Loading...
HomeMy WebLinkAbout175 Lake Dr Town of Southold P.O Box 1179 Southold, NY 11971 r * * * RECEIPT * * * Date: 02/21/20 Receipt#: 267419 Quantity Transactions Reference Subtotal 1 Excavation Permits 1385 $550.00 Total Paid: $55000 Notes: Payment Type Amount Paid By CK#26347 $550.00 Alternative, Cable Construction Inc. Southold Town Clerk's Office 53095 Main Road, PO Box 1179 Southold, NY 11971 Name: Alternative, Cable Construction Inc. 2 Cobblestone Court Farmingville, NY 11738 Clerk ID: LYNDAR Internal ID 1385 Permit No. RECEIVED T 'Fl%; OF S OUT!-10!-71) MA HIGHWAY DEPARTMENT k7l FEB 2 0 2020 Peconic Lane P e c c.n i e w York 11958 (631)765-3140 Southold Town Cler AND A -f- 'VAY EXCik17ATJO?1,T REPAIR 0PLICATION PEPOvIlT FOR F11GIB APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit pursuant to Chapter 237 of the Code of the Town of Southold,Suffolk County,New York,and other applicable laws,ordinances or re'--fl for each indi'vid-Liall coritig-t-lous excavation project herein A-zrribed- The applicant agrees to comply all nn1i 1 1, nr, 0 ZD -a] Conditions of Permit"and"Special Conditions",if any and to ordinances,codes and regulations,the attached"General permit authorized inspectors to make necessary inspections of the Job site. Print or Type A 16- LWAS �Mmaweql" 11-718 Name of Applicant Phone Number - Address of Applicant 2. s vrm s QS X66\16 Name of Contractor Phone Number Address of Contractor 3. Kim Gwfownb )?� Lpy-,� Omoe� Swrpco Name of Property Owner Requesting Service(if applicable Address of Owner (�C)ao eu� , -"/-�S' LAa Vvo ui�- '7-1 L"L, �6 Po Work Description and Location(Street Number,Hamlet,Cross Street) (a) Is construction located within 75 feet of tidal wetlands? Yes No *If yes,other Town permits may be required. NO-ILE,: AR inforinatelon requested by thus &Diatuire of Applicant Application /11 errinii vorni is Required for a complete application! Date 5. (a) Attached plot plan to reasonably and adequately describe the proposed work. Provide accurate schematic site plan showing the location of all proposed excavations and relationship to adjoining premises,public streets or areas,and give a detailed description of all site and pavement restoration work. (b) Attach all other necessary permits and licenses for this project. (c) Work covered by this application may not colmilence before issuance of a Highway Excavation Pen-nit by the Town Clerk. e%/2 6. Tax Map No.: District 1000 Section 59 Block 5 Lot 0D 7 Staxtinla Date: z I 2D 2 D.2- Coinplettion Date: 2126[,WZD 8. Work Schedule: Phase Completion Date Excavktion 21-2o-7—ZHO Work Schedule Facility Installation 7-1261 26-20 Must be provided Backfill&Completion -7-12blzb� for consideration as a Pavernent Replacement )v TR Ce-7PPlete APPEcation. 9. Under which authority is application being made: See Town Code Chapter 237(E)-Provide Resolution by,or authority from,the Utility being modified. 10. Estimated Cost of Proposed Work: $-Mott i i. Remarks: 90Lnt)NL- CA-W kl- U,\MJL 1-6 66 -1DW6 IX G-QA�61,5V1WL0W- akEPr D-10 1 of 3 12. Insurance Coverage: (Attach Copy) Gmn.p°.IL"iy: (b) Policy#: (c) State whether policy of certification on file with the Highway Department: (d)Coverage required extended to the Town: Any Loss including Bodily irgury,property or commercial injury caused by or attributable to thv work i er formed: 3l Ann l�Ye 1 —gica 1 n 000,uvv per Occurret}ce a.?d 2,0000-0v r ra a�,,_�a.{. 13. Security: (a)Surety Bond or Certified Check provided in the total Amount of S (b)Maintenance Bond provided: 2 years or 3 years. 14. Fees for Applications and permits: �� Banc App.i-ati Fee for Each Project L ocatjer: - �.�� A Project Location would include each Bell Hole and/or every road opening or excavation within any 50' Radius whether or not they may be inter-connected by open trench or directional boring. The/total number of Project Locations shall be subject to the approval of the Highway Superintendent. Al. / !Service Connections excavations @$50.00 $ No- A2. /Additional Excavations same service(a,$20.00 $ No. B. Trench Excavations 18"in depth or less Total Lineal Footage of Excavation; L.F.@$10.00 $ C. Trench Excavations 18"in depth to 5' in depth Total Lineal Footage of Exca v anon; L.F. @$30.00 $ D. Trench Excavations 5' in depth and over Total Lineal Footage of Excavation; L.F. @$50.00 $ E. Utility Repair Excavations @$1,000.00/Each $ \ No. \ Additional Repairs of Same Service @$500.00/Each $ No. TOTAL$ #6SC) F. Official Notice to public utilities-proof must be provided and Shall be attached to this application prior to issuance of perinit. Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation permit to: in cordance with this application and subject to the"General Conditions"and"Special Conditions"of permit(if any attached hereto. SUPERINTENDEi OF H TOWN OF SOU O _ Vindent M.Or d Date Date Received by the Town Clerk �Zo 10 Date Permit issued ` o�0 20 Permit No. NOTE: Permit expires one(1)year from date of issuance. Nowork to start•.'ithout 24 ho*:r notice to Superintendent of I iglrxays. Permit must be available at all times for inspection,on site,during construction. D-39 2 of 3 � S Copv Distribution: Highway Depar-ftnent Engineer(with page 3) Applicant Town Clerk(Original) INSPECT"R"S RECORDS Inspection Date Findings (use code) Applicant Notified 1 St 3`d stn (To Permit Clerk) REMARKS CODE � IB hmp:;.e. Barricades IL Improper Lights ST Sunken Trench or Excavation UTM Unable to Measure(due to backfilling) BUC Building Under Construction WIP Work In Progress LN'R Improper i�ackfzll(too high,not sutticlent} HrS inspector Holding for Final Settlement of Excavation RFR Ready for Repair D-39 3 of 3 i - J I 1 I J I I I I I _ � I I i I GENERAL CONDITIONS OF PERMIT APPLICATION/PERIVIIT FOR HIGHWAY EXCAVATION AND REPAIR 1. Permittee's Contractors to Comply with Permit Requirements: The Permittee is responsible for informing its independent contractors,employees,agents and assigns of their responsibility to comply with this permit,including all special/site specific and general conditions imposed by the Highway Superintendent while acting as the permittee's agent with respect to the permitted activities,and such persons shall be required to comply with all permit requirements. 2. No Right to Trespass or Interfere with Private Property Rights: This permit does not convey to the -permittee any right to trespass upon the lands of adjacent property owners in order to perform the permitted work nor does it authorize the impairment of any rights,title,or interest in real or personal property held or vested in a person not a paity to the permit. 3. Protection of the Highway and Future Highway Maintenance: If future operations or highway maintenance projects by the Town of Southold require an alteration in the position of the utility, structure or work herein authorized,or if,in the opinion of the Highway.Superintendent the work performed under this permit shall cause unreasonable obstruction to required highway maintenance or endanger the health, safety and/or welfare of vehicular or pedestrian traffic,this permit shall be revoked and the utility, structure,fill, excavation,or other modification of the highway hereby authorized shall not be completed. Additionally,the permit may be revoked if the Highway Superintendent finds that the issuance of the permit was illegal or unauthorized or that the applicant failed to comply with any of the terms and conditions of the permit or Chapter 237 of the Town Code. 4. Revocation of the Permit by the Mghway Superintendent: If the Highway Superintendent deems it necessary to revoke this permit and the project hereby authorized has not been completed, the applicant shall,without expense to the Town and to such extent and in such time and manner as the Superintendent may require,remove all or any portion of the uncompleted utility,structure or fill and restore the site to its former condition. S. Notice of Commencement: At least 24 hours prior to commencement of the project,the permittee and/or contractor shall notify the Town Highway Department in writing that they are fully aware of and understand all terms and project conditions of this permit. Upon completion of the work,the contractor shall provide photographs of the completed work to the Town Highway Department and request a Final inspection. 6. Storage of Equipment&Materials: The storage of construction equipment and/or materials shall be confined within the project work area and/or adjacent areas where permission/legal access has been obtained in a manner that does not interfere with normal highway traffic. 7. Utility Mark-Outs: The Applicant/Contractor shall be responsible for verification of all existing utility mark-outs and shall take all precautions to protect same. Damage to existing utilities shall be the responsibility of the contractor and shall be repaired at the contractor's expense. 8. Road Closures: All scheduled road closures must first receive written permission from the Southold Town Board prior to closing a road. Temporary lane closures may be permitted with the approval of the Highway Superintendent. This item will included but not be limited to the installation of appropriate signage and flag men to stop and start traffic to allow for single lane traffic. Road Closures due to unforeseen emergencies require immediate notification of the Highway Department and shall be limited to immediate and/or expedited restoration of the Work Zone. 9. No Construction Debris in Road Shoulder Area: All Construction Debris shall be removed from the job site on a daily basis. All stockpiled soil as well as all other project materials that will be staged within the Right-of Way must be delineated with reflective signage or other means to meet the minimum requirements of the NYS DOT Construction Standards. w GENERAL CONDITIONS OF PERMT 7M BUN,1CATT�Di�(�` � i4 �T FOR H.�isfis i^a�A7Y EXC.A A t BU AND P. MPAIR (Continued) l0, stS4^li Maintain F,rrssia�as Controls: I?eq��red I=rOSiOn Control�feaStrreS 5il_} enC;rg) iS tze nlar-fr! on the downslope edge of any disturbed area. This sediment barrier is to be put in placti befbre an7 disturbance of the ground occurs and is to be maintained in good fiLnctiona.l condition until thick ve ,atati;: c�ver is established. i 1. Clean Fill Oisly: All project back-fill shall consist of clean sand, gravel or soil (NOT asphalt,slag,flyash, broken concrete or demolition debris). All unsuitable soils excavated at tl.e site(i.e. Cluy,Bob, etc.) re tc be removed from the site and not used to backfill any excavation within a Town Highway. 12. X31 Areas (➢flS(9i9 g9i0tiBY97dlce : H11 areas of Sll1l dlSitirl7aTlce resulting from The approved project snit/ he stabilized to the satisfaction of the Highway Superintendent immediately following project completion. If the project site remains inactive for more than 48 hours or planting is impractical due to the season,then the area shall be stabilized with Sia`v;,hay mulch and/or.jute matting ulntri•weathe'i conditions favor germination. 13. Bactrfiai & Compaction of ah Excavations: Back Fill shali consist of clean fill or soils which exEibit a well-defined moisture density relationship as determined to be in accordance with ASTMD 698. Fill shall be placed in maximum lifts of twelve (12")inches thick and shall be mechanically compacted to a Ninety- live (95%)percent nraxiniunr dry density. Suitable hydraulic compaction by water_jetting at three 40Ot intervals will also be permitted subject to a project specific approval by the Highway Superintendent. 14. Restoration of the Road Shoulder Area: All mars-made improvements located .vithin existing read shoulder areas must be protected to the greatest extent practical. Items would include but not be limited to driveway&private road aprons,mail boxes, sprinkler systems,trees and ornamental plantings. \ rxcavations through driveways and private road pavements must be reconstructed to meet all requirein\eziis of Southold Town Highway Specifications. All pre-existing road shoulder improvements that have been disturbed daring construction must be replaced or repaired by the contractor to the satisfaction of the Highway Superintendent. 15. Schematic Plains with all Technical information's and Scope of Work: To reasonably and adequately describe the proposed work, accurate schematic site plans must be provided to show or indicate all proposed construction activity required under this permit. All Pavement surfaces scheduled for excavation must be saw cut to the full delith of asphalt and/or concrete pavements. Accurate size of bell holes or width of trenching must be indicated by dimension or labeling. This schematic site pian must provide,details on all restoration required to meet the requirements of these General Conditions and requirements found in the Southold Town Highway Specifications. 16, Pavement Reconstruction: All Pavement sections must be reconstructed in the following manner; (Cote:When Concrete Pavements aLe Present.Please review Restoration requirements with the Highway Sutneuateadent) a) Complete all back-fill&soil compaction work as needed to provide a suitable sub-base; b) Over-cut existing asphalt bell hole or trench by twelve (12")inches on all sides; c) Install a compacted lift of 4"thick Stone Blend base(RCA Blend must meet NYS DOT Specification); d) Install a two and one half(2.5")inch compacted lift of Asphalt Base Course; e) Install a one and one half(1.5")inch of Asphalt(Type 6)Wearing Course. (Provide AC at all joints) All work listed herein.must meet the minimrim requirements of the Southold Town.HigiYJay Specifications. 19. Trenching of Pavement Surfaces Exceeding One Hundred (1001),Fee All trenching of pavement surfaces exceeding 100' in length must first be reconstructed to meet the requirements of Item # 16 as noted above. Once all pavement reconstruction is completed to the satisfaction of the Highway SuperIIltendent,the entire road section and/or width of road over the entire length of trench shall be repaved with a two (2")inch lift of Asphalt(Type 6)Wearing Course (Typical,shoulder to shoulder).