Loading...
HomeMy WebLinkAboutSummit Ridge Energy SUMMIT RIDGE ENERGY Solar and Battery Storage Proposal for Town of Southold Landfill at 6155 Cox Lane, Cutchogue, NY r'— moo a III s, x � r b Will Fischer Vice President July 17, 2020 100 Church Street, Suite 800 • New York, NY 10007 www.srenergy.com '4� SUMMIT RIDGE ENERGY July 17, 2020 To Whom It May Concern: Summit Ridge Energy (Summit Ridge) is pleased to provide the enclosed proposal to lease the Town of Southold's landfill (the Landfill) on Cox Lane for the construction of a ballasted solar photovoltaic system coupled with battery energy storage. The Summit Ridge management team is comprised of industry leaders with years of experience developing off-site solar projects across the U.S. Summit Ridge launched in June 2017; in June 2019, we announced Summit Ridge Capital, our exclusive, joint venture partnership with Hannon Armstrong Sustainable Infrastructure (NYSE: HASI) to provide equity for our community solar pipeline. We believe our partnership with Hannon Armstrong, familiarity with community solar and experience in the New York market makes us uniquely positioned to transform the Southold landfill into a revenue-producing asset for the Town of Southold. Summit Ridge Energy met with Bob Ghosio in early 2020 and provided an unsolicited offer to lease the Landfill. Since that time, PSEG-LI has significantly bolstered its incentives for solar built through the Community Distributed Generation (CDG) program which has allowed SRE to significantly increase its offer. In addition, the SRE team has been busy working with other property owners on the North Fork to lease their land for battery storage, with a signed lease with a property owner on Route 25 in Greenport Village. SRE is working to stabilize and de- stress the power grid during peak power usage season by siting in the areas of highest need in and around commercial and industrial zones. Thank you for your time and consideration of this proposal, we look forward to negotiating the lease agreement and pushing the project development forward. Please don't hesitate to reach out at any time, we are happy to provide additional references upon request. Sincerely, w ; �� Will Fischer Vice President wfischer@srenergy.com 646-979-7066 2 '001� SUMMIT RIDGE ENERGY TABLE OF ONTENTS SUMMIT RIDGE ENERGY OVERVIEW................................................................................... 4 CompanyProfile ...............................................................................................................................4 LandfillExperience...........................................................................................................................4 ProjectReferences...........................................................................................................................6 PROJECTMANAGEMENT.................................................................................................... 10 Development...................................................................................................................................10 Engineering.....................................................................................................................................10 Interconnection, Permitting & Other Third-Party Approvals......................................................11 Procurement & Construction.........................................................................................................13 Commissioning...............................................................................................................................14 Operations & Maintenance ............................................................................................................15 PROJECTPROPOSAL.......................................................................................................... 16 LeaseOffer .....................................................................................................................................16 SolarSystem Design .....................................................................................................................19 StorageSystem Design.................................................................................................................20 Exhibit A: PSEG-LI Interconnection Pre-Application Results .......................................... 22 Exhibit B: Form of Site Lease Agreement.......................................................................... 23 Exhibit C: PVWatts Simulation Results.............................................................................. 24 Exhibit D: Bidder Attestation............................................................................................... 25 Exhibit E: Conceptual Site Plan........................................................................................... 26 3 '411111� SUMMIT RIDGE ENERGY SUMMIT RIDGE EN�RGY OVERVIEW Company Profile Summit Ridge Energy (SRE) was founded in June 2017 and is comprised of industry leaders with decades of collective experience developing onsite and offsite solar projects with top market-share positions in New York, Massachusetts, New Jersey, and Maryland. Previous customers include the Fall River Housing Authority, Tufts University, Bristol Community College, the City of New Bedford, Town of Webster, City of Brockton, MIT Lincoln Laboratories, Wal-Mart, Anheuser-Busch InBev, Praxair, Bloomberg, and Columbia University. The mission at SRE since day-one, however, has been different: to offer the benefits of solar power to the ratepayer— to the people. As such, SRE has developed financing capabilities uniquely suited to community solar. SRE is a community solar pioneer, having financed one of the first community solar projects in the country with 100% residential subscribers. In June 2019, SRE announced an exclusive, joint venture partnership with Hannon Armstrong Sustainable Infrastructure (NYSE:HASI) to finance its community solar pipeline. Hannon Armstrong is a leading capital and services provider focused on sustainable infrastructure markets that address climate change with approximately $5.5 billion of managed assets. Since its IPO in 2013, Hannon Armstrong has financed approximately $6 billion in energy efficiency and renewable energy transactions driven by its extensive in-depth knowledge of the solar and energy services industries, project and structured finance and the management of portfolios of numerous power projects. Landfill Experience The SRE team has extensive experience developing solar atop former landfills, in some cases with Summit Ridge Energy and in other cases, with former employers. Below is a sample of these projects, which demonstrate a deep understanding of the engineering, development and financing considerations unique to landfills. . . . Ledge • � Panorama Superfund Webster Street Street Landfill Landfill Landfill Landfill Landfill System 1.8 MW 1.8 MW 2.7 MW 4.7 MW 6.6 MW Size (13C) System Ground Ground Ground Ground Ground Type mount, mount, mount, mount, mount, pile- ballasted ballasted ballasted ballasted driven Location New Bedford, Webster, MA Pembroke, Brockton, MA Fort 4 '4� SUMMIT RIDGE ENERGY MA MA Washingto , MD Remediated Landfill EPA Municipal Municipal Municipal Construction Type Superfund Solid Waste Solid Waste Solid Waste & Demolition Site Year 2015 2015 2017 2017 2019 Completed Table 1: SIRE Team's Landfill Experience Active Markets SIRE is a community solar pioneer, having financed one of the first community solar projects in the country with 100% residential subscribers. It is an active developer and financier in the New York Community Distributed Generation (CDG) program and is the leading developer/financier of community solar projects in Illinois through the Illinois Power Agency's Adjustable Block Program. Below is an overview of the markets in which it currently operates. MIA 0 , NJ Nl RI MD DC Figure 1: SRE's active community solar markets 5 .,O� SUMMIT RIDGE ENERGY Project References Summit Ridge Energy has established itself as a leader in community solar, and several other solar markets nationwide, within its first three years of operation. Below is a list of references to demonstrate SRE's ability to execute on projects and drive value for its development partners and clients. r - r k o ' F al n '.. 9 4z, •+ l. r a=. Y I • •1 • •'• • —��I&nt atop former rubblelandfill 'W W Community Solar 777777777777 Co-Developer Project Contact Hillel Halberstram Synergen Solar 600 Reisterstown Road, Suite 310 /: 410-440-3597 6 D s. v F. f s" • Sys#em Size 3.80 MW (dc) Utility Baltimore Gas& Electric System Type Ground mount Financing Mechanism Communi#y Solar SRE Role Co-Developer and Financier(Summit Ridge Capital) Project Reference Don Zimmerman, CEO Alder Energy Systems, LLC 495 Jessen Lane Charleston, SC 29492 843.353.0066 drum@alder-energy.com SEmba � System Size 3.00 MW(dc} Utility Pepco-MD System Type Ground mount A446,4, SUMMIT RIDGE ENERGY logo AW Financing Mechanism Community Solar SRE Role Co-Developer and Financier(Summit Ridge Capital} Project Reference Roberto Spoerer Cypress Creek Renewables 445 Bush Street, 8th Flaor San Francisco, CA 94108 roberto.spoerer@ccrenew.com 415-799-1432 -A� SUMMIT RIDGE ENERGY ll" X1 1" " gs Rfl " l M.� •c:��.��� �s �M, rya,u�� "r,. @ a ��� ��0 �� �T a f System " r Typerill r • r •r r -• " •- t • 'r ' 1t- - rr- r r • • Project rI A' ContactDurkee 11 r Director, a Office City of Bedford 9 '01111� SUMMIT RIDGE ENERGY PROJECT MANAGEMENT Summit Ridge's "best in class" experience spans the full development lifecycle including origination, contracting, due diligence, permitting, financing and construction management. The team has experience with rooftop, carport and ground-mounted solar projects. In its first three years of operation, SRE has closed on or constructed over 100 MWdc of solar photovoltaic projects. Development Following stated interest from a property owner, SRE will initiate negotiation of a land lease. SRE's project development team will conduct due diligence to fully assess site conditions, which will dictate the engineering plans and requirements, and ultimately the final project design. Meanwhile, project management staff will develop a list of required permits and approvals, as well as a final project schedule that the property owner will approve. Summit Ridge is actively developing battery storage projects around Long Island, including in Southold and adjacent jurisdictions. Engineering Once due diligence is complete, SRE will develop detailed engineering design documents for the projects. The final design for each project will adhere to all federal, state, and local codes, and facility requirements. A third-party engineer will perform quality assurance and verify all project designs. SRE will ensure that the system meets these codes and certifications: • Local codes, zoning laws, and all local authorities having jurisdiction • Local utility's technical requirements for interconnection with solar energy systems • All applicable Renewable Energy-specific standards set forth by the Solar America Board for Codes and Standards • IEEE 1547: "Standard for Interconnecting Distributed Resources with Electric Power" • IEEE 519: "Recommended Practices and Requirements for Harmonic Control in Electric Power Systems" • IEC- 21561 • UL-1741: "Inverters, Converters, and Interconnection System Equipment for Use with Distributed Energy Resources" including but not limited to: o Over and under voltage trip points and times o Over and under frequency trip points and time o Total harmonic distortion control IEEE 519 10 '01111� SUMMIT RIDGE ENERGY o Anti-islanding protection o DC ground-fault detection and interruption • UL-1703: "Flat-Plate Photovoltaic Modules and Panels' • All products shall be UL listed or certified by other Nationally Recognized Testing Laboratory (NRTL) whenever possible. • NFPA 70: National Electrical Code 2011 o Article 690, Solar Electric Systems o Article 705, Interconnected Electrical Power Production Sources • ANSI C12.1: "Code for Electricity Metering" • FCC Electromagnetic Interference Part 15 A & B • DC system grounding to comply with NEC 2011, article 690 (C) • Any additional requirements of PSEG-LI Where required, designs will be "stamped" by a third-party professional engineer, who will be licensed in NY. Once the design is stamped, permits and interconnection applications will be submitted. SRE anticipates having to complete structural drawings and electrical three-line drawings for the system, both stamped by a NY-licensed Professional Engineer, in addition to a site plan and stormwater management plan. Balance of system components shall include combiner boxes, DC disconnect and AC disconnect switches. All shall be heavy duty, UL listed and housed in a NEMA-rated enclosure as required by the installation hardware. SRE shall use appropriate signage, including laminated diagrams including AC and DC disconnect locations and electrical one-line diagrams of the system; these signs shall be mounted in appropriate and visible locations. Each DC disconnect shall be labeled with label material described above for operating DC current (Imp), system operating DC voltage (Vmp), maximum string DC voltage (Voc), and maximum system DC current (Isc). The system interconnection point shall be labeled as such indicating the system AC voltage, current, and the array rating in Watts DC and Watts AC. Interconnection, Permitting & Other Third-Party Approvals SRE will submit applications and obtain all necessary third-party approvals prior to constructing the system, at its expense. This is included but not limited to utility interconnection and all permits required by local authorities having jurisdiction. Timing of these approval is vital to maintaining the project schedule. SRE has extensive experience permitting in New York, including navigating the State Environmental Quality Review(SEAR) process and has engaged local firms to best facilitate the discretionary permit process. 11 '0� SUMMIT RIDGE ENERGY SRE will provide, at a minimum, the following to the AHJs: • Manufacturer's data sheets on all products being used including storage and handling requirements and recommendations, and installation methods and manuals. • Manufacturer-detailed testing and commissioning procedures. • Full Site Plan and Design Drawings with the exact locations of all installed hardware o Electrical designs featuring wiring diagrams for photovoltaic array and interconnecting hardware. o Structural designs detailing exact position of all equipment used for structural support of any system components As of today, the Town of Southold's zoning ordinances do not allow for battery energy storage systems. Thus, in order for the project to proceed following award, SRE would look to the Planning Board to grant a special exception to code or draft a zoning law amendment that would allow for the construction of the battery energy storage system. SRE has assisted nearby jurisdictions with similar processes and would be happy to help here as well. Below is an indicative project development schedule for the landfill project. The likely durations of each item are shown in parentheses. SRE expects to be able to issue Notice to Proceed and move to begin construction in 2021 as long as the site lease can be signed in a reasonable timeframe after the results of the RFP are announced. • September 2020 - Environmental Due Diligence and Interconnection Application o USFWS, SHPO, USACE Consultation o Wetland Delineation (2 weeks) o Solar Glare Hazard Analysis (1 day) o Phase 1 Environmental Suitability Assessment (2 weeks) o Boundary and Topographic Survey (2 weeks) • November 2020 — NY Department of Environmental Conservation (DEC) Use Modification Request (2 months) • November 2020 — Town of Southold Zoning Application and State Environmental Quality Review Application (4 months) • February 2021 - DEC Post Closure Management Application (2 months) SRE will manage the interconnection process with Public Service Enterprise Group — Long Island (PSEG-LI) following its Standard Interconnection Requirements (SIR). SRE has already 12 '01111� SUMMIT RIDGE ENERGY (submitted an interconnection pre-application with SEG-LI and received the results, which are favorable for interconnecting the proposed sola and storage system. These results are attached to this bid as Exhibit A. Once the lease is executed, SRE will submit a formal interconnection application to PSEG-LI to begin the interconnection review process. SRE would except to receive preliminary results indicating the need for a Coordinated Electrical System Impact Review (CESIR) and would subsequently pay PSEG-LI to begin that study, which takes as long as 60 business days. Once in hand, the CESIR would include the interconnection cost for the system — this would confirm the viability of the project. From that point, SRE would cut the check and place a 25% deposit, which would retain the project's interconnection position and indicate to PSEG-LI that it intends to proceed with development. SRE has assumed that PSEG-LI would charge $0.10/Wdc to interconnect the system to the grid. Procurement & Construction In engineering, developing, and constructing these projects, SRE will rely heavily on decades of combined experience gained by its staff in the industry, and the experience of its network of contractors. SRE will contract with a well-qualified Engineering, Procurement, and Construction (EPC) partner, who will construct the system. As the developer, SRE will manage the EPC throughout the construction process, ensuring that the project schedule is adhered to daily. SRE will procure major equipment via turnkey EPC agreements with its local EPC partner. SRE is largely agnostic as to equipment manufacturers. If the equipment meets investor's technical specifications, SRE will work with its EPC partners to choose the most appropriate solution based on long-term performance, financial strength, quality of warranty, and economics to support the project. SRE's contractors will pay prevailing wages to their employees and follow OSHA regulations, including but not limited standard 1926 Safety and Health Regulations for Construction. All work shall be performed by skilled workers regularly engaged and specializing in the installation of the Systems. SRE shall employ at least one North American Board of Certified Energy Practitioners (NABCEP) Certified Photovoltaic Installer to supervise the installation. SRE will take special care during installation to ensure that the installed system does not prevent operation and maintenance of the cap, including gas venting and storm water runoff into collection basins via swales. Summit Ridge proposes installing a ballasted solar array, in which the solar panels are attached to metal racking that is anchored using ballast blocks, rather than steel piles, in order to maintain the integrity of the landfill cap and not disturb the existing drainage, venting and monitoring systems on site. Conduit runs, combiner boxes and other connections made atop the cap will be installed with protective membrane to ensure that 13 -,A� SUMMIT RIDGE ENERGY there is cushion. Our installers will use care when staging nd installing equipment to prevent any "sucking" of equipment, or exceed any weight limits, that could potentially harm the landfill cap or damage the existing slope of the site. Commissioning When construction of the system is complete, commissioning of projects will be performed by multiple parties during the course of any given project, first by the EPC of record in most cases. Third-party commissioning services will, in some cases, be performed by the designated O&M ("Operations & Maintenance") contractor foreach project. In either event, SRE will vet the qualifications of the commissioning firm and ensure that they adhere to industry standard. SRE finds alignment in having the designated O&M perform the third-party commissioning, as it also helps enable the handover process from EPC to O&M. This keeps the onus of quality on the EPC contractor while giving the O&M contractor an opportunity to adopt the asset in a manner that creates long-term buy-in. In any case, SRE will conduct an in-depth inspection to ensure that the system is installed in a workmanlike manner and consistent with industry practice, applicable codes and standards and operation requirements. SRE shall maintain a photo-record of the installation and major components, including modules, inverters, transformers and combiners. Photos will show connections within all installed enclosures. Tests shall include, but not be limited to, • Test each system string for Voc and Isc under good, clear weather conditions and follow the manufacturer's instructions when conducting tests • Grounding: Resistance between ground connection and accessible conductive part should be less than 0.1 Ohm, tested with 25 A current. • Test each array for resistance to ground with a mega Ohm meter. An array with an insulation resistance which is below 1 mega Ohm at 500 VDC will be considered defective and the condition shall be corrected before conducting inverter operational tests. • Inverter operational tests The Commissioning Team shall consist of representatives from the following parties involved in the design and construction of the system: Facility Manager or representative, Contractor representative, Client representative and Client's engineer SRE shall provide an operation and maintenance manual for the system to the Town of Southold, which shall include: • All electrical, structural, and other as-built plans developed for the project, including originals of those stamped by Professional Engineers 14 '0� SUMMIT RIDGE ENERGY • Copies othe required submittals P • All i o t cut sheets • A plan for ongoing maintenance of the system in order to achieve a minimum 25 year design life including recommended procedures to on-site staff, recommendations on the frequency of regular system checkups, and what should be included in such check-ups • Troubleshooting procedures • Emergency shut-down procedures • A copy of all start-up tests described herein • A copy of the photo record described herein • A copy of the written acceptance letter from Town of Southold • Written PSEG-LI approval of the system • Product warranties for all system components • SRE and installer contact information. Operations & Maintenance Once the system is operational, Summit Ridge Energy will operate and maintain the system. It will retain a third-party O&M provider to continuously monitor operating systems through online data acquisition systems using automated notifications software. SRE will coordinate all onsite diagnostics and maintenance with local maintenance providers or supporting contractors as needed. SRE shall make regularly scheduled maintenance visits to the site at least twice per year to carry out all manufacturer-recommended maintenance and prudent industry practices to keep the system fully functioning. Specifically, SRE will ensure that no damage to the landfill, landfill membrane, landfill equipment, erosion of topsoil, or other possible issues are caused by the system's installation. O&M services will exceed that which is required to meet the warranty requirements for the system. SRE will maintain a single general-purpose email address and phone number that property owners and customers can use to directly contact the company for support and emergencies. SRE will ensure that all system components are warrantied for their life spans. System components will carry a minimum twenty-five (25) year warranty, with the exception of the inverter which has a ten (10) year warranty and will be replaced every ten years. SRE will ensure that the HVAC systems for the battery storage system are maintained and assumes that a full replacement of the HVAC components will happen in year 10. 15 'A� SUMMIT RIDGE ENERGY PROJECT PROPOSAL To maximize value for the Town of Southold, Summit Ridge recommends a ground lease that allows it to develop a community solar project paired with battery storage at the Southold Landfill. Summit Ridge would develop, build, own and maintain a solar array, with a DC- coupled battery system, that would be interconnected directly to Public Service Enterprise Group — Long Island's (PSEG-LI) utility network. The exported electricity would generate bill credits which would then be sold to households on Long Island through New York's community distributed generation (CDG) program, including the residents of Southold and neighboring jurisdictions. Unlike participation in the feed-in-tariff (FIT) programs run by PSEG-LI which is run as a reverse auction, with winners and losers, the CDG program in NY is an open program and there is no risk to the Town of Southold. SRE offers to post a performance bond to cover its obligations hereunder, as shown in Exhibit D. Lease Offer SRE offers the Town of Southold monthly lease payments for acres occupied by the solar array and battery storage system. This lease term is 25 years with two 5-year extensions at lessee's unilateral election. At the end of the second extension term, the Town of Southold has the option to further extend the lease or, at the Town's direction, remove and decommission the system. SRE will hold insurance throughout the entire lease term, inclusive of any extensions. This lease arrangement is common in many of the markets in which Summit Ridge operates and would be zero cost to the Town of Southold. Following execution, Summit Ridge would pay $8,000 per year for a 24-month option period to allow for interconnection and development work; once the project is ready for construction, Summit Ridge would exercise the lease and begin making lease payments until the end of the term. In assembling its offer, SRE has assumed that the Town of Southold would agree to abate personal and real property taxes for the solar and storage system through the execution of a minimum 15-year payment in lieu of taxes (PILOT) agreement. This allows SRE to maximize its lease rate offer, rather than have to balance payments to the town between the lease payments and any tax payments. SRE has attached a form of its site lease agreement, attached to this proposal as Exhibit B. Below is its offer for the lease rate for the combined solar+storage system. 16 "O� SUMMIT RIDGE ENERGY Lano Lease Rate $335,000 /year Annual Escalator 1.5% Lease Term 25 years with two 5-year extensions 35-Year Cumulative Lease $15,273,349 Revenue Table 2: Lease Terms 17 '0� SUMMIT RIDGE ENERGY Cumulative Annuall-ease Lease Year Payment Revenue 1 $335,000 $335,000 2 $340,025 $675,025 3 $345,125 $1,020,150 4 $350,302 $1,370,453 5 $355,557 $1,726,009 6 $360,890 $2,086,900 7 $366,303 $2,453,203 8 $371,798 $2,825,001 9 $377,375 $3,202,376 10 $383,036 $3,585,412 11 $388,781 $3,974,193 12 $394,613 $4,368,806 13 $400,532 $4,769,338 14 $406,540 $5,175,878 15 $412,638 $5,588,516 16 $418,828 $6,007,344 17 $425,110 $6,432,454 18 $431,487 $6,863,941 19 $437,959 $7,301,900 20 $444,528 $7,746,428 21 $451,196 $8,197,625 22 $457,964 $8,655,589 23 $464,834 $9,120,423 24 $471,806 $9,592,229 25 $478,883 $10,071,113 26 $486,067 $10,557,180 27 $493,358 $11,050,537 28 $500,758 $11,551,295 29 $508,269 $12,059,565 30 $515,893 $12,575,458 31 $523,632 $13,099,090 32 $531,486 $13,630,576 33 $539,459 $14,170,035 34 $547,551 $14,717,586 35 $555,764 $15,273,349 Table 3: Lease revenue projection based on proposed system size 18 "O� SUMMIT RIDGE E\I k R G'�' Solar System Design Summit Ridge proposes installing a ballasted soar array covering 21 acres atop the landfill cap. The ballasted design, in which the solar panels are attached to metal racking that is anchored using ballast blocks, rather than steel piles, maintains the integrity of the landfill cap and without disturbing the existing drainage, venting and monitoring systems on site. SRE will consider RBI, Schletter, and Solar FlexRack in its designs. Conduit runs, combiner boxes and other connections made atop the cap will be installed with protective membrane to ensure that there is cushion. Our installers will use care when staging and installing equipment to prevent any stacking of equipment, or exceed any weight limits, that could potentially harm the landfill cap or damage the existing slope of the site. SRE performed a slope analysis of the property based on publicly available GIS data, shown below. Additionally, SRE reached out to Christopher F. Dwyer of L.K. McLean Associates, P.C., who provided SRE with site-specific topology information. SRE will likely not site panels in areas where the slope is in excess of 10%, or, alternatively, SRE will work with its racking vendor to shorten the tables for those arrays in order to accommodate the site topology. SRE is not proposing to site solar panels where the site topology cannot accommodate them. Iii► i Y7fY ' T 1 b � x s � WACKNO q�E.E Figure 2: Slope Analysis 19 '4� SUMMIT RIDGE ENERGY SIRE koposes to install 420 Watt bifacial modules that phoduce electricity on both sides of the panel. The rows of panels will be spaced roughly 14 feet apart, resulting in a rough coverage ratio of 48%. Modules will be tilted 25 degrees in order to maximize production. SIRE proposes to locate its solar equipment atop the landfill and run conduit to equipment located off-cap in the area labeled "Battery Storage System" on the site plan. The total space required here for the inverter, transformer, switchgear and battery system will not exceed 3,000 square feet. Storage System Design SIRE is an active developer and financier of battery storage projects in the northeast, with a portfolio of development assets totaling 120 MWh in NY and 150 MWh in MA. Given the state's commitment to deploying battery storage to better balance the grid and optimize performance of wind and solar, SIRE proposes to site a 1 MW, 4 hour or 4 MWh DC-coupled battery at the Landfill. This DC-coupled battery storage system will "firm" the output of the solar array, capturing production that would have otherwise been lost to clipping and augmenting the solar array's output to maximize production during the grid's peak summer hours. This will maximize the system's benefit to the power grid by focusing exported electricity during hours that the grid is most stressed, reducing the need for new ratepayer-funded grid infrastructure improvements. In order to take advantage of the federal investment tax credit, the battery system will charge no less than 75% from the solar array's output— but SIRE plans to have it charge 100% from the solar array output. SIRE plans to take advantage of the NYSERDA incentive for battery energy storage systems on Long Island. Currently, that incentive stands at $250/kWh. SIRE can reserve incentives once it has received permits to build the system, completed the SEQRA process and paid its 25% interconnection deposit to the utility. Below is our proposed system size based on a preliminary design. SIRE is confident that it can achieve this system capacity, given the information accessible to it at the time of this bid. System Type Fixed Tilt, Ballasted racking DC-coupled battery storage Solar System Size DC 4,857 Solar System Size AC 3,500 20 SUMMIT RIDGE ENERGY Storage System Size 4 MWh Solar Panel Size and Type 420 W Bifacial modules Table 4: System Design SRE has included a full site plan below as well as in Exhibit E. SRE looks forward to discussing the design with the Town to optimize solar array and battery placement and begin development on the property. AP 180 k 3 UOULLE IPA a . AI 71LT AN 2S T$ 'R N QUAh 1 R 7 QuWITY t Sat SY, _I E . 485, PACK O6WNi Tr..._- 48'7 2x 13 SFR I - -- 'H fFRFEP CFS._ NVffR+TR—tjtMN `r-- 188 :F,,,ND COVERAGE RATIO .48 .F4GiNG(TP 14 :•FENCE FERIVETER(FT) 5627 HIIIIIIIIIIIIIIIIII am .. —FENCE AREA(ACKS) SITE SFECIFY„ATONS j. �SONT SETBACK(FT) $ 20 R �f q t IDE'I LYPACK . i'" t '�E a� � REAR 5Et80.CR�FTJ 20 wIASF! LiMG USr LANDFILL MINIM J 6, 911111111111W 4111111111111111111 mom a1rII�B e. <u r Figure 3: Aerial view and panel layout for proposed landfill system 21 ,4� SUMMIT RIDGE ENERGY Exhibit A: PSEG-LI Interconnection Pre-Application Results 22 APPENDIX D Appendix D-Pre-Application Report PRE-APPLICATI N REPORT FOR THE CONNECTION OF PARALLE� GENERATIO EQUIPMENT TO LIPA's DISTRIBUTION SYSTEM DG Project Information: Provided to Utility by A Hcant) Customer name SRE Solar Origination 2, LLC Location of Project: Address and/or GPS Coordinates 6155 Cox Ln,Cutchogue, NY 11935 DG technology type solar farm-PV only DG fuel source/configuration Pv Proposed project size in kW AC 5.00 Mac Date of Pre-Application Request 1/23/20 Pre-Application Re ort: (Provided to Applicant by Utility— 10 Business Days) Operating,voltage of closest distribution line 13.2kV Phasing at site 3-Phase Apprommate distance to 3-Phase if only 1 or 2 phases nearby N/A Circuit capacity Norm: 517A; Emer: 600A Fault current availability. if readily obtained 3,242A Circuit peak load for the previous calendar year 17.2MW Circuit minimum load for the previous calendar year MDL - 69.2A; ML - 62.7A Approximate distance (miles)between serving substation and project site 2.4 Number of substation banks 2 Banks 2A+2B: Norm - 17.6; LTE - 21 .2; STE - 25 Total substation bank MVS capacity( ") Bank 1 : Norm - 17; LTE - 19.6; STE - 24.1 Total substation peak load(MVS') 31.7MW Aggregate existing distributed generation on the circuit(k'%)593.29kW Aggregate queued distributed generation on the circuit (W') 1167.50kW 49 '0� SUMMIT RIDGE ENERGY Exhibit B: Form of Site Lease Agreement 23 SOLAR LEA E AGREEMENT This SOLAR LEASE AGREEMENT ( is Agreement ) is made, dated and effective as of the Effective Date(defined below),by and between Landowner(defined below)and SRE Solar Origination 2, LLC, a Delaware limited liability company ("Lessee"). 1. Basic Provisions. The following terms used in this Agreement have the meanings set forth below: 1.1. "Landowner" 1.2. "Property" The real property consisting of the parcel(s) located in County, State of ("State"), more particularly described in Exhibit A, together with any improvements located thereon and rights, benefits and easements appurtenant thereto. 1.3 "Leased Premises" The real property consisting of approximately acres, more particularly described in Exhibit B,together with all appurtenant rights and easements. The exact acreage of Leased Premises will be determined during the Development Period. 1.4. "Adjacent Any portion of the Property not included in the Leased Premises Property" 1.5. "Effective Date" , 2020 1.6. "Development The period commencing on the Effective Date and, unless earlier Period" terminated pursuant to Section 5.3, expiring five hundred fifty (550) days after the Effective Date, subject to two (2)twelve(12) month extensions (see Section 5.1). 1.7. "Development $ per year,payable on a quarterly basis. See Section 6.1. Period Rent" 1.8. "Operations The period commencing on the date, as notified by Lessee to Period" Landowner no fewer than ten(10) days in advance, on which Lessee intends to commence construction-related activities at, or will otherwise take control over, the Leased Premises (the "Operations Period Commencement Date") and expiring on the twenty-fifth (251) anniversary of the Operations Period Commencement Date, subject to Lessee's right to extend the Operations Period for two (2) five (5)-year extension terms (see Section 5.2). BTM.767584v2 1 1.9. "Operations Period A payment of$ per acre of Leased Premises per year, Rent" payable on a quarterly b is, escalating at a rate of_per annum during the O erations Pe iod. See Section 6.2. 1.10 "Signing Bonus" A one-time signing bonus in the amount of$ for the purpose of reimbursement of attorneys' fees and any other costs or expenses incurred by Landowner in connection with review and negotiation of this Agreement. 2. Grant of Lease. For the Term (defined in Section 5) Landowner hereby leases the exclusive occupancy of the Leased Premises to Lessee and its successors and assigns, and Lessee hereby leases from Landowner and its successors and assigns the exclusive occupancy of the Leased Premises, in accordance with the terms and conditions of this Agreement. 3. Purpose of Lease, Permitted Uses: Grant of Easements. 3.1 Purpose of Lease. Lessee leases the Leased Premises for the purpose of constructing,operating,maintaining,repairing,replacing,and removing all or any part of the Solar Power Facilities(defined in Section 3.2.2 below) and any improvements that may be necessary to construct, maintain and repair any new and existing roadways and other means of ingress and egress over,across and along the Adjacent Property,including paving or surfacing of the roadways with asphalt, gravel or other roadway materials, installation of road signs and the construction and installation of culverts, bridges, drainage ditches, gates, cattle guards and similar structures and facilities (the"Roadway Improvements") located on the Leased Premises. Throughout the term of this Agreement, Lessee shall have the sole and exclusive rights to use the Leased Premises for such purposes and any and all other activities related to such purposes. 3.2 Permitted Uses of the Property by Lessee. The rights granted to Lessee in this Agreement permit Lessee, and its agents, contractors and employees,to do the following: 3.2.1 Extract soil samples, perform geotechnical tests, and conduct such other tests, studies, inspections and analyses on the Leased Premises as Lessee deems necessary, useful or appropriate. 3.2.2 Construct, erect, install, operate, maintain, reinstall, enhance, replace, relocate and remove, from time to time, the Roadway Improvements and the following "Solar Power Facilities"on the Leased Premises during the Operations Period: (a) meteorological and solar measuring equipment, including, but not limited to, insolation monitoring towers and all necessary and proper appliances and fixtures for use in connection with said towers, to determine the feasibility of solar energy conversion on the Property, on adjacent property or elsewhere; (b) solar panels, inverters, steel racking, foundations and concrete pads, support structure, footings, anchors, fences and other fixtures and facilities, maintenance, security, office and/or guest facilities, staging areas for the assembly of equipment, BTM.767584v2 2 power generation facilities to be operated in conjunction with large solar installations, control building$, laydown areas, crane pads, and related facilities and a uipment; (c) electrical wires and cables required for the gathering and transmission of electrical energy and/or for communication purposes, which may be placed overhead on appurtenant support structures or underground, and one or more substations or interconnection or switching facilities from which Lessee may interconnect to a utility transmission system or the transmission system of another purchaser of electrical energy (collectively, "Transmission Facilities"), together with the appropriate rights of way on, along, in and under the Property; and (d) any other improvements,including Roadway Improvements, facilities, machinery and equipment that Lessee reasonably determines are necessary, useful or appropriate to accomplish any of the foregoing. Items (a) — (d) collectively, the "Improvements"). Notwithstanding anything to the contrary herein, Lessee shall be entitled to determine the size,type, manufacturer and exact location of the Solar Power Facilities to be located upon the Leased Premises in its sole and absolute discretion. Lessee may, at its sole and absolute discretion, use the Leased Premises for one consolidated project or Lessee may elect to divide the Leased Premises into multiple phases or projects. Lessee may exercise its right to use all or any part of the Leased Premises as and when Lessee deems it necessary or advisable to do so to perform the activities for which this right is granted, including, without limitation, staging areas and parking for Lessee's employees. 3.2.3 Remove,trim,prune,top or otherwise control the growth of any tree, shrub,plant or other vegetation on or that intrudes(or upon maturity could intrude)into the Leased Premises, including, without limitation, anything that could obstruct, interfere with or impair the Solar Power Facilities or the intended uses of the Leased Premises by Lessee under this Agreement. 3.2.4 Excavate, grade, level and otherwise modify the Leased Premises, all in Lessee's sole and absolute discretion as Lessee may deem desirable or necessary in connection with Lessee's intended uses of the Leased Premises under this Agreement (subject to the restoration obligations set forth in Section 7.5). Landowner authorizes Lessee, at Lessee's sole expense, to take reasonable safety and security measures to reduce the risk of damage to the Solar Power Facilities or the risk that the Solar Power Facilities will cause damage, injury or death to people, livestock, other animals and property, including,without limitation,fencing around the perimeter of the Solar Power Facilities as Lessee may deem necessary or appropriate to secure or enclose the same, without unduly burdening Landowner's use of the Property. 3.3 Grant of Easements. In addition to and in connection with the leasehold interest granted pursuant to Section 2 and the permitted uses provided in Section 3.2, during the Operations Period Landowner hereby grants and conveys to Lessee and its successors and assigns BTM 7675842 3 the following easements (collectively, the "Easements") on, about, above, over, under, through and across any o I the Adjacent Property: 3.3.1 The exclusive easement to the free and unobstructed insolation of solar energy over the entirety of the horizontal space and the entirety of the vertical air space lying above the surface of that portion of the Adjacent Property for the benefit of the Leased Premises (the "Solar Easement"), provided Landowner shall have the continued right to use the Adjacent Property exclusive of the Leased Premises for any uses existing as of the Effective Date and any new uses which do not interfere with Lessee's use of the Leased Premises. Landowner shall not at any time knowingly engage in any activity on the Adjacent Property or any other neighboring property owned by Landowner that interferes with the sunlight direction over any portion of the Leased Premises; cause a decrease in the output or efficiency of the Solar Power Facilities; or otherwise interfere with Lessee's operation of the Solar Power Facilities or exercise of any rights granted in this Agreement (collectively, an "Interference"). Notwithstanding the foregoing, nothing in this Section shall prevent Landowner or its agents and lessees from conducting their normal activities on the Adjacent Property or any other neighboring property owned by Landowner. Lessee acknowledges that it has reviewed Landowner's current agricultural operations, including location of trees in the area of the Adjacent Property and finds that it will make every effort to proceed with development such that the current use does not and will not result in any Interference as defined herein and thus no current activity of Landowner on the Adjacent Property will be prohibited pursuant to the terms of this Section. Lessee's proposed plan of development and calculation of acreage of the Leased Premises will include sufficient area for the Solar Power Facilities, including area surrounding the Solar Power Facilities reasonably sufficient to avoid Interference from the Adjacent Property. 3.3.2 [The non-exclusive easement to use the Property for Lessee's construction, installation, operation, use, maintenance, repair or replacement of the Transmission Facilities, including an easement, to be located at a mutually acceptable location on a portion of the Adjacent Property, to be used for temporary (i) storage and staging of tools, materials and equipment; (ii) construction laydown; (iii) parking of construction crew vehicles and temporary construction trailers; (iv) vehicular and pedestrian access and access for rigging and material handling; and (v) construction or installation of other facilities reasonably necessary to construct, erect, install, expand, modify or remove the Solar Power Facilities (the "Construction Easement"). Lessee shall return the are of the Construction Easement to the condition existing immediately prior to such use by Lessee to the extent reasonably practical (reasonable wear and tear, casualty and condemnation excepted).] [To the extent Lessee requires portions of the Adjacent Property outside of the Leased Premises in order to perform any of the activities for construction of the Solar Power Facilities, Lessee and Landowner agree to enter into a separate written agreement, or agreements as the case may be, which shall be negotiated in good faith between the Parties to govern the terms of Lessee's use of said portions of the Adjacent Property.] 3.3.3 The right to have unobstructed vehicular and pedestrian access and ingress to and egress for from the Solar Power Facilities over and across the Adjacent Property by means of any existing roads and lanes thereon (the "Access Easement"). To the extent that BTM.767584v2 4 Roadway Improvements and access may be required by Lessee over the Adjacent Property, prior to the construction of an�Roadway Improvements on the Adjacent Property a d prior to the commencement of the Op rations Period, Lessee shall provide a proposed plan f development and survey showing the location of the Access Easement more specifically, and Lessee and Landowner agree to amend this Agreement accordingly. Lessee shall, at its sole cost and expense, repair any damage done to Roadway Improvements which result from use by Lessee, its agents, servants or employees. Such Roadway Improvements shall be maintained in the condition necessary for use by Lessee's equipment,and with regard to existing roads, shall be maintained in at least the condition that existed prior to Lessee's first use of such Roadway Improvements, ordinary wear and tear excepted. 3.3.4 The non-exclusive easement over the Adjacent Property, at such locations as Lessee and Landowner shall reasonably determine, to construct, use and maintain signs, fences, gates(whether locked or unlocked)and other safety and protection facilities around or about the Solar Power Facilities and/or to restrict access to portions of the Property around or about any of the Transmission Facilities. 3.3.5 The non-exclusive easement to enter the Adjacent Property and to remove, trim, prune, top or otherwise control the growth of any tree, shrub, plant or other vegetation on or that intrudes (or upon maturity could intrude) into the Leased Premises, or could obstruct, interfere with or impair the Solar Power Facilities or the intended uses of the Leased Premises by Lessee under this Agreement. The Easements granted by Landowner in this Agreement are easements in gross, and the easements and other rights granted to Lessee herein are for the benefit of Lessee and its successors and assigns, as owner of the Solar Power Facilities. Notwithstanding the fact that the Easements, if any, are non-exclusive, any concurrent uses of the Easement by Landowner or any third parties shall not interfere with Lessee's rights granted herein. 3.4 Survival of Covenants. The covenants, conditions, rights and restrictions in favor of Lessee pursuant to this Agreement shall not be deemed invalid or inoperative or otherwise be disregarded while any portion of the Solar Power Facilities on the Leased Premises or other property are under development, being replaced, or operational. 4. Development Period Development Period Oblizations. Within five (5) days following the Effective Date, Landowner shall make available to Lessee copies of all leases, contracts, easements, environmental, geotechnical and other site assessments, surveys, plans and other such records of Landowner which in any way relate to the Property. During the Development Period,Lessee may investigate and determine the feasibility of obtaining entitlements and agreements for Lessee's proposed solar power development, including having a survey of the Property prepared by a licensed surveyor (the "Survey") and/or a preliminary title report of the Property (the "Title Report"). During the Development Period Lessee shall have the right of ingress and egress over the Adjacent Property to perform investigations of the Property. The acreage that will be required from the Property to construct the Solar Power Facilities will be determined after completion of BTM-767584v2 5 inspection,testing, and studying of the Property, after which Lessee shall deliver to Landowner a proposed plan of development andpreliminary calculation of the acreage required for the eased Premises, which may be less acre a than the total acreage comprising the Property and�vhich will be included as Exhibit B to this Agreement. Landowner shall amend this Agreement to revise the description on Exhibit B and the acreage of the Leased Premises prior to or concurrent with the Operations Period Commencement Date. [Landowner acknowledges that Exhibit B as of the Effective Date shows a preliminary depiction of the Leased Premises.] 4.1 Survey. During the Development Period Landowner shall assist and fully cooperate with Lessee in complying with or obtaining any land use permits and approvals, tax- incentive or tax-abatement program approvals,building permits, environmental impact reviews or any other approvals, consents, orders or authorizations required or deemed desirable by Lessee in connection with the development, financing, construction, installation, replacement, relocation, maintenance,operation or removal of the Solar Power Facilities, including execution and filing of applications for such approvals,consents,orders or authorizations and delivery of information and documentation related thereto, and execution, if required, of any orders or conditions of approval. 4.2 Title Report. During the Development Period if Lessee, in its sole discretion,determines that the existence,use,operation,implementation or exercise of any matters identified by the Title Report or Survey could materially delay, interfere with, impair or prevent Lessee's development, operation or financing of the solar energy project, then Lessee may notify Landowner of such issues and Landowner shall cooperate with Lessee in efforts to obtain a release, subordination, non-disturbance agreement, consent or other agreement (in a form reasonably acceptable to Lessee) from the holder(s) of such rights as set forth in Section 10.3 herein. 5. Development Period Term; Operations Period Term; Renewal Terms. Subject to Lessee's rights to terminate this Agreement set forth in Section 5.3, Lessee's rights under this Agreement will continue throughout the Development Period and the Operations Period (collectively, the "Term"); provided, that nothing expressly stated or implied in this Agreement or represented to Landowner shall be construed as requiring Lessee to: (i)undertake construction, installation or operation of any Solar Power Facilities on the Leased Premises; (ii) generate or sell any minimum or maximum amount of solar energy from the Leased Premises; or (iii) continue operations of any Solar Power Facilities from time to time located on the Leased Premises. 5.1 Development Period. During the Development Period, Lessee or any Permitted Assignee may, by notice to Landowner received no later than thirty (30) days prior to the expiration of the Development Period, elect to extend the term of the Development Period for up to two additional twelve (12) month periods, the first commencing upon either the thirty-six (36) month anniversary of the Effective Date, and the second on the forty-eight (48) month anniversary of the Effective Date, as applicable. 5.2 Operations Period. Lessee shall have the option to commence the term of Operation Period by providing Landowner written notice not fewer than ten(10) days prior to the expiration of the Development Period, such notice to be effective on the earlier of the date Lessee BTM 767584v2 6 commences construction as provided in such notice or the expiration of the Development Period (the"Operations Period Commence ent Date"). The Operations Period shall commence on e Operations Period Commencement D to and, unless validly extended, expire on the twenty-fifth (25') anniversary of the Operations Period Commencement Date. During the term of the Operations Period, Lessee or any Permitted Assignee may, by notice to Landowner received no later than ninety(90)days prior to the expiration of the Operations Period, elect to extend the term of the Operations Period for up top two periods of up to five (5) years each. 5.3 Termination Riehts. (a) At any time prior to the Operations Period Commencement Date, Lessee shall have the right to terminate this Agreement and its interests in or under this Agreement, as to all or any part of the Property, effective upon seven (7) days written notice to Landowner. Upon such termination, except for rights and obligations that expressly survive termination as set forth herein,neither party shall have any further liability under this Agreement as to the portion of the Property so terminated. If such termination is as to only part of the Property, this Agreement shall remain in effect as to the remainder of the Property. (b) Lessee shall also have the right to terminate this Agreement and/or its interests in or under this Agreement, as to all or any part of the Property,at any time during the Operations Period(i) if Lessee is unable to renew any license deemed necessary by Lessee for the Solar Power Facilities, in which event this Agreement shall terminate on thirty (30) days' notice from Lessee; (ii) if Lessee is unable to obtain to renew any easement deemed necessary by Lessee for the Solar Power Facilities from the owners of any land not owned by Landowner, in which event this Agreement shall terminate upon thirty (30) days' notice from Lessee; and/or (iii) if for any reason the operation of the Solar Power Facilities is no longer economical for Lessee,in which event this Agreement shall expire on the date set forth in Lessee's termination notice. 5.4 Actions on Expiration or Earlier Termination. Upon expiration of the Term or earlier termination of this Agreement, whether as to the entire Property, the Leased Premises or Easements, Lessee shall, upon written request by Landowner, (a) execute and record the documents referenced in Section 15.4 with respect to the Property, Leased Premises or Easements,or to that part thereof as to which this Agreement has been terminated, and(b)remove all Solar Power Facilities from the Property,or the portion thereof as to which this Agreement was terminated,exclusive of any continuing right established pursuant to this Agreement to survive the term of this Agreement, and perform the restoration obligations set forth in Section 7.5. Landowner hereby grants to Lessee a license to enter upon the Property to perform the activities required to be performed by Lessee pursuant to Section 7.5, which license shall be effective commencing upon the date of termination or expiration of this Agreement and shall continue for one hundred eighty (180) days thereafter. 6. Payments. During the Term Lessee will pay Landowner the following amounts: 6.1 Development Period Rent. During the Development Period Lessee shall pay Development Period Rent to Landowner as follows: BTM 7675842 7 6.1.1 Within fifteen(l )business days of the Effective Date, Lessee shall pay Landowner the(i) Signing Bonus and(ii) evelopment Period Rent in the amount set forth in Section 1.7 for the first calendar quarter of the Development Period, or if less than a full calendar quarter, Development Period Rent prorated based on the number of days in that calendar quarter. 6.1.2 Beginning on the first day of the first full calendar quarter of the Development Period following the first calendar quarter of the Development Period and throughout the remainder of the Development Period, Lessee shall pay Landowner the Development Period Rent in the amount set forth in Section 1.7 for each calendar quarter within fifteen (15) days of the first day of each remaining calendar quarter during the Development Period. 6.2 Operations Period Rent. During the Operations Period Lessee shall pay Operations Period Rent to Landowner as follows: 6.2.1 Within fifteen (15) business days of the Operations Period Commencement Date, Lessee shall pay Landowner the first installment of the Operations Period Rent in the amount set forth in Section 1.9 for the first calendar quarter of the Operations Period, or if less than a full calendar quarter, Operations Period Rent prorated based on the number of days in that calendar quarter reduced by any payment made as a Development Period Rent for such calendar quarter. 6.2.2 Beginning on the first day of the first full calendar quarter of the Operations Period following the first calendar quarter of the Operations Period and throughout the remainder of the Operations Period, Lessee shall pay Landowner the Operations Period Rent in the amount set forth in Section 1.9 for the applicable calendar quarter within fifteen (15) days of the first day of each remaining calendar quarter during the Operations Period. 7. Ownership and Operation of Solar Power Facilities. 7.1 With the exception of Roadway Improvements, fences and gates that Landowner may elect to remain as property of Landowner at the end of the Term,any and all other Improvements constructed or installed on the Leased Premises and any other portion of the Property by or on behalf of Lessee specifically including the Solar Power Facilities are personal property within the meaning of Article 9 of the Uniform Commercial Code of the State of - regardless of the manner of attachment to the Leased Premises and/or the Property and may be repaired, replaced, relocated, removed, added to or expanded upon by Lessee at any time during the Term. Landowner acknowledges and agrees that despite that such portions of the Improvements may be affixed to the Leased Premises and/or the Property, (i) Lessee, its affiliate or equipment lessor is the exclusive owner of the Improvements, (ii) the Improvements shall not be construed to be a fixture and (iii) Lessee or its affiliate or transferee is the exclusive owner of the electricity generated by the Improvements and the Environmental Attributes and Environmental Incentives of the Improvements. Landowner has no right, title or interest in the BTM.767584v2 8 Improvements, the Environmental Attributes and the Environmental Incentives of the improvements and hereby waives any and all rights it m#have to a lien on the Improvements,the nvironmental Attributes and the Environmental Incenti es of the Improvements and all rights of distraint and seizure for rent and all other lien rights, claims and demands of every kind against the Improvements, the Environmental Attributes and the Environmental Incentives of the Improvements. For purposes of this Agreement, the Improvements shall be deemed to include, without limitation, all output and products of all such property, including,without limitation,the electrical output, Environmental Attributes and Solar Incentives from or associated with the Improvements and Solar Operations and any other solar energy generation facility and related improvements, facilities and equipment constructed, installed or placed by Tenant on the Property, including any storage facilities. "Environmental Attributes" means, without limitation, any renewable energy credits or certificates, emissions reduction credits, emissions allowances, carbon trading credits, green tags and tradable renewable credits. "Environmental Incentives" means, without limitation,any tax credit,benefit or incentive for alternative energy expenditure established by any local, state or federal government for the production and storage of electricity, including, without limitation, any federal, state or local accelerated depreciation, installation or production-based incentives,investment tax credits and subsidies(including,without limitation credits under Section 45 of the Internal Revenue Code of 1986, as amended). 7.2 Operation of the Solar Power Facilities. The manner of operation of the Solar Power Facilities, including, but not limited to, decisions on when to conduct maintenance, is within the sole and absolute discretion of Lessee. 7.3 As-Built Survev. Within ninety (90) days of the Solar Power Facilities being in commercial operation Lessee shall provide Landowner an"as-built"survey and"as-built" construction plan set of the Leased Premises and all Improvements thereon, which survey and set shall include the final acreage contained within the Leased Premises and shall serve as Exhibit C to this Agreement. For purposes of clarification, the surveyed boundaries of the Leased Premises shall not materially deviate from the approximate boundaries shown in Exhibit B without Landowner's prior written consent,not to be unreasonably withheld, conditioned or delayed. 7.4 Acknowledgment and Acceptance of Certain Effects. Landowner acknowledges and accepts that, during the Lease Term, the Property may be affected by certain non-life-threatening (to humans or livestock)visual,view, light, flicker, noise, shadow, vibration, electromagnetic,electrical and radio frequency interference, and other non-life-threatening effects attributable to the Solar Facility located on the Leased Premises and no such non-life-threatening effects shall be considered a violation of the terms of this Agreement. 7.5 Removal of the Solar Power Facilities. 7.5.1 Lessee shall have the right, in its sole and absolute discretion, at any time during the Term and for six (6) months after the expiration of the Term to remove the Solar Power Facilities or any part thereof and any related equipment from the Property at any time. BTM.767584v2 9 Upon expiration of the Operations Period or earlier termination of this Agreement, Lessee shall remove 01 of the Solar Power Facilities from the Property. At he sole cost of Lessee, the soil surface of the Property shall be returned to substantially the same condition as existed on the date possession of the Property is delivered to Lessee; provided, however, that all concrete mountings shall be removed to a depth of at least three(3)feet below surface grade,and that any underground cabling or wiring at a depth of three (3) feet or greater may be abandoned in place if they are not a hazard and do not interfere with agricultural use or other consistent resource uses of the land. 7.5.2 If Lessee fails to remove such Solar Power Facilities within six (6) months of termination of this Agreement, Landowner may do so, in which case Lessee shall reimburse Landowner for reasonable and actual costs of removal incurred by Landowner, less any salvage value received by Landowner, within thirty (30) days after receipt of an invoice from Landowner. 7.5.3 Lessee shall at all times comply with any governmental requirements relating to decommissioning security (any "Decommissioning Ordinances"). Lessee shall, to the extent permissible by applicable law, make the surety bond funds required by any Decommissioning Ordinance, or any remaining portion thereof, if applicable, accessible by Landowner for completion of the Lessee's obligation to remove the Solar Power Facilities in the event of noncompletion by Lessee or the local government. During the Term,upon written request of Landowner,Lessee shall provide Landowner with written evidence of Lessee's compliance with any Decommissioning Ordinance and the terms of this Section. 8. Taxes. During the Operations Period, in addition to the Operations Period Rent, Lessee shall pay all real property taxes and assessments that are levied against the Property that are attributable to the installation of the Solar Power Facilities on the Leased Premises or any reclassification of the Property as a result of the Solar Power Facilities or this Agreement, to the extent that such increase is not separately assessed as personal property to Lessee and paid directly by Lessee to the taxing authorities. Lessee, however, shall not be required to pay any increase in real property taxes that may be levied against the Property that is attributable to any sale or other transfer of the Property by Landowner or other change of ownership of the Property involving Landowner. Any such increase in real property taxes due to such a transfer or change of ownership in the Property shall remain the sole obligation of Landowner. Landowner shall submit the real property tax bill for the Property to Lessee within ten (10) days after Landowner receives the bill from the taxing authority. No later than ten (10) days prior to the due date of any installment, Lessee shall either (i) pay that portion of the real property taxes for the Property directly to the taxing authority and deliver written evidence thereof to Landowner, or (ii) deliver the sum due to Landowner for payment to the taxing authority, which Landowner shall do and deliver written evidence thereof to Lessee. In the event Landowner fails to pay the taxing authority, Lessee shall be entitled (but not obligated) to make payments in fulfillment of Landowner's obligations to the taxing authority, including any penalties for late payments, and may offset the amount of all such payments from amounts due Landowner under this Agreement. 8.1 Lessee's Richt to Contest. Lessee shall have the right, upon prior written notice to Landowner, to contest or review the amount, applicability or validity of any real or BTM.767584v2 10 personal property taxes which are assessed against the Property or separately assessed against the Solar Power Facil ties by one or more appropriate lawful proceedings, w ich, if instituted, shall be diligently conducted by Lessee in good faith at its own cost and expense, and free of any expense to Landowner(all such expenses of Landowner will be paid by Lessee),and, if necessary, in the name of Landowner, and Landowner shall, upon the request of Lessee, execute all documents reasonably necessary to accomplish such contest or review; provided, however that Landowner shall not be required to assume any expenses, obligations or liabilities with respect thereto. In the event that Landowner determines that it would benefit from such a contest or review, which determination shall be made in Landowner's reasonable discretion, Lessee agrees to provide reasonable cooperation to Landowner in connection with such contest or review; provided,however,that Landowner shall pay all reasonable costs and expenses incurred by Lessee in providing such cooperation. Notwithstanding the foregoing, Lessee shall indemnify and hold Landowner harmless from and against all claims arising out of such contest or review conducted by Lessee. 8.2 Forfeiture of Property. If at any time the Property or any part thereof is subject to forfeiture,or if Landowner shall be subject to any liability arising out of the nonpayment of real property or personal property taxes, Lessee shall, notwithstanding any pending contest or review, either pay such taxes or post such bonds as the taxing authority may require to prevent such forfeiture or liability, in which event Lessee shall be entitled to a credit against Operations Period Rent equal to the amount paid by Lessee. 9. Lessee's Representations, Warranties and Covenants. Lessee hereby represents,warrants and covenants to Landowner as follows: 9.1 Landowner Activities. 9.1.1 Lessee shall consult with Landowner on its site development plan prior to construction of any Solar Power Facilities, showing Landowner the proposed location of solar panels, roads and electric power lines, before making Lessee's final decisions as to location of the Solar Power Facilities on the Leased Premises, but Lessee shall make all final siting decisions in its sole and absolute discretion. Lessee shall post the access roads it constructs going to the Solar Power Facilities as being private roads only for use by authorized personnel in connection with the Solar Power Facilities. Landowner may use or cross such roads only to the extent that Landowner does not interfere with Lessee's rights under this Agreement. Lessee shall not install any underground storage tanks on the Property. 9.1.2 During the Development Period, Landowner may continue to use the Property to the extent such use by Landowner does not,currently or in the future,interfere with Lessee's operations hereunder or enjoyment of the rights hereby granted. Lessee shall make reasonable efforts not to disturb Landowner's activities on the Property to the extent such activities are consistent with Lessee's rights under this Agreement. Landowner shall have no right to use the Leased Premises during the Operations Period. 9.2 Insurance. BTM-767584v2 l l 9.2.1 Lessee shall, at its expense, maintain insurance with respect to the Improvements against loss Or damage by fire,lightening and other risks from timet time included under typical "all risk" p licies and against loss or damage by earthquake, flood, collapse, vandalism,malicious mischief and explosion, in amounts sufficient to enable Lessee to reduce the Improvements to grade and clear the land(or, if greater,to enable Lessee to comply with Lessee's obligations under Section 7.5 to remove the Solar Power Facilities at the expiration of the Term). 9.2.2 Lessee shall, at its expense, maintain a commercial general liability insurance policy insuring Lessee and Landowner against loss or liability caused by Lessee's occupation and use of the Leased Premises under this Agreement, in an amount not less than One Million Dollars ($1,000,000) of combined single limit liability coverage per occurrence, accident or incident,and Two Million Dollars($2,000,000)in the aggregate. Lessee shall name Landowner as an additional insured. Certificates of such insurance evidencing the coverages required by this Agreement shall be provided to Landowner at Landowner's reasonable request. Lessee shall have the right to use a qualified program of self-insurance to meet the insurance requirements. Lessee may also carry such other types of insurance as Lessee elects in its sole and absolute discretion, including without limitation coverage amounts and deductibles. 9.2.3 Landowner and Lessee each hereby waives any right of recovery against the other and the authorized representatives of the other for any loss or damage that is covered or required by this Agreement to be covered by any policy of insurance maintained with respect to the Property or any operations therein, even though such loss or damage might have been occasioned by the negligence of such party. 9.3 Indemnity. Lessee will indemnify, defend, and hold harmless Landowner against liability for physical damage to property and for physical injuries or death to Landowner, Landowner's property or the public, to the extent caused by Lessee's construction, operation, maintenance,or removal of the Solar Power Facilities on the Leased Premises,except to the extent such damages, injuries or death are caused or contributed to by the negligence or willful misconduct of Landowner or Landowner's tenants, invitees or permittees. The reference to property damage in the preceding sentence does not include any damage or any losses of rent, business opportunities, profits and the like that may result from Landowner's loss of use of any portions of the Leased Premises occupied by, or otherwise attributable to the installation of, the Solar Power Facilities pursuant to this Agreement. The terms set forth in this Section 9.3 shall survive termination of this Agreement. 9.4 Requirement of Governmental Agencies. Lessee, at its expense, shall comply in all material respects with valid laws, ordinances, statutes, orders and regulations of any governmental agency applicable to the Solar Power Facilities. In its sole and absolute discretion and through appropriate legal proceedings brought in the name of Lessee or in the names of both Lessee and Landowner where appropriate or required, Lessee shall have the right to contest the validity or applicability to the Property or the Solar Power Facilities of any law,ordinance, statute, order, regulation, property assessment or the like now or hereafter made or issued by any federal, state, county, local or other governmental agency or entity. Landowner shall cooperate in every BTM 7675842 12 reasonable way in such contest, provided Lessee reimburses Landowner for its reasonable and actual out-of-pocket expense direct incurred in connection with such cooperation, to thextent Lessee has approved such expens in advance in writing. Any such contest or procelding, including any maintained in the name of Landowner, shall be controlled and directed by Lessee, but Lessee shall indemnify and defend Landowner from losses Landowner incurs due to Lessee's failure to observe or comply during the contest with the contested law, ordinance, statute, order, regulation or property assessment. 9.5 Construction Liens. Lessee shall keep the Property free and clear of all liens and claims of liens for labor and services performed on,and materials, supplies or equipment furnished to, the Property in connection with Lessee's use of the Property pursuant to this Agreement. Lessee shall remove, or cause the removal of, any such lien by bond or otherwise within sixty (60) days after Lessee becomes aware of the existence of such lien. 9.6 Hazardous Materials. Lessee shall not violate, and shall indemnify Landowner against, any violation by Lessee or Lessee's agents or contractors of any federal, state or local law, ordinance or regulation relating to the generation, manufacture, production, use, storage, release or threatened release, discharge, disposal, transportation or presence of any substance,material or waste which is introduced,released, or brought onto the Property by Lessee and which is now or hereafter classified as hazardous or toxic, or which is regulated under current or future federal, state or local laws or regulations. 9.7 Brokers' Agreements. Lessee hereby agrees to indemnify, defend and hold Landowner harmless from any claims or actions by any third parties claiming to represent or be acting on behalf of Lessee for a broker's commission or fee in connection with this Agreement. 10. Landowner's Representations,Warranties and Covenants. Landowner hereby represents, warrants and covenants to Lessee as follows: 10.1 Landowner's Authority. Landowner is the sole owner of the Property and has the unrestricted right and authority to execute this Agreement and to grant to Lessee the rights granted hereunder. No rights to convert the solar resources of the Property or to otherwise use the Property for solar energy purposes have been granted to or are held by any party other than Lessee. Each person signing this Agreement on behalf of Landowner is authorized to do so,and all persons having any ownership or possessory interest in the Property (including spouses) are signing this Agreement as Landowner. When signed by Landowner, this Agreement constitutes a valid and binding agreement enforceable against Landowner in accordance with its terms. No consent or other approval, authorization or action by, or filing with, any person is required to be made or obtained by Landowner for Landowner's lawful execution, delivery and performance of this Agreement. 10.2 No Interference. Landowner's activities and any grant of rights Landowner makes to any person or entity,whether located on the Property or elsewhere, shall not, currently or in the future, impede or interfere with: (i)the siting, permitting, construction, BTM.767584v2 13 installation, maintenance, operation, replacement, or removal of the Solar Power Facilities, whether located on the Leased Premises orlsewhere; (ii)the flow of solar, solar speed or solar ccess direction over the Property; (iii) aove the Property to the Solar Power Facilities, whether located on the Leased Premises or elsewhere; or (iv)the undertaking of any other activities of Lessee permitted under this Agreement. In no event during the term of this Agreement shall Landowner construct,build or locate or allow others to construct,build or locate any solar energy conversion system, solar panels or project similar to the Solar Power Facilities on the Property. 10.3 Title Review and Cooperation. Landowner shall cooperate with Lessee to obtain nondisturbance, subordination and other title curative agreements as requested by Lessee from any person with a lien, encumbrance,mortgage, lease or other exception to Landowner's fee title to the Property to the extent necessary to eliminate any actual or potential interference by any such person with any rights granted to Lessee under this Agreement.Any mortgagee of Landowner must agree, among other things, not to disturb Lessee's possession and use of the Adjacent Property and to waive any and all rights and/or liens to the Improvements. If Lessee and Landowner are unable to obtain such agreements from any third party holding an interest in the Property, Lessee, and any Permitted Assignee, in addition to any other rights provided for herein, shall be entitled (but not obligated) to make payments or performance in fulfillment of Landowner's obligations to such third party and may offset the amount of such payments or performance from amounts due Landowner under this Agreement; provided, that if such obligations cannot be satisfied by the payment of money or performance by Lessee, Lessee shall have the right to immediately terminate this Agreement. Landowner shall also provide Lessee with any further assurances and shall execute any estoppel certificates, consents to assignments or additional documents that may be reasonably necessary for recording purposes or otherwise reasonably requested by Lessee within ten (10) business days of Lessee's request, including without limitation under Section 12 below. All such agreements shall be obtained at Landowner's sole cost and expense. Lessee shall have the right,but not the obligation,to obtain a Title Insurance Policy securing its leasehold interest in the Property from a title insurer of its choice, at its sole cost. 10.4 Requirements of Governmental Agencies. Landowner shall assist and fully cooperate with Lessee in complying with or obtaining any land use permits and approvals, tax-incentive or tax-abatement program approvals, building permits, environmental impact reviews or any other approvals required or deemed desirable by Lessee in connection with the development, financing, construction, installation, replacement, relocation, maintenance, operation or removal of the Solar Power Facilities, including execution of applications for such approvals and delivery of information and documentation related thereto, and execution, if required, of any orders or conditions of approval. Lessee shall reimburse Landowner for its reasonable and actual out-of-pocket expenses directly incurred in connection with such cooperation, to the extent Lessee has approved such expenses in advance in writing. Lessee shall be entitled to any and all benefits of any tax-incentive or tax-abatement programs to the extent arising out of the Solar Power Facilities. No person or entity representing Landowner shall under any circumstances publicly or privately object to the Solar Power Facilities. BTM.767584v2 14 10.5 Indemnity. Landowner will defend, indemnify and hold harmless Lessee for,from and against liability by reason of,resulting frm,whether directly or indirectly,or arising out of(i) the inaccuracy of any representation or w anty set forth in this Agreement, (ii) the 1 nonfulfillment or nonperformance of any covenant or agreement of Landowner set forth in this Agreement, (iii) the negligence or willful misconduct of Landowner or its representatives and agents in the performance of their obligations under this Agreement, and(iv) for physical damage to property (including, without limitation, Lessee's roads) and for physical injuries or death to Lessee or its tenants, invitees, contractors or the public, to the extent caused by the operations, activities,negligence or willful misconduct of Landowner or its invitees,permittees or tenants. 10.6 Hazardous Materials. Landowner is in material compliance with all environmental laws as the same are applicable to the Property, and is not subject to any environmental proceedings with respect to the Property. Landowner has not received any written notice of any violation, and to the knowledge of Landowner, no other Person has received any written notice of any violation, that, as of the date hereof, remains uncured, and no writs, injunctions,decrees,orders or judgments are outstanding and no suits,claims,actions,proceedings or investigations have been instituted or filed, and none are pending or, to the knowledge of Landowner, threatened, under any environmental laws with respect to the ownership, use or occupation of the Property. As of the Effective Date, to the knowledge of Landowner, (i) no hazardous materials have ever been produced on the Property or disposed of thereon or therein, (ii) no hazardous materials release has occurred on the Property, and (iii) no hazardous materials have migrated to the Property. Landowner shall not violate, and shall indemnify,defend and hold harmless Lessee for, from and against any violation (past, present or future) by Landowner or Landowner's agents or contractors of any federal, state or local law, ordinance or regulation relating to the generation, manufacture, production, use, storage, release or threatened release, discharge, disposal,transportation or presence of any substance,material or waste which was or is introduced, released, or brought onto the Property by Landowner and which was or is now or hereafter classified as hazardous or toxic, or which is regulated under current or future federal, state or local laws or regulations. 10.7 Quiet Enioyment. Landowner covenants and warrants that Lessee shall peacefully hold and enjoy all of the rights granted by this Agreement for its entire term without hindrance or interruption by Landowner or any person lawfully or equitably claiming by,through, under or superior to Landowner, subject to the terms of this Agreement. 10.8 Utilities. Landowner shall cooperate with Lessee in Lessee's efforts to obtain utility services to and from the Leased Premises,including without limitation executing any applications necessary for such service to the Leased Premises, and granting service providers easements or licenses to cross the Adjacent Property, all at no additional cost to Lessee, provided that Lessee shall be solely responsible for all costs related to such services. 10.9 Brokers' Agreements. Landowner hereby represents and warrants that no broker's commission or fee is due to any party in connection with this Agreement and agrees to indemnify, defend and hold Lessee harmless from any claims or actions by any third parties BTM 767584v2 15 claiming to represent or be acting on behalf of Landowner for a broker's commission or fee in connedtion with this Agreement. 10.10 Landowner's Insurance. Landowner may,at its expense,carry such other types of insurance as Landowner elects in its sole and absolute discretion, including without limitation coverage amounts and deductibles. 10.11 Minerals. To the best of Landowner's current knowledge, Landowner owns all of the oil, gas and other minerals, and all rights associated therewith, on or under the Property. 11. Assignment. 11.1 Lessee Assignment. Lessee and any Permitted Assignee (as defined below) shall have the right, without need for Landowner's consent, to do any of the following, conditionally or unconditionally, with respect to all or any portion of the Property: finance the Solar Power Facilities (for development, construction, term or permanent financing); grant co- leases, separate leases, subleases, easements, licenses or similar rights (however denominated) to one or more Permitted Assignees; or sell, convey, lease, assign (collaterally or otherwise) or transfer to one or more Permitted Assignees this Agreement, or any right or interest in this Agreement, or any or all right or interest of Lessee in the Property or in any or all of the Solar Power Facilities that Lessee or any Permitted Assignee may now or hereafter install on the Property;provided in no event shall Landowner be required to subordinate or encumber its fee title interest in the Property or any part thereof or interest therein in connection with any such encumbrance or hypothecation. An"Permitted Assignee"is any of the following: (i)any one or more parties involved in investing in or lending to Lessee or in any Solar Power Facilities; (ii)any purchaser or lessee of any of the Solar Power Facilities, or any purchaser of all or substantially all of the equity interests in Lessee; or (iii) a corporation, limited liability company, partnership or other entity that acquires all or substantially all of Lessee's business, assets or capital stock, directly or indirectly, by purchase, merger, consolidation or other means. Lessee or a Permitted Assignee that has assigned an interest under this Section 11.1,will give notice of such assignment (including the address of the assignee thereof for notice purposes) to Landowner, provided that failure to give such notice shall not constitute a default under this Agreement but rather shall only have the effect of not binding Landowner with respect to such assignment until such notice shall have been given. 11.2 Other Assignment. Except as permitted under Section 11.1 above or Section 12 below, Lessee shall not assign, sublet, enter into franchise, license or concession agreements, change ownership or voting control, mortgage, encumber, pledge, hypothecate or otherwise transfer(including any transfer by operation of law)all or any part of this Agreement or Lessee's or any Permitted Assignee's interest in the Property without first procuring the written consent of Landowner,which consent shall not be unreasonably withheld, conditioned or delayed. BTM.767584v2 16 11.3 Landowner Assignment. This Agreement may not be assigned by Landowner witilout the prior written consent of Lessee, which consent hall not be unreasonably withheld. No a signment of Landowner's interest in the Property or"s Agreement shall relieve Landowner of any of its obligations under this Agreement,nor may any such assignment be made unless fee title to the Property is simultaneously transferred to the permitted assignee hereunder and unless such permitted assignee has assumed all of Landowner's obligations under this Agreement in writing. 12. Lender Protection. 12.1 Right to Mortgage. Landowner acknowledges that in order to finance the Improvements,Lessee may,without Landowner's consent,partner with various financing parties, including without limitation, lenders, banks and tax equity investors. Lessee may, upon prior written notice to Landowner, but without requiring Landowner's consent or approval, mortgage, collaterally assign, or otherwise encumber and grant security interests in all or any part of its interest in this Agreement and the Leased Premises to any institutional lender(s) and/or tax equity investor(s). These various security interests in all or a part of this Agreement and the Lessee Property are collectively referred to as a"Lessee Mortgage" and holder of such security interest, a "Lessee Mortgagee." Any Lessee Mortgagee shall use the Lessee Property only for the uses permitted under this Agreement. Upon completion of a grant of a security interest under this Section 12.1, Lessee will give Landowner notice of the Lessee Mortgage (including the name and address of the Lessee Mortgagee for notice purposes). 12.2 Notice of Default and Opportunity to Cure. As a precondition to exercising any rights or remedies related to any alleged default by Lessee under this Agreement, Landowner shall give written notice of the default to each Lessee Mortgagee (of which it has been notified in writing) at the same time it delivers notice of default to Lessee, specifying in detail the alleged event of default and the required remedy. Each Lessee Mortgagee or its designee shall have the right, but not the obligation, to cure any default of Lessee, and/or the right, but not the obligation, to remove any Improvements or other property owned by Lessee or such Lessee Mortgagee located on the Landowner's Property to the same extent as Lessee. The cure period for any Lessee Mortgagee shall be the later of(i)the end of the Lessee cure period under Section 13; (ii) thirty (30) days after such Lessee Mortgagee's receipt of the default notice for a monetary default; (iii)ninety(90)days after such Lessee Mortgagee's receipt of the default notice for a non- monetary default; or(iv)the extended cure period in Section 12.3. Failure by Landowner to give an Lessee Mortgagee(of which it has been notified in writing)a notice of default shall not diminish Landowner's rights against Lessee, but shall preserve all rights of the Lessee Mortgagee or its designee to cure any default and to remove any Improvements or other property of Lessee or the Lessee Mortgagee located on the Landowner's Property. 12.3 Extended Cure Period. If any default by Lessee under this Agreement (except for any Lessee Payment Default)cannot be cured without the Lessee Mortgagee obtaining possession of all or part of the Lessee Property,then any such default shall be deemed remedied if an Lessee Mortgagee: (i)within sixty(60)days after receiving notice from Landowner as set forth BTM.767584v2 17 in Section 12.2, acquires possession of all or part of the Lessee Property, or begins appropriate judicial or nonjudicial 1proceedings to obtain the same; (ii) diligently prosf cutes any such proceedings to completi n; and (iii) after gaining possession of all or part of th Lessee Property performs all other obligations as and when the same are due in accordance with the terms of this Agreement. 12.4 Lender Consent. Within ten (10) days of Lessee's written request, Landowner shall execute and deliver to Lessee a written consent and estoppel substantially in the form as may be reasonably requested by a Lender. In such consent and estoppel,Landowner shall certify that this Agreement is unmodified and in full force and effect (or, if there have been modifications, that the Agreement is in full force and effect as modified and stating the modifications), and the dates to which any payments have been paid, and stating whether or not the Lessee is in default in keeping, observing or performing any term, covenant or condition contained in this Agreement, and, if in default, specifying any such default, and any other factual matters pertaining to this Agreement reasonably requested, it being intended that any such statement delivered pursuant to this Section 12 may be relied upon by the Lender, or any prospective purchaser or encumbrancer of a party's interest in the Agreement. 12.5 Lessee Mortgagee Liability. Any Lessee Mortgagee whose interest in the Lessee Property is held solely for security purposes, shall have no obligation or liability under this Agreement unless and until the Lessee Mortgagee succeeds title to the Lessee Property. An Lessee Mortgagee shall be liable to perform obligations under this Agreement only for and during the period it holds such title. 12.6 Amendment. The Parties shall negotiate in good faith any amendment to this Agreement from time to time to include any provision that may be reasonably requested by Lessee or any Lessee Mortgagee to implement the provisions contained in this Agreement or to preserve a Lessee Mortgagee's security interest. 12.7 Lessee Mortgagee's Right to Enforce Mortgage and Assign. Each Lessee Mortgagee shall have the right, in its sole discretion: (i)to assign its Lessee Mortgage; (ii) to enforce its lien and acquire title to all or any portion of the Lessee Property by any lawful means; (iii) to take possession of and operate all or any portion of the Lessee Property and to perform all obligations to be performed by Lessee under this Agreement,or to cause a receiver to be appointed to do so; and (iv) to acquire all or any portion of the Lessee Property by foreclosure or by an assignment in lieu of foreclosure and thereafter to assign or transfer all or any portion of the Lessee rights under this Agreement to a third party in accordance with Section 14 below. Any Lessee Mortgagee or other party who acquires Lessee's interest in all or a portion of the Lessee Property pursuant to foreclosure or assignment in lieu of foreclosure shall not be liable to perform the obligations imposed on Lessee by this Agreement,which are incurred or accruing after such Lessee Mortgagee or other party no longer has ownership or possession of the Lessee Property so long as those obligations are expressly assumed by its successor. BTM-767584v2 18 12.8 New Aereement. If the Lessee Property is foreclosed upon or there is an assignment in lieu of foreclosur , or if this Agreement is rejected or disaffirmed pur uant to bankruptcy law or other law aff cting creditor's rights and, within ninety (90) days a4er such event,Lessee or any Lessee Mortgagee or other purchaser at a foreclosure sale shall have arranged to the reasonable satisfaction of Landowner to cure any material defaults under this Agreement, and for the payment of the Annual Installment Payments or other charges due and payable by Lessee as of the date of such event, then Landowner shall execute and deliver to Lessee or such Lessee Mortgagee or other purchaser at a foreclosure sale, or to a designee of one of these parties, as the case may be, a new agreement ("New Agreement") which (i) shall be for a term equal to the remainder of the Term of this Agreement before giving effect to such rejection or termination; (ii) shall contain the same covenants, agreements, terms, provisions and limitations as this Agreement (except for any requirements that have been fulfilled by Lessee or any Lessee Mortgagee or other purchaser at a foreclosure sale prior to rejection or termination of this Agreement); and (iii) shall include that portion of the Lessee Property in which Lessee or such other Lessee Mortgagee or other purchaser at a foreclosure sale had an interest on the date of rejection or termination. If more than one Lessee Mortgagee makes a written request for a New Agreement pursuant to this provision, the New Agreement shall be delivered to the Lessee Mortgagee requesting such New Agreement whose Lessee Mortgage is prior in time, and the written request of any other Lessee Mortgagee whose lien is subordinate shall be void and of no further force or effect. The provisions of this Section 12.9 shall survive the termination, rejection or disaffirmation of this Agreement and shall continue in full force and effect thereafter to the same extent as if this Section 12.9 were a separate and independent contract made by Landowner, Lessee and each Lessee Mortgagee, and, from the effective date of such termination, rejection or disaffirmation of this Agreement to the date of execution and delivery of such New Agreement, such Lessee Mortgagee or other purchaser at a foreclosure sale may use and enjoy the Lessee Property without hindrance by Landowner or any person claiming by, through or under Landowner; provided that all of the conditions for the New Agreement as set forth above are complied with. 12.10 Lessee Mortzazee's Consent to Amendment. Termination or Surrender. Notwithstanding any provision of this Agreement to the contrary, the Parties agree that so long as any Lessee Mortgage remains outstanding and Landowner has been notified in writing of such Lessee Mortgage, this Agreement shall not be modified or amended prior to expiration of the Term of this Agreement, without the prior written consent of the Lessee Mortgagee holding such Lessee Mortgage. This provision is for the express benefit of and shall be enforceable by each Lessee Mortgagee as if it were a party named in this Agreement. 13. Default. 13.1 Event of Default. With respect to Landowner or Lessee (each a"Party"), an event of default("Event of Default") shall exist under this Agreement if: (a) such Party fails to pay any amount within ten (10) business days after receipt of written notice that such amount is past due; BTM.767584v2 19 (b) such Party is in breach of any representation or warranty set forth herein or fails to perform any material ob igation set forth in this Agreement and such breach or failure is not cured within sixty (60) dayJ after notice from the non-defaulting Party; provided, however, that if the breach or failure is such that it cannot be cured within such sixty (60) day period using commercially reasonable efforts, the cure period shall be extended so long as the defaulting Party is diligently pursuing such cure; and further provided, however, that the cure period shall be extended by the number of days during which the defaulting Party is prevented from taking curative action solely by Force Majeure(as defined below) if the defaulting Party had begun curative action and was proceeding diligently, using commercially reasonable efforts, to complete such curative action; or (c) such Party files a petition or answer seeking reorganization or arrangement under the federal bankruptcy laws or any other applicable law or statute of the United States of America or any State,district or territory thereof,and such petition is not dismissed within sixty (60) days. 13.2 Remedies. Upon an Event of Default by one Party, subject to the rights of any Lender,the other Party shall have the right,but not the obligation,to terminate this Agreement, in part or in whole as to the Property, with respect to all obligations arising after the effective date of such termination (other than payment obligations relating to obligations arising prior to such termination). The defaulting Party shall be liable to reimburse the non-defaulting Party for such non-defaulting Party's expenses and costs relating to such default (including, but not limited to, reasonable attorney's fees). 13.3 Cumulative Remedies. Subject to the other terms and conditions of this Agreement, each Party shall have all rights and remedies available at law and in equity for any breach of this Agreement by the other parry. 14. Condemnation; Casualty. 14.1 Entire or Partial Termination. If the whole or any part of the Property shall be taken or condemned, Lessee shall have the right, in its sole and absolute discretion, to either (i) terminate this Agreement, without penalty, or (ii) in the event of a taking of less than all of the Property, continue under this Agreement with respect to the portion of the Property not taken. Lessee reserves the right to claim and prosecute its claim for any award or damages based upon loss, damage or injury to its leasehold interest (as well as relocation and moving costs), the Solar Power Facilities and other property interests of Lessee in and to the Property. If applicable law allows or requires the recovery or award from the condemnor to be paid into a common fund or to be paid to Landowner only, and if such recovery or award is so paid into a common fund or to Landowner only, then the recovery or award so paid shall be apportioned between the parties according to the value of their respective property interests as they exist on the date of the condemnation, giving due consideration for the number of years remaining in the term and the condition of the Solar Power Facilities and improvements. If the recovery or award from the condemnor is paid into a common fund or paid to Landowner only,then the Lessee shall be entitled to that portion of such award given for the value of the Solar Power Facilities, Except for Lessee's BTM.767584v2 20 leasehold interest in the Premises(that will be apportioned in accordance with this Section),Lessee shall not be entitled to share in any separate award made to Landowner for the value of any land owned by Landowner which is the subject of the t ing. Landowner shall not be entitled to share in any separate award made to Lessee for the va ue of the Solar Facility, Lessee's relocation expenses, and Lessee's other expenses. The provisions of this Section shall survive any termination of this Agreement. 14.2 Insured Casualty. If the Solar Power Facilities are partially or totally destroyed by fire or any other peril, Lessee shall have the right, in its sole and absolute discretion, to either (i)terminate this Agreement without any payment to Landowner, in which event this Agreement shall cease and terminate as of the date of such notice, or (ii)repair the damage. If Lessee elects to reconstruct the Solar Power Facilities, Operations Period Rent and all other amounts due under this Agreement shall abate in proportion to the degree to which Lessee's use of the Property is impaired until such time as the reconstruction of the Solar Power Facilities is completed. Upon termination of this Agreement pursuant to this Section 14.4, an equitable adjustment shall be made concerning any payments made by Lessee to Landowner. 15. Miscellaneous. 15.1 Force Maieure. If performance of this Agreement or of any obligation hereunder is prevented or substantially restricted or interfered with by reason of an event of Force Majeure(defined below),the affected party,upon giving notice to the other party, shall be excused from such performance to the extent of and for the duration of such prevention, restriction or interference. The affected party shall use commercially reasonable efforts to avoid or remove such causes of nonperformance and shall continue performance hereunder whenever such causes are removed. "Force Majeure"means fire,earthquake,flood or other casualty or accident; strikes or labor disputes; war, civil strife or other violence; any law, order, proclamation, regulation, ordinance, action, demand or requirement of any government agency or utility; or any other act or condition beyond the reasonable control of a party hereto. 15.2 Confidentiality. Landowner shall maintain in the strictest confidence all information pertaining to the financial terms of or payments under this Agreement. Notwithstanding the foregoing, Landowner may disclose such information to (a) Landowner's lenders, attorneys, accountants and other personal financial advisors solely for use in connection with their representation of Landowner regarding this Agreement, (b) any prospective purchaser of the Property who has a made a written offer to purchase or otherwise acquire the Property that Landowner desires to accept or (c)pursuant to lawful process, subpoena or court order requiring such disclosure; provided, that Landowner in making such disclosure advises the party receiving the information of the confidentiality of the information and obtains the written agreement of said party not to disclose the information, which agreement shall run to the benefit of and be enforceable by Lessee;provided,further,that with respect to(c),Landowner shall promptly notify Lessee of the lawful process, subpoena or court order and afford Lessee the opportunity to contest same. The provisions of this Section 15.2 shall survive the expiration or earlier termination of this Agreement. BTM-767584v2 21 15.3 Successors and Assigns. The Agreement shall burden the Property and shall run with the land. This Agreement shall inure toJhe benefit of and be binding upon o Lanwner and Lessee and, to the extent provided in anassignment or other transfer under Section 11 hereof,any Permitted Assignee,and all of their respective heirs,transferees,successors and assigns, and all persons claiming under or through them. 15.4 Memorandum of Lease. The Parties agree that this Agreement shall not be recorded, but the Parties shall execute and Lessee may record a Memorandum of Lease in the form attached hereto as Exhibit D. Lessee may record an updated memorandum when the legal description of the Leased Premises is finalized. Landowner hereby consents to the recordation of the interest of any Permitted Assignee in the Property. Upon expiration or earlier termination of this Agreement, Lessee will execute and record a termination of such memorandum. 15.5 Notices. All notices or other communications required or permitted by this Agreement,including payments to Landowner,shall be in writing and shall be deemed given when personally delivered, or in lieu of such personal service, five (5) days after deposit in the United States mail, first class, postage prepaid, certified, or the next business day if sent by reputable overnight courier, provided receipt is obtained and charges prepaid by the delivering party. Any notice shall be addressed as follows: If to Landowner: If to Lessee: SRE Solar Origination 2, LLC Attn: Legal Department 1515 Wilson Blvd, Suite 300 Arlington, VA 22209 Email: legal@srenergy.com If to any Permitted Assignee: At the address indicated in the notice to Landowner provided under Section 11.1 hereof. Any party may change its address for purposes of this paragraph by giving written notice of such change to the other parties in the manner provided in this paragraph. 15.6 Entire Agreement; Amendments. This Agreement constitutes the entire agreement between Landowner and Lessee respecting its subject matter. Any agreement, understanding or representation respecting the Property, this Agreement, or any other matter referenced herein not expressly set forth in this Agreement, or in a subsequent writing signed by both parties,is null and void. This Agreement shall not be modified or amended except in a writing signed by both parties. BTM.767584v2 22 15.7 Legal Matters. 15.7.1 This Agreement shall be governed by and interpreted in accordance with the laws of the State. If the parties are unable to resolve amicably any dispute arising out of or in connection with this Agreement, they agree that such dispute shall be resolved in the State court located in the county in which the Property is situated. 15.7.2 TO THE EXTENT PERMITTED BY LAW, EACH OF THE PARTIES KNOWINGLY,VOLUNTARILY AND INTENTIONALLY WAIVES THE RIGHT TO A TRIAL BY JURY IN RESPECT OF ANY LITIGATION BASED ON THIS AGREEMENT, OR ARISING OUT OF, UNDER OR IN CONNECTION WITH THIS AGREEMENT AND ANY OTHER AGREEMENT CONTEMPLATED TO BE EXECUTED IN CONJUNCTION HEREWITH. THIS PROVISION IS A MATERIAL INDUCEMENT TO EACH OF THE PARTIES FOR ENTERING INTO THIS AGREEMENT. 15.7.3 IT IS EXPRESSLY UNDERSTOOD AND AGREED THAT NOTWITHSTANDING ANYTHING IN THIS AGREEMENT TO THE CONTRARY, AND NOTWITHSTANDING ANY APPLICABLE LAW TO THE CONTRARY, THE LIABILITY OF LESSEE HEREUNDER (INCLUDING ANY SUCCESSOR TO LESSEE) AND ANY RECOURSE BY LANDOWNER AGAINST LESSEE SHALL BE LIMITED SOLELY AND EXCLUSIVELY TO THE INTEREST OF LESSEE IN AND TO THE SOLAR POWER FACILITIES, LESSEE SHALL NOT HAVE ANY PERSONAL LIABILITY THEREFOR, AND LANDOWNER HEREBY EXPRESSLY WAIVES AND RELEASES SUCH PERSONAL LIABILITY ON BEHALF OF ITSELF AND ALL PERSONS CLAIMING BY, THROUGH OR UNDER LANDOWNER. 15.7.4 In the event that either Landowner or Lessee fails to perform any of its obligations under this Agreement or in the event a dispute arises concerning the meaning or interpretation of any provision of this Agreement, the defaulting party or the party not prevailing in such dispute, as the case may be, shall pay any and all reasonable costs and expenses incurred by the other party in enforcing or establishing its rights hereunder, including, without limitation, court costs and reasonable counsel fees, including any such amounts incurred on appeal or in enforcing a judgment. 15.8 Partial Invalidity. Should any provision of this Agreement be held in a final and unappealable decision by a court of competent jurisdiction to be either invalid, void or unenforceable,the remaining provisions hereof shall remain in full force and effect and unimpaired by the court's holding 15.9 Counterparts. This Agreement may be executed with counterpart signature pages and in duplicate originals, each of which shall be deemed an original, and all of which together shall constitute a single instrument. 15.10 Drafting Interpretations. Preparation of this Agreement has been a joint effort of both the parties and the resulting document shall not be construed more severely against one of the parties than against the other. BTM 7675842 23 15.11 Time of the Essence. Time is of the essence with respect to the performance of all obligations to be performed or observed by the parties and r this Agreement. [Signature page follows.] BTM-767584v2 24 IN WITNESS WHEREOF, Landowner and Lessee have caused this Agreement to be executed and delivered b their duly authorized representatives as of the EffectivI Date. LESSEE: SRE Solar Origination 2, LLC, a Delaware limited liability company By: Name: Title: LANDOWNER: , a By: Name: Title: BTM-767584v2 25 EXHIBIT A Description of Property [Insert Legal Description of Property] BTM:767584v2 EXHIBIT B Depiction of IJ,eased Premises (SEE ATTACHED) BTM.767584v2 EXHIBIT C Form of Lender Consent BTM.767584v2 EXHIBIT D I MEMORANDUM OF LEASE I This Memorandum of Lease is entered into on this _ day of , 2020 by and between , having a mailing address of (hereinafter referred to as "Landowner") and SRE Solar Origination 2, LLC, a Delaware limited liability company, having a mailing address of 1515 Wilson Boulevard, Suite#300, Arlington, VA 22209 (hereinafter referred to as"Lessee"). 1. Landlord and Tenant entered into a certain Solar Lease Agreement(the"Agreement") on the _day of 2020, for the purpose of installing, operating, maintaining and decommissioning a solar-powered electric generation facility("Solar Facility")and easements for access and servicing the Solar Facility as set forth in the Agreement. Capitalized terms used herein but not defined shall have the meanings ascribed in the Agreement. 2. The Agreement includes a Development Period effective from the date of the Agreement and for 550 days with options to extend. The Operations Period will be twenty-five years commencing on the effective date of written notification by Lessee to Landlord of the start of the Operations Period,with options for two(2)periods of five(5)years each to renew,and then up to 180 days to decommission the Solar Facility. 3. The portion of the land within which the Leased Premises where the Solar Facility and the supporting easements will be located is described in Exhibit 1 annexed hereto. 4. This Memorandum of Lease is not intended to amend or modify, and shall not be deemed or construed as amending or modifying, any of the terms, conditions or provisions of the Agreement, all of which are hereby ratified and affirmed. In the event of a conflict between the provisions of this Memorandum and the provisions of the Agreement, the provisions of the Agreement shall control. The Agreement shall be binding upon and inure to the benefit of the parties and their respective heirs, successors, and assigns, subject to the provisions of the Agreement. SIZE Solar Origination 2, LLC, LANDOWNER a Delaware limited liability company By: By: Its: Manager Name: Title: BTM 7675842 Exhibit 1 to Memorandum of Lease Leased Premises BTM.767584v2 Tenant Acknowledgment STATE OF ) ss COUNTY OF ) On 2020, before me, a Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s)whose name(s)is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature of the Notary Public (Seal) BTM:767584v2 Landowner Acknowledgment I STATE OF ) ss COUNTY OF ) On 2020, before me, a Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s)whose name(s)is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature of the Notary Public (Seal) BTM:767584v2 .40� SUMMIT RIDGE ENERGY Exhibit C: PVWatts Simulation Results 24 :;*N f2 E L RESULTS 6,921 ,186 kWh/Year* Caution: Photovoltaic system performance predictions calculated by PVWatts@ include System output may range from 6,758,538 to 7,095,599 kWh per year near this location. many ether cit assumptions and Y P Y 9 P Y uncertainties a do not in variations between PV t nologies nor site-specific .. _... _..._ _.. _ .. .. _.. .. __ _.. .._ -. ._.... .. characteristicsxcept as represented by Month Solar Radia ion AC Energy Value PVWatts" inpu For example,PV modules with better performance are not (kWh I m2 I day) (kWh) ($) differentiated within PVWatts�9 from lesser performing modules.Both NREL and private companies provide more sophisticated PV January 3.25 421,968 80,300 modeling tools(such as the System Advisor Model at https://sam nrel gov)that allow for February 4,04 452,038 86,023 more precise and complex modeling of PV systems The expected range is based on 30 years of March 5.35 643,314 122,423 actual weather data at the given location and is intended to provide an indication of April 6.12 691,370 131,568 the variation you might see. For more information,please refer to this NREL report, The Error Report May 6.20 713,020 135,688 June 6.31 698,120 132,852 Disclaimer The PVWattsn° Model("Model") July 6.41 711,474 135,393 is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable August 6.21 686,798 130,698 Energy, LLC ("Alliance") for the U S. Department Of Energy("DOE")and may be used for any purpose whatsoever. September 5.68 618,848 117,767 The names DOE/NREL/ALLIANCE shall not October 4.27 509,429 96,944 be used in any representation,advertising, publicity or other manner whatsoever to endorse or promote any entity that adopts or November 3.48 412,548 78,508 uses the Model DOE/NREL/ALLIANCE shall not provide December 2.84 362,260 68,938 anysupport, consulting, training or assistance of any kind with regard to the use of the Model or any updates, revisions or Annual 5.01 6,921,187 $ 1,317,102 new versions of the Model YOU AGREE TO INDEMNIFY DOE/NREL/ALLWICE,AND ITS AFFILIATES, OFFICERS, AGENTS, AND EMPLOYEES AGAINST ANY CLAIM OR DEMAND, Location and Station Identification INCLUDING REASONABLE ATTORNEYS - FEES, RELATED TO YOUR USE,RELIANCE, Requested Location 11935,USA OR ADOPTION OF THE MODEL FOR ANY PURPOSE WHATSOEVER THE MODEL IS PROVIDED BY DOE/NREL/ALLIANCE"AS IS" Weather Data Source Lat,Lon:41.01,-72.5 1.0 mi AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF Latitude 41.01'N MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE EXPRESSLY Longitude 72.5°W DISCLAIMED IN NO EVENT SHALL g DOE/NREL/ALLIANCE BE LIABLE FOR ANYSPECIAL - DAMAGE, INDIRECT A CONSEQUENTIAL PV System Specifications Resldentlal DAMAGES OR ANY DAMAGES WHATSOEVER, Y p INCLUDING BUT NOT LIMITED TO CLAIMS ASSOCIATED WITH THE LOSS OF DATA OR PROFITS,WHICH MAY RESULT FROM ANY DC System Size 4857 kW ACTION IN CONTRACT, NEGLIGENCE OR OTHER TORTIOUS CLAIM THAT ARISES OUT Module Type Standard OF OR IN CONNECTION WITH THE USE OR PERFORMANCE OF THE MODEL The energy output o range is based on Array Type Fixed(open rack) analysis of 30 years of historical weather data for nearby,and is intended to provide Array Tilt 25° an indication of the possible mterannual variability in generation for a Fixed(open Array Azimuth 180° rack)PV system at this location System Losses 14.08% Inverter Efficiency 96% DC to AC Size Ratio 1.39 Economics Average Retail Electricity Rate 0.190$/kWh Performance Metrics Capacity Factor 16.3% '4� SUMMIT RIDGE ENERGY Exhibit D: Bidder Attestation 25 SECTION C TOWN OF SOUTHOLD Request for Proposals for the Leasing of the Cutchogue Landfill Property for the Development, Construction, Operation and Maintenance of Renewable Energy System, Including Battery Energy Storage and/or Solar Photovoltaic Systems CONTRACTOR BID FORM 1.0 GENERAL BID STATEMENT TO: TOWN OF SOUTHOLD STATE OF NEW YORK 53095 MAIN ROAD SOUTHOLD,NEW YORK 11971 Gentlemen: The undersigned Bidder has carefully examined the forms and content of the Bid Solicitation, including notice to bidders, bid bond, sample operating agreement,performance bond, certificates of insurance, general conditions, bid specifications, and addenda, has familiarized itself with the sites of work, and hereby proposes to furnish all necessary services,permits, labor, materials, equipment, vehicles, and tools required to perform and complete the work in strict accordance with all of the bid documents written by or on behalf of the Town of Southold for this project. The undersigned Bidder agrees to abide by all conditions stated, intended, implied both particularly and generally by the terms of this Bid Solicitation,the Agreement to be provided by the Town, and the unit price Bid herein stated. 1. The Undersigned Bidder also agrees as follows: FIRST: If this bid is accepted,to execute the Agreement and furnish to the Town a satisfactory performance bond, and notification of insurance within ten(10) calendar days. SECOND: To begin the process of approvals for the contemplated project proposed on the commencement date of any Agreement awarded hereunder. THIRD: To pay the Town any and all damages it may incur as a result of the Contractor's failure to perform all acts necessary to the execution of the Agreement as provided in the Bid Solicitation. FOURTH: During the performance of this Agreement, the Contractor hereby agrees as follows: a. a Contractor shall not discriminate against any emplo ee or applicant for mployment because of age, race, creed, color, sex, sexu�l orientation, marital status, national origin, or physical disability. b. The Contractor shall comply with the provisions of Sections 290 through 301 of the Executive Law, shall furnish all information and reports deemed necessary by the State Commission for Human Rights under these nondiscrimination clauses and such sections of the Executive Law, and shall permit access to his books, records, and accounts by the State Commission for Human Rights, the Attorney General, and the Industrial Commissioner for purposes of investigation to ascertain compliance with these on discrimination clauses and such sections of the Executive Law and Civil Rights Law, c. This Agreement may be forthwith cancelled, terminated, or suspended, in whole or in part, by the Town upon the basis of a finding made by the State Commission for Human Rights that the Contractor has not complied with these nondiscrimination clauses. d. No laborer, workman or mechanic in the employ of the Contractor or subcontractor shall be permitted or required to work more than eight hours in any one calendar day, or more than five days in any one week except as otherwise provided in Labor Code Section 220. e. The Contractor shall include the provisions of clauses (a) through(e) in every subcontract or purchase order in such a manner that such provisions will be binding upon each subcontractor or vendor as to operations to be performed within the State of New York. FIFTH: By submission of this bid, the Bidder and each person signing on behalf of any Bidder certifies, and in case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury that to the best of his knowledge and belief: a. The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement for the purpose of restricting competition. b. Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to opening. c. No attempt has been made nor will be made by the Bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition. 2. The undersigned also declares that it has or they have carefully examined the Bid Solicitation requirements and sample operating agreement and that it has or they have personally in pected the actual location of work,together with the l0 1 sources of supply, has of have satisfied itself or themselves as to all the quantitills and conditions, and waives all rights to claim any misunderstanding, omissions or errors regarding the same which such inspection and observation would have disclosed. 3. The Bidder has completed the Contract Bid Form in accordance with these bid requirements. The undersigned hereby submits the following prices bid for the leasing of the Cutchogue Landfill Property for the development, construction, operation and maintenance of Renewable Energy Systems, including but not limited to battery energy storage and/or solar photovoltaic systems. SIGNATURE BLOCK The undersigned hereby submits the foregoing to furnish the services as described in this solicitation: 100 Church Street,Suite 800 Bidder: Summit Ridge Energy, LLC New York, NY 10007 Firm-Corporation Address By: March 31, 2020 Signature- Authorized Representative Date Print, Brian Dunn 'A� SUMMIT RIDGE ENERGY Exhibit E: Conceptual Site Plan i 26 F � d tz ^flh ' MI F .S .. 1 lie Y y AA �y Z r m Z A r A N A m Z m O n2 A ~ D O O n C1 A Z Nm >000"z � D A m m m A O N A n N OC c Z m o D 5 N N N D O O ti ZZ Z m s m A m f O mm < O mmm00 O.N-. c A 0 3 A (Cil > n D D m y .Zm1 V1 m N OC F C m z Tl m z z O m ^D ti n D ^!D A D NDm ZZr_m=< Z V A A Z m mz y mZ A�GJ _ y _ y N n ol n p O � D Z J N p N N A JYNZ X Oo�Om NN�D7 s N W OOGrN UArn� r o (O O I W 1N01 JO N O N 3 O m I A C ..,,, ...ice...,... 1515 K1150N 8LY➢ ^ 7I7RO20 SOUTHOLD LANDFILL PV R PROGRESS sw*E wo CONCEPTUAL LAYOUT oa 6155 COX LNPR NT OTFO NOT FOR � wE Nc*oN D CUTCHOCUE,NY 11935 CONSTRMTNN SUMMIT RIDGEENERGY N.sNENEam coN9 .�.�