Loading...
HomeMy WebLinkAboutPBA-02/08/2021 OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex QF So(/�' P.O.Box 1179 54375 State Route 25 ®�� /y®l Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Q Southold NY Telephone: 631765-1938 www.southoldtownny.gov �ycoUNTY,� RECEIVE® PLANNING BOARD OFFICE TOWN OF SOUTHOLD EB 1 2 1 PUBLIC MEETING AGENDA Southold Town Clerk Monday,February 8,2021 6:00 p.m. This meeting is public. The Planning Board may add or remove application's from the Agenda upon its discretion,without further notice. Applications may riot be heard in the order they appear on this agenda. This public meeting will be held virtually via the Zoom online platform. Pursuant to Executive Order 202.1 of New York Governor Andrew Cuomo in-person access by the public will not be permitted. Options for public attendance: • To join via computer: Click Here Or ti Online at the website zoom.us,click"Join a Meeting' and enter the Meeting.ID: 998 9120 9805 Password: 792938 • Join by telephone: Call 1(646)558-8656 Enter Meeting ID and password when prompted (same as above) Southold Town Planning Board Public Meeting — February 8, 2021— Page 2 :; =, SE7TINGUFTHE =1V`EX17 ' DAMNING �,, BOARD MEETI'IVG: a�f -a:�� ....;u_..,....- Board to set Monday, March 8, 2021 at 6:00 p.m. as the time for the next regular Planning Board Meeting. : ^ ..s...,.,,,.., "Y_D[VOI S,�,,0 N 5,,,�� 4 a b„n % _._v^a�a„�>x�a�rs�..�asa�..,.,.�,�.ta� .z.,.,�.,..,y„"� FINAL PLAT EXTENSION: Gonzalez Standard Subdivision —This proposal is for the standard subdivision of a 4.29-acre parcel into two lots, where Lot 1 is 2.07 acres and Lot 2 is 2.22 acres in the R- 80 Zoning District. This parcel is located at 2050 Platt Rd (+/- 1,830' south of S.R. 25); Orient. SCTM#1000-27.-1-9 ` SIE NgAPpLICA� La„u = ,�s+'.:x"4r*rs`:%k>u�xraa..••;`�„,; + _.�a. F >^.�a " ,, .,.�'� • , ,a DETERMINATIONS: Fishers Island Airport Hangar—This Site Plan is for the proposed construction of a 4,200 sq. ft. aircraft hangar and ±13,830 sq. ft. of paved access and tarmac area at an existing airport on 192 acres in the R-400 Zoning District. The property is located on Whistler Avenue, Fishers Island. SCTM#1000-12-1-18 Peconic Landing Amended - Duplex Conversions (5) —This amended site plan is for the proposed conversion of five (5) existing 1-story single-family dwellings (units #19, 20, 60, 68, 74) to two-family dwellings with no expansion of living area and no basement, 4 parking stalls on a Hamlet Density (HD) and R-80 split zoned parcel totaling 143 acres. The property is located at 1205 Route 25, Greenport. SCTM#1000- 35-1-25 Tenedios Barn & Greenhouse Amended—This amended agricultural site plan is for the relocation of a one story 8,664 sq. ft. building to house livestock and store feed, supplies and farm equipment; which was granted conditional approval from the Planning Board in 2019 and not constructed. The plan includes a 60' x 24' (1,440 sq. ft.) greenhouse and other accessory agricultural buildings on a 34.5 acre farm, of which 29.5 acres have development rights held by Southold Town and 5 acres have development rights intact (the greenhouse is located in the 5-acre area and the barn is located in the 29.5-acre area) in the R-200 Zoning District. The property is located at 28410 Route 25, Orient. SCTM#1000-19-1-1.4 & 1.3 APPROVAL EXTENSION: 870 Love Lane Professional Office and Apartment—This proposed site plan is for the conversion of an existing two-story single family dwelling to a 1,296 sq. ft. Professional office on the first floor and 830 sq. ft. apartment on the second floor with nine parking stalls on 0.7 acres in the Residential Office (RO) zoning district, Mattituck. The property is located at 870 Love Lane. SCTM#1000-140-2-17 Southold Town Planning Board Public Meeting — February 8, 2021 — Page 3 STATE ENVIRONMENTAL QUALITY REVIEW ACT -ADOPT THE FINAL SCOPE: Strong's Storage Buildings —This Site Plan is for the proposed construction of two (2) buildings for boat storage, one at 52,500 sq. ft. and the other at 49,000 sq. ft., located on 32.6 acres in the MII and R-80 Zoning Districts where there are 69,245 sq. ft. of existing boatyard buildings. The property is located at 3430 Mill Road, Mattituck. S CTM#1000-106-6-13.4 6:01 p.m. - Colusa North Conservation Subdivision —This proposal is for an 80/60 Conservation Subdivision of 66.2 acres into 11 residential lots ranging in size from 0.8 acres to 2 acres with a private road (2.5 acres), and an agricultural lot of 51.26 acres, from which development rights are proposed to be sold to the Town of Southold in the AC and R-80 zoning districts. The property is located at 7750 Bridge Lane, Cutchogue. SCTM#1000-84-2-1.1, 3.3, 3.4 6:02 p.m. — Heritage at Cutchoque Amended (aka Harvest Pointe) —This amended site plan proposes to change eight of the approved units from the B2 unit design (livable floor area 1,599 sq. ft.) to a revised C unit design (livable floor area 1,999 sq. ft.). The livable floor area will increase by a total of 3,200 sq. ft. for the overall site. The property is located at 75 Schoolhouse Road, Cutchogue. SCTM#1000-102-1-33.3 6:03 p.m. —Wickham Road LLC Offices —This site plan is for the proposed conversion of an existing 770 sq. ft. accessory apartment to a principle office structure, no footprint expansion or basement, with four (4) parking stalls on 0.23 acres in the Hamlet Business Zoning District. The property is located at 12800 Route 25, Mattituck. SCTM#1000-114-11-15 6:04 p.m. - Olde Colonial Place LLC—This Site Plan is for the proposed construction of a 4,500 sq. ft. building to consist of four (4) retail units with full basement for storage and twenty-four parking stalls on 0.5 acres in the HB Zoning District. The property is located at 615 Pike Street, Mattituck. SCTM#1000-140-2-21 H'E,Rf GS HELD°t0 E jHt - , Koehler Family Limited Partnership - This proposal is a Clustered Standard Subdivision of a 14.94 acre parcel into seven lots where Lot 1 equals 0.80 acres; Lot 2 equals 0.90 acres inclusive of 0.08 acres of unbuildable lands; Lot 3 equals 1.11 acres inclusive of 0.14 acres of unbuildable lands and .07 acres of easement area; Lot 4 equals 0.70 acres; Lot 5 equals 0.66 acres; Lot 6 equals 0.70 acres; Lot 7 equals 9.51 acres inclusive of 8.72 acre area of Open Space and a .05 right of way easement; located in the R-80 Zoning District. The property is located at 4180 New Suffolk Avenue, on the corner of Marratooka Road and New Suffolk Avenue, in Mattituck. SCTM#1000- 115-10-1 OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex �F SOUrP.O. Box 1179 54375 State Route 25 O�� y�l Southold,NY 11971 (cor. Main Rd. &Youngs Ave.) Q Southold NY Telephone: 631 765-1938 www.southoldtownny.gov �y�4UNTY,�� PLANNING BOARD OFFICE February 9, 2021 TOWN OF SOUTHOLD Charles R. Cuddy, Esq. P.O. Box 1547 Riverhead,,NY'1.1901 Re: Extension Conditional Final Plat Approval — Gonzalez Standard Subdivision Located at 2050 Platt Road, approximately 1823' south of NYS Route 25 in Orient SCTM#1000-27.-1-9 Zoning District: R-80 Dear Mr. Cuddy: The Southold Town Planning-Board adopted the following resolution at a Public Meeting held on Monday, August 10, 2020: WHEREAS, this proposal is for a Standard Subdivision of a 4.29-acre parcel into two lots where Lot 1 is 2.07 acres and Lot 2 is 2.22 acres located in the R-80 Zoning District; and WHEREAS, on August 5, 2019, the Planning Board granted Conditional Final Plat Approval on the application; and WHEREAS, on January 31, 2020, the applicant requested a 6-month extension of the Conditional Final Plat Approval granted August 5, 2019 and set to expire February 6, 2020 to provide time to receive approval from the Suffolk County Department of Health Services; and WHEREAS, on February 10, 2020, at their work session, the Planning Board agreed to retroactively extend the Conditional Final Plat Approval from February 6, 2020, to August 6, 2020; and WHEREAS, on August 10, 2020, at their work session, the Planning Board agreed to extend the Conditional Final Plat Approval from August 6, 2020, to February 6, 2021; and Gonzalez Page 12 February 9, 2021 WHEREAS, the agent requested that the Conditional Final Plat Approval be extended an additional six months to provide time to receive approval from the Suffolk County Department of Health Services; therefore be it RESOLVED, that the Southold Town Planning Board hereby extends the Conditional Final Plat Approval upon the plan entitled, "Gonzales Standard Subdivision Final Plat," prepared by John T. Metzger, Land Surveyor, dated April 29, 2015, and last revised July 3, 2019, from February 6, 2021 to August 9, 2021 with the following two conditions: 1. Submission of 12 paper copies and 4 Mylars of the Final Plat including the Health Departments stamp of approval; 2. File the covenants and restrictions with the office of the Suffolk County Clerk. Upon a finding that all conditions have been met, the Planning Board will schedule the application for a Final Determination at the next available Public Meeting. If you have any questions regarding the above, please contact this office at 765-1938. Respectfully, C��L)au Donald J. Wilcenski Chairman OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex OF soy P.O. Box 1179 54375 State Route 25 O�� TyOI Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Q Southold NY Telephone: 631765-1938 www.southoldtownny.gov OOUNTI,� PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 9, 2021 Mr. John Mealy MBB Architects, 48 West 37th Street, 14th Floor New York, NY 10014 Re: Approval — Fishers Island Airport Hangar Airport Drive, Fishers Island SCTM#1000-12.-1-18 Dear Mr. Mealy: - The following resolutions were adopted at a meeting of the Southold Town Planning Board on Monday, February 8, 2021: WHEREAS, this Site Plan is for the proposed construction of a 4,200 sq. ft. aircraft hangar and ±13,830 sq. ft.,of paved access and tarmac area at an existing airport on 192 acres in the R-400 Zoning District; and WHEREAS, on October 24, 2019, John Mealy, authorized agent, submitted materials for the Site Plan Application review; and WHEREAS, on November 4, 2019, John Mealy, authorized agent, submitted additional materials for the Site Plan Application review; and WHEREAS, on November 4, 2019, the Planning Board found the application incomplete for review; and WHEREAS, on November 13, 2019, John Mealy, authorized agent, submitted additional materials for the Site Plan Application review; and WHEREAS, on November 20, 2019, John Mealy, authorized agent, submitted additional materials for the Site Plan Application review; and FI Airport Hangar Page 2 February 9, 2021 WHEREAS, on December 2, 2019, the Planning Bound accepted the application as complete for review; and WHEREAS, on December 2, 2019 the Southold Town Planning Board, pursuant to State Environmental Quality Review Act (SEQRA) 6 NYCRR, Part 617, determined that the proposed action is an Unlisted Action as it does not meet any of the thresholds of a Type I Action, nor does it meet any of the criteria on the Type II list of actions; and WHEREAS, on December 13, 2019, the Planning Board, pursuant to Southold Town Code §280-131 C., distributed the application to the required agencies for their comments; and WHEREAS, on December 17, 2019, the Southold Town Code Enforcement officer verified that there were no open violations on the subject parcel; and WHEREAS, on January 13, 2020, a Public Hearing was held and kept open; and WHEREAS, on January 15, 2020, the Southold Town Trustees responded that the proposed action is outside the wetland jurisdiction under Chapter 275 and 111 of the Southold Town Code; and WHEREAS, on January 22, 2020, the Architectural Review Committee reviewed the proposed project and approved it as submitted; and WHEREAS, on January 27, 2020, the Southold Town Fire Inspector reviewed and determined that there was adequate fire protection and emergency access for the site; and WHEREAS, on January 27, 2020, the proposed action was determined a matter for local determination by the Suffolk County Planning Commission (SCPC); and WHEREAS, on February 7, 2020, the Southold Town Engineer reviewed the proposed application and determined that the certain revisions were required in order for the application to meet the minimum requirements of Chapter 236 for Storm Water Management; and WHEREAS, on February 11, 2020, the Fishers Island Water Corp. stated that water was not readily available and the developer would have to incur the cost and extension of water supply; and WHEREAS, on February 10, 2020, a Public Hearing was continued and kept open two (2) weeks for written comment only; and WHEREAS, on February 24, 2020, the Public Hearing was closed; and FI Airport Hangar Page 3 February 9, 2021 WHEREAS, on March 17, 2020, in a state of emergency response to the COVID-19 public health pandemic, the Town of Southold closed its offices to non-essential employees including the Planning Department; and WHEREAS, on May 26, 2020, the Town of Southold re-opened its offices to non- essential employees at 50% capacity; and WHEREAS, on June 3, 2020, the Town of Southold Local Waterfront Revitalization Program Coordinator reviewed the proposed project and determined it to be consistent with the Southold Town LWRP policies with certain recommendations to be considered; and WHEREAS, during this time period, the applicant was provided direction to obtain certain information received from referral agencies and staff prior to and during the COVID-19 closure; and WHEREAS, on September 14, 2020, the Fishers Island Conservancy provided information for the Planning Board to review; and WHEREAS, on December 7, 2020, the Southold Town Planning Board, as Lead Agency pursuant to SEQRA, made a determination of non-significance for the proposed action and granted a Negative Declaration; and WHEREAS, on January 25, 2021, the Southold Town Planning Board determined that all applicable requirements of the Site Plan Regulations, Article XXIV, §280 — Site Plan Approval of the Town of Southold have been met; and RESOLVED, that the Southold Town Planning Board has determined that this proposed action is consistent with the policies of the Town of Southold Local Waterfront Revitalization Program; and be it further RESOLVED, that the Southold Town Planning Board approves the Site Plan with three (3) conditions to the plans entitled "Fishers Island Airways" prepared by Richard H. Strouse dated November 4, 2020 and authorizes the Chairman to endorse the Site Plan after condition #1 is met. Conditions 1. Prior to endorsement of site plan, obtain a use certification from the Chief Building Inspector as required by Town Code. 2. Prior to the issuance of a Certificate of Occupancy, additional plantings may be required during the final site inspection process to provide sufficient screening of the hangar building at the discretion of the Planning Board. 3. All exterior lighting on the property shall comply with the provisions of Chapter 172 of the Town Code and the approved site plan. Any future exterior light FI Airport Hangar Page 4 February 9, 2021 fixtures not shown on the approved site plan must be reviewed for compliance and approved by the Planning Board prior to installation. Please also note the following requirements in the Southold Town Code relating to Site Plans: 1. Any new lighting fixtures beyond those approved as part of the Lighting Plan must conform to the Code and may require Planning Board approval depending on their number, size, intensity and location. Fixtures shall be shielded so the light source is not visible from adjacent properties and roadways and shall focus and direct the light in such a manner as to contain the light and glare within property boundaries and conform to §172 of the Town Code. 2. All storm water run-off from grading,, driveways and gravel areas must be contained on site. 3. Proposed storm water run-off containment systems must be inspected by the Town Engineer at the time of installation. Please call the Southold Town Engineer prior to beginning this work. 4. Approved Site Plans are valid for eighteen months from the date of approval, within which time all proposed work must be completed, unless the Planning Board grants an extension. 5. Any changes from the Approved Site Plan shall require Planning Board approval. 6. Prior to the issuance of a Certificate of Occupancy, the Planning Board must inspect the site to ensure it is in conformity with the Approved Site Plan, and issue a final site inspection approval letter. Should the site be found not in conformance with the Approved Site Plan, no Certificate of Occupancy may be issued unless the Planning Board approves the changes to the plan. A copy of the Approved_Site Plan is enclosed for your records. One copy will also be sent to the Building Department and the Town Engineer/Highway Department. If you have any questions regarding the above, please contact this office. Respectfully, Donald J Wilcenski Chairman Encl. cc: Building Dept. w/map Town Engineer w/map FI Airport Hangar Page 5 February 9, 2021 By signing this letter, the applicant acknowledges that there are Town Code requirements and conditions, including those listed above, that must be satisfied prior to the issuance of a Certificate of Occupancy. Print name: , Applicant Signature: Date: OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex 0f SU!/ P.O. Box 1179 54375 State Route 25 O�� ryOl Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Q Southold, NY � � Telephone: 631765-1938 www.southoldtow-nny.gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 9, 2021 Charles Cuddy,, Esq. P.O. Box 1547 Riverhead, NY 11901 Re: Approval —Amended Site Plan for Peconic Landing Duplex donnversions'(5) 1500 Brecknock Road, Greenport SCTM#1000-35.-1-25 r Dear Mr. Cuddy: The following resolutions were adopted at a meeting of the Southold Town Planning Board on Monday, February 8, 2021: WHEREAS, this amended site plan is for the proposed conversion of five (5) existing 1- story single family dwellings (units 19, 20, 60, 68, 74) to two family dwellings with no expansion of living area and no basement, 4 parking stalls on a Hamlet Density (HD) and R-80 split zoned parcel totaling 143 acres; and WHEREAS, on'December 26, 2019, Charles Cuddy, authorized agent, submitted an amended Site Plan Application for review; and WHEREAS, on January 13, 2020, the Planning Bound accepted the application as complete for review; and WHEREAS, the Southold Town Planning Board, pursuant to State Environmental Quality Review Act (SEQRA) 6 NYCRR, Part 617.5 (c), determined that the proposed action is a Type II Action as it falls within the following description for 6 NYCRR, Part 617.5(c)(7) construction or expansion of a primary or accessory/appurtenant, non- residential structure or facility involving less than 4,000 square feet of gross floor area and not involving a change in zoning or a use variance and consistent with local land use controls, but not radio communication or microwave transmission facilities;,and Peconic Landinq Duplex (5) Page 2 February 9, 2021 WHEREAS, on January 28, 2020, the Planning Board, pursuant to Southold Town Code §280-131 C., distributed the application to the required agencies for their comments; and WHEREAS, on February 10, 2020, a Public Hearing was held and closed; and WHEREAS, on February 14, 2020, the Southold Town Code Enforcement officer verified that there were no open violations on the subject parcel; WHEREAS, on February 14, 2020, the Architectural Review Committee reviewed the proposed project and approved it as submitted; and WHEREAS, on February 21, 2020, the Southold Town Fire Inspector reviewed and determined that there was adequate fire protection and emergency access for the site; and WHEREAS, on February 24, 2020, the proposed action was determined a matter for local determination by the Suffolk County Planning Commission (SCPC); and WHEREAS, on March 17, 2020, in a state of emergency response to the COVID-19 public health pandemic, the Town of Southold closed its offices to non-essential employees including the Planning Department; and WHEREAS, on May 26, 2020, the Town of Southold re-opened its offices to non- essential employees at 50% capacity; and WHEREAS, on June 1, 2020, the Town of Southold Local Waterfront Revitalization Program Coordinator reviewed the proposed project and determined it to be exempt from the Southold Town LWRP policies; and WHEREAS, on July 1, 2020, the Southold Town Engineer reviewed the proposed application and determined that the application met the minimum requirements of Chapter 236 for Storm Water Management; and WHEREAS, on July 6, 2020, the Southold Town Planning Board determined that all applicable requirements of the Site Plan Regulations, Article XXIV, §280 — Site Plan Approval of the Town of Southold have been met with exception of approval from the Suffolk County Department of Health Services (SCDHS); and WHEREAS, on January 13, 2021, the Planning Board received the Suffolk County Department of Health Services (SCDHS) approval reference #C-20-0043 stating that the project does not require additional sewage disposal or water supply facilities; therefore be it RESOLVED, that the Southold Town Planning Board has determined that this proposed action is exempt from the policies of the Town of Southold Local Waterfront Revitalization Program; and be it further Peconic Landing Duplex (5) Page 3 February 9, 2021 RESOLVED, that the Southold Town Planning Board approves the Site Plan with one (1) condition to the plans entitled "Proposed Duplex Cottage for units #19, 20, 60, 68, 74)" prepared by Frank B. Ryan Jr., R.A. dated July 30, 2019 and authorizes the Chairman to endorse the Site Plan after the condition below is met. Condition 1. Prior to endorsement of site plan, obtain a use certification from the Chief Building Inspector as required by Town Code. Please also note the following requirements in the Southold Town Code relating to Site Plans: 1. Any new lighting fixtures beyond those approved as part of the Lighting Plan must conform to the Code and may require Planning Board approval depending on their number, size, intensity and location. Fixtures shall be shielded so the light source is not visible from adjacent properties and roadways and shall focus and direct the light in such a manner as to contain the light and glare within property boundaries and conform to §172 of the Town Code. 2. All storm water run-off from grading, driveways and gravel areas must be contained on site. 3. Proposed storm water run-off containment systems must be inspected by the Town Engineer at the time of installation. Please call the Southold Town Engineer prior to beginning this work. 4. Approved Site Plans are valid for eighteen months from the date of approval, within which time all proposed work must be completed, unless the Planning Board grants an extension. 5. Any changes from the Approved Site Plan shall require Planning Board approval. 6. Prior to the issuance of a Certificate of Occupancy, the Planning Board must inspect the site to ensure it is in conformity with the Approved Site Plan, and issue a final site inspection approval letter. Should the site be found not in conformance with the Approved Site Plan, no Certificate of Occupancy may be issued unless the Planning Board approves the changes to the plan. A copy of the Approved Site Plan is enclosed for your records. One copy will also be sent to the Building Department and the Town Engineer/Highway Department. Peconic Landinq Duplex (5) Page 4 February 9, 2021 If you have any questions regarding the above, please contact this office. Respectfully, Donald J. Wilcenski Chairman Encl. cc: Building Dept. w/map Town Engineer w/map By signing this letter, the applicant acknowledges that there are Town Code requirements and conditions, including those listed above, that must be satisfied prior to the issuance of a Certificate of Occupancy. Print name: , Applicant Signature: Date: OFFICE LOCATION: MAILING ADDRESS: Town Hall AnnexOF SOU P.O. Box 1179 54375 State Route 25 O�� P.O. Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Southold,NY � � Telephone: 631 765-1938 www.southoldtowirmy.gov �yIrou�r►,��' PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 9, 2021 Ms. Patricia;C. Moore, Esq. 51020 Main Road Southold, NY 11971 Re: Amended approval —Tenedios Agricultural Barn & Greenhouse #,3 28410 NYS Route 25, s/w corner of Narrow River Road & Route 25, Orient SCTM#1000-19.-1-1.4 & 1.3 Dear Ms. Moore: The following resolutions were adopted at a meeting of the Southold Town Planning Board on Monday, February 8, 2021: WHEREAS, this amended agricultural site plan is for the relocation of a one story 8,664 sq. ft. building to house livestock and store feed, supplies and farm equipment; which was granted conditional approval from the Planning Board in 2019 and not constructed. The plan includes a 60' x 24' (1,440 sq. ft.) greenhouse and other accessory agricultural buildings on a 34.5-acre farm, of which 29.5 acres have development rights held by Southold Town and 5 acres have development rights intact (the greenhouse is located in the 5-acre area and the barn is located in the 29.5-acre area) in the R-200 Zoning District; and WHEREAS, on June 15, 2020, Patricia Moore, authorized agent, submitted materials regarding the amended Site Plan Application for review; and WHEREAS, on July 13, 2020, the New York State Department of Environmental Conservation (NYSDEC) granted a modified permit for the amended site plan including the greenhouse and relocated barn structure, with sixteen (16) Natural Resource Permit Conditions for reference #1-4738-03952/00003 which expires on April 30,2024; and WHEREAS, on July 31, 2020, Patricia Moore, authorized agent, submitted additional materials regarding the amended Site Plan Application for review; and Tenedios Barn & Greenhouse Amended #3 Page 2 February 9, 2021 WHEREAS, on August 24, 2020, the Planning Bound found the application incomplete for review and required additional information; and WHEREAS, on September 4, 2020, Jeffrey T. Butler, P.E., submitted revised site plans to the Planning Board for the amended site plan application; and WHEREAS, on September 14, 2020, the Planning Bound accepted the application as complete for review; and WHEREAS, the Southold Town Planning Board, pursuant to Southold Town Code §280-139 B (5), has the discretion to vary or waive the parking requirements for Site Plan Applications where doing so would not have a detrimental effect on the public health, safety or general welfare, and will not have the effect of nullifying the intent and provision of the Site Plan Requirements chapter of the Town Code. The Planning Board has found that this application is eligible for a waiver of parking requirements because there is no need to provide for parking -the application is for agricultural buildings not open to the public and the parcel is large in size relative to the proposed structures (less than I% lot coverage total); and WHEREAS, on September 14, 2020, the Southold Town Planning Board, pursuant to State Environmental Quality Review Act (SEQRA) 6 NYCRR, Part 617.5 (c), determined that the proposed action is a Type II Action as it falls within the following description for 6 NYCRR, 617.5(c)(3) agricultural farm management practices, including construction, maintenance and repair of farm buildings and structures, and land use changes consistent with generally accepted principles of farming. The action is for the construction of an 8,664 sq. ft. agricultural building and 1,440 sq. ft. greenhouse, and amending the previous location for the agricultural barn; and WHEREAS, on October 5, 2020, the Public Hearing was held and kept open for two (2) weeks for written comments only. This was due to a typographical error on a physical sign noticing the public hearing on site; and WHEREAS, on October 7,, 2020, the Planning Board, pursuant to Southold Town Code §280-131 C., distributed the application to the required agencies for their comments; and WHEREAS, on October 16, 2020, the Southold Town Code Enforcement officer verified that there were no open violations on the subject parcel; and WHEREAS, on October 19, 2020, the Public Hearing comment period was closed; and WHEREAS, on November 13, 2020, the Southold Town Agricultural Advisory Committee unanimously recommended approval of the project as submitted; and WHEREAS, on November 18, 2020 the action was determined to be a matter for local determination by the Suffolk County Planning Commission (SCPC); and Tenedios Barn & Greenhouse Amended #3 Page 3 February 9, 2021 WHEREAS, on November 23, 2020, the Southold Town Fire Marshal reviewed and determined that there was adequate fire protection and emergency access for the site; and WHEREAS, on November 23, 2020, the Town of Southold Local Waterfront Revitalization Program Coordinator reviewed the proposed project and determined it to be consistent with Southold Town LWRP policies provided that the Planning Board considered and required recommendations to the greatest extent practicable; and WHEREAS, on December 7, 2020, survey stakes were installed on site to mark the proposed location of the agricultural building; and WHEREAS, on December 15, 2020 a site visit was conducted by members of the Planning Board (no quorum was present) and staff; and WHEREAS, on January 14, 2021 another site visit was conducted by members of the Planning Board (no quorum was present) and staff; and WHEREAS, at their work session on January 25, 2021, the Planning Board reviewed comments from referral agencies and staff analysis, and considered clarifications to certain conditions to prevent livestock from entering the vegetated buffer areas (1, 2 and 3) as shown on the subject plan and listed below. At this work session it was determined that all applicable requirements of the Site Plan Regulations, Article XXIV, ' §280 — Site Plan Approval of the Town of Southold have been met; therefore be it RESOLVED, that the Southold Town_ Planning Board has determined that this proposed action is consistent with the policies of the Town of Southold Local Waterfront Revitalization Program; and be it further RESOLVED, that the Southold Town Planning Board grants an amended approval with conditions for the site plan entitled "Amended Site Plan for Tenedios Farm" prepared by Jeffrey T. Butler, P.E. dated March 22, 2017 and last revised August 21, 2020, and authorizes the Chairman to endorse the site plan after Condition "A" is met: Conditions: A. Prior to endorsement of the site plan, a use certification must be obtained from the Chief Building Inspector as required by Town Code. B. Effective immediately, fencing shall be installed prior to any livestock being adjacent to the areas that include any part of the Vegetated Buffers 1, 2 and 3 (this serves as a clarification to condition #s 3 and 4 below). C. Prior to the issuance of a Certificate of Occupancy for the agricultural building and the greenhouse, fencing of sufficient design shall be constructed and verified along the boundaries of the required vegetated buffers to exclude all livestock as Tenedios Barn & Greenhouse Amended #3 Page 4 February 9, 2021 shown on the approved site plan (this serves as a clarification to condition #s 3 and 4 below and must be done regardless of the presence of livestock at the time). D. Additional Conditions of approval (ongoing) 1. The public is not permitted to access the barn or greenhouse; 2. The barn and the driveway to the barn shall be used for agricultural purposes only as per the Town's development rights easement; 3. Livestock grazing, paddocks, shelters and enclosures shall be located outside the vegetated buffers shown on the site plan; 4. Livestock shall be prevented from entering the vegetated buffers; 5. Buffers Vegetated Buffers 2 & 3 shall be managed for the following benefits: a. Provide denitrification and nutrient uptake; b. Slow water runoff and enhance infiltration; c. Trap pollutants in surface runoff& subsurface flow; d. Stabilize soils. Vegetated Buffer 1 shall be managed to maintain existing trees, shrubs and groundcover; 6. Signs Any sign that requires a sign permit must be reviewed and approved by the Planning Board prior to installation; 7. Lighting Four proposed (4) exterior lights on the barn were reviewed and approved in connection with this amended site plan. Any exterior lights on the barn or elsewhere on site must be reviewed and approved by the Planning Board and must meet Town Code §172 Lighting; 8. The, Planning Board strongly encourages the property owner to follow the guidelines developed by the USDA for sustainable numbers of animals on pasture. The Board further encourages the farm owner to request a nutrient management plan for the animal husbandry portion of the farm, as well as consulting with the USDA Natural Resource Conservation Service (NRCS). The Board also strongly encourages the property owner to develop a Comprehensive Nutrient Management Plan (CNMP) to address nutrient loading to surface and Tenedios Barn & Greenhouse Amended #3 Page 5 February 9, 2021 ground waters by working with the Suffolk County Soil and Water Conservation District and/or USDA NRCS. If you have any questions regarding the above, please contact this office. Respectfully, Donald J. Wilcenski Chairman cc: Michael Verity, Chief Building Inspector Michael Collins, Town Engineer By signing this letter, the applicant acknowledges that there are Town Code requirements and conditions, including those listed above, that must be satisfied prior to the issuance of a Building Permit and Certificate of Occupancy. Print name: , Applicant— Steve Tenedios Signature: Date: OFFICE LOCATION:- MAILING ADDRESS: Town Hall Annex �F SOU P.O.Box 1179 54375 State Route 25 O�� lyOl Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Q Southold,NY � � Telephone: 631 765-1938 www.southoldtownny.gov CA &UNTY,� PLANNING BOARD OFFICE TOWN OF SOUTHOLD February9, 2021 Mr. Steve Racanelli 175 Oxford Boulevard Garden City, NY 11530 Re: Extension of Approval - Site Plan for 870 Love Lane Professional Office & Apartment 870 Love Lane, s/e corner of Love Lane & CR 48, Mattituck SCTM#1000-140.-2-17 Zoning District: Residential Office (RO) Dear Mr. Racanelli: The following resolution was adopted at a meeting of the Southold Town Planning Board on Monday, February 8, 2021: WHEREAS, on October 15, 2018, this Site Plan was approved with conditions for the conversion of an existing two-story single-family dwelling to a 1,296 sq. ft. professional office on the first floor and 830 sq. ft. apartment on the second floor with nine parking stalls on 0.7 acres in the Residential Office (RO) Zoning District, Mattituck; and WHEREAS, on January 29, 2021, the applicant requested a final site inspection and extension of site plan approval; and WHEREAS, at a Work Session held on February 8, 2021, the Planning Board reviewed the application and determined that the expired Site Plan was in compliance with current rules and regulations; and RESOLVED, that the Southold Town Planning Board grants an Extension of Approval with Conditions, listed below, for six (6) months from February 8, 2021 to August 8, 2021 of the site plan entitled "Proposed Office & Apartment at the Racanelli Building" prepared by Donald G. Feiler, Registered Architect, dated August 30, 2017 and last revised January 19, 2018. 870 Love Lane Office &Apt. Page 2 February 9, 2021 Conditions 1. A 25-foot landscape buffer is required along the entire north property line that abuts County Road 48. This buffer shall extend from the corner of Love Lane and CR 48 to the east property line and is required to preserve evergreen and other existing trees located within the buffer; 2. The existing barn is for accessory storage to the office or apartment use only and any other use of this area will require an amended site plan application; Please also note the following requirements in the Southold Town Code relating to Site Plans: 1. Any new lighting fixtures beyond those approved as part of the Lighting Plan must conform to the Code and may require Planning Board approval depending on their number, size, intensity and location. Fixtures shall be shielded so the light source is not visible from adjacent properties and roadways and shall focus and direct the light in such a manner as to contain the light and glare within property boundaries and conform to §172 of the Town Code. 2. All storm water run-off from grading, driveways and gravel areas must be contained on site. 3. Proposed storm water run-off containment systems must be inspected by the Town Engineer at the time of installation. Please call the Southold Town Engineer prior to beginning this work. 4. Approved Site Plans are valid for eighteen months from the date of approval, within which time all proposed work must be completed, unless the Planning Board grants an extension. 5. Any changes from the Approved Site Plan shall require Planning Board approval. 6. Prior to the issuance of a Certificate of Occupancy, the Planning Board must inspect the site to ensure it is in conformity with the Approved Site Plan, and issue a final site inspection approval letter. Should the site be found not in conformance with the Approved Site Plan, no Certificate of Occupancy may be issued unless the Planning Board approves the changes to the plan. A copy of the Approved Site Plan is enclosed for your records. One copy will also be sent to the Building Department and the Town Engineer/Highway Department. If you have any questions regarding the above, please contact this office. 870 Love Lane Office &Apt. Page 3 February 9, 2021 Respectfully, Donald J. Wilcenski Chairman Encl. cc: Building Dept. Town Engineer By signing this letter, the applicant acknowledges that there are Town Code requirements and conditions, including those listed above, that must be satisfied prior to the issuance of a Certificate of Occupancy. Print name: , Applicant/Agent Signature: Date: OFFICE LOCATION: MAILING ADDRESS: Town Hall AnnexP.O.Box 1179 54375 State Route 25 o��OF S�UjyDl Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Q Southold,NY � � Telephone: 631 765-1938 www.southoldtownny.gov �yCou�m,��' PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 9, 2021 Martin D. Finnegan, Esq. Twomey, Latham, Shea, Kelley, Dubin & Quartararo P.O. Box 9398 Riverhead, NY 11901 Re: Public Hearing Colusa North Conservation Subdivision Located at 7750 Bridge Lane, Cutchogue _ SCTM#1000-84-2-1.1, 3.3 and 3.4 Zoning District: R-80 &AC Dear Mr. Finnegan: A Public Hearing was held by the Southold Town Planning Board on Monday, February 8, 2021 regarding the above-referenced application. The Public Hearing was closed. If you have any questions regarding the above, please contact this office. Respectfully, C��L)a, Donald J. Wilcenski Chairman 1 OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex OF SOU P.O.Box 1179 54375 State Route 25 O�� jyOl Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Q Southold,NY � � Telephone: 631765-1938 www.southoldtownny.gov UNV I PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 9, 2021 Henry Alia Rimor Development LLC P.O. Box 908 Cutchogue, NY 11935 Re: Public Hearing —The Heritage at Cutchogue Residential Site Plan Amended, aka Harvest Pointe 75 Schoolhouse Road, Cutchogue, SCTM#1000-102-1-33.3 Zoning District: Harrilet Density - HD Dear Mr. Alia: A Public Hearing was held by the Southold Town Planning Board on Monday, February 8, 2021 regarding the above-referenced application. The Public Hearing was closed. If you have any questions regarding the above, please contact this office. Respectfully, Donald J. Wilcenski Chairman OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex �F SOU P.O. Box 1179 54375 State Route 25 O�� �y01 Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Q Southold, NY � � Telephone: 631 765-1938 www.southoldtownny.gov CAI 41C � /'oUfdT'1,� PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 9, 2021 Mr., Stephen Kiely P.O. Box 567 Mattituck, NY 11952 Re: Public Hearing —Wickham Road LLC Office 12800 Main Road, s/e/o Love Lane & Main Road, Mattituck SCTM#1000-114.-11-15 Dear Mr. Kiely: A Public Hearing was held by the Southold Town Planning Board on Monday, February 8, 2021 regarding the above-referenced application. The Public Hearing was closed. If you have any questions regarding the above, please contact this office. Respectfully, Donald J. Wilcenski Chairman OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex fjF SOU P.O.Box 1179 54375 State Route 25 O�� TyOI Southold, NY 11971 (cor. Main Rd. &Youngs Ave.) O Southold,NY � � Telephone: 631765-1938 www.southoldtownny.gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD February, 9, 2021 Mr. Anthony.Portillo AMP Architecture 1075 Franklin Road Laurel, NY 11948 Re: Public Hearing — Olde Colonial Place Retail 615 Pike Street, Mattituck SCTM#1000-140.-2-21 Dear Mr. Portillo: A Public Hearing was held by the Southold Town Planning Board on Monday, February 8, 2021 regarding the above-referenced application. The Public Hearing was closed. If you have any questions regarding the above, please contact this office. Respectfully, Donald J. Wilcenski Chairman OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex �F soy P.O.Box 1179 54375 State Route 25 O�� TyOI Southold, NY 11971 (cor. Main Rd. &Youngs Ave.) Q Southold,NY � � Telephone: 631 765-1938 www.southoldtownny.gov CA PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 9, 2021 John Koehler 108 Allen Blvd. Farmingdale, NY 11735 Re: Public Hearing on the Proposed Standard Subdivision Koehler Family Limited Partnership Located at 4180 New Suffolk Avenue, on the corner of Marratooka Road and New Suffolk Avenue, Mattituck SCTM#1000-115-10-1 Zoning District: R-80 Dear Mr. Koehler: A Public Hearing was held by the Southold Town Planning Board on Monday, February 8, 2021 regarding the above-referenced application. The Public Hearing was closed. If you have any questions regarding the above, please contact this office. Respectfully, c�� Donald J. Wilcenski Chairman OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex OF soar P.O. Box 1179 54375 State Route 25 O�� y�l Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Q Southold, NY Telephone: 631 765-1938 www.southoldtowymy.gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 9, 2021 Charles R' 'Cuddy, Esq. P.O. Box 1547 , Riverhead, NY 11901 Re: SEAR Final Scope - Strong's Storage Buildings 3430 Mill Road, Mattituck SCTM#1000-106.-6-10 & 13.4 Dear Mr. Cuddy: The following resolution was adopted at a meeting,of the Southold Town Planning Board on Monday, February 8, 2021: WHEREAS, this site plan is for the proposed construction of two (2) buildings for boat storage, one at 52,500 sq. ft. and the other at 49,000 sq. ft., located on 32.6 acres in the MII and R-80 Zoning Districts where there are 69,245 sq. ft. of existing boatyard buildings; and WHEREAS, on February 10, 2020 the Southold Town Planning Board, pursuant to State Environmental Quality Review Act (SEQRA) 6 NYCRR, Part 617, determined that the proposed action is a Type I action pursuant to 617.4(b)(10): Any Unlisted action, that exceeds'25 percent of any threshold in this section, occurring wholly or partially within or substantially contiguous to any publicly owned or operated parkland, recreation area or designated open space, including any site on the Register of National Natural Landmarks pursuant to 36 CFR Part 62, 1994 [see 617.17]. The physical alteration of 3.74 acres exceeds 25% of the 10 acre threshold listed in 617.4(b)(6); and WHEREAS, on August 10. 2020 the Southold Town Planning Board declared itself as Lead Agency and issued a Positive Declaration for the action; and WHEREAS, on September 11, 2020 the applicant submitted a Draft Scope prepared by P.W. Grosser Consulting Inc.; and WHEREAS, pursuant to the Regulations of the State of New York Title 6 Department of Environmental Conservation Chapter VI General Regulations Part 617 State Environmental Quality Review the Planning Board held a public hearing on the Draft Scope on November 2, 2020; and Strong's Storage Buildings Page 12 February 9, 2021 WHEREAS, on November 16., 2020 the public comments received to date were discussed at a Planning Board work session; the public comment period was held open until December 7, 2020 and additional written comments were received; and WHEREAS, The Planning Board as lead agency included in this Final Scope all rationale, reasoning, comments and elements necessary to thoroughly analyze all identified potential adverse environmental impacts of the proposed project; therefore be it RESOLVED, that the Southold Town Planning Board adopts the Final Scope for Strong's Yacht Center Proposed Boat Storage Buildings dated February 8, 2021. The Final Scope is available on the Town's Website at http://24.38.28.228:2040/weblink/0/doc/l 047267/Pagel.aspx If you have any questions regarding the information contained in this resolution, please contact the Planning Board Office. Res ctfully,,� Ja es H. Rich III Vice Chairman Encl. Scott Russell, Southold Town Supervisor Yvette Aguilar, Riverhead Town Supervisor Southold Town Clerk for Southold Town Board Southold Town Zoning Board of Appeals Southold Town Building Department Southold Town Engineer Southold Town Police Department Southold Town Local Waterfront Revitalization Program Coordinator Southold Town Highway Department Southold Tree Committee Southold Economic Advisory Council Mattituck Fire District Suffolk County Department of Public Works Suffolk County Department of Health Services Suffolk County Water Authority Suffolk County Planning Commission Suffolk County Legislator Albert Krupski Sheri Aicher, New York State Department of Environmental Conservation Michelle Gibbons, New York State Department of Environmental Conservation NYS Natural Heritage Program New York State Department of Transportation PSEG Long Island/ National Grid Environmental Notice Bulletin Town Website Any Interested Party File Final Scope DRAFT ENVIRONMENTAL IMPACT STATEMENT STRONG'S YACHT CENTER—PROPOSED BOAT STORAGE BUILDINGS 3430 MILL ROAD MATTITUCK,TOWN OF SOUTHOLD,NY SCTM NO.:DISTRICT 1000, SECTION 106,BLOCK 6,LOTS 10& 13.4 February 8,2021 Introduction This document is the Final Scope for the Draft Environmental Impact Statement (DEIS) for a site plan application to the Town of Southold Planning Board that includes the development of two boat storage buildings of 52,500 square feet (sq. ft.) and 49,000 sq. ft., along with associated improvements including water supply, sewage disposal, site grading and drainage, landscaping and lighting,to support the existing operations of the Strong's Yacht Center. The proposed development would be situated on a 32.96±-acre parcel located on the west side ofMattituck Creek,which is zoned Marine 11 (M-II) and Residential Low-Density A (R-80). All development is proposed to occur on the portion of the site zoned M-1I. The subject property is designated Suffolk County Tax Map (SCTM)Nos. 1000-106-6-10 and 13.4. The proposed action is subject to permits and approvals from the Town of Southold Planning Board (site plan), Town of Southold Trustees (Wetlands Permit), Suffolk County Department of Health Services (SCDHS) (Water Supply and Sanitary Disposal), and New York State Department of Environmental Conservation (NYSDEC) (State Pollution Discharge Elimination System [SPDES] Permit for Stormwater Discharges from Construction Activity). The proposed application has been reviewed by the NYSDEC and has received an Article 25 (Tidal Wetlands)Permit for select regulated project components and a Non-Jurisdictional determination for all work landward of the 10-foot contour, by permit dated January 31, 2020 (Permit ID 1-4738-01843/0028). The permit, however, was granted prior to the Positive Declaration under SEQRA. The proposed application has been reviewed by Suffolk County Water Authority (SCWA) and the availability of water has been determined through an extension of the water main. The Suffolk County Planning Commission (SCPC) has General Municipal Law planning review authority over the proposed action. Utility service connections are also required from PSEG Long Island and National Grid. The proposed application was filed with the Town Building Department on August 27, 2018. A Notice of Disapproval requiring site plan review before the Town Planning Board was issued on September 18, 2018. Subsequent to the filing of the application and the Notice of Disapproval, and at the request of the Town Planning staff, the Applicant attended a work session with the Town Planning Board on October 15, 2018. The Applicant continued to provide additional project information in 2018 and 2019. 1 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mattituck, Town of Southold,NY On February 10,2020,the Planning Board classified the action as Type I and commenced coordinated review with the involved agencies. After review of Part 1 of the Full Environmental Assessment Form (FEAF) and materials transmitted thereafter, the Planning Board caused to be prepared Part 2 and Part 3/Determination of Significance and identified one or more significant adverse impacts that may result from the proposed project. On August 10, 2020, a Positive Declaration was issued by the Planning Board, as lead agency. To ensure that the DEIS will address all significant issues, in accordance with the New York State Environmental Quality Review Act (SEQRA) regulations set forth at 6 NYCRR §617.8, formal scoping is being undertaken. This Final Scope provides a description of the proposed action and the proposed content for the DEIS, based upon the FEAF Part 2 and FEAF Part 3/Determination of Significance, as prepared by the Town Planning Board. This Final Scope has been prepared in accordance with 6 NYCRR §617.8(e) and sets forth the following: • Brief description of the proposed action; • Potentially significant adverse impacts; • Extent and quality of information needed to adequately address potentially significant adverse impacts; • Initial identification of mitigation measures; and • Reasonable alternatives to be considered. The proposed organization and overall content of the DEIS is also included herein. Brief Description of the Proposed Project The proposed action includes the construction of two boat storage buildings of 52,500 SQ. FT. and 49,000 SQ.FT.to support the operations of the Strong's Yacht Center,with associated improvements including gravel-based driveways and parking areas,water supply, sewage disposal, site grading and drainage, landscaping and lighting. Also proposed is the removal of a pool and patio. The Strong's Yacht Center is situated on a 32.96±-acre parcel located south of Old Mill Road and on the west side of Mattituck Creek on lands zoned M-II (approximately 16.46 acres) and R-80 (approximately 16.5 acres). Prior to its purchase by Strong's in April 2017, the subject site was known as the Mattituck Inlet Marina and Shipyard which existed as a frill-service marina, maintenance, repair and storage operation for over 60 years. As illustrated on the proposed site development plans prepared by Young & Young, the subject property is currently comprised of 40 boat slips with associated ramps and fueling and developed with eight buildings to support the operation of the marina, as well as the sale, maintenance, dockage and storage of boats. The eight existing buildings include the following: • Building 1: One-story residence (1,610 SQ. FT.) • Building 2: Two-story office (2,702 SQ. FT.) 2 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Matliluck, Town of Southold,NY • Building 3: One-story storage (17,320 SQ. FT.) • Building 4: One-story storage (I69,SQ. FT.) • Building 5: One-story storage (341 SQ.FT.) • Building 6: One-story storage (10,766 SQ.FT.) • Building 7: One-story storage (15,076 SQ. FT.) • Building 8: One-story storage (22,425 SQ.FT.) The two proposed buildings would become Building 9(49,000 SQ.FT.)and Building 10(52,500 SQ. FT.). Upon implementation of the proposed action, the total gross floor area of all buildings would increase from 69,245 SQ. FT. to 171,929 SQ. FT. The proposed buildings would be situated to the west of Buildings 7 and 8, which would allow direct access and transport of yachts from the existing lift station to each of the proposed buildings. The purpose of the proposed action is to provide indoor and heated winter storage for yachts that utilize local waters in the peak season but are required to be transported to warmer climates in the winter months due to a lack of adequate storage in the Town of Southold and across the entire east end of Long Island.Based upon an average yacht size of 60 feet, it is estimated that approximately 88 yachts could be stored within the proposed buildings during the winter months; all of which would arrive to the site via Mattituck Inlet (as confirmed by surveys and soundings for the entire Inlet). It is also expected that maintenance and repair activities for larger vessels would occur on the subject property, having direct access from the Mattituck Inlet via the existing lift, further supporting a demand of the existing local boating market.There are approximately 13 full-time staff at the Strong's Yacht Center and, upon implementation of the proposed action, the Applicant expects to create an additional 15 career positions. The subject parcel is adjacent to Federal and State-regulated Tidal Wetlands (Mattituck Creek), with a portion of the site located within a 100-year floodplain (Zone AE: Elevation 8). The proposed buildings would be constructed in a portion of the site located within a 500-year floodplain (Zone X) at Elevation 10.0. The proposed action has been reviewed and approved by the NYSDEC by permit dated January 31,2020, however this permit was granted prior to the proposed action being classified under SEQRA as a Type I action and receiving a positive declaration from the Lead Agency. Additional review from the NYSDEC tidal wetlands permitting agency may be required. Due to significant grade changes on the site,the proposed project will require approximately 134,000 cubic yards of cut for the placement of the proposed buildings at Elevation 10.0. The proposed excavation plan includes two routes for truck movements and would occur over a projected duration of approximately seven (7) months based upon loads of 30 cubic yards per truck and six-day work weeks. An additional six months is projected to complete the proposed project, inclusive of the retaining wall, infrastructure and two buildings (i.e., total construction duration is 13 months). The proposed plan includes the installation of a concrete and evergreen retaining wall along the west side of Buildings 9 and 10 and along the north side of Building 10, which serves to both stabilize the slope as well as enhance the visual screening of the subject property. The total proposed disturbance is 3.9±acres, with approximately 493 trees of six-inch diameter or greater proposed for removal. 3 Final Scope for Final Emm•017177ental Impact Slatement Strong's Yacht Center—Proposed Boat Slot-age Buildings Mattrtuck, Town ofSoulhold,NY As part of the proposed action, one new on-site wastewater treatment system (I/A OWTS) would be installed and an existing on-site sanitary system would be replaced with an I/A OWTS. The two systems would be designed to serve the Strong's Yacht Center operations, inclusive of all buildings, the office and marina. Also proposed is an extension of the water main from Naugles Drive by 765 feet to allow for the site to be served by the public supply system. Upon implementation of the proposed action, the existing on-site supply well would be available for non-potable use. Regarding stormwater management,the proposed action includes the installation of on-site leaching pools, French drains and the use of pervious gravel to accommodate stormwater from the proposed development. The proposed stormwater management plan is designed to accommodate a two-inch rain event, in accordance with Town of Southold regulations. It is noted that in addition to the full-service marina operation, the Strong's Yacht Center currently hosts six commercial fishing boats,and also supports the Marine Program of the Cornell Cooperative Extension of Suffolk County, by hosting eight (8) FLUPSYs (Floating Upweller Systems), which provide protected nurseries for hard clam seed to assist with the NYS Shellfish Restoration Initiative. None of these activities would be affected by the proposed action. In order to develop the site as proposed,the following approvals are required: �fteld `f:., .» x-"<'• $ ''�'d;, $;�z;b'" *PQ,Twlt jkflV Town of Southold Planning Board Site Plan Review and Approval Town of Southold Trustees Wetlands Permit Suffolk County Department of Health Services Wastewater Disposal and Water Supply Suffolk County Planning Commission Review and Approval New York State Department of Environmental State Pollutant Discharge Elimination System Conservation (SPDES) General Permit for Stormwater Discharge during Construction Activities Tidal Wetlands Permit and Non-Jurisdictional Determination (Permit ID 1-4738-01843/0028 dated January 31,2020) Suffolk County Water Authority Extension of Water Main and New Connection PSEG Long Island/National Grid Electric and Natural Gas service connections Review temporary road apron, possible curb cut Town of Southold Highway Superintendent permit required. Review for archeological significance NYS Office of Parks, Recreation, and Historic Preservation 4 Final Scope for Final Environmental Impact Statement Sarong's Yacht Center—Proposed Boal Storage Buildings Mattituck, Town of Southold,NY The section of the DEIS entitled Description of the Proposed Action will provide a thorough description of the existing conditions on the 32.6±-acre subject property and the proposed action. The Description of the Proposed Action section of the DEIS will specifically include information relating to the following: • Project location, setting, land use and zoning(with appropriate maps and aerial photographs). • Summary of the surrounding land uses and zoning. • Physical characteristics of the site, including property acreage, site cover types(e.g.,pervious and impervious areas), and existing structures. • Project layout and design, including information about the proposed development, zoning compliance, changes in site cover types, site access and circulation, and parking. • Infrastructure requirements, including water supply, sanitary waste disposal, drainage, and utilities. • Solid waste generation and the proposed plans for on-site minimization and recycling. • Project objectives and benefits to the community, including a summary of the project's consistency with the proposed land uses set forth in the Local Waterfront Revitalization Program (LWRP). • Projected construction schedule. • Required permits and approvals. Potentially Significant Adverse Impacts The DEIS will be prepared in accordance with this Final Scope promulgated by the lead agency and in accordance with 6 NYCRR §617.9(b). Based upon review of the site, architectural plans and elevations, site plans and the FEAF Part 1 prepared by the Applicant, the Planning Board prepared a FEAF-Parts 2 and 3/Determination of Significance,for the proposed application which indicates that one or more significant adverse impacts may result fi-om the proposed project. The Planning Board issued a Positive Declaration on August 10, 2020, specifically identifying as potential moderate to large impacts to Land, Surface Waters, Groundwater, Flooding, Air, Plants and Animals, Aesthetic Resources, Noise, and Community Character. The DEIS will fully address the identified potential significant adverse impacts, as well as other relevant issues. Where the impact analyses conducted in the DEIS indicate the potential for significant adverse impacts, the DEIS will set forth measures to mitigate those impacts. 5 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mattituck, Town of Southold,NY A description of each section of the DEIS is set forth below, followed by a proposed outline for the DEIS. Natural Environmental Resources Impact on Soils and Topography This section of the DEIS will identify the existing soil type(s) on the subject property, based upon the Suffolk County Soil Survey and any available test hole data. The grading program will also be discussed, based upon the required plans and data (e.g., estimates of volumes of soil excavated, cut/filled, removed from site and maximum depths of cut/fill). The topographic conditions will be evaluated, and a topographic map will be provided.The existing and proposed changes to slopes will be included, and stabilization measures will be identified in detail. Construction-related impacts will also be discussed, including truck trips for soil removal and associated truck routes. Mitigation measures for soil limitations/constraints, erosion, sedimentation, and dust generation, to the extent necessary, will be included. See the section on Construction-related impacts for more details. The DEIS will also: 1. Discuss the types and tested physical characteristics of the soils on site that will be subject to excavation, future load bearing, and installation of sanitary systems and stormwater conveyance systems. The location, size, and thickness of any clay or buried peat formations will be described and mapped. 2. Discuss potential adverse impacts to sea grass and on shellfish from potential sedimentation. 3. Discuss possible mitigation for these potential adverse impacts. Impact on Water Resources (Groundwater and Surface Waters) This section of the DEIS will describe the groundwater conditions, including depth to groundwater and groundwater quality beneath the subject property, based upon relevant documentation. The Groundwater Management Zone IV (as classified under Article 6 of the SCSC) within which the subject property is located, and site drainage characteristics will be described. Groundwater flow direction based upon Suffolk County Groundwater Contour Maps and field study will be identified and an assessment of the potential impacts to downgradient resources and nearby wells will be included. The location of private and public wells will also be determined and a study to determine any impacts this action might have on the quantity and quality of potable water for those wells will be provided. This section will also include calculations of projected sanitary flow, discussion of the proposed method of sanitary disposal (i.e., the on-site wastewater treatment systems [I/A OWTS]), and consistency with Article 6 of the SCSC. The SCDHS Notice of Incomplete Application issued for the proposed action will also be included and consultations with the SCDHS would be undertaken as part of the DEIS and described herein. The proposed installation of four, 2,000-gallon liquid propane aboveground tanks and consistency with Article 12 of the SCSC would be evaluated. 6 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mattituck, Town of Southold,NY Groundwater quantity (i.e.,water usage)will also be evaluated, including the extension of the public water supply main to the subject property and the availability of water supply based upon consultations with the SCWA. The post-development benefits of the water supply main would also be identified. The impacts to groundwater quantity available to neighboring wells will also be evaluated based on field studies over four seasons. The impacts to surface waters would be evaluated, including the appropriateness of the proposed use given the site's location and existing marina operations. Drainage and post-development stormwater management measures, and erosion control measures, will also be discussed and evaluated in accordance with the relevant standards. The surrounding wetlands will be described and the findings of the NYSDEC will be included. An assessment of the Trustees standards for the issuance of a Wetlands Permit will also be included. Finally, the effects of climate change as it relates to sea level rise and flooding will be addressed. Mitigation measures which may reduce potential water quality or quantity impacts will also be identified, as necessary. The DEIS will also: 1. Analyze and discuss in detail the impacts on private wells in the surrounding area including technical details on groundwater depth, quality, quantity, freshwater lens, saltwater interface, amount of flow in GPM, direction of travel, and travel times. Include zones of influence from each wellhead. 2. Analyze and discuss the effect of excavation on groundwater, as well as any expected impacts to neighboring wells. Include an analysis on the potential for salt-water intrusion into neighboring well as a result of the excavation's effect on groundwater in the area. 3. Discuss onsite and nearby tidal wetlands and the NYSDEC's input, ecological communities in those wetlands and their ecosystem services and values, including contributions to surface water quality. 4. Discuss the narrowness of the creek in this area and tidal flow restrictions in an acceptable model. Include the increase in tidal flow volume and velocity restrictions that could result from the increase in boats or docks (if any). 5. Discuss possible mitigation for these potential adverse impacts. Impact on Ecological Resources Environmental studies will be detailed and undertaken over a multi-season period (all four seasons) to properly assess potential impacts. This section of the DEIS would address the existing ecological resources on the subject property. As part of the DEIS, a qualified biologist/ecologist will inspect the site to determine the vegetation, wildlife, and general habitat character. An inventory of flora and fauna, as observed,will be prepared and included in this section of the DEIS, and an assessment of the species that could be expected to utilize the subject site will be performed. Protected native plants; plant and animal species listed as endangered, threatened, and special concern (or with other protective status), will be identified, including the noted piping plover, southern sprite, and Eastern box turtle, and suitability of habitat as roosting or summary foraging habitat for protected New York State and Federally-protected bat species. An assessment of potential impacts to the contiguous Town of Southold woodland identified as 25.29 acres to the south (SCTM41000-106-6-20.3) and the adjacent tidal wetlands of Mattituck Creek will also be performed. Consultations with the New York Natural Heritage Program will be 7 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Nlaltiluck, Town of Southold,NY undertaken for site information. This section of the DEIS will include the quantitative impacts to habitats as well as a qualitative assessment of the impacts to plants and animal species. Mitigation measures to reduce potential impacts will be identified. The DEIS will also: Impact on Plants and Animals 1. Discuss potential adverse impacts to sea grass and on shellfish. 2. Provide a complete description of the ecological communities represented in the forest and their ecological relationships to those of the adjoining Town-owned preserve.Forests provide important ecosystem services within their bounds and for the surrounding landscape and waterways; these ecosystem services will be described. For example,the forest ecosystem of the subject property, contiguous with forest protected by the Town, is the last relatively large block of native forest supplying clean groundwater to Mattituck Inlet that has not been converted to farmland or interrupted by residential and commercial development, with their attendant sanitary system and stormwater impacts. 3. Discuss the cumulative effect of the elimination of the forest on the subject property on the total native forest cover in the Town of Southold.Native forest cover in the Town is relatively rare in comparison with agricultural land and residential/commercial development;remaining patches are isolated from one another, existing as "islands" in the overall landscape. What patches do remain are of varying sizes, spatial relationships with wetlands and waterways, and habitat value. 4. Include a discussion on the potential adverse impacts of net forest loss on wildlife species that have large home ranges, including birds and bats, and that seek deep forest cover and travel between forest patches. 5. Provide a complete analysis and discussion on the proposed destruction of the forest on the slopes,the forest interior exposed and new forest edge, proximity to the boundary of a 25.29- acre, Town-owned, preserve. Include the following: direct harm to the preserve by reducing the overall size of the forest and by removing its buffer area trees that had developed in a high-wind environment; exposure of trees that grew in an environment protected from high wind to northeast, with attendant potential for: destabilization of root systems and tree throw; drying of soils; increased light exposure from sunlight and night-time lighting at the storage facility and marina (effects on plants, as well as insects and wildlife, requiring shade and moisture); introduction of invasive species to disturbed soils; higher soil temperatures and effects on seedling growth and forest regeneration; reduction in forest litter because of convective drying and windblow; result in reduction of nutrients available for plants and increase in the effects of drought conditions in summer and the depth of freeze events in the winter; increase in the ratio of forest edge to forest interior that results from decreasing the overall size of the forest, including impacts of physical damage and biological invasions; reduction of uninterrupted forest cover on successful nesting of warblers, thrushes,vireos and other songbirds; reduction or loss of populations of wildlife species requiring the seclusion offered by forest interiors and those requiring nocturnal conditions without artificial light intrusion; degradation of habitat because of noise reaching further into the forest, both during construction and permanently, from traffic and operations at the marina and storage site. 8 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mailituck, Town of Southold, N3' 6. Evaluate and discuss the need to remove 493 trees and carbon sequestration and if planting of trees elsewhere can be accomplished to offset tree loss. 7. Assess the action to Mattituck Inlet and the Significant Coastal Fish and Wildlife Habitat (SCFWH) documentation. 8. Discuss possible mitigation for these potential adverse impacts. Impact to the Environment The DEIS will also: 1. Discuss the operations of the site and the overall impact on the environment. 2. Describe the short-and long-term impacts to the ecosystem, biodiversity habitats and the rarity and significance of Mattituck Creek as an estuary, both from construction activities as well as from operations. Discuss the impacts to the wetlands on east side of inlet and wildlife (egrets, osprey and waterfowl). 3. The subject property's relationship to surrounding land uses and location within surface-and groundwater contributing areas to Mattituck Creek will be described and mapped. 4. Discuss possible mitigation for these potential adverse impacts. Impact on Flooding 1. Climate Change and Resiliency: The DEIS will describe the potential adverse impact on the parcel resulting from climate change and sea level rive. The DESI will: • Discuss SEQRA's implementing regulations and measures to avoid or reduce impacts associated with the effects of climate change such as sea level rise and flooding. See NYCRR:617.9(b)(5)(iii)(i)].Include the potential impacts associated with coastal flooding, storm events, and rising sea levels. The future physical climate risk due to storm surge (including sea level rise) and flooding should be considered in project design. The analysis will specifically analyze the effect of rising groundwater on upland resources. The analysis will also consider the effects of intensifying precipitation-- including more seasonal precipitation and higher rates and more total precipitation during storms-- both during construction and operation. The action will be assessed to the following: ■ 2014 C1imAID update (Horton et al. 2014) and the New York State Community Risk and Resiliency Act (CRRA) SLR projections. ■ Using Natural Measures to Reduce the Risk of Flooding and Erosion Guidance (NYDEC). ■ Community Risk and Resiliency Act Guidance for Consideration of Flood Risk in Smart Growth Public Infrastructure Assessment (NYDEC). ■ USGS Groundwater-Flow Modeling-Long Island, New York. 9 Final Scope for Frnal Environmental Impact Slatement Strong's Yachl Cenler—Proposed Boal Storage B:rrldings Allallauck, Town ofSozahold,NY 2. The relationship of final landscape elevations to the potential for nor'easter and other weather events to inundate the property during and post construction will be discussed in the DEIS to fully afford proper review of adverse water quality impacts. 3. The increase in frequency of potential inundation events related to predicted climate change effects will also be discussed. 4. Discuss possible mitigation for these potential adverse impacts. Human Resources Impact on Human Health 1. Provide an analysis on the chemicals stored and disposed on site and the potential adverse impacts from the increase in volume of chemicals used and stored on site during the proposed action. 2. Provide NYSDEC regulations related to the storage of chemicals on site. 3. Assess potential impacts to neighboring wells (see section on Water Resources for more details). 4. Discuss possible mitigation for these potential adverse impacts. Impact on Transportation The proposed action could result in a moderate to large adverse impact by significantly increasing the number of vehicles (including construction and service vehicles) on local and regional roadways for long durations. Capacity of the roadways may be adversely impacted. The proposed action will add substantial traffic to the area and due to current road conditions,traffic, and intersection conditions, the roads may not have the ability to handle it. The level of service (LOS) at intersections may be adversely impacted. The design and condition of the roads leading to the site (route) is a concern. Many areas exhibit stress cracks on the pavement. The design of the roads and the ability to increase traffic on these roads, including construction traffic and trucks, is a significant concern.Curves,declines and inclines exist on the route to the parcel. Receptors along the route to the parcel may be adversely impacted for long durations. The proposed action could result in a moderate to large adverse impacts to the public and user groups from the increase of vehicular traffic on local and regional roads affecting the public's use and enjoyment of the roads while conducting activities (driving, walking, biking). The number of truck trips proposed could result in large, adverse impacts to West Mill Road, Cox Neck Road, Suffolk County Route 48, New York State Route 25, Sound Avenue, Northville Turnpike, Suffolk County Route 58 and other local and regional roads. This section of the DEIS will: 1. Provide a comprehensive vehicle traffic study in the DEIS conducted by an traffic engineer of 10 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mattitzick, Town of Southold,NY all local and regional roads (include vehicle trips on Cox Neck Lane and West Mill Road)which includes real time data gathered over four seasons for all phases (including mobilization and demobilization of resources) of the proposed action: The study shall include: Real time traffic counts on Cox Neck Lane, West Mill Road, Suffolk County Route 48 and Sound Avenue, and best available data for NYS Route 25. Include the road capacity, existing number of vehicles (trucks) using the roadways, types of vehicles and anticipated vehicle trips and times, Level of Service at intersections, accident data(including data from the Southold Police Department)and the geometry of the roadways along the proposed truck routes. The traffic study shall include vehicle trip data sets from the operations of the marina facility and potential impacts from trucks hauling large boats on local roads. Discuss traffic mitigation including possible limitations on the trucks per day and limit the number of hours per day, and include how this would affect the duration of the construction phase. Discuss what temporary traffic signals will be considered. What traffic control measures will be implemented? Discuss what private resources that will be required to control traffic. The traffic study would include, but not be limited to: • Traffic counts over four seasons. • Site and area visits for observations of existing traffic movements at various times of the day and under different conditions. • Collection of data and evaluations as described above. • Review of available traffic data from the NYSDOT and the Suffolk County Department of Public Works. • Consultations with the Town of Southold Highway Department regarding local roadway conditions. • Evaluation of accident data from the NYSDOT and Southold Town Police Department to determine if there are any existing accident problems and whether construction traffic may affect the existing accident patterns. • Review the estimates of traffic anticipated to be generated during the construction of the proposed development. Determine the make-up of the added traffic and hourly new traffic volumes to be placed on the existing road system. • Provide and discuss a vehicle routing plan for all phases of the project (site preparation, construction and operations after construction).Identify the roads used, speed limits,existing road condition with photographic representation, all intersections, all school zones, anticipated traffic levels and traffic chokepoints along a proposed route. Determine the dimensional characteristics of the road and the existing traffic control provided. Examine whether the additional construction related traffic can safely be accommodated on the existing roadways Discuss the suitability of the road capacity. The traffic flow along Cox ] 1 Final Scope for Final Enwronmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Matlituck, Town of Southold,NY Neck Lane and West Mill Road and how vehicles will navigate the curves on the roadways. • Examine the proposed construction access road for the site from the standpoint of location, design and traffic safety. • Discuss the potential damage and destruction of local and regional roads by trucks and all other vehicle types involved in the staging, clearing, excavation, site preparation, construction and post construction and operations of the facility. Include the aprons at the access points. Provide all specifications of the loaded and unloaded trucks involved in the excavation and construction. • Discuss specific provisions for a performance guarantee to assure appropriate reclamation/restoration of any areas (including local roadways) that may be required, or in the event that the project does not come to completion after a specifically defined period of time. • Potential mitigation measures to reduce potential impacts will be identified. 2. Evaluate and discuss the duration of potential adverse impacts from all vehicle trip types included in each phase and post construction, the wear and tear on roadways caused by vehicle types, quality of life impacts to the community and receptors along the routes including adjacent Towns where vehicles will be travelling. 3. Discuss the potential increase in trailered vessel traffic and if trucks should be limited to certain hours, low speeds and the number of trucks per day. 4. Include a roadway user group safety study and analysis in the DEIS during all four seasons on the use of the roadways (route) by user groups, including potential adverse impacts on pedestrians walking (with Strollers),jogging, biking and children waiting for the school bus that will could be adversely impacted by vehicles including loaded trucks. Include an analysis of the proposed truck route's road width and the capacity to accommodate two vehicles passing at the same time and location as a pedestrian or cyclist, and whether the roads are currently safe for such an interaction, including the perceived safety from the perspective of the pedestrian or cyclist. 5. Discuss the impacts of vibration from loaded trucks on structures along the vehicle route(s). 6. Discuss the effects of excavation and vibration from machinery, heavy equipment and trucks on structures surrounding the site. 7. Provide a detailed analysis on the potential, long-term adverse impacts to adjacent roadways (surfaces, condition), surrounding properties, neighborhood(s), and region through the clearing, excavation, storing and transporting of cleared vegetation, excavated materials and construction of the site over a multi-month period in multiple phases. 12 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mattituck, Town of Southold,NY 8. Include a discussion about whether using barges to transport materials is a viable alternative for mitigating impacts from transporting materials associated with the site preparation and construction of the project. 9. Discuss how streets will be repaired. The DEIS will also address specific provisions for performance bonding to assure appropriate reclamation/restoration of any areas (including local roadways) that may be required after excavation, or in the event that the project does not come to completion after a specifically defined period of time. 10. Provide a comprehensive boat (vessel) traffic study analysis in the DEIS of the potential moderate to large significant increase of boats to the Mattituck Inlet. Include the existing conditions analysis and potential adverse impacts on: a. Boat Characteristics - Include the number of additional new boats added to Mattituck Inlet, average size of these boats, average draft and maximum draft? b. Navigation - Provide the depth of inlet from Long Island Sound to the marina. Navigation suitability of Mattituck Inlet, navigation impediments, narrowness of the creek in the area to the north west of the marina. Discuss if the project will include dredging in the future. c. Tidal marsh — include an assessment on the impacts from current and increase boat traffic on low and high marsh areas within the creek. Discuss the impact from boat wakes, emissions and chemicals (bottom paints) on the ecosystem. d. Water quality— include a discussion on the current and potential adverse moderate to large impacts to surface water quality in the short and long term (duration). Provide the NYSDEC shellfish closure areas, types of pollutants occurring in the creek currently, types of chemicals in marina and vessel maintenance needs in the proposed construction and operation of the marina facility and mitigation. Include, but not limited to, dissolved oxygen, clarity, eutrophication, and sustainability for estuarine and marine life, as well as existing sources of stormwater. The potential for sedimentation during construction, and resulting, post-construction, long-term stormwater runoff contributions from the site will be described and quantified. e. Discuss the washing,fueling of, and operation of boats and potential threats from these practices of introducing pollutants into the waterway. The impact of potential fuel spills and cleaning materials spills. f. Provide the potential growth inducing aspects resulting for the action of a significant moderate to large increase of large boats using the Mattituck Inlet/Creek. Include the management of boats on site, staging areas of arriving boats, sufficiency of current dock, plans for additional docks, any new dock configurations and facility configuration to accommodate vessels, sufficiency of dimensions of travel lifts to haul boats, and other anticipated impacts on the waterway to user groups. User groups include boats of all sizes, manual and engine powered, kayaks, paddleboarders, swimmers and commercial fisherman. g. Include hours of operation, particularly of heavy machinery. During the hauling and launching season the hours of operation of the travel lift. Other boat moving machinery and cleaning apparatus. Identify additional equipment needed to haul-out, put-in, transport, service and store boats. 13 Final Scope for Final Ennironniental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mattmick, Town of Southold,NY h. Provide an assessment of all boat support services in the area including the availability of functioning pump out boats and stations. How does the marina handle sanitary and solid waste in boats? What advisories does or will the marina provide to boaters on pollutants (coliform bacteria) capable of entering the waterway. How will the disposal of solid and sanitary waste be prevented in the waterway? i. Discuss the impact of increased boat traffic due to the expanded activities including devising a methodology to police and monitor the water quality. j. Discuss possible mitigation for these potential adverse impacts. Impact on Aesthetic Resources If constructed the subject proposal may significantly alter the shoreline and community character of Mattituck Inlet environs and this potential impact must be fully evaluated. The proposed action is of scale and dimension that will be visible from publicly accessible scenic resources (Mattituck Creek) by operators of vessels using the waterway during seasonal use resulting in a potential moderate impact to scenic enjoyment of the waterway. Note that Mattituck Creek is a Federal waterway. The proposed action could result in a moderate to large adverse impact to the aesthetic resource (Mattituck Creek) through the diminishment of public enjoyment by users and members of the community under different circumstances and activities in a location that also has an important role in recreation and tourism economy.Both are important and changes to scenic and aesthetic resources may have adverse impacts on both the quality of life of residents and broader economic impacts. This section of the DEIS will describe the existing viewshed and general consistency or compatibility with existing elements of the community. As part of the assessment of impacts on visual resources, 3D computer-generated imagery would be provided to depict post-development viewshed changes from Mattituck Creek and the adjacent roadway. The proposed buildings and cement and evergreen retaining wall, as well as the site and building lighting, would be described. The impacts to the community character as it relates to changes to the existing natural landscape with the proposed development would be evaluated. The impacts to community character as it relates to the viewshed from waterway(Mattituck Creek)will be evaluated and the project's consistency with the proposed use of land as set forth in approved LWRP, will be discussed. Measures to mitigate impacts will be identified, as appropriate. The DEIS will: 1. Provide a detailed visual impact analysis for the action, including (dimensional relief and color of site structures existing and proposed) identification of the project's zone of visual influence (ZVI), identification of sensitive receptors (scenic views including views from Mattituck Creeks, outdoor recreation facilities, historic properties, etc.)within that zone, and viewshed analyses to determine if and how sensitive receptors would be affected. Computer- generated imagery for viewshed changes should not be limited to views from Mattituck Creek and the adjacent roadway. 2. Include detailed visual renderings of the proposed action, and alternative actions, to reflect how the development would be viewed from the waters of Mattituck Inlet, as well as any surrounding residential development. 3. Include a visual rendering of a typical yacht to be stored in the building as it would appear traveling south down the creek towards the marina from the perspective of a person in a kayak on the creek headed north. 14 Final Scope for Final Environmental Impact Statement Sirong's Yacht Cenier—Proposed Boa!Storage Buildings Allalliluck, Town of Southold, NY 4. Possible mitigation for adverse impacts. Impact to Community Character The proposed action could result in an irreversible, adverse impacts to existing community character (physical alteration on site over a multi-year period, large building size and noise) and from the intensity of the proposed operations near residences.Adverse impacts could occur to the community from the construction timeframe in increased intensity and long duration. The DEIS will discuss and analyze: 1. How the proposed action conforms to the town's community character priority (as stated in the Comprehensive Plan Update), which is to "protect its scenic resources. 2. The historic and rural character of this section of Mattituck Inlet defined by in part by the presence of the steeply sloped, thickly vegetated forest on and adjoining the site. 3. The potential permanent and irreversible adverse impacts on neighborhood character related to destruction of the forest on the slopes of the subject property. 4. The potential adverse impacts of introducing big-box storage facilities on the neighborhood character surrounding the site, the areas facing the site from across Mattituck Inlet, and the character of the general area traversed by boaters using the inlet should be presented and given thorough analysis. 5. The aesthetic impacts of removing native forest and hillside upon the bucolic setting of the site. 6. The potential adverse impacts from Transportation on community character(see above). Impact on Open Space and Recreation The proposed action could result in a moderate to large adverse impact and significantly interfere with nesting/breeding, foraging or overwintering habitat by removing 3.94 acres of vegetation, including the removal of important habitat features such as dead trees used for nesting and cover. This habitat area is connected to a 25.29 acre parcel with similar habitat that is protected by the Town of Southold (SCTM# 106-6-20.3) to the south. This woodland assemblage comprises the largest undeveloped acreage in the Mattituck Creek watershed. Other areas of woodland to the south and to the west on the R-80 zoned portion of the parcel may also be affected. The DEIS will discuss and analyze: 1. Discuss the potential adverse impacts to the Town owned preserved property, the deforestation and impacts to the user groups of the property including hikers. 2. Analyze the adverse impacts related to noise, changes in view-sheds, the effect on wildlife, and alteration of a sense of place from this project on the public's enjoyment of the Town owned preserved property during all phases of the action. 3. Discuss the impacts of the increased large vessel traffic in the inlet, and its effects on small local vessels, kayaks, and paddle boarders attempting to navigate the narrow creek. 4. Potential mitigation for adverse impacts. 15 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mattituck, Town of Southold,NY Impact from Noise The proposed action could result in a moderate to large adverse impact from excessive noise levels during multiple phases over long duration.Noise associated with the operation of heavy equipment and trucks includes but is not limited to; engine noise, noise from moving and backing up heavy equipment(reversal warning sound) and the operation, accelerating and deceleration and Jake braking of trucks on site and on roadways. Similarly, operation of chain-saws and wood chippers for long durations may generate large, adverse noise impacts to receptors in the neighborhood. The DEIS will include, discuss and analyze the following: 1. A comprehensive noise study.Include in the assessment existing ambient noise levels,noise produced by all phases of the project,the sources of the noise,and including hours,duration, decibel level both at the source and at the receptor sites (e.g., the outdoor spaces of neighbors' properties such as decks or back yards), and impact on tranquility for residents within hearing range,as well as wildlife.Discuss the duration of each type of noise expected. Include an evaluation of cumulative noise generation where multiple machines/activities might be running simultaneously. Include protocols for monitoring of the noise level during construction and during operations and include how noise will be attenuated or mitigated. 2. Analyze and discuss the potential significant adverse impacts from noise on the quality of life and to public health resulting from all phases of site work and construction over long durations over a multi-month period. 3. Include the potential adverse impacts from noise on receptors and wildlife generated by the operation of machinery, heavy equipment and trucks both on-site and off-site as they travel through neighborhoods and the region including: ➢ Noise from the operation of machines, heavy equipment and truck engines moving and backing up(reversal warning sound),accelerating and deceleration. ➢ Noise from Jake braking of trucks on roadways. ➢ Noise from the operation of chain-saws and wood chippers for long periods and potential large, adverse impacts to receptors in the neighborhood and wildlife. ➢ Noise generated by each alternative. 4. Clarify whether or not blasting will be conducted. 5. Discuss the adverse impacts on the quality of life from the noise generated from the action and what mitigation is proposed to lessen adverse impacts. Impact on Air Quality The proposal involves the operation of heavy machinery and trucks on and off site over a long duration of time that could result in moderate adverse impacts to local air quality. This section of the document will address mobile source impacts (i.e., those related to construction activity)and post-development impacts to biomass as a result of the proposed land clearing activities. 16 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boal Slorage Buildings Matimick, Town of Southold,NY An air quality assessment will be performed and appended to the DEIS and summarized in the body of the text. The air quality assessment would include the following: ➢ Mobile Sources - The latest version of the Motor Vehicle Emission Simulator (MOVES2014b),developed by the USEPA Office of Transportation and Air Quality,will be used to estimate emissions associated with off-road and on-road mobile engines.If available, emission factors will be obtained from the NYSDEC or NYSDOT MOVES specific data for the County of Suffolk, otherwise national average emission factors in MOVES for Suffolk County using default distribution assumptions will be used.Mitigation measures,as required, will also be identified. ➢ Off-Road Mobile Equipment - Activity levels (i.e. hours of operation) of each piece of equipment will be estimated based on the square footage of the construction area and the associated activity type.The activity levels represent the total number of hours each piece of equipment is anticipated to be used for the duration of the project. Operating hours will be based on the projects need for the equipment rather than assuming continuous operation. It is assumed that all off-road equipment will operate on diesel fuel. Off-road mobile equipment emission rates for criteria pollutants will be computed and compared with USEPA National Ambient Air Quality Standards (NAAQS). Emission rates for hazardous air pollutants (HAPs) will be computed and compared to New York State Department of Environmental Conservation DAR-1 Guidelines for the Evaluation and Control of Ambient Air Contaminants Under Part 212. ➢ On-Road Mobile Vehicles - Vehicle miles traveled (VMT) data for each on-road construction vehicle and employee trips will be estimated from roundtrip distances and the number of vehicles and employees based on the activity specific construction schedule. It is assumed that all on-road equipment will use either gasoline or diesel fuel. Typical vehicle types will be passenger car, passenger truck, single unit short-haul, and commercial short-haul. The emission rates for criteria pollutants on-road construction vehicles will be computed and compared to USEPA National Ambient Air Quality Standards (NAAQS). Emission rates for hazardous air pollutants (HAPs) will be computed and compared to New York State Department of Environmental Conservation DAR-1 Guidelines for the Evaluation and Control of Ambient Air Contaminants Under Part 212. Provide air quality analysis for boat traffic. ➢ Fugitive Dust - Fugitive dust emissions (particulate matter or PM) from site preparation, land clearing, equipment movement on unpaved areas, material handling will be calculated utilizing USEPA published emission factors (USEPA, Air Emission Factors and Quantification, AP-42: Compilation of Air Pollutant Emission Factors). Erosion control measures and water programs to minimize fugitive dust and particulate emissions at construction sites will be considered in the analysis. Estimated emission rates for particulate matter (PM) will be computed and compared to USEPA National Ambient Air Quality Standards (NAAQS) for PM2.5 and PM 10. 17 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Matlituck, Tones of Southold,NY ➢ Carbon Sequestering — The proposal also involves the removal 3.94 acres of soil and vegetation including 493+ hardwood trees contributing to carbon sequestering. Carbon sequestration is the process by which atmospheric carbon dioxide is taken up by trees, grasses, and other plants through photosynthesis and stored as carbon in biomass (trunks, branches, foliage, and roots) and soils. The oak is the genus with the most carbon- absorbing capabilities, there are other notable deciduous trees that sequester carbon as well. Carbon sequestering estimates will be determined utilizing published sources, including but not limited to:USEPA, Office of Atmospheric Programs,Greenhouse Gas Mitigation in U.S.Forestry and Agriculture carbon sequestering factors;U.S.Department of Energy, Energy Information Administration, Method for Calculating Carbon Sequestration by Trees in Urban and Suburban Settings; and/or 2006 Intergovernmental Panel on Climate Change (IPCC) Guidelines for National Greenhouse Gas Inventories. Sources will be dependent on the most up to date and appropriate specific to the types of vegetation/soil conditions and the classification of the area to be cleared. Soil types will be identified from soil boring logs and published data through the USDA Suffolk County Soil Survey. Construction-Related Impacts This section will address the construction-related impacts related to vegetation and material removal, site preparation, and construction activities.The proposed excavation plan will be presented, and the impacts associated with noise, traffic and land disturbance activities (e.g., dust) will be assessed. Measures to mitigate impacts will be identified, as appropriate. The DEIS will: 1. Identify specific materials e.g., excavated materials, vegetation, concrete and building materials. 2. Discuss the potential adverse impacts from water line and natural gas extensions on public roads. 3. Discuss why the project is necessary as proposed. 4. Discuss why this parcel is suitable for this project. This project will require large amount of forest, slope and soil removal. 5. Discuss why the construction of the buildings requires the need to excavate 134,921CY of soil and why the buildings cannot be constructed without excavation. 6. Clarify if the cubic yard calculation of soil to be excavated from the site includes a "swell" factor. 7. Discuss why the length of construction is necessary (13 months). 8. Discuss how the R-80 zoned portion of the parcel will be affected by the proposed action. 18 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mattrtuck, Town of Sourthold,NY 9. Provide a complete evaluation of impacts associated with all proposed mining, erosion, materials transport (including roadway impacts and impacts on nearby residential development), materials storage, materials sales, materials processing, vehicle operations, and habitat destruction. The proposed action requires an extensive amount of excavation, which will ultimately result in significant off-site transport of sands and gravels extracted from the site. 10. Assess the noise from all stages of site preparation and construction as described in more detail in the Noise section above. 11. Describe in detail the process by which the temporary road will be constructed and the impacts that will result including but not limited to noise, vibration, vegetation and soil removal, and tree removal. 12. Discuss the potential of slope failure and effect of excavation and ground vibration from the operation of machinery, heavy equipment and trucks on existing neighboring structures. 13. Discuss the potential of destabilization of adjacent properties and impacts from vibration and excavation on adjacent properties, the impact of timing in between each phase, the threat of catastrophic soil loss and erosion if there is a pause in the project schedule due to weather or other event, and the future maintenance, type of construction, inspection schedules and monitoring for defects of the retaining wall.The potential catastrophic failure of the retaining wall, in whole or in part and effect on adjacent properties. 14. Address growth inducing actions and if there will be a future request to develop the property and/or increase the size of the marina/docks as a result of this proposed project. And if the marina and docks will be expanded as a result of this proposed project, discuss whether or not that would constitute the segmentation of the SEQRA review if that expansion is not included in this review. 15. Discuss the potential need to increase the boat storage capacity of the current site and for a future travel lift, boat staging, in water docking and the impact on adjacent wetlands. 16. Discuss if the excavated material can be removed by barge through Mattituck Inlet for off- site disposal. 17. Discuss how the unexpected site conditions,weather, pandemic, and work flow and schedule changes will be addressed to not impact the community? 18. Provide a complete evaluation of impacts associated with all proposed mining, erosion, materials transport (including roadway impacts and impacts on nearby residential development), materials storage, materials sales, materials processing, vehicle operations, and habitat destruction. 19. Discuss alternative plans for disposal of any excavated material that cannot be sold, and provide an evaluation of any disposal sites, other than commercially-operated sites 19 Final Scope for Final Environmental Impact Sialeineni Strong's Yacht Center—Proposed Boat Storage Buildings Mattituck, Toum of Southold,NY specifically designed to receive fill. Identify the off-site disposal location. 20. Include a plan for specifically targeted and carefully undertaken soil borings to inform an excavation plan that is designed to prevent catastrophic mass soil movement and soil slumping. The DEIS will not rely solely on published soil surveys or soil borings performed by others for a project involving excavation of 134,000CY of a forested hill's soil, especially one adjoining a waterway. Without specifically targeted and carefully undertaken soil borings to inform an excavation plan, the potential exists for a catastrophic mass soil movement event during, or subsequent to, disturbance of the steep slopes by heavy equipment. The proposed excavation could cause sudden faulting and structural disturbances associated with the slope and soil slumping to the immediately adjoining and steeply sloped preserve, as well as cause sedimentation in the waterway. Sedimentation can have a devastating effect on the estuarine life in the inlet because of rapid burial and destruction of benthic organisms, such as shellfish or crustacea. 21. Discuss the effect of precipitation on the re-established steep slope with regard to potential exacerbation of soil movement. It also will show the new retaining structure can adequately support the final slope and resulting hydrostatic pressure behind the wall. 22. Mitigation of potential adverse impacts. Consistency with Community Plans and Studies In 2020,the Town adopted The Southold Comprehensive Plan,the proposed project will be assessed to the goals and objectives of this plan and others. The DEIS will: 1. Include a section focused on the consistency between the proposed action (and alternative actions), and the relevant goals, objectives, and standards of existing planning, land use and policy documents relevant to the subject site and its surroundings. 2. An in-depth analysis of the action on the following policy and planning documents, legislation, and implementing rules and regulations: o Southold Town Comprehensive Plan ■ Natural Resources and Environment ■ Community Character ■ Land Use and Zoning (Marine Zoning Update) ■ Natural Hazards ■ Economic Development ■ Transportation and Infi"aStrueture o Town of Southold Local Waterfi•ont Revitalization Plan & Policies o State and local wetlands protection laws o The Mattituck Watershed Management Plan 20 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mattituck, Town of Southold,NY o "NYSDEC Environmental Resource Mapper" -with respect to wildlife evaluation o NYSDOS Coastal Significant Fish and Wildlife Habitat designations (Mattituck Inlet) o Articles 6,7 and 12 of the Suffolk County Sanitary Code 0 2019 Suffolk County Special Grand Jury Report: Illegal Dumping & Mining, Suffolk County Impacts on Archeological and Cultural Resources The parcel is located within an area with historic use and buildings. The DEIS will discuss the following potential, adverse impacts to archeological and cultural resources from the action. The DEIS will: 1. Discuss the project's potential impacts to historic and archeological resources. a. Part 11 of the Full EAF for the project indicates that the project is not adjacent to a historic or archeological site. However, NYSDEC guidance on how to prepare the EAF notes that in preparing responses in this section of the EAF one must ask "Does the project site contain, or is it contiguous with, a known archaeological site, even though it may not be included on the NY SHPO inventory?" As no archeological survey of the project area has been made it is not possible to answer this question in the negative. b. Although NYS OPRHP's Cultural Resources Information System (CRIS) does not identify the project area as archeologically sensitive, this should not be construed as meaning that the area does not have the potential to contain potentially significant archeological resources. CRIS relies on the prior identification of archeological sites in proximity to a given area to evaluate sensitivity. CRIS's archeologically sensitive GIS layer specifically states: "Note that locations outside of the buffer areas may also be archaeologically sensitive."In the case of the project area the failure to identify it as "sensitive" is a reflection of the total lack of prior archeological surveys in the immediate vicinity of the project. The project area's location on high ground adjacent to Mattituck Creek(believed to be part of a principal portage route used by Native Americans to travel from the North to South shores of Long Island), suggests that evidence of Native American occupation could be present. c. There are three unevaluated structures listed in CRIS within approximately 1000 feet of the project area. Include an evaluation as to if and how these structures may be visually or otherwise (noise, vibration during construction) affected by the project and, if potentially affected, if they satisfy the eligibility criteria for the State Register of Historic Places. Other Required Sections Social and Economic Impacts 1. Describe the public benefit to the community. 2. Economy a. Provide a frill economic analysis/study of the positive and negative impacts on the community and economy from the action, include the short- and long-term impacts and the 21 Final Scope for Final Environmental Impact Stalenienl Strong's Yachl Center—Proposed Boal Storage Buildings Mallituck, Town of Southold,NY viability of the commercial use. The number of jobs created (full-time and part time). Include the current levels of employment by Strong's at the site and employment that would be generated by job description, salary benefit levels, etc. Assess the impact of additional employees. b. Discuss the claimed benefit to the local economy. It should include data about stored boat ownership and where the boat is docked during the season. 3. Threat to Public Safety: Fire The DEIS will discuss the threat of fire and explosion on site from all ignitable sources. Include the evaluation of potential fire hazards, and if the Mattituck Fire Department is adequately equipped to respond to a fire at the site. This is of special concern given the size of the structures and the combustibles within the stored boats. Use and Conservation of Energy - This section of the DEIS will describe the proposed energy sources, expected levels of consumption and means to reduce consumption. Consultations with the service providers (PSEG LI and National Grid) will be undertaken and the findings and recommendations of these providers will be included. Unavoidable Adverse Effects - This section enumerates those short and long-term impacts that cannot be mitigated. Irretrievable and Irreversible Commitment of Resources — This section includes a brief discussion of natural resources consumed as a result of project implementation. The discussion should include the irreversible impacts from excavation of sand, deforestation, on the Town owned preserve. Include a discussion on the irreversible adverse short and long-term impacts on community character resulting from the potential degradation of the quality of life. Growth-Inducing Aspects -The potential growth-inducing aspects of the project will be presented in this section. (See above) Extent and Quality of Information Existing and Needed To conduct the analyses of potential adverse impacts, available information will be collected and reviewed, and empirical information will be developed. While it is not possible to determine all information sources to be used,the following represent sources/research that have been preliminarily identified as necessary to perform the required analyses in the DEIS. Impact on Soils and Topography • USDA, Suffolk County Soil Survey • USGS Topographic Map • Proposed Site Development Plans 22 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Maltituck, Town of Southold,NY • Proposed Erosion and Sedimentation Control Plan • Soil Boring Logs • Cut/Fill Estimates • Soil borings performed on site to inform the excavation Impact on Water Resources • Southold Town Comprehensive Plan (2020) • Town of Southold Local Waterfront Revitalization Plan & Policies • Water quality assessment of current conditions in Mattituck Inlet over all four seasons (applicant generated) • Water/Tidal flow modelling/study in front of the Marina including docks and boats_(applicant generated) • Study the groundwater supply to determine any impacts to neighboring wells on quality and quantity of groundwater as a result of this action (applicant generated) • USGS Water Table map and monitoring well data, as available • Suffolk County Groundwater Contour Maps • Mattituck Inlet Surveys with Soundings • Relevant plans, standards and regulations, including the SCDHS Suffolk County Sanitary Code, New York Standards and Specifications for Erosion and Sediment Control,New York State Stormwater Management Design Manual,and the Suffolk County Comprehensive Water Resources Management Plan. • NYSDEC Freshwater and Tidal Wetland maps • NYSDEC Letter of Non-Jurisdiction • U.S. Fish and Wildlife Service—National Wetlands Inventory • Federal Emergency Management Agency (FEMA)Flood Insurance Rate Maps • Chapter 236 (Stormwater Management) of the Town Code Impact on Ecological Resources • Southold Town Comprehensive Plan (2020) • Town of Southold Local Waterfront Revitalization Plan & Policies • Correspondence with the New York Natural Heritage Program • Field investigations • Published material regarding the potential presence of protected native plants, plant and animal species listed as endangered, threatened, and/or special concern (or with other protective status) and significant habitat areas on or in the vicinity of the project site • Ecological Communities Map • Ecological Inventory of Site for Observed Plants and ecological communities and observed/expected wildlife • Tree Removal Plan updated with Tree Species, as identified during field visits • State and local wetlands protection laws • The Mattituck Watershed Management Plan • NYSDEC Environmental Resource Mapper" -with respect to wildlife evaluation 23 Final Scope for Final Enwronmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mattituck, Town of Southold,NY • NYSDOS Coastal Significant Fish and Wildlife Habitat designations (Mattituck Inlet) • Articles 6,7 and 12 of the Suffolk County Sanitary Code • 2019 Suffolk County Special Grand Jury Report: Illegal Dumping &Mining, Suffolk County Impact on Transportation • Southold Town Comprehensive Plan (2020) • Four season Traffic Study analyzing real-time data (applicant generated) and including the construction phase as well as the operations of the completed site. • Four season roadway user group study (applicant generated) • Regional and local vehicle routing study and plan (applicant generated) • Four season comprehensive boat(vessel)traffic study (applicant generated) • Most-recent three-year accident data, as published by NYSDOT and accident data from the Southold Police Department if more recent or more detailed than that available from the NYSDOT • The Institute of Transportation Engineers, Trip Generation Manual, 10th Edition • The Institute of Transportation Engineers, Parking Generation Manual, 5th Edition • Highway Capacity Manual, latest edition • Consultations and/or review of available information from the Town of Southold Highway Department,NYSDOT and SCDPW Impact on Aesthetic Resources and Community Character • Southold Town Comprehensive Plan (2020) • Town of Southold Local Waterfront Revitalization Plan &Policies • Visual Impact Study that includes computer-generated imagery for viewshed changes from Mattituck Creek and adjacent roadways (Applicant generated) • Architectural plans and elevations • Site and area inspections • Chapter 172 (Lighting, Outdoor) of the Town Code Impact on Air Quality • Southold Town Comprehensive Plan (2020) • Town of Southold Local Waterfront Revitalization Plan & Policies • Motor Vehicle Emission Simulator(MOVES2014b) • Published emission factors from NYSDOT, NYSDEC or USEPA • Construction schedule, with projected truck and equipment types • USEPA, Air Emission Factors and Quantification, AP-42: Compilation of Air Pollutant Emission Factors • Carbon sequestering estimates to be based on published sources, including but not limited to USEPA, Office of Atmospheric Programs. Greenhouse Gas Mitigation in U.S. Forestry and Agriculture carbon sequestering factors; U.S. Department of Energy, Energy Information Administration, Method for Calculating Carbon Sequestration by Trees in Urban and 24 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buddungs Mattituck, Town of Southold,NY Suburban Settings; and/or 2006 Intergovernmental Panel on Climate Change (IPCC) Guidelines for National Greenhouse Gas Inventories. • Tree Survey and Tree Identification, as provided by Land Use Ecological Services, Inc. • Code of Federal Regulations — Title 40, Part 50, National Ambient Air Quality Standards (NAAQS). • New York State Department of Environmental Conservation: DAR-1 Guidance (August 2016). Impact from Noise • Southold Town Comprehensive Plan (2020) • Town of Southold Local Waterfront Revitalization Plan & Policies • Comprehensive Noise Study (Applicant Generated) • Chapter 180 Noise of the Southold Town Code Impact on Archeological and Cultural Resources • Southold Town Comprehensive Plan (2020) • Town of Southold Local Waterfront Revitalization Plan &Policies • Cultural Resource Survey including NYS CRIS system findings. • Consultation with the NYS Office of Parks, Recreation and Historic Preservation office. Social and Economic Impacts • Southold Town Comprehensive Plan (2020) • Comprehensive Social and Economic Impact Study on the Community and Town (Applicant Generated) Construction-Related Impacts • Proposed Site Development Plans • Proposed Excavation Plan, including soil borings to evaluate and inform the plan • Proposed Construction Schedule • Traffic Study, User Group Study and Routing Plan (see above) • Chapter 180 (Noise) of the Town Code Initial Identification of Mitigation Measures As the DEIS analyses have not yet been conducted, no specific mitigation measures have yet been developed. Nonetheless, where the impact analyses conducted in the DEIS indicate the potential for significant adverse impacts, the DEIS will set forth measures to mitigate those impacts within the topic sections, as presented herein. 25 Final Scope for Final Environmental Impact Statement Strong's Yacht Center—Proposed Boat Storage Buildings Mattituck, Town of Southold,NY Reasonable Alternatives to Be Considered Pursuant to 6 NYCRR Part 617, the DEIS must contain a description and evaluation of reasonable alternatives to the proposed action that are feasible, considering the objectives and capabilities of the project sponsor. This DEIS will analyze the impacts of the following alternatives and compare (quantitatively and qualitatively) these impacts to those associated with implementation of the proposed action, based upon the specific issues outlined above: I. No-Action (site remains as it currently exists). 2. Alternative Material Removal Plan — This alternative is intended to mitigate the impacts associated with the removal of material via trucks over local roadways and will include the barging of cleared vegetation including trees, stumps and excavated materials. 3. Constructing the project on another site. 4. Constructing the proposed storage buildings without the need for excavation. 5. Constructing smaller building(s)with less excavation. 6. The reconfiguration or reconstruction of existing buildings on-site for larger boat storage. Proposed Organization and Overall Content of the DEIS The DEIS will conform with the basic content requirements as contained in 6 NYCRR Part 617.9 (b)(3). The proposed outline of the DEIS is as follows: Executive Summary 1.0 Description of the Proposed Action 1.1 Project Location and Site Conditions 1.2 Project Design and Layout 1.3 Project Objectives and Benefits 1.4 Construction and Operations 1.5 Required Permits and Approvals 2.0 Natural Environmental Resources 2.1 Impact on Soils and Topography 2.1.1 Existing Conditions 2.1.2 Potential Impacts Analysis 2.1.3 Proposed Mitigation 2.2 Impact on Water Resources 2.2.1 Existing Conditions 2.2.2 Potential Impacts Analysis 2.2.3 Proposed Mitigation 2.3 Impact on Ecological Resources 2.3.1 Existing Conditions 2.3.2 Potential Impacts Analysis 2.3.3 Proposed Mitigation 26 Final Scope for Final Environmental Impacl Slatement Strong's Yacht Center—Proposed Boat Storage Buildings A4attituck, Town of Southold, NY 2.4 Impact on Plants and Animals 2.4.1 Existing Conditions 2.4.2 Potential Impacts Analysis 2.4.3 Proposed Mitigation 2.5 Impact to the Environment 2.5.1 Existing Conditions 2.5.2 Potential Impacts Analysis 2.5.3 Proposed Mitigation 2.6 Impact on Flooding 2.6.2 Existing Conditions 2.6.3 Potential Impacts Analysis 2.6.4 Proposed Mitigation 3.0 Human Environmental Resources 3.1 Impact on Human Health 3.1.1 Existing Conditions 3.1.2 Potential Impacts Analysis 3.1.3 Proposed Mitigation 3.2 Impact on Transportation 3.2.1 Existing Conditions 3.2.2 Potential Impacts Analysis 3.2.3 Proposed Mitigation 3.3 Impact on Aesthetic Resources 3.3.1 Existing Conditions 3.3.2 Potential Impacts Analysis 3.3.3 Proposed Mitigation 3.4. Impact on Community Character 3.4.1 Existing Conditions 3.4.2 Potential Impacts Analysis 3.4.3 Proposed Mitigation 3.5 Impact on Open Space and Recreation 3.5.1 Existing Conditions 3.5.2 Potential Impacts Analysis 3.5.3 Proposed Mitigation 3.6 Impact from Noise 3.6.1 Existing Conditions 3.6.2 Potential Impacts Analysis 3.6.3 Proposed Mitigation 3.7 Impact on Air Quality 3.7.1 Existing Conditions 3.7.2 Potential Impacts Analysis 3.7.3 Proposed Mitigation 3.8 Social and Economic Impacts 3.8.1 Existing Conditions 27 Final Scope for Final Enwronmental Irnpacl Statement Strong's Yacht Center—`Proposed Boat Storage Buildings Matlzluck, Town of Sozilhold,NY 3.8.2 Potential Impacts Analysis 3.8.3 Proposed Mitigation 3.9 Construction-Related Impacts 3.9.1 Description of Proposed Construction Schedule and Activities 3.9.2 Potential Impacts Analysis 3.9.3 Proposed Mitigation 3.10 Consistency with Community Plans and Studies 3.10.1 Existing Conditions 3.10.2 Potential Impacts Analysis 3.10.3 Proposed Mitigation 3.11 Impact on Archeological and Cultural Resources 3.11.1 Existing Conditions 3.11.2 Potential Impacts Analysis 3.11.3 Proposed Mitigation 4.0 Other Required Sections 4.1 Social and Economic Impacts 4.2 Threat to Public Safety 4.3 Use and Conservation of Energy 4.4 Adverse Impacts That Cannot Be Avoided (Short-Term and Long-Term) 4.5 Irretrievable and Irreversible Commitment of Resources 4.6 Growth-Inducing Impacts 5.0 Alternatives and Potential Impacts 5.1 Alternative 1: No-Action 5.2 Alternative 2: Alternative Material Removal Plan Using Barges 5.3 Alternative 3. Constructing the project on another parcel. 5.4 Alternative 4. Constructing the proposed storage building(s) without the need for excavation. 5.5 Alternative 5. Constructing smaller building(s) with less excavation. 5.6 Alternative 6. The reconfiguration or reconstruction of existing buildings on-site for larger boat storage. 6.0 References 28