Loading...
HomeMy WebLinkAbout250 Sunset Path Town of Southold P.0 Box 1179 Southold, NY 11971 * * * RECEIPT * * * Date: 12/09/20 Receipt#: 276726 Quantity Transactions Reference Subtotal 1 Excavation Permits 1447 $550.00 Total Paid: $550.00 Notes: Payment Type Amount Paid By CK#29336 $550.00 Long, Island Power Authority Southold Town Clerk's Office 53095 Main Road, PO Box 1179 Southold, NY 11971 Name: Long, Island Power Authority 117 Doctors Path Riverhead, NY 11901 Clerk ID: LYNDAR Internal ID: 1447 144 1 Permit No. TOWN OF SOUTHOLD �QgUFFO��c HIGHWAY DEPARTMENT .� °oy� �iCS l� Peconic Lane Peconic,New York 11958 (631)765-3140ol APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit pursuant to Chapter 237 of the Code of the Town of Southold,Suffolk County,New York,and other applicable laws,ordinances or regulations for each individual contiguous excavation project herein described. The applicant agrees to comply with all applicable laws, ordinances,codes and regulations,the attached"General Conditions of Permit'and"Special Conditions",if any and to permit authorized inspectors to make necessary inspections of the job site. Print or Tvpe _ Lvm-<.I uld bux bv-1 - ;B Furl N," M BI V71- ! 4,& 40�) Name oflApplicant Phone Number Address of Applicant v�a,[e(Ay2. Name of Contractor Phone Number Address of Contractor 3. N 6 and rnOLh fVe ag0 SOW SCE RAJ- sb L)1-14 o t-d Name of Property Owner Requesting Service(if applicable) Address of Owner 4. ihsiowa:-M of phwarq +0 2111 s-I�h (� SU k e-� pc�I - sw, 4 old Work Description and Location(Street Number,Hamlet,Cross Str t)w() <' i5 0 VeQ, t5 QV2lL h 0M PVV& (a) Is construction located within 75 feet of tidal wetlands? *Yes No V t *If yes,other Town permits may be required. 0,�Lc, NOTE: All information requested by this Signature of Applicant Application/Permit Form is Required for a complete application? ►11 I( �/ ((��(rf I, e Date U/' 5 (a) Attached plot plan to reasonably and adequately describe the proposed work. Provide accurate schematic site plan showing the location of all proposed excavations and relationship to adjoining premises,public streets or areas,and give a detailed description of all site and pavement restoration work. (b) Attach all other necessary permits and licenses for this project. (c) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the Town Clerk. 6. Tax Map No.: District 1000 , Section SLA Block l Lot 7. Starting Date. Completion Date: 8 Work Schedule• Phase Completion Date Excavation Work Schedule Facility Installation Must be provided Backfill &Completion for consideration as a Pavement Replacement Complete Application. 9. Under which authority is application being made: See Town Code Chapter 237(E)-Provide Resolution by,or authority from,the Utility being modified. 10 Estimated Cost of Proposed Work: $ 11. Remarks: D-39 1 of 5 12. Insuiance Coverage (Attach Copy) (a) Insurance Company•_ (b) Policy#: _ (c)State whether policy of certification on file with the Highway Department: (d)Coverage required extended to the Town: Any Loss including Bodily injury,property or commercial injury caused by or atti ibutable to the work performed: $1,000,000 per Occuirence and$2,000,000 general aggregate. 13. Security. (a)Surety Bond or Certified Check provided in the total Amount of$ (b)Maintenance Bond provided: 2 years or 3 years. 14 Fees for Applications and permits Basic Application Fee for Each Project Location - $500.00 A Project Location would include each Bell Hole and/or every road opening or excavation within any 50' Radius whether or not they may be inter-connected by open trench or directional boring. The total number of Project Locations shall be subject to the approval of the Highway Superintendent. Al. /Service Connections excavations @$50.00 $ No. A2. /Additional Excavations same service @$20.00 $ No. B. Trench Excavations 18"in depth or less Total Lineal Footage of Excavation; L.F.@$10.00 $ C. Trench Excavations 18"in depth to 5'in depth Total Lineal Footage of Excavation; _' ` ' '_L.F.@$30.00 $ D Trench Excavations 5'in depth and over Total Lineal Footage of Excavation; L.F.@$50.00 $ E. Utility Repair Excavations @$1,000.00/Each $ No. Additional Repairs of Same Service @$500.00/Each $ No. _ �l TOTAL$ b 0 F. Official Notice to public utilities-proof must be provided and Shall be attached to this application prior to issuance of permit. Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway xcavation permit to: in accordance witl this application and subject to the"General Conditions"and"Special Conditions"of permit if an )attached a et . SUPERINT D N G TOWN OF OU 10 OLD NE /Vincent Mrl ndo ^ Date Date Received by the Town Clerk `olJ Date Permit Issued [I – 1— Permit No. I LA Ll NOTE. Permit expires one(1)year from date of issuance. No work to start without 24 hour notice to Superintendent of Highways. Permit must be available at all times for inspection,on site,during construction. D-39 2 of S Copy Distribution: Per-mit# Highway Department Engineer(with page 3) Applicant Town Clerk(Original) INSPECTOR'S RECORDS Inspection Date Findings(use code) Applicant Notified 1 St 2nd 3rd 01 (To Permit Clerk) REA ARKS CODE IB Improper Barricades IL Improper Lights ST Sunken Trench or Excavation UTM Unable to Measure(due to backfilling) BUC Building Under Construction WIP Work In Progress DB Improper Backfill(too high,not sufficient) HFS Inspector Holding for Final Settlement of Excavation RFR Ready for Repair D-39 3 of 5 Request for Southo � d FEE Date11 / 13 / 20 Permit Required to open This work calls f or the installation of 2 / C 1 / 0 Al Primary cable directionally drilled from the S / S of Hortons Lane , P # 60 , Approximately 230 ' W / ❑ Majors Path to BG 99502 at 250 Sunset Path to ref eed the neighborhood A 3x3 bellhole to be installed to make connections at the existing transformer . Permit Requested By: PSEG LONG ISLAND 1:1Q,N, Cent, OW,S, ®E,S, TD Type of road M a c a d a m Service for Work Request #9 0 0 00 01116117 Charge account # Disbersement to be made out to petty cash 11:1 To be billed No fee Return Permit To: Distribution Design Department GENERAL,CONDITIONS OF PERMIT APPLICATION/PERMIT FOR HIGI-IWAY EXCAVATION ANIS REPAIR 1. Permittee's Contractors to Comnly with Permit Requirements: The Permittee is responsible for informing its independent contractors,employees,agents and assigns of their responsibility to comply with this permit, including all special/site specific and general conditions imposed by the Highway Superintendent while acting as the permittee's agent with respect to the permitted activities,and such persons shall be required to comply with all permit requirements. 2. No Rieht to Trespass or Interfere with Private Property Rights: This permit does not convey to the permittee any right to trespass upon the lands of adjacent property owners in order to perform the permitted work nor does it authorize the impairment of any rights,title,or interest in real or personal property held or vested in a person not a party to the permit. 3. Protection of the 1-Hiahwav and Future Hi2hwav Maintenance: If future operations or highway maintenance projects by the Town of Southold require an alteration in the position of the utility,structure or work herein authorized,or if, in the opinion of the Highway Superintendent the work performed under this permit shall cause unreasonable obstruction to required highway maintenance or endanger the health, safety and/or welfare of vehicular or pedestrian traffic,this permit shall be revoked and the utility, structure,fill,excavation,or other modification of the highway hereby authorized shall not be completed. Additionally,the permit may be revoked if the Highway Superintendent finds that the issuance of the permit was illegal or unauthorized or that the applicant failed to comply with any of the terms and conditions of the permit or Chapter 237 of the Town Code. 4. Revocation of the Permit by the Highwav Superintendent: If the Highway Superintendent deems it necessary to revoke this pen-nit and the project hereby authorized has not been completed,the applicant shall, without expense to the Town and to such extent and in such time and manner as the Superintendent may require,remove all or any portion of the uncompleted utility,structure or fill and restore the site to its former condition. 5 Notice of Commencement: At least 24 hours prior to commencement of the project,the permittee and/or contractor shall notify the Town Highway Department in writing that they are fully aware of and understand all terms and project conditions of this permit. Upon completion of the work,the contractor shall provide photographs of the completed work to the Town Highway Department and request a Final inspection. 6. Storage of Equipment& Materials: The storage of construction equipment and/or materials shall be confined within the project work area and/or adjacent areas where permission/legal access has been obtained in a manner that does not interfere with normal highway traffic. 7. Utility Marl:-Outs: The Applicant/Contractor shall be responsible for verification of all existing utility mark-outs and shall take all precautions to protect same. Damage to existing utilities shall be the responsibility of the contractor and shall be repaired at the contractor's expense. 8. Road Closures: All scheduled road closures must first receive written permission from the Southold Town Board prior to closing a road. Temporary lane closures may be permitted with the approval of the Highway Superintendent. This item will included but not be limited to the installation of appropriate signage and flag men to stop and start traffic to allow for single lane traffic. Road Closures due to unforeseen emergencies require immediate notification of the Highway Department and shall be liinited to immediate and/or expedited restoration of the Work Zone. 9. No Construction Debris in Road Shoulder Area: All Construction Debris shall be removed from the job site on a daily basis. All stockpiled soil as well as all other project materials that will be staged within the Right-of Way must be delineated with reflective signage or other means to meet the minimum requirements of the NYS DOT Construction Standards. `f a f GENERAL CONDITIONS OF PERMIT APPLICA'T'ION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR (Continued) 10. Install.Maintain Erosion Controls: Required Erosion Control Measures(i.e.silt fencing)is to be placed on the downslope edge of any disturbed area. This sediment barrier is to be put in place before any disturbance of the ground occurs and is to be maintained in good functional condition until thick vegetative cover is established. 11. Clean Fill Only: All project back-fill shall consist of clean sand,gravel or soil (NOT asphalt,slag,flyash, broken concrete or demolition debris). All unsuitable soils excavated at the site(i.e.Clay,Bog,etc.)are to be removed from the site and not used to backfill any excavation within a Town Highway. 12. All Areas of Soil Disturbance: All areas of soil disturbance resulting from the approved project shall be stabilized to the satisfaction of the Highway Superintendent immediately following project completion. If the project site remains inactive for more than 48 hours or planting is impractical due to the season,then the area shall be stabilized with straw,hay mulch and/or jute matting until weather conditions favor germination. 13. Backfill&Compaction of all Excavations: Back Fill shall consist of clean fill or soils which exhibit a well-defined moisture density relationship as determined to be in accordance with ASTMD 698. Fill shall be placed in maximum lifts of twelve(12")inches thick and shall be mechanically compacted to aNinety- five(95%)percent maximum dry density. Suitable hydraulic compaction by water jetting at three-foot intervals will also be permitted subject to a project specific approval by the Highway Superintendent. 14. Restoration of the Road Shoulder Area: All man-made improvements located within existing road shoulder areas must be protected to the greatest extent practical. Items would include but not be limited to driveway&private road aprons,mail boxes,sprinkler systems,trees and ornamental plantings. Excavations through driveways and private road pavements must be reconstructed to meet all requirements of Southold Town Highway Specifications. All pre-existing road shoulder improvements that have been disturbed during construction must be replaced or repaired by the contractor to the satisfaction of the Highway Superintendent. 15. Schematic Plans with all Technical information and Scope of Work: To reasonably and adequately describe the proposed work,accurate schematic site plans must be provided to show or indicate all proposed construction activity required under this permit. All Pavement surfaces scheduled for excavation must be saw cut to the full depth of asphalt and/or concrete pavements. Accurate size of bell holes or width of trenching must be indicated by dimension or labeling. This schematic site plan must provide details on all restoration required to meet the requirements of these General Conditions and requirements found in the Southold Town Highway Specifications. 16. Pavement Reconstruction: All Pavement sections must be reconstructed in the following manner; (Note:When Concrete Pavements are Present,Please review Restoration requirements with the Highway Superintendent) a) Complete all back-fill &soil compaction work as needed to provide a suitable sub-base; b) Over-cut existing asphalt bell hole or trench by twelve(12")inches on all sides; c) Install a compacted lift of 4"thick Stone Blend base(RCA Blend must meet NYS DOT Specification); d) Install a two and one half(2.5") inch compacted lift of Asphalt Base Course; e) Install a one and one half(1.5")inch of Asphalt(Type 6)Wearing Coarse. (Provide AC at all joints) All work listed herein must meet the minimum requirements of the Southold Town Highway Specifications. " 17. Trenching of Pavement Surfaces Exceeding One Hundred(100') Feet in Length: All trenching of pavement surfaces exceeding 100' in length must first be reconstructed to meet the requirements of Item # 16 as noted above. Once all pavement reconstruction is completed to the satisfaction of the Highway Superintendent, the entire road section and/or width of road over the entire length of trench shall be repaved with a two(2")inch lift of Asphalt(Type 6) Wearing Course(Typical,shoulder to shoulder). JOB NAME RICHARD MANFREDI VILLAGE/TOWNSOUTHOLD NOTIFICATION #900000116117 GR STREET ADDRESS 240 SUNSET PATH NOD099-E-62/6,3 POLE W.O. #800000270486 PERMIT TYPE NO. 8 B 7 K 6 N MBERT 1 300 SERVICES W.0 R # REQUIRED (Y/N) Y TOW N EASEMENT REQ'D (Y/N)N CONTRIBUTIONS CENTER EC U R NOUTRIGHT WORK OTIFICATION OEQ# 800000270488 NOUNS NOUNS NOTIFIEDCUSTOMER OWF#800000270487 NOTIFICATION INITIATED Y DATE 1 1 13 2 0 ID# . FLAGGING/TRAFFICENVIRONMENTAL SERVICE CONTROL REQUIRED REQUIREMENTS SATISFIED El UG WIRE W.O. #REQ'D. BY: 800000270490 TREE TRIM REQUIRED N PRIj�A)1.0�ERATIN�VOLTAGE ACAD FILE: CONDUIT/MH W.O. # By,PREPARED CONOR BUTLER PH-631-2118455-5215 DATE DWG. COMPLETED uEQ # 800000270489 AUTHORIZED RICH INSERRA PH:631-284-5298 11/13/20 FOREMAN IN CASE WORK CANNOT BE COMPLETED AS SHOWN: BY: s �� LONG DISTRIBUTION DESIGN NOTIFY: PHONE ri°t ' ISLAND 175 E. OLD COUNTRY ROAD TRANSF. SEC'DY CUSTOMER LOAD: A'e uaAv dmi s wnrA o�eau HICKSVMLE, NY. 11801 LOAD REG. LEGEND BLUE EXISTING RED INSTALL GREEN REMOVE MAGENTA R/I REVISION # REVISION DATE REVISION EXPLANATION REVISED BY OWN ' POLE# LOCATION POLE (I) 1 (R) FURN SET OWN REM TR RE# REASONS SET SIZES SIZES OWN AS DEF. INAD NEW RELOC. L 60 S/S HORTONS LANE, X230 W/0 MAJORS PATH D 40' 35' L L L LG X IST ALL N N' TI-KET #(s) HERE 4484455 PSEG- &N THIS WORK CALLS FOR THE INSTALLATION OF 2/C #2 AL PRIMARY WIRE .DIRECTIONALLY DRILLED FROM P#60 TO BG # 99502 AND THE OPENING OF PRIMARY AT P#21. THIS,IS TO IMPROVE RELIABILITY IN THIS AREA DUE TO A LARGE NUMBER OF OUTAGES. NEW OPEN POINT AND OUT OF PHASE CONDITION CREATED AT P#21 AND EXISTING OPEN POINT RELOCATED FROM P#59 ON HORTONS LANE TO P#58 ON HORTONS LANE. MARK OUT REQUIRED DIRECTIONAL DRILLING FROM P# 60 TO BG#99.502 INSTALL 4" CONDUIT AND PULL 15kV 2/C #2 AL PAGE 1 OF 2 �O �Q. S 0 P#18.5 HYATT RD W AL P#21 O P#21 239860 N U R—PTP & INS P#19 I— 15KV DDE P#20 CREATES NEW OUT OF PHASE CONDITION GRID:099-62-8815 P#21 50 kVA N B A BG 99502 P#21.5 1-#2 ELBOW 2/C #2 AL i BUS:7953 i BG#99502 50 kVA 250 / 415 A � P#22A _ 31> \ \ P#22B S y 240 280 125 A 2/C #2 A ; X22, PSEG TO DIRECT DRILL 4" CONDUIT HILL TOP PATH AND PULL 2/C #2 AL XLPE CABLE. L, P#228A 155 LnP#8 R—PTP & INS cov 7870 I— 15KV DDE NEW OPEN POINT OUT OF PHASE CONDITION P#61 '� . HORTONS SANE GRID:099-62-8815 O #6 3/c P#60 # P#60 R-50 kVA P#59 TRANSFORMER 1-40' CL 2 P#59 1-100 AMP P#58 CUTOUT F— 10T R/I-15 kVDDE LBF #20437 R/I—SEC'DY STR 1—#2 POTHEAD 1-50 kVA GRP 3 I—PHASE LA. TRANSFORMER GRID:099-63-7181 R-100 AMP CUTOUT — OPEN POINT 1-100 AMP CUTOUT F-10T PAGE 2 OF 2 GRID:099-63-8122 ,oe ' P M S t9L A, D M moke diags work for you Distribution Design Department 117 Doctors Path, Riverhead, NY 11901 October 20, 2020 Town of Southold PO Box 178 Peconic Lane Peconic, NY 11958 Re: PERMIT APPLICATION & SKETCH 240 SUNSET PATH, SOUTHOLD Gentlemen: Attached is the paperwork for a permit for work being done at 240 Sunset Path, Southold. I have applied to our Accounts Processing Department today for the $500.00 permit fee. This check with be sent directly to you shortly. I have informed them to put the address for the location of work on the check so you can easily identify the check is for, I hope this helps. If you have any questions regarding this matter, please feel free to email Co nor.Butler(cD-pseg.com His phone # 631-284-5215 Thank You Ann Marie Mc Kenna PSEGLI Riverhead Office