Loading...
HomeMy WebLinkAbout44262-Z Town of Southold 7/24/2020 P.O.Box 1179 0 o _ .4 53095 Main Rd Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 41280 Date: 7/24/2020 THIS CERTIFIES that the building FARM BUILDING Location of Property: 39935 Route 25;Peconic SCTM#: 473889 Sec/Block/Lot: 85.-2-9.2 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 4/20/2011 pursuant to which Building Permit No. 44262 dated 10/7/2019 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: farm building as applied for. The certificate is issued to Pindar Vineyards LLC of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. PLUMBERS CERTIFICATION DATED VW tho ' e Signature i ? rr TOWN OF SOUTHOLD �o�g�fFO(,�cp�y BUILDING DEPARTMENT TOWN CLERK'S OFFICE ` o • SOUTHOLD, NY y'b plr a BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 44262 Date: 10/7/2019 Permission is hereby granted to: Pindar Vineyards LLC C/O Herodotus Damianos 591-A Bicycle Path Port Jefferson Sta, NY 11776 To: , CONSTRUCT A FARM BUILDING PER PLANNING BOARD APPROVAL AS APPLIED FOR. f REPLACES EXPIRED B.P. # 41957 At premises located at: 39935 Route 25 SCTM # 473889 Sec/Block/Lot# 85.-2-9.2 Pursuant to application dated 10/7/2019 and approved by the Building Inspector. To expire on 4/7/2021. Fees: PERMIT RENEWAL $150.00 CERTIFICATE OF OCCUPANCY $50.00 Total: $200.00 Building Inspector o�SUFFot,r�oTOWN OF SOUTHOLD BUILDING DEPARTMENT y s TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 41957 Date: 9/11/2017 Permission is hereby granted to: Pindar Vineyards LLC C/O Herodotus Damianos 591A Bicycle Path Port Jefferson Sta, NY 11776 To: CONSTRUCT A FARM BUILDING PER PLANNING BOARD APPROVAL AS APPLIED FOR. REPLACES EXPIRED B.P. # 39224. At premi es located at: Route 25, Peconic SCTM #473889 Sec/Block/Lot S — �-- Pursuant to application dated 9/8/2017 and approved by the Building Inspector. To expire on 3/13/2019. Fees: PERMIT RENEWAL $200.00 Total: $200.00 Building Inspector o�sU o��co TOWN OF SOUTHOLD BUILDING DEPARTMENT y z TOWN CLERK'S OFFICE o • SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 39224 Date: 9/29/2014 Permission is hereby granted to: Pindar Vineyards LLC C/O Herodotus Damianos 591A Bicycle Path Port Jefferson Sta, NY 11776 To: CONSTRUCT A FARM BUILDING PER PLANNING BOARD APPROVAL AS APPLIED FOR. REPLACES EXPIRED B.P. # 37894 At premises located at: ?)Rc) Route 25, Peconic SCTM # 473889 Sec/Block/Lot# - 4-9 , a Pursuant to application dated 9/29/2014 and approved by the Building Inspector. To expire on 3/30/2016. Fees: PERMIT RENEWAL $150.00 Total: $150.00 Building Inspector Q�SUF of��co TOWN OF SOUTHOLD BUILDING DEPARTMENT y TOWN CLERK'S OFFICE oy . SOUTHOLD, NY X01 � dao BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 37894 Date: 3/29/2013 Permission is hereby granted to: Damianos, Herodotus 591A BICYCLE PATH STE. A PORT JEFFERSON STATION, NY 11776 To: CONSTRUCT A FARM BUILDING PER PLANNING BOARD APPROVAL AS APPLIED FOR. REPLACES EXPIRED B.P. # 36732. At premises located at: 3q 449&Route 25, Peconic SCTM # 473889 Sec/Block/Lot# Bfi-- a Pursuant to application dated 9/30/2011 and approved by the Building Inspector. To expire on 9/29/2014. Fees: PERMIT RENEWAL $150.00 Total: $150.00 -'4 ejo D Building Inspector S�FFoic TOWN OF SOUTHOLD BUILDING DEPARTMENT y x TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit #: 36732 Date: 10/3/2011 Permission is hereby granted to: Damianos, Herodotus 591-A Bicycle Path Port Jefferson Sta, NY 11776 To: construct a Farm building per Planning Board approval as applied for At premises located at: 4405-Route 25, Peconic SCTM #473889 Sec/Block/Lot 5 Pursuant to application dated 9/30/2011 and approved by the Building Inspector. To expire on 4/3/2013. Fees: FARM BUILDING ALTERATIONS $150.00- CO-NEW 150.00CO-NEW CONSTRUCTION/ALTERATION/REPAIR $50.00 Total: $200.00 I . Building.lnspector Form No.6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: 1. Final survey of property with accurate location of all buildings,property lines,streets,and unusual natural or topographic features. 2. Final Approval from Health Dept. of water supply and sewerage-disposal(S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1%lead. 5. Commercial building,industrial building,multiple residences and similar buildings and installations, a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings (prior to April 9, 1957)non-conforming uses, or buildings and "pre-existing"land uses: 1. Accurate survey of property showing all property lines, streets,building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is denied,the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees 1. Certificate of Occupancy-New dwelling$50.00,Additions to dwelling$50.00,Alterations to dwelling$50 00, Swimming pool$50.00,Accessory building$50.00,Additions to accessory building$50.00,Businesses $50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy-$.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy-Residential$15.00, Commercial$15.00 Date. New Construction: y � Old or Pre-existing Building- (check one) Location of Property: 3 q C7-'zV SV-,d E— toQOfJ)C House No. Street Hamlet Owner or Owners of Property: Suffolk County Tax Map No 1000, Section Block Lot -z– Subdivision Filed Map. Lot: Permit No. Date of Permit. Applicant: Health Dept. Approval: Underwriters Approval: Planning Board Approval: Request for- Temporary Certificate Final Certificate: P (chooi __ Fee Submitted: $ Applicant Sign to 50(/l # # TOWN VF�SOUTHOLD BUILDING DEPT. °`ycou765-1602 INS=PECTION [ FOUNDATION IST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND - [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT'PENETRATION- - [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O REMARKS: DATE INSPECTOR / of so — - �o� olo # # TOWN OF SOUTHOLD BUILDING-DEPT. °`ycnurmN�' 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] I SULATION/CAULKING [ ] FRAMING /STRAP --fq FINAL��/N� PV`I 1 t ACE & CHIMNEY [ ] FIRE SAFETY INSPE ION [• ]= FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] -ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O REMARKS: ten Do DATE Y INSPECTOR FIELD INSPECTION REPORT I -pATjE I COMMEN FOUNDATION (1ST) �y ------------------------------------ C FOUNDATION (2ND) z �o H ROUGH FRAMING& PLUMBING r INSULATION PER N.Y. H STATE ENERGY CODE 74114 71 FINAL / ADDITIONAL COMMENTS �- z m b y z FIELD INSPECTION REPORT DATE COMMENTS h ,b 1 FOUNDATION(1ST) - ------------ ...... — FOUNDATION(2ND) Jr, ROUGH FRAMING& PLUMBING y INSULATION PER N.Y. H STATE ENERGY CODE ' 4 , FINAL _i ADDITIONAL COMMENTS i 94- 17 1 � `iz T 65 fl tm cnin _a 1 a � t a b tm TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health SOUTHOLD, NY 11971 4 sets of Building Plans TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 Survey Southoldtownny.gov PERMIT NO. Check Septic Form N.Y.S D.E.C. Trustees C:O.Application Flood Permit Examined 120 Single&Separate Truss Identification Form Stone-Water Assessment Form Contact: Approved ,20 Mail to: Disapproved a/c Phone: Expiration ,20 T� 4 Building Inspector ' Q ! I ! APPLICATION FOR BUILDING PERMIT OCT 2 1 2019 Date 20 INSTRUCTIONS a. This,appli'dafig'AIR'6ST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans,,aectir to"sp�l61F Acale.Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or areas, and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this application, the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an addition six months. Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws, Ordinances or Regulations,for the construction of buildings, additions, or alterations or for remo al or demoliti rein d ri ed. The applicant agrees to comply with all applicable laws, ordinances,building code usi de, d r do , and to admit authorized inspectors on premises and in building for necessary inspection . (Signature of appli ant or name,if a corporation) (210 (Mailing address of applicant) c,,NCYR" State whether ap licant is owner, lessee, agent, architect, engineer, general contractor, electrician,plumber or builder Name of owner of premises (As on the tax roll or latest deed) If ap is t a corporbio , signature of 1 uthorized officer (Name and title of corporate officer) Builders License No. Plumbers License No. Electricians License No. Other Trade's License No. 1. Location o land on which proposed work-will be do e• 3 IR 3�' ma c - �J iN House Number Street Hamlet County Tax Map No. 1000 Section S— Block 2— Lot 0 Subdivision Filed Map No. Lot 2. State existing use and occupancy of premi$es and intended use and occupancy of proposed construction: a. Existing use and occupancy") b. Intended use and occupancy 3. Nature of work(check which applicable): New Building' Addition Alteration Repair emoval Demolition Other Work (Description) 4. Estimated Cost 0®a Fee (To be paid on filing this application) 5. If dwelling, number of dwelling units W�r Number of dwelling units on each floor If garage, number of cars j 6. If business, commercial or mixed occupancy, specifyr nature and extent of each type of use.nb � 7. Dimensions of existing strictures, if any: Front v Rear r Depth Height Number of Stories �— Dimensions of same structure with alterations or additions: Front --� Rear Depth 4-Q-- Height 44--- Number of Stories 8. Dimensions of entire new construction: Front 40 Rear t Depth 6 a Height Number of Stories 9. Size of lot: Front Rear Depth 10. Date of Purchase Name of Fonner Owner 11. Zone or use district in which premises are situated 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO 13. Will lot be re-graded? YES NO_�- Will excess fill be removed from premises?YES NOY—' 14. Names of Owner of premises Address Phone No. Naive of Architect Address Phone No Name of Contractor Address Phone No. 15 a. is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO * IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below,must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES NO * IF YES, PROVIDE A COPY. STATE OF NEW YORK) SS: COUNTY OF ) being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract) above named, (S)He is the (Contractor, Agent, Corporate Officer, etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to mak a d file this application; that all statements contained in this application are true to the best of his knowledge and belief, and a l] be performed in the manner set forth in the application filed therewith. Sworn to before me this day of 20 Notary Public Signature of Applicant TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWNHA),L = Board of Health SOUTHOLD,NY 11971 4 sets of Building-Plans TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 Survey—A SoutholdTown.N-orthFork.net PERMIT NO. �p Z-�P, Check Septic Form N.Y.S.D.E.C. Trustees Flood Permit Examined ,20 l f Storm-Water Assessment Form Contact: Approved h9 20 1 Mail to: Disapproved a/c 4 R l- ,_51my Phone:L,'�)yL 5--03S56 Expiration ,201 D EC EJ V E Building Inspector APR 2 0 2011 AP I TION FOR BUILDING PERMIT Date , 20 BLDG. DEPT INSTRUCTIONS TOWN OF mgwnLD a. This application MUST be comp e e filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale. Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or areas, and waterways. L The work covered by this application may not be commenced before issuance of Building Permit. d.Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premiseAavailable for inspection throughout the work. e. No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an addition six months.Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County, New York, and other applicable Laws, Ordinances or Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances,building code,housing code, and regulations, and to admit authorized inspectors on premises and in building for necessary inspections. (Signature of applicant or name,if a corporation) 332- �4mmR = (Mailing address of applicant) ' C� State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician,plumber or builder Ota Name of owner of premises (39- ®0 ()J S o/H I NJ(� (As on the tax roll or latest deed) If applicant is a corporation, signature of duly authorized officer (Name;a ,dtitl o ,e� ote officer) 1P'.r�C al t c?t:ti t v.t:.q Builders Plumbers License (i. "` "' Electricians License No. Other Trade's License No. 1. Location Gland on which proposed xvor^�11 be done: HMO V-0 9 cm. N C— House Num er Street Hamlet County Tax Map No. 1000 Section cBlock Lot Subdivision Filed Map No. Lot 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy �u b. Intended use and occupancy 94A_C�� 3. Nature of work (check which applicable): New Building___!! � Addition Alteration Repair Removal Demolition Other Work (Description) 4. Estimated Cost ezo 006 Fee (To be paid on filing this application) 5. If dwelling, number of dwelling units Number of dwelling units on each floor If garage, number of cars 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use.['__Qy IPKE' J f SNa(1 7. Dimensions of existing structures, if any: Front Rear ` Depth Height Number of Stories Dimensions of same structure with alterations or additions: Front Rear Depth Height Number of Stories � • at ter, 8. Dimensions of entire newonstruction: Front 374 6 Rear �a L6 Depth t�U lir Height 1 L}• Number of Stories OIL 9. Size of lot: Front '31 Rears Dep h__j 10. Date of Purchase Name of Former Owner S.�1 11. Zone or use district in which premises are situated 12. Does proposed constructtlon violate any zoning law, ordinance or regulation? YES NO–)—t 13. Will lot be re-graded? YES NO$ Will excess fill be removed from premises? YES NO 14. Names of Owner of prremises' 6R%A PW —JEFF .SM60Phone No. Name of Architect `00-MPM Address �tuM eD&E Phone No 63 1 S� Name of Contractor Address Phone No. 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO I` * IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO' * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES NO * IF YES, PROVIDE A COPY. STATE OF-NEW YORK) SS: COUNTY O 7 being duly sworn, deposes and says that (s)he is the applicant (Name of individual signing contract) above named, CONNIE 1D.BUNCH Notary Public,Stater of Now York (S)He is the No 01BU6195050 (Contractor, Agent, Corporate Officer, etc.) Qualified in Suffolk County Commission Expires April 14,X 0 1 of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be performed in the manner set forth in the application filed therewith. Sworn to before me this 'Zo day of Avq 20 H _ Notary Public ignature of Applicant TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT - Do you have or need the following,before applying9 TOWN HALL ' _ - Board of Health SOUTHO`i,D, NY 11971 4 sets of Building Plans TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 Survey�l SoutholdTown.NorthFork.net PERMIT NO. Check Septic Form N.Y.S.D.E.C. Trustees Flood Permit Examined ,20 1� Storm-Water Assessment Form Contact: Approved /v �!20 Mail to: Disapproved a/c 4o Phonel,3 flq --()3 Expiration ,201 ® E Building Inspector APR 2 0 2011 AP I TION FOR BUILDING PERMIT Date , 20 BLDG.DEPT. INSTRUCTIONS TOWN OF SOUTNOLD - a. This application MUST be comp e e filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale. Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or areas, and waterways. c The work covered by this application may not be commenced before issuance of Building Permit. d.Upon approval of this application, the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e. No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim, the Building Inspector may authorize, in writing, the extension of the permit for an addition six months. Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County, New York, and other applicable Laws, Ordinances or Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws, ordinances,building code,housing code, and regulations, and to admit authorized inspectors on premises and in building for necessary inspections. (Signature of applicant or name,if a corporation) (Mailing address of applicant) State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder OWpa7 Name of owner of premises O� rl ooy S o i m( (As on the tax roll or latest deed) If applicant is a corporation, signature of duly authorized officer (Name.and.title'of;co orate officer Builders License No:' Plumbers License No. Electricians License No. Other Trade's License No. 1. Location of land on which proposed pork will be done: c HMO `' VML/ P SP 1 C__ House Num er Street Hamlet County Tax Map No. 1000 Section C� Block Lot Subdivision Filed Map No. Lot 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. - Existing use and occupancy Ar., m co�=TQ Re- -, b. Intended use and occupancy /C al Ct ) LB) 3. Nature of work (check which applicable): New Building Addition Alteration Repair Removal Demolition Other Work (Description) 4. Estimated Cost A200 ©v Fee y� (To be paid on filing this application) 5. If dwelling, number of dwelling units Number of dwelling units on each floor If garage, number of cars 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use.ESQ IP (S16 7. Dimensions of existing structures, if any: Front Rear Depth Height Number of Stories Dimensions of same structure with alterations or additions: Front Rear, Depth Height Number of Stories 8. Dimensions of entire�nnstruction: Front 3 �1 '6 Real; 3� _6 Depth ,U�i-C� Height Number of Stories 9. Size of lot: Front J� �- �� Lar �� , '�,4 Depth---:3 i 0 10. Date of Purchase Name of Fonner Owner S Nk IT 11. Zone or use district in which premises are situated C-)UTM(Y,- 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO 13. Will lot be re-graded? YES NO$--Will excess fill be removed from premises? YES NO 14. Names of Owner of premises R&M PbPTjG'F , M60Phone No. Name of Architect Soo-VtOM Address `?tuh IEW�F Phone No 63 I S� Name of Contractor Address Phone No. 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO 1` * IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES NO IF YES, PROVIDE A COPY. STATE OF NEW YORK) SS: COUNTY OFSffi�. being duly sworn, deposes and says that (s)he is the applicant (Name of individual signing contract) above named, CONNIE D.BUNCH is the Notary Public,State of New York (S)He No 01BU6185050 (Contractor, Agent, Corporate Officer, etc.) Qualified in Suffolk County ` Commission Expires April 14, of said owner or owners, and is duly authorized to perform or have perfornied the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief, and that the work will be performed in the manner set forth in the application filed therewith. Sworn to before me ibis ZO day of 20 H e-A� Notary Public ignature of Applicant TOWN OF SOUTHOLD FORM NO. 3 NOTICE OF DISAPPROVAL DATE: May 4, 2011 TO: Pindar Vineyards LLC P O Box 332 Peconic, NY 11958 Please take notice that your application dated April, 20, 2011 For permit to construct a farm building at Location of property: 4195 Main Road, Peconic, NY County Tax Map No. 1000- Section 86 Block 1 Lot 15 �5 a�n� Is returned herewith and disapproved on the following grounds: Pursuant to Article XXIV, Section 280-127, the proposed use requires Site Plan approval from the Southold Town Planning Board. 9 � Authorized Signature CC: file, Planning Bd. i Note to Applicant: Any change or deviation to the above referenced application, may require further review by the Southold Town Building Department. i OFFICE LOCATIONS ' zztiY MAILING ADDRESS: Town Hall Annex 1fU �tZF UP, P.O.Box 1179 Southold NY 11971 54375 State Route 25 , (cor.Main Rd. &Youngs Ave.) Southold,NY g r Telephone: 631 765-1938 rs3 - www.southoldtovmny.gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD June 5, 2018 Mr. Charles Southard Jr. 435 Bay Home Road Southold, NY 11971 Re: Approval - Site Plan for Pindar Agricultural Storage Building 37325 NYS Route 25, ±1,341' w/o corner of Peconic Lane & Route 25, Peconic SCTM#1000-85.-2-9 Dear Mr. Southard: The following resolutions were adopted at a meeting of the Southold Town Planning Board on Monday, June 4, 2018: WHEREAS, this Agricultural Site Plan is for the proposed relocation and construction of a 1-story 3,259 sq. ft. building for agricultural equipment storage and no basement, located on 70.4 acres in the AC Zoning District, where there is 7,151 sq. ft. of existing buildings; and WHEREAS, on January 26, 2018, Charles Southard, authorized agent, submitted an application for Site Plan review; and WHEREAS, the Southold Town Planning Board, pursuant to §280-933 C of the Southold Town Code, has the discretion to waive any or all of the requirements in §280- 133 for those applications involving uses strictly related to agriculture as long as they are not necessary to further the objectives set forth in Town Code §280-929 to maintain public health, safety, and welfare. The Planning Board has found that this application is eligible for a waiver of certain elements of the Site Plan requirements because it is an agricultural use, the details of which are included in the Staff Report dated February 5, 2018; and WHEREAS, the Southold Town Planning Board, pursuant to Southold Town Code §280-139 B (5), has the discretion to vary or waive the parking requirements for Site 4 Pindar Agricultural Building Page 2 June 5, 2018 Plan Applications where doing so would not have a detrimental effect on the public health, safety or general welfare, and will not have the effect of nullifying the intent and provision of the Site Plan Requirements chapter of the Town Code. The Planning Board has found that this application is eligible for a waiver of parking requirements because there is no need to provide for parking - the application is for an agricultural storage building not open to the public and the parcel is large in size relative to the proposed structure (less than 1% lot coverage total); and WHEREAS, on February 5, 2018, the Planning Board formally accepted the agricultural application as complete for review; and WHEREAS, on February 5, 2017, the Southold Town Planning Board, pursuant to State Environmental Quality Review Act (SEQRA) 6 NYCRR, Part 617.5 (c), determined that the proposed action as a Type II Action as it falls within the following description for 6 NYCRR, Part 617.5(c)(3) agricultural farm management practices, including construction, maintenance and repair of farm buildings and structures, and land use changes consistent with generally accepted principles of farming. The action is for the construction of a 1-story 3,259 sq. ft. building for agricultural equipment storage and no basement; and WHEREAS, on February 20, 2018, the Architectural Review Committee reviewed the application and approved it as submitted; and WHEREAS, on February 22, 2018, the Planning Board, pursuant to Southold Town Code §280-131 C., distributed the application to the required agencies for their comments; and, WHEREAS, the proposed action is exempt from review by the Suffolk County Planning Commission (SCPC); and WHEREAS, on February 26, 2018, the Southold Town Fire Inspector reviewed and determined that there was adequate fire protection and emergency access for the site; and WHEREAS, on March 7, 2018, the Southold Fire District determined there was adequate fire protection for the site; and WHEREAS, on March 12, 2018, the Public Hearing was rescheduled to April 9, 2018 because the Planning Board did not have a quorum for the scheduled hearing; and WHEREAS, on April 9, 2017, a Public Hearing was held and closed; and WHEREAS, on April 17, 2018, the Southold Town Engineer reviewed the above- referenced application and has determined that the proposed building and site'meet the minimum requirements of Chapter 236 for Storm Water Management; and • j Pindar Agricultural Building Page 3 June 5, 2018 WHEREAS, on April 18, 2018, the Town of Southold LWRP Coordinator reviewed the above-referenced project and has determined the proposed project to be consistent with Southold Town LWRP policies; and WHEREAS, on April 23, 2018, the Southold Town Chief Building Inspector reviewed and certified the proposed Agricultural Storage Building as a permitted use in the A-C Zoning District; and WHEREAS, on June 4, 2018, the Southold Town Planning Board determined that all applicable requirements of the Site Plan Regulations, Article XXIV, §280 — Site Plan Approval of the Town of Southold, have been met; therefore, be it RESOLVED, that the Southold Town Planning Board hereby waives certain Site Plan Application requirements as noted above; and be it further RESOLVED, that the Southold Town Planning Board hereby waives the parking requirements as noted above; and be it further RESOLVED, that the Southold Town Planning Board has determined that this proposed action is consistent with the policies of the Town of Southold Local Waterfront Revitalization Program; and be it further RESOLVED, that the Southold Town Planning Board grants Approval with three (3) conditions to the Site Plan entitled "Relocated Steel Storage Building for Pindar Vineyards" prepared by Charles B. Southard, dated October 19, 2017 and authorizes the Chairman to endorse the Site Plan. Conditions: 1. Provide a minimum of ten (10) evergreen plantings along the west side of the subject building, to extend north from the existing hedge row, at 7' — 8' tall and five feet on center; 2. No exterior lights were reviewed or approved in connection with this site plan. Any exterior lights on or around the outside of this barn must be reviewed and approved by the Planning Board and must meet Town Code §172 Lighting. 3. This building is approved for agricultural storage only. It may not be used for retail sales or access by the public. Please also note the following requirements in the Southold Town Code relating to Site Plans: { • L Pindar Agricultural Building Page 4 June 5, 2018 1. Proposed storm water run-off containment systems must be inspected by the Town Engineer at the time of installation. Please call the Southold Town Engineer prior to beginning this work. 2. Approved Site Plans are valid for eighteen months from the date of approval, within which time all proposed work must be completed, unless the Planning Board grants an extension. 3. Any changes from the Approved Site Plan shall require Planning Board approval. 4. Prior to the issuance of a Certificate of Occupancy, the Planning Board must inspect the site to ensure it is in conformity with the Approved Site Plan, and issue a final site inspection approval letter. Should the site be found not in conformance with the Approved Site Plan, no Certificate of Occupancy may be issued unless the Planning Board approves the changes to the plan. A copy of the Approved Site Plan is enclosed for your records. One copy will also be sent to the Building Department and the Town Engineer/Highway Department. If you have any questions regarding the above, please contact this office. Respectfully, Donald J. Wilcenski Chairman Encl. cc: Building Dept. w/map Town Engineer w/map By signing this letter, the applicant acknowledges that there are Town Code requirements and conditions, including those listed above, that must be satisfied prior to the issuance of a Certificate of Occupancy. Print name: , Applicant Signature: Date: OFFICE LOCATION: - MAILING ADDRESS: Town Hall Annex *,Qf SOP.O.Box 1179 54375 State Route 25 AN ,, Southold,NY 11971 (cor.Main Rd.&Youngs Ave.) Telephone: 631765-1938 Southold,NY --, www.southoldtownny-gov 0 IV, I E JUL 2 4 2020 BUMDING DEFT PL,� G BOARD OFFICE '_'J'70LD TOWN OF SOUTHOLD July 23, 2020 Mr. Charles Southard Jr. 435 Bay Home Road Southold, NY 11971 Re: Approved Agricultural Site Plan for Pindar Storage Building 37325 NYS Route 25, ±1,341' w/o corner of Peconic Lane & Route 25, Peconic SCTM#1000-85.-2-9 Dear Mr. Southard: The Planning Board has found that the requirements of the above-referenced Site Plan have been completed based on the site inspections made on July 9, 2020. The site is now in conformance with the Approved Agricultural Site Plan entitled "Relocated Steel Storage Building for Pindar Vineyards" prepared by Charles B. Southard, dated October 19, 2017. This letter does not condone any other changes from the approved Residential Site Plan and approvals from other agencies; Planning Board approval is required prior to any significant changes to the site. Respectfully- Donald J. Wilcenski Chairman cc: Michael Verity, Chief Building Inspector Michael Collins, Town Engineer SMD APPROVAL' 0.- S 71'59'20"W \ NEW SUFFOLK AVENUE FQ z A 159.30' S 77'43'20"E 63.35' 20115 r O 22' 157,18' 24 F,; M GF lV C, SCTM#1000-115,09-pi T77"ME 0,.T GF RV k L If 1b, cm=.,0, % Im1000. 1 AkDQVALD eIVfts�a 'a" C2,CLVCMCZ PROPERTY 2320 NEW SUFFOLD AVE ADDRESS MATITTLICKWILISS2 S In Lu ZONING R40 4 - ALLOWABLE 35' tH L'I%, BLULDING WAHT ZO af ACT6AL-20' . ........... ENEMYCODE OOMFLJE3WITH2U5JEQO H4'nnax.4vw' 3°6 LOT C- OVERAGE. UMM- 45,209Mr Ar 61, (45.269.39 an X(.2) BO54.f E)d39A9 O—IiIng I'9es.1 tvm .r So 408. mVo®Psi PROPOMTA6 Z4M GM) mfIIVR` Tammo—MM To Re a1.48761 EftO&G..9� 4081f 0LTCMCQ UWq ShM- 50.1 :0 PI.Pmd 11� ERWIN m PpomdAddftI­ 5813f Prcet eead PAOFOGEO P.;. C­dp­ 366f P.Med S—MM ftMh 2416f RESIDENCE 3A" ppROpEFM LINE Lj POOL 00 OM918 ,,OAS= 2pW .A SKI) z -04 ELEV PROPERTY LINE_— E. r D AJ?L, 28T N 76'27 30"W 140007 N 77'45'30'W 9178' 249 L KR /) 1000-122-5M E R Y L K R A M E A 4 h I I t N1011'SUSAN NORRIS agriculture-no known well pl 213 EAST FRONT STREET -10 POST OFFICE BOX 6B3 Scale:f=30 ft Site Plan OF NIEEV GREEN PORT, NY 11944 Am 17,2016 mkarch,tect 'T MAILING ADDRESS: PLANNING BOARD MEMBERS J.WILCENSKIo��OF so�ryol Southold,,ox 1179 11971 Chair � � OFFICE LOCATION: WILLIAM J.CREMERS vy Town Hall Annex PIERCE RAFFERTY p@ 54375 State Route 25 JAMES H.RICH �lifm (cor.Main Sou h dYoungs Ave.) MARTIN H.SIDOR `sou 11,, Telephone: 631765-1938 www.southoldtownny.gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD Certified Mail/Return Receipt March 26, 2015 II'r 216 20lS Ms. Barbara Pelis si_uc E,C'PT 55 Fanning Boulevard 01F 501,71-10LD Riverhead, NY 11901 Re: Final Approval: Proposed Site Plan for Barb's Veggies Located at 4195 State Route 25, Peconic 85 SCTM#1000-86-1-15 Zoning District: R-40 Dear Mr. Polak: The Site Plan Approval granted by the Southold Town Planning Board on July 11, 2011 has expired (resolution attached). If the work on the site has been completed, please submit a request for a final site inspection. If the work has not been completed, please submit your request for an Extension of Site Plan Approval for consideration by the Planning Board, including the reason why an extension is necessary. If we do not hear from you within thirty days from the date of this letter, we will consider this application withdrawn. If you have any questions regarding this matter, you may contact our office. Very truly yours, WT Donald J. Wilcenski Chairman Encl. cc: Michael Verity, Chief Building Inspector Kevin Polak, Agent so�Ty MAILING ADDRESS: PLANNING BOARD MEMBERS ��� OHO P.O.Box 1179 MARTIN H.SIDOR Southold,NY 11971 Chair 41 OFFICE LOCATION: G Q WILLIAM J.CRETown Hall Annex MERS � � KENNETH L.EDWARDS Ol� 54375 State Route 25 JAMES H.RICH III CQUNTI (cor.Main Rd. &Youngs Ave.) DONALD J.WILCENSKI Southold,NY Telephone: 631765-1938 Fax:631765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD July 12, 2011 at > + Mr. Kevin Polak 55 Fanning Boulevard Riverhead, NY 11901 Re: Approval: Proposed Site Plan for Barb's Veggies Located at 4195 NYS Route 25, Peconic SCTM#1000-86-1-15 Zoning District: A-C Dear Mr. Polak: The following resolutions were adopted at a meeting of the Southold Town Planning Board on July 11, 2011: WHEREAS, this Site Plan is for a proposed 740 s.f. hoop house adjacent to a 384 s.f. pre-existing non-conforming farm stand on 28.370 acres. The hoop house is to be used for storing plants, flower baskets and vegetables during the night, and not used by the public. Also on-site is a proposed storage building for Pindar Vineyards, located 600' north of NYS Rt. 25. This storage building is being approved in a separate resolution by the Planning Board; and WHEREAS, the applicant submitted an application for Site Plan review on May 5, 2011; and WHEREAS, at a Work Session held on May 17, 2010, the Planning Board accepted the application for review; and WHEREAS, the Southold Town Planning Board, pursuant to State Environmental Quality Review.(SEQR) 6 NYCRR, Part 617.5 (c) (3) has determined that the proposed action is a Type II Action as it falls within the following description for 6 NYCRR, Part 617.5 (c) (3) "agricultural farm management practices, including construction...offarm buildings and structures..." and not subject to review under SEQRA; and WHEREAS, on May 20, 2010, the Southold Town Architectural Review Committee reviewed and determined that the proposed hoop house was acceptable; and 'i► Barb's Veggies Page Two July 12, 2011 WHEREAS, on May 24, 2010, the Planning Board, pursuant to Southold Town Code §280-131 C., distributed the application to the required agencies for their comments; and WHEREAS, on June 10, 2010, the Southold Fire District determined there was adequate fire protection and emergency access for the site; and WHEREAS, on June 14, 2010, a public hearing was held; and WHEREAS, on July 19, 2010, the NYSDOT responded that no Highway Work Permit is necessary for this application; and WHEREAS, on August 2, 2010, the Planning Department sent a letter to the applicant requesting that the following information be added to the Site Plan: 1. The distance of set-backs for the hoop house from the property lines; and 2. Drainage; and 3. An affidavit stating that the hoop house would not be open to the public; and WHEREAS, on June 23, 2011, the Town of Southold LWRP Coordinator reviewed the above referenced project(as part of the Pindar Agricultural Storage Building Site Plan on the same parcel), and has recommended the proposed project be found consistent with Southold Town LWRP policies with the condition that an archaeologist be present on-site during excavation of the drainage and foundation. The area is identified as an Itarcheo-sensitive area" by the New York State Historic Preservation Office; and WHEREAS, on June 28, 2011, the applicant submitted a notarized affidavit stating that the hoop house (aka greenhouse) will not be open to the public at any time and is used for growing vegetables and flowers; and WHEREAS, on July 5, 2011, the Southold Town Engineer reviewed the above- referenced application (as part of the Pindar Agricultural Storage Building Site Plan on the same parcel) and has determined the project to provide adequate drainage and the proposed drainage meets the minimum requirements of Chapter 236 for Storm Water Management; and WHEREAS, on July 11, 2011, the Southold Town Chief Building Inspector reviewed and certified the proposed Site Plan as a permitted use in the A-C Zoning District; and WHEREAS, the Southold Town Planning Board, pursuant to §280-133 C of the Southold Town Code, has the discretion to waive any or all of the requirements in §280- 133 for those applications involving uses strictly related to agriculture as long as they are not necessary to further the objectives set forth in Town Code §280-129 to maintain public health, safety, and welfare. The Planning Board has found that this application is eligible for a waiver of certain elements of the Site Plan requirements because it is an Barb's Veggies Page Three July 12, 2011 agricultural use and a hoop house for storage accessory to a pre-existing non- conforming farm stand; and WHEREAS, the Southold Town Planning Board, pursuant to Southold Town Code §280-131 B (5), has the discretion to vary or waive the parking requirements for Site Plan Applications where doing so would not have a detrimental effect on the public health, safety or general welfare, and will not have the effect of nullifying the intent and provision of the Site Plan Requirements chapter of the Town Code. The Planning Board has found that this application is eligible for a waiver of parking requirements because there is no need to provide for parking -the application is for an agricultural use and is for growing.plants and not open to the public. Further, parking for employees is already provided for at the pre-existing farm stand; and WHEREAS, at their Work Session on July 11, 2011, the Planning Board found that all applicable requirements of the Site Plan Regulations Article XXIV, §280—Site Plan Approval of the Town of Southold have been met; be it therefore RESOLVED, that the Southold Town Planning Board hereby waives certain elements of the Site Plan requirements as noted above; and be it further RESOLVED, that the Southold Town Planning Board hereby waives the parking - requirements as noted above; and be it further RESOLVED, that the Southold Town Planning Board has determined that this proposed action is consistent with the policies of the Town of Southold Local Waterfront Revitalization Program with the condition that an archaeologist be on site during excavation of the drainage trenches; and be it further RESOLVED, that the Southold Town Planning Board grants Approval to the Site Plan entitled "Barb's Veggies", dated July 11, 2011, and authorizes the Chairman to endorse the site plan. Please note the following requirements in the Southold Town Code relating to site plans: 1. Any outdoor lighting shall be shielded so the light source is not visible from adjacent properties and roadways. Lighting fixtures shall focus and direct the light in such a manner as to contain the light and glare within property boundaries. 2. All storm water run-off from.grading, driveways and gravel areas must be contained on site. 3. Approved Site Plans are valid for three years from the date of approval, within which time all proposed work must be completed, unless the Planning Board grants an extension. 4. Any changes from the Approved Site Plan shall require Planning Board approval. Barb's Veggies Page Four July 12, 2011 5. ' Prior to the issuance of a Certificate of Occupancy, the Planning Board must inspect the site to ensure it is in conformity with the Approved Site Plan, and issue a final site inspection approval letter. Should the site be found not in conformance with the Approved Site Plan, no Certificate of Occupancy may be issued unless the Planning Board approves the changes to the plan. Please note: the Site Plan Application known as Pindar Storage Building is also shown on this Site Plan they are on the same parcel though each building is owned by different owners. The approval resolution for the Pindar Storage Building was done - separately on July 11, 2011. A copy of the Approved Site flan is enclosed for your records. One-copy will also be sent to the Building Department and the Town Engineer/Highway Department. If you have any questions regarding the above, please contact this office. Very truly yours, Martin H. Sidor { Chairman Encl. cc: Building Dept. w/map Town Engineer w/map MAILING ADDRESS: PLANNING S O J.�MEMBERS ENSIU ��®� S®���® Southold,ox 1179 DONNY 11971 Chair `�® 'r I® OFFICE LOCATION: WILLIAM J.CREMERS '..' Town Hall Annex PIERCE RAFFERTY , , ,} ; 54375 State Route 25 JAMES H.RICH MARTIN H. �i�, � � (cor.Main Southold,NY ngs Ave.) Telephone: 631765-1938 www.southoldtownny.gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD April 11, 2017 Mr. Pindar Damianos P.O. Box 332 �- Peconic, NY 11958 Re: Extension of Final Approval -Approved Site Plan for Pindar Vineyard 2011 Located at 4195 Main Rd., +/-1,132' w/o Peconic Ln. & NYS Rt. 25, Peconic SCTM#1000-86-1-15 Zoning District: A-C Dear Mr. Damianos: The following resolution was adopted at a meeting of the Southold Town Planning Board on April 10, 2017: WHEREAS, this Site Plan is for the proposed re-location of a 3,259 sq. ft. steel agricultural storage building from an adjacent parcel. The building is 82' x 39', with a height of 15', and will be located 600 ft. north of NYS Rt. 25; and ti^-�H!17 RFAS; on April 12, 2010, the Planning Board granted Approval to the Site Plan UI siitled "Pindar Vineyards Storage Building", prepared by Charles W. Southard, Jr. on Marsh 10 211, and last revised by Pindar Damianos on June 20, 2011; and WHEREAS, on July 11, 2014, the Site Plan Approval expired; and WHEREAS, on April 21, 2015, Alexander Damianos, owner/agent, submitted a letter requesting an Extension of Site Plan Approval; and WHEREAS, on June 1, 2015, the Planning Board extended the Site Plan approval for eighteen (18) months; and WHEREAS, on December 22, 2016, the Site Plan Approval expired!; And Pindar Vineyard 2011 Page 2 April 11, 2017 WHEREAS, on March 21, 2017, Alexander Damianos, owner/agent, submitted a letter requesting an Extension of Site Plan Approval in order to begin construction June 2017; and WHEREAS, at a Work Session held on April 10, 2017, the Planning Board reviewed the application and determined that the expired Site Plan is in compliance with current rules and regulations; be it therefore T= Dinn ,ir�g Rnarri grants an Extension of Site Plan f_e_=_a.Aprii 10, 2017 to October 10, 2018 on the Sire Man entitled "Pindar Vineyards Storage Building", prepared by Charles W. - ------------ %..%T i ----------..%;3 ;nwn -nmz n3 jnn+.nnc rnngrhinn tha nhn%ia nIs==QA nnntnnt tniq ntnnu- Very truly yours, Donald J. Wilcenski Chairman Town of Southold 0 Erosion, Sedimentation & Storm-Water Run-off ASSESSMENT FORM o I PROPERTY LOCATION: S.CT.M.#: THE FOLLOWING ACTIONS MAY REQUIRE THE SUBMISSION OF A yC1�jY�� STORM-WATER,GRADING,DRAINAGE AND EROSION CONTROL PLAN -15lstrict a ion B oc —Cot— CERTIFIED BY A DESIGN PROFESSIONAL IN THE STATE OF NEW YORK. SCOPE OF WORK - PROPOSED CONSTRUCTION ITEM# / WORK ASSESSMENT Yes No ; a• What is the Total Area of the Project Parcels? (Include Total Area of all Parcels located within � Will this Project Retain All Storm-Water Run-Off Generated by a Two(2")Inch Rainfall on Site? 0 the Scope of Work for Proposed Construction) (S.F./Acres) (This item will include all run-off created by site v/ I b. What is the Total Area of Land Clearing clearing and/or construction activities as well as all — and/or Ground Disturbance for the proposed Site Improvements and the permanent creation of j construction activity? impervious surfaces.) (S.F./Acres) Y)E]2 Does the Site Plan and/or Survey Show All ProposedPROVIDE BRIEF PROJECT DESCRIPTION (Provide Additionai Pages as Needed) Drainage Structures Indicating Size&Location?ThisItem shall include all Proposed Grade Changes andSlopes Controlling Surface Water Flow.J ��m/ C..I'eC ' i r3 Does the Site Plan and/or Survey describe the erosion Q lwo 16-ru and sediment control practices that will be used to ❑ control site erosion and storm water discharges. This 4_5A&e �J�,S item must be maintained throughout the Entire f �struction Period. II YV%J �\ ® �Q� �41VVi11 this Project Require any Land Filling,Grading or �f 46 n Excavation where there is a change to the Natural Y✓ q f Existing Grade Involving more than 200 Cubic Yards — of Material within any Parcel? `e 5 Will this Application Require Land Disturbing Activities Encompassing an Area in Excess of Five Thousand (5,000 S.F.)Square Feet of Ground Surface? — — 6 Is there a Natural Water Course Running through the I Site? Is this Project within the Trustees jurisdiction General DEC SWPPP Requirements: Or within One Hundred(100')feet of a Welland or F-1 Submission of a SWPPP is required for all Construction activities involving soil Beach? disturbances of one(1)or more acres; including disturbances of less than one acre that 7 Will there be Site preparation on Existing Grade Slopes are part of a larger common plan that will ultimately disturb one or more acres of land; which Exceed Fifteen(15)feet of Vertical Rise to including Construction activities involving soil disturbances of less than one(1)acre where I the DEC has determined that a SPDES permit is required for storm water discharges. One Hundred(100')of Horizontal Distance? — (SWPPP's Shall meet the Minimum Requirements of the SPDES General Permit 8 Will Driveways,Parking Areas or other Impervious ❑ i for Storm Water Discharges from Construction activity-Permit No.GP-040-001.) Surfaces be Sloped to Direct Storm-Water Run-Off 4 1.The SWPPP shall be prepared prior to the submittal of the Not.The NOI shall be into and/or in the direction of a Town right-of-way? submitted to the Department prior to the commencement of construction activity. i 2.The SWPPP shall describe the erosion and sediment control practices and where 9 Will this Project Require the Placement of Material, required,post-construction storm water management practices that will be used and/or Removal of Vegetation and/or the Construction of any constructed to reduce the pollutants In storm water discharges and to assure Item Within the Town Right-of--Way or Road Shoulder — f compliance with the terms and conditions of this permit.In addition,the SWPPP shall Area?(This Item will NOT include the Installation of Driveway Aprons.) i Identify potential sources of pollution which may reasonably be expected to affect the quality of storm water discharges. NOTE: If Any Answer to Questions One through Nine is Answered with a Check Mark 3.All SWPPPs that require the post-construction storm water management practice in a Box and the construction site disturbance is between 5,000 S.F.&1 Acre in area, component shall be prepared by a qualified Design Professional Licensed in New York a Storm-Water,Grading,Drainage&Erosion Control Plan is Required by the Town of that Is knowledgeable in the principles and practices of Storm Water Management Southold and Must be Submitted for Review Prior to Issuance of Any Building Permit (NOTE A Check Mark(4)and/or Answer for each Question is Required for a Complete Application) ;I STATE OF NEW YORK, Notary Public,State of New York i COUNTY 0 .........SS No.01 BU618505t? Qualified in Suffolk County j That I.................................................................................being duly sworn,deposes an@9) t9/�i�ie ppp114, o ermit, (Name of individual signing Document) Andthat he/she is the .......................................................................................::........................................................................... (Owner,Contractor,Agent,Corporate Officer,etc.) Owner and/or representative of the Owner or Owners,and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his knowledge and belief;and (, that the work will be performed in the manner set forth in the application filed herewith. Sworn to before me this; ................................day of. ............. ,201. ' Notary Public: .....L 7...!!...P..�.. . ! ................ ... .....--•....................... (Signature of Applicant) ` FORM - 06/10 ; "TOWN OF SOUTHOLD CHAPTER 236 STORM WATER MANAGEMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) A. General Town of Southold SWPPP Renuireinents: (For Land Disturbance between 5,000 SF and 1,acre in area) 1.The SWPPP shall be preparedprior to the application for Building Permit. 2.The SWPPP shall describe the erosion and sediment control practices and where required, post-construction storm water management practices that will be used*and/or constructed to reduce " the Pollutants in storm water discharges and to assure compliance with the terms and conditions of Town Code Chapter 236 for Storm Water Management prior to the issuance of a Town Building Permit. In addition,the SWPPP shall identify potential sources of pollution which may reasonably be expected to affect the quality of storm water discharges.. 3.All SWPPPs that require a post-construction storm water management practice caniponent shall be prepared by a qualij?ed design,profession'd that is knowledgeable in the principles and practices of storm water management and treatment. 4 Tie owner,contractor or opera or ren su (keep t ie VVPPPcurrent so that it at all times accurately documents the erosion and sediment control practices that are being used or will:be used during construction, and all post-construction storm water management practices that will be constructed on the site.At a minimum,the owner, contr.actor or operator shall amand the SWPPP:•- a.whenever the current provisions prove to be ineffective in minimizing pollutants-in storm water discharges from the site; Z:whenever there is a change in design,construction,or opekation at the construction site that has.or could have an effect ori the discharge of pollutants; and c.to address issues or,deficiencies identified during an inspection by-a Building inspector,or other regulatory authority. 5.The BuildingDepartment may notify the owner, contractor or operator at any time that the SWPPP does not meet que or more of the minimum requirements of the buiidi g pea t.The notification shall' be in writing-and identify the provisions o€the SWPPP that require calendar ria "moclriicaflon.Within fourteen(14) ys of such notification,oras otherwise indicated by the T wn,the owner,-contractor or operator sha11 mage-the required changes to the SWPPP and submit written notification to the Town that the changes have been made.If the owner,,contractor or operator does not respond to the Town's comments in the specified time frame,the Town may-issue a stop work order and/or suspend the current Building Permit. 6.Prior-to the commencement-of construction actiWty,'the owner, contractor or operatormust identify the contractor(s)and subcontractors)that will be responsible for.instal,Constructing,repairing,- replacing,:inspeeting and.maintaining the erosion and sediment control practicesciuded in the SWPPP;,and the contractors)--aiid subcontraetor(s)that will be responsible for constructing the post- construction storm water management practices included in the SWPPP.The owner, contractor or operator shall have each of the contractors and subcontractors identify at least one person from their company that will be responsible for implementation of the-SWPPP. r i I 7.The owner,contractor or operator shall have each of the contractors and subcontractors identifiedp in item##6 above sign a copy of the following certification statement below before they commence any construction activity: "I hereby certify that I understand and agree to comply with the terms and conditions of the SWPPP and agree to;implement any corrective actions identified by the building inspector during a site inspection. In addition to providing the certification statement above,the ' certificationa e must also identify p g the specific elementsof the SWPPP that W14 contractor and me subcontractor will be responsible for and include the naand title of the person providing the signature; the name and title of the contractor responsible for SWPPP implementation;the name, address and telephone number of the contracting firm;the address(or other identifying desc4tion) of the site;and the date the certification statement is signed. The owner, contractor or operator shall attach the certification statement(s)to the copy of the SWPPP that is maintained at the construction site.If new or additional contractors are hired to implement measures identified in the SWPPP after construction has commenced,they must also sign the certification statement and provide.thc information listed-above. 8. Erosion and sediment control component-All SWPPPs pfepared pursuant to a Building Permit Application shall include erosion and sediment control practices designed to comply with Town Code 14 Chapter 236 for Storm Water Management and implement site improvements for Erosion and Sediment-Control. Where erosion and sediment control practices are provided,the owner, contractor or operator must demonstrate that,at a minimum,the erosion and sediment control component of the `Town•SWPPP shall include the following: a:'$aclrground information about the scope of the project,including the location,type and size I ''. .of project; 1%:A site map/construction drawings)for the project including a general location map.At a i minimum,the site map shall show the total site area;all improvements;areas of disturbance;areas that will not be disturbed;existing vegetation;on-site and adjacent GH site surface waier(sI wetlands and drainage patterns-that court be affected by the construction activity;.existing and final slopes; locations of different-soil types with boundaries;material,waste,borrow,or equipment storage areas located on adjacent properties; and lvcation(s)of the storm water discharge(s); c.A.description of the soil(s)-present at the site,including a test hole indicating depth of ground. water; d.A construction phasing plan and sequence of operations describing the intended,order of construetion aetivitiesi including clearing and-grabbing,-excavation and grading,utility and infrastructure installation and'any.other activity at the site that results in soil disturbance; e.A-description of the minimum.erosion and sediment control practices to be installed ok ' I implemented for each construction activity that will result in soil disturbance. Include a schedule that identifies the timing of initial placement or implementation*of each erosion and sediment control practice and the"minimum time frames that each practice should remain in place orbe implemented; f.A-temporary and permanent soil stabilization plan that-meets the requirements of the most current version of the technical standard,New York State Standards and Specifications for Erosion-and Sediment Control,for each"stage of the project,including initial land clearing and grubbing to project completion and achievement of final stabilization; g.A-site map/construction drawing(s)showing the specific location(s),size(s),and lengths),of each erosion and-sediment control practice; - I z . - 1Y. The dimensions,material specifications,installation details,.and operation and maintenance requirements for all erosion and sediment control practices.Include the location and sizing of any temporary sediment basins and structural practices that will be used to divert flows from exposed soils; i.A maintenance inspection schedule for the contractors)to ensure continuous and effective operation of the erosion and sediment control practices.The maintenance inspection schedule shall be,in accbrdame with the requirements n the most.currcnt version of the technical standard,New'fork State Standards and Specifications for Erosion and Sediment Control; j.A description of the pollution P?ev ticm measures that will be used to cbntrQl litter, construction chemicals and construction debris from becoming a pollutant source in the storm water discharges; B. Re uiired SW-PPP.CO *t Town nf.' onti tbold Storm Water Polluo gxo�e (For Land Disturbance.be on and.1 acre.fn arra) :clan: MINIMUM SITE PLAN REQUIREMENTS;. 1. Applicant information: Provide name;legaltaddtess, and telephone -number., 2. Common address, Suffolk County Tax Map No. and legal description of site. 3. Signature and stamp of registered [design Professional (Architect��nc�ineer.�surveyor and/or design/owner certification. ) 4. Vicinity map, 5. Existing and proposed mapping, and plans(Maximum scale of I,*_5W orgreater detail) which-illustrate at a minimum: 8 Existing and proposed topography(minim of 2:foot.contours reeQrnmended - Perennial and intermittent ). streams and/or N-aturaF t�fater Course; C:) Mapping of predominant soils and location of test-hole or site-spec borehole investigations that have been performed, 0 Boundaries of existing predominant veoetation and proposed limits ofj le 'Location and b.Qundar)es of resoitr prQtedon- re septic setbacks);- s such as viret}ands, ponds, and other setbacks{e.g., strdam-breis,drinking water well setbacks, . - - Location of existing and proposed roads, buildings, and other structures; 0 Location of existing and proposed utilities (e.g.,water, sewer, gas, electric)and easements; 0- Location of oxistingarfd proposed conveyance systems such as_grass bhanneta; swales, storm drains or other storm Water BI1 ® Flaw*paths; Location of floodplain/ifoodway limits-and•relationship-of*slteto-upstrdarn and downstream properties and drainages; 0 Location and dimensions df proposed.channel modifications, such as brid culvert crossings where applicable; ge or Location, size, maintenance access, and limits of disturbance of proposed structural storm water Management practices; i i r - . k 6. Representative cross-section and profile drawings and defails of structural storrm waiver Management practices and conveyances (i.e., storm drains, open channels; swales,etc.) which include: Q Existing and proposed structural elevations fe.g., invert of pipes, manholes, etc.); C) Design water surface elevations; 0 - Structural details of outlet structures, embankments, spillways,stilling basins, grade control structures,-conveyance channels, etc. 0 Logs*of test hole investigations that have been performed indicating soil type and water table elevations along with a supporting geotechnical report-where . applicable: 7. Drainage Calculations for all structural components of storm water system to meet the minimum requirements of Town Code Chapter 236 for Storm Water.Management.' fe;&-Catch Basins, storm drains, open ct�arinets,-sv�ales; Best Management i practices, etc.)for applicable design storms includinjo: 0 Existing condition drainage swale areas, runoff rptes;quantities of runoff generated by impervious surfaces, storm water velocities, and surface water . elevations showing methodologies used.and supporting calculations 0 Proposed containment area, runoff rates, volumes, velocities,water surface '! elevations, and routing showing the methodologies used and supporting calculations; 0 Final sizing calculations for structural storm water Management practices ! including, contributing drainage area, storage capacity, piping•and-ouflet configuration; ® Final analysis of potential downstream impactleffects of project, where necessary; 8. Final landscaping plans for structural storm water Management,practices and any site reforestation or re-vegetation. 9. Structural calculations, where necessary. 10.Appl'icarble construction specifications. 11.Erosion and sediment control-plan.that at a minimum meets the req*irements of the loyal erosion and Sediraient dontCot Cuide,lines. , 12.Sequence of construction. 13.Maintenance plan which will include: 0 Name, address, and phone number of responsible parties for maintenance; 0 Description of annual maintenance tasks; 0 Description of applicable easements; ® Minimum vegetative coyer requirements; f C) Access and safety'issues; ; C) Testing and disposal of sediments that W10 likely be necessary. !1 14.Evidence of acquisition of all applicable local and non-local permits. 15.Evidence of acquisition of all necessary legal agreements (e.g., easements, covenants, land trusts, etc.). C PROPERTY INFORMATION' SITE DEVELOPMENT DATA: Site Area 28,31 acres Address Main Rand / Ayrlcultural Area =2500 acres S Pcconlc, w York 11958 Suffolk Gounty Tax M tt 1000-56-1-15 t Proposed Use. T__ �`�-�— 51)a.� 1 1 �pvi Std- K<ri.. Pink 7111 It, ft. "r1/'--GC _s LAND �I OF GATALANO r---—--- O 9 (\ -- -- --------- IIOQI -- --------`--- - _ 2 v C/ 35' ,y \,L t✓-� FJl15Fi 1~ 01 axleLln 1 I � _ -P-s-". farm sE � In I O ' I 90S19T s _5o fr I Ca i+ LAND OF N`� eutllft DAMIAN05 05ED < ` WORK AREA Cohd i�lon: reawo:^scr�r�,res�un tosa.•nen�mwr�atuasnere;n IDavonAaoonroc!.c mArnmtanim\roxs w'�sTre nu+ A,, a�<leDiJiJ1 mug} 6< on-ri}� rfu�i, �i° �I—Aemucu oo�eo//1J°Cmma�s<a�°sam°mor � C.XC aYw71e., oQ '�v o'1'i^3� <n� c�ro�l.9.��r`tnc�<J, rnrAsaraun��E(//� fo♦� °..Ql\ ltltE DRIB 1 i TROVWISY °QOM PLINMND BOARD q -(,'!n�¢- noriE - Atmnxlxfos�+Anrvr rme oAie r'^ oT �r'tnc1�<J TO a5 nec.l.. D f-ewcl\ NOTE-The approved site developmem plan shall be valid for a p:Dod of dace(3)yeas fmm the date of approval s per _ �a II ml,s.wn IOD-255 1 I Charles W Southard Jr PROPERTY INFORMATION. A R G H I TEG T ' I Owner- Herodotos 0—I.— Plndar BVineyards 455 Bay Home Road ' \� �i' nROVDE""�''rOgS�""TiO SOV^r°�Tonv mn[scrnoN Business Address 54Iq gicycie Pah I Southold, New York 11971 aoulm,�o,nmi[ncrsnurni[rnvomo,�s orn,[sn[ruv Pot Jefferson Station,NY �rrB TOB„Hurt Rrsotuno.or�rrBm:a,.oArEo Slto Address, 37'161-54999 Main Raad NY 25 I J2r nor ois[[[o � ov B[saEeno ' N all „e Peconle,New York II j Rhone(651) 471-5228 1 Suffolk county Tax Mop°,1000-085-02-9, cwsorchitect@o tonllnenet NORTH , �En„,n,r,Hsi n eJ000-094 4 3— P n�� Zoning, •A-c° 5 Q` ;in5m 11111.B.its Eting xisa Proposod Uso Vlnoyord j 30550' N 01C � 9m I I rn\I0.rE,ie� 51TE DEVELOPMENT DATA: ,M1 1 Z ,° r 7L T4•rm.d k.d,.r ,a Pi„n°u e•nl,�fa.P,Aod d ect'-pl) Sita Area, 91587 acros or 5,98952912 sq ft j to lmu�4,r•f •Pva,me,.nron uauLt. , v I Existing Building Area, 7,151./-sq ft Proposod Building Area- Equipment Storage=3,260 sq ft. I I TOTAL-10,411 sq ft Proposed FAR, 26% I BUILDING DATA• j Usage, Miscellaneous Farm Storage Ooretructlon, Tjpe 21, j I I GENERAL NOTES' j 1 'I I All site hfarmotion was token from a saucy by Roderick Van Tuyl PC Land 5u ghe I �I tl I •I i I 1 I j AI , v , 1 1 I 11 I I I phSTEP'G w ; In I 558d24'10°W p O ® I m 167D' _� __558d4l'OO°W .43' I I SITE PLAN d MAIN ROAD (Route 25) a I D j FULL SITE PLAN scalp I°=2500' , N iH,rkshop Af°RDP05ED METAL 5 orago W I 2'0'.- I STORAGE&IILDING RGIOcated Steel Storage I _ Building for Pinder Vinyard L__________ —--- Existing prlvot hcdga row I 558d24'10'W 16"10' �, Equlpmont p, I Storage 1 w N OI A �I Equlpmen I�_ Storago 2 story Re Iden Routo 25 Main Road Peconic,New York II O I I sc.TM a l000-085-2-9.2 o' I Oct 19,2017 I J ' ________�__________—_ ___O____ (88295' 558d4l'00°W IC (r Vprh' MAIN ROAD (Route 25) PARTIAL 51TE PLAN Ir� �1,� JIN252of I P�imiafwr„ 1 4 __ r 1 2-3• 3-3" 3-B• Charles W Southarc J i A R G H I T E G i __ nI my 1' `L, 5/0' x 10' long onchar bolts I I i it '1 N tc,'s Edge �/ i "l_ �ure�'o•po• �o IIOZ"! ZI�sZ °I 3tra ®2i•oc "1 1 \parQ" Sia 1 i �F'rone(63)e4ll-5220 6 1S_�__o � �d sv-p�.�q moHinos io an�ol •a6-ts Y' VIO!A-011J GUVOS ONINNVId cwsorchitectcoptonllrene- -alit>-�VQAQ)Jdw Ag a3AO-dddV A i, /Ro F oo is o aF 0 go a ga ariz d Ste I '1 rC7 30 t-"i.IOS 1 a a9`POE^tuR!fa%ld i f I >,a c,rovdLV , I I '------- ---------------------------------------------------------------J 39'-6• EAST $ WEST ELEVATIONS SCALE 1/4"=1'-0" I 6"thick crushed stone base Wol /Re,F pan fls or of O go a gal onize I ste I 0 I o ' I I I NORTH ELEVATIONS SCALE 1/4"=1'-0" - ...• 7,x\I i, Elevotlons sliding door Frame s'Iding door frame sliding door Wall/Roof p nels a e F 20 3age 3alvo ized s eel 16 Relocated Storage 5uildm ewing mc doo For Fmdar Wmery I I I � I I I I I I I I I I I I I LL-------------------------------------------------1 J Main Road l MAY -5 2011 Fecon-c,New York SOUTH ELEVATIONS J" Mar 10,2011 11 SCALE I/4"=I'-0• I 4-d FLOOR PLAN i S.:ALE 1/4" = 1'-0" of 2 Charles K Southard Jr. Fiz:;�OFERT)"` INFORMATION : SITE DEVELOF` ENT DATA : ARC H I TE G T d d O d LJ t7 � d"� •1 Owner Herodotus Domianos Site Area 28.37 acrec-, Address: Main Road Agricultural Area = 28.00 acres 7 Water's Edge Peccric, New York 111i58 Suffolk County Tax Map #: 1000-86-1-15 Storage Shed Area: Proposed = 525'i sq. ft. Smith Point, New York II1i67 Proposed Use: Agricultural Equipment Storage Shed Phone (651) 471-5228 cwsarchitect©optonljne.net d A a LAND �I CATALANO d Q 5 350 25'45" E of Q (�i �p• � - - - - - - ..� - - ._ - - ..-_ - - - - - - - - •--• - - -- - - - - _ .�, _ - -3310.21' � O 1 Q� d to m ' existing�o I IR farm stand t j I Proposed Storage 5,11ding m Z Q I�m z d� a O ' - - - — - - - -/-A � - - - - - - - - - - - - - - - - - - - N3"D14'20"W3024.37' LAND I OF PROPOSED DAM I ANOS WORK AREA a . p d 0ENERAL NOTE.-S: Q d I. Contractor shall verify conditions and dimensions and notify Architect 12" wide x 44" deep of inconsistencies, prior to proceeding with any work. 3500 psi concrete foundation 2. The Architect is not responsllole for construction supervision unless specified by written contract. = 3. All work shall be done in accordance with all Federal, Building Code 6" thick crushed stone base of New York State, � local Euilding Godes 4. All electrical work shall be cone in accordance with the National Electrical Code, the Board o" Fire Underwriters, and Electrical rode of NYS, Part VIII, chapters 33-42. a 5. Do not scale these drawings. Refer to written dimensions. a d d ° = �ancre e I.All design and construction shall conform to the American Concrete Institute " Building a I-I I I 1 d ° III III_— Code Requirements for Reir"_,rced Concrete". A.G.I. 518 latest edition and chapter• 1 I i—III I ,_O„ ° III IIIc 111of BGNY5. See section 14: 8 of BCNI'S for modifications to AGI 518 a .. 2. Concrete exposed to the weather shall be d 5500p5i @ 28 days and have between 51/6 and 7% air entrainment by volume ° d ° a I 5.Reinforcing steel shall conform to ASTM A615-6r 60 p d 4.Goncrete work and materials shall conform to The American Concrete Institute " Specification for Structural Concrete for Buildings", AGI 501, Latest Edition <4 Foundation ll 5-Joint fillers shall be reformEd resilient bituminous expansion joint fillers conforming to �nARCy/�, "� ASTM D1751, Latest Edition. p g `�P 5ouryq�oo� SCALE I" = I'-O" 6.The top of all concrete surfaces shall be true and level, with a smooth float for w {.; -J3 d footings and foundations and a steel trowel finish for building slabs and a broom finish for exterior surfaces. All surfaces shall be within 1/8" +/- t,o 7. Continuous reinforcement shall be lapped 48 bar diameters at splices and corners s T - �° and hooked at non continuous, ends or extended 24 bar diameters unless otherwise noted All reinforcement shall be in accordance with AGI SP-66. 8. Temperature reinforcement, splices, support for reinforement shall conform to - requirements of AGI 318 Fourid&tlon Plan, dCtails OF: e.:n fires ; -. N:i- : ODES q. All voids in exterior exposed concrete surfaces shall be hand patched to provide a� r. : y�� OND;1( NS d Wall / Ro els are of 20 gage galvanized steel, a smooth finish. ....... 30UTHO!DTD%Z�A d E x r a v a t an ✓_—SOUTHOLD TOWN PLANS 1G BOARD ES l.Contractor shall verify the location of all existing underground utilities prior to any excavation. 2.Contractor shall excavate to required depths and any excavation below shall be filled with concrete. RETAIN STORM WATER RUNOFF 3.Controctor shall compact NI under slabs to a5 PURSUANT TO CHAPTER 236 OF THE TOWN CODE. 4.Fill under slabs shall be clean and free of clay or organic materials. 5.Soil under footings shall hove a minimum bearing capacity of 11/2 tons per square foot L1_q -'%)- Relocated Steel Storage a APPROVED AS NO TED Building For Pindar Winery 5/8" x 10" long anchor bolts DATE' iD /( B p g 27" O.G. FEE: � BY <. I l.' �.� '�i i t��'�, O NOTIFY BUILDING DEPARTMENT-- T 765-1802 8 AM TO 4 PM FOR TI IE -O' FOLLOV NG INSPECTIONS: f.,,.1 o fsF , T INwoREOUIRED r5ULDN� �TUCTRAL DATAOR POURE„)CONCRETE d qq H-FRAvit4G P U"4"EiNG, STRAPPING. ELECTRICAL&CAULKI G a 3. INSULATION A�gengthp�51.24' 4. FINAL-INSULATION Main Road f� /� I I ll I I t� I &ELECTRIC L Peconic, New York SE�T I O ILII In EDC7COR �0D I F I E FIJI EL AR�l-1 5U I LD I 6 51.24' x 20#/ sf snow load = 1025#/ If MUST HALL M 0.E � Y � 1� 51.24' x 5#/ sf building load = 256#/ If ALL CONSTRUCTION SMALL MEET THE I. This buildin is being relocated from a site at Pindar Vineyards. REQUIREMENTS OF THE CODES OF NEI Y YORK STATE. NOT RESPONS113LE FOR SCALE I/4" = I'-O" g g y Total load = 1281#/ If 2. Wall / Roof panels are of 20 gage galvanized steel. Concrete Footing 34i.5 x 30# = 1185 DESIGN OR CONSTRUCTION ERRORS Mar 10, 2011 5. Building has a steel baseplate bolted to the foundation, as shown. a a a a d d a a a 4. This Building has no utilities. No wsoil bearing assumed @ 1.5 tons / sfJ. ater, sewage, heat or electric. — 1185# / I.ST = .315 sf area -FOUNDATION PEAL use wide x 3' deep 3000 psi concrete foundation Nall SCALE 1/4" = 1 '-0" of 2 Gharle5 K Southard Jr. m N 5/8" x 10" long anchor bolts 7 Water's Edge ® 27" O.G. N Smith Point, New York IIq67 Phone (631) 471-5228 cwsarchitect@optonIine.net a Wal / Ro f par 131 Is or of 1O ga e ga Onize d ste I. I I I L - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - J EAST BEST ELEVAT ONS SCALE 1/4" = I'-C)" 6" thick crushed stone base Wal / Rod f pan Is or,, of 0 eac e gal /onizebl etee I. N NORTH ELEVAT ONSpF-DAL, S16.soVT'�i�, SCALE 1/4" = 1'-0" f ��' `� `�o t Elevations sliding door frame sliding door frame sliding door Wall ; Roof p nets a e oF 20 3age 301voflzed s eel. 16' all Relocated Storage EVIdirc. swing rnc i doo For Pindar Winery I I I I I I Main Road Peconic, New York SOUTH ELEVATIONS SCALE 1/4" = 1'-0" Mar 10, 2011 — FLOOF� FLAN Sr-,ALE 1/4" = 1 '-0" of 2