply with the prescribed Proposal requirements and such data as may be requested. E. The Town may conduct such investigations as necessary to establish the responsibility, qualifications and financial ability of the Contractor, or any proposed subcontractors, to perform the work in accordance with the contract documents. 2.2 FACTORS OF EVALUATION A. The following criteria will be used to evaluate the Proposals:' a. Completeness of information requested b. References and reputation of Contractor c. Quality and capability of organization d. Project approach e. Suitability of disposal facility (as applicable) f. Cost g. Contract terms and conditions Please note: The above order of criteria does not imply an order of importance. Request for Proposal Page 4 of 10 Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District o��$UFFOLk�oG • ,�� yam, RFP: Hauling and Disposal of Construction and Demolition Waste ti Southold Town Solid Waste Management District Date: April 29, 2021 �01 * The Town may select two or more Contractors on the basis of the aforementioned factors and request interviews to discuss in detail the project approach and services to be provided prior,to making an award pursuant to this RFP. The interview and the information obtained at that time will become as binding as the information in the Proposal and shall be used to make the final determination of the Contractor. 3.0 FINAL AWARD A.The Town reserves the right to reject any or all offers and discontinue the proposal process without obligation or liability to any potential Contractor, or reject any or all Proposals, including without limitation, nonconforming, non-responsive, unbalanced, or conditional Proposals. The Town further reserves the right to reject the Proposal of any Contractor whom it finds, after reasonable inquiry and evaluation, to lack the capabilities to adequately provide the services regt.ested. The Town may also reject the Proposal of any Contractor if the Town believes it would not be in the best interest of the residents of Southold Town to make an award to the Contractor. The Town also reserves the right to waive all informalities, including price or approach, and to negotiate contract terms with the Contractor deemed to be most suitable for the work required. If the contract is to be awarded, the Town will award the contract to the Contractor with the greatest overall benefit to the Town. B.The Town reserves the right to accept a Proposal other than the lowest price offered, or award the contract on the basis of initial offers received, without discussions or requests for best and final offers. 4.0 INSTRUCTIONS TO BIDDERS A. Please complete Appendix A and submit it to: Elizabeth A. Neville Southold Town Clerk PO Box 1179 53095 Main Road Southold, NY 22971 Proposals are due no later than 2:00 pm on May 27. 2021 at which time they will be opened and read aloud in public. Proposals received after this due date and time will be considered late and non-responsive.-The Town anticipates awarding the contract during a regularly scheduled Town Board meeting in June, 2021. B. All Proposals shall be sealed. The envelope containing the Proposal will be clearly marked and identified as: "Proposal for C&D Waste Hauling and Disposal." C. All Proposals shall contain explicit assurance that all Scope of Services and Contract Requirements contained within this RFP will be met (see Section 1.0). Request for Proposal Page 5 of 10 Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District O��Surru[�-CO� RFP: Hauling and Disposal of Construction and Demolition Waste y ; Southold Town Solid Waste Management District Date: April 29, 2021 ' ` D. Contractor will provide a rate, as in "price per ton", to transport approximately three thousand five hundred (3,500) tons of C&D Waste per year from SWTS (see Figure 1) to a permitted' and regulatory compliant Disposal Facility, and dispose of the waste at the Disposal Facility, E. Upon selection by the Town of Southold as the winning bidder, Contractor will be responsible to provide a performance bond equal to the estimated costs of performance to the Town for a seven (7) year period, Said performance bond may be reduced by a value of one year's estimated costs of performance. If the Contractor cannot complete the project in the timeframe agreed upon at ccntract signing or is otherwise in material breach of the specification or agreement terms, Contractor agrees to either forfeit performancE bond or allow the Town of Southold to select an alternate contractor to del ver the services set forth in the bid. F. Any exemptions to the conditions or specifications required by this RFP shall be explicitly listed in Appendix 1, Section F. G. Contractor's Proposal shall contain the following items ("a" through "e") in the order presented herein. Items "a" through "e" are the minimum qualifications that a response must fulfill. However, exceptions to any conditions may be submitted as alternatives to the base Proposal. a. Letter of Introduction: The letter of introduction shall briefly describe the services that the Contractor is proposing and any special exceptions or additions to the program as described. The letter should be signed by a representative capable of binding the company to a contractual obligation. b. Description of Firm: This section should describe the company including (at a minimum) its location, number of offices corporately, length of time in business (both corporately and for the actual office which will complete the work), corporate structure, rumber of employees, and relationship to a parent company, if a subsidiary. If any subcontractors are to be used, the same information should be provided for all subcontractors. The description of the disposal facility should be included here and include (at a minimum) the name of facility, operator, permit number, date facility began operations, estimated date of closure, tons per day received, brief description of the liner system, and one way distance from the Town. c. Contractor Qualifications: This section should provide description3 of the firm's qualifications to complete the work as proposed. At a minimum, this section should include a description of why this firm is uniquely qualified to complete the work and descriptions of at least three (3) projects for which the firm is providing similar services. Long Island references are preferred, but not mandatory. The descriptions should provide information on the type of project, equipment and personnel required; location and contact; contract amount; and, any unusual services provided to the customer that may be of interest to the Town. In addition, at least three (3) references should be provided with project name, contact person, phone number, address and relationship to the firm. If any subcontractors are tc be used, they must also provide information on their qualifications in similar detail. Request for Proposal Page G of 10 Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District RFP: Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District Date: April 29, 2021 d. Project Approach: This section should provide a description of tf a services offered and the personnel and equipment requirements. e. Contractor's Qualification Statement: The Contractor shall complete the form provided in Appendix 1. Appendix 1 shall also be completed for each subcontractor. Request for Proposal Page 7 of 10 Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District Off0(,��� RFP: Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District o Date: April 29, 2021 ��od �a°¢ �rmxtrdl APPENDIX 1 QUALIFICATION STATEMENT FOR HAULING AND DISPOSAL OF CONSTRUCTION AND DEMOLITION WASTE TOWN OF SOUTHOLD, NY Proposal for Hauling and Disposal Service: Name of Contractor: Years in Business: A. Fees Hauling and Disposal operations (including all personnel, equipment, fuel, disposal and any other related costs, fees or charges associated with this contract). The Contractor shall complete the work in accordance with the required sections of the Request of Proposal for a fee of: 1. Construction and Demolition Waste Hauling and Disposal C&D Waste Hauling and Disposal per Ton: B. Subcontractors and Disposal Facility Identification Contractor shall identify all Subcontractors and Disposal facilities. List all Subcontractors, contact information, and identify proposed service(s): Disposal Facility (List name, location, operator, permit holder, and permit number): C. List the following information for any three (3) contracts of this nature that you have completed or currently hold (to be completed by Contractor and all Subcontractors): 1. Contract: Name,Address&Telephone of Contact: Request for Proposal Page 8 of 10 Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District . O�OSot"'`O`�r�G RFP: Hauling p and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District Date: April 29, 2021 °41, 2. Contract: Name,Address&Telephone of Contact:------------------------------------------- ,-- 3. Contract: Name,Address &Telephone of Contact: D. Have you ever failed to complete work awarded to you? If so, state where and why (to be completed by Contractor and for all Subcontractors): E. Have you ever performed similar work under the direction of a Local Government? 'If so, list the two (2) most recent entities, giving a name, address, telephone number and the name of the project (to be completed by Contractor and all Subcontractors): 1. Local Government: Name,Address &Telephone of Contact: 2. Local Government: .........................................................- .................................................. Name, Address & Telephone of Contact: F. Comments or Clarifications (attach additional pages if necessary): Request for Proposal Page 10 of 10 Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District r RFP: Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District y x Date: April 29, 2021 G. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the Town in verification of the recitals comprising this statement of Contractor's qualifications. H'. State the -true, exact, correct and complete name of the partnership, corporation, or trade name under which you do business and the address of the place of business. (If a corporation, state the name of the President and Secretary. If a partnership, state the names of all partners. If a trade name, state the names of the individuals who do business under the trade name. It is absolutely necessary that this information be furnished.) Legal Nameof Contractor: Type of Business (Corporation; Partnership, Individual): State of Incorporation (if applicable): Principal Address of Business: PhoneNumber: ......................................................................_.......................------.......------.......... Namesof Corporate Officers, Partners, orindividuals: Authorized Signature: Printed Name Above: ................................................. ............................. Title: Date: Witness (Signature): PrintedName Above:...........................................................I.....---......._ Title: Date: Request for Proposal Page 10 of 10 Hauling and Disposal of Construction and Demolition Waste Southold Town Solid Waste Management District Times Review Media Group Invoice #: ca15051a The Suffolk Times Date: 04/28/2021 Bill To Customer Email SOUTHOLD TOWN BARD lynda.rudder@ town.southold.ny.us Description Publish Date Amount Public Notice 04/29/2021 $ 40.42 Affidavit 1 $ 25.00 Total:$ 65.42 Please remit checks payable to: Times Review Media Group c/o New York Press Service 621 Columbia,St Ext Suite 100 Cohoes, NY 12047 )TICE IS HEREBY GIVEN THAT :ALED PROPOSALS ARE )LIGHT AND REQUESTED FOR IE FOLLOWING: Hauling and Disposal of Construction and Demolition Waste ifinite specifications may be tained at the Southold Town ark's Office beginning April 29, 21 ACE OF OPENINGS, )UTHOLD TOWN CLERKS =FICE 095 MAIN ROAD )UTHOLD,NY 11971 ATE/TIME OF OPENING' ay 27,2021 2:00 PM )NTACT PERSON: mes Bunchuck wn of Southold,631-734-7685 :NDORS MUST SUBMIT tOPOSALS IN SEALED 1VELOPES. EASE PRINT ON THE FACE OF IVELOPE: NAME&ADDRESS OF BIDDER PROPOSAL NAME s the bidder's responsibility to id the attached Specifications, ;tructions to Bidders,and meral Conditions,which outline iding rules of the Town of iuthold. Upon submission of bid, s understood that the bidder has ad,fully understands and will mply with said GENERAL )NDITIONS and specification juirements. e Town of Southold requires that s document be returned intact d that it be filled out completely. ;ase do not remove any pages ,m this bid package and make a py of the bid document for your ;ords. e Town of Southold welcomes d encourages minority and )men-owned businesses to rticipate in the bidding process. ited: April 6,2021 IZABETH A.NEVILLE )UTHOLD TOWN CLERK LEGAL NOTICE INVITATION TO BID NOTICE IS HEREBY GIVEN THAT SEALED PROPOSALS ARE SOUGHT AND REQUESTED FOR THE FOLLOWING: HAULING AND DISPOSAL OF CONSTRUCTION AND DEMOLITION WASTE Definite specifications may be obtained at the Southold Town Clerk's Office beginning April 29, 2021 PLACE OF OPENINGS: DATE OF OPENINGS: TIME OF OPENINGS: TOWN OF SOUTHOLD May 27, 2021 2:00 PM TOWN CLERKS OFFICE 53095 MAIN ROAD SOUTHOLD,NY 11971 CONTACT PERSON: James Bunchuck Town of Southold, 631-734-7685 VENDORS MUST SUBMIT PROPOSALS IN SEALED ENVELOPES. PLEASE PRINT ON THE FACE OF ENVELOPE: 1)NAME &ADDRESS OF BIDDER 2) PROPOSAL NAME It is the bidder's responsibility to read the attached Specifications, Instructions to Bidders, and General Conditions, which outline bidding rules of the Town of Southold. Upon submission of bid, it is understood that the bidder has read, fully understands and will comply with said GENERAL CONDITIONS and specification requirements. The Town of Southold requires that this document be returned intact and that it be filled out completely. Please do not remove any pages from this bid package and make a copy of the bid document for your records. The Town of Southold welcomes and encourages minority and women-owned businesses to participate in the bidding process. Dated: April 6, 2021 ELIZABETH A. NEVILLE SOUTHOLD TOWN CLERK PLEASE PUBLISH ON APRIL 29,2021, AND FORWARD ONE (1) AFFIDAVIT OF PUBLICATION TO ELIZABETH A. NEVILLE, TOWN CLERK, TOWN HALL, 53095 MAIN ROAD, PO BOX 1179, SOUTHOLD,NY 11971. Copies to the following: Suffolk Times Town Board Members Town Attorney Comptroller DSW Times Review Media Group Invoice #: cal5051 a The Suffolk Times Date: 04/23/2021 Bill To Customer Email SOUTHOLD TOWN BOARD lynda.rudder@ town.southold.ny.us DetcriptionPublish ®ate Amount Public Notice 04/29/2021 $ 40.42 Affidavit 1 $ 25.00 Total:$ 65.42 Please remit checks payable to: Times Review Media Group c/o New York Press Service 621 Columbia St Ext Suite 100 Cohoes, NY 12047 )TICE IS HEREBY GIVEN THAT :ALED PROPOSALS ARE )LIGHT AND REQUESTED FOR IE FOLLOWING: Hauling and Disposal of Construction and Demolition Waste ofinite specifications may be tained at the Southold Town ark's Office beginning April 29, 21 ACE OF OPENINGS: )UTHOLD TOWN CLERKS =FICE 095 MAIN ROAD )UTHOLD,NY 11971 kTE/TIME OF OPENING: ay 27,2021 2:00 PM )NTACT PERSON: mes Bunchuck wn of Southold,631-734-7685 'NDORS MUST SUBMIT IOPOSALS IN SEALED IVELOPES. EASE PRINT ON THE FACE OF IVELOPE: NAME&ADDRESS OF BIDDER PROPOSAL NAME s the bidder's responsibility to ad the attached Specifications, ,tructions to Bidders,and meral Conditions,which outline Wing rules of the Town of iuthold. Upon submission of bid, s understood that the bidder has ad,fully understands and will mply with said GENERAL )NDITIONS and specification auirements. e Town of Southold requires that s document be returned intact d that it be filled out completely. lase do not remove any pages ,m this bid package and make a py of the bid document for your ;ords. e Town of Southold welcomes d encourages minority and )men-owned businesses to rticipate in the bidding process. ded: April 6,2021 IZABETH A.NEVILLE )UTHOLD TOWN CLERK Southold Town Board - Letter Board Meeting of April 6, 2021 �sr RESOLUTION 2021-252 Item # 5.13 ADOPTED DOC ID: 16935 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 2021-252 WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON APRIL 6, 2021: WHEREAS the Town's contract with Power Crush, Inc. for hauling construction and demolition debris (C&D) from the Cutchogue Transfer Station for disposal expires on May 8, 2021, it is RESOLVED that the Town Board of the Town of Southold hereby authorizes and directs the Town Clerk to advertise for bids/proposals for the continued hauling and disposal of C&D materials. Elizabeth A. Neville Southold Town Clerk RESULT: ADOPTED [UNANIMOUS] MOVER: Sarah E.Nappa, Councilwoman SECONDER:James Dinizio Jr, Councilman AYES: Nappa, Dinizio Jr, Doherty, Ghosio, Evans, Russell Generated April 9, 2021 Page 22