Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
43924-Z
®�qs� F� Town of Southold 11/18/2019 0 P.O.Box 1179 co 53095 Main Rd o� ' Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 40869 Date: 11/18/2019 THIS CERTIFIES that the building SOLAR PANEL Location of Property: 800 Theresa Dr.,Mattituck SCTM#: 473889 Sec/Block/Lot: 115.43-18 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 6/21/2019 pursuant to which Building Permit No. 43924 dated 7/2/2019 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: ROOF-MOUNTED SOLAR PANELS TO AN EXISTING ONE FAMILY DWELLING AS APPLIED FOR The certificate is issued to Debenedittis,Robert&Caroline of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. 43924 08-13-2019 PLUMBERS CERTIFICATION DATED Authorized Signature o�gvFw4co TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN CLERK'S OFFICE c • SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 43924 Date: 7/2/2019 Permission is hereby granted to: Debenedittis, Robert 25 Vernon Ave East Norwich, NY 11732 To: installation of roof-mounted solar panels as applied for. At premises located at: 800 Theresa Dr., Mattituck SCTM # 473889 Sec/Block/Lot# 115.-13-18 Pursuant to application dated 6/21/2019 and approved by the Building Inspector. To expire on 12/31/2020. Fees: SOLAR PANELS $50.00 CO -ALTERATION TO DWELLING $50.00 Total: $100.00 I� Building Inspector Form No.6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: 1. Final survey of property with accurate location of all buildings,property lines, streets,and unusual natural or topographic features. 2. Final Approval from Health Dept. of water supply and sewerage-disposal(S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1%lead. 5. Commercial building,industrial building,multiple residences and similar buildings and installations, a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings(prior to April 9, 1957)non-conforming uses,or buildings and"pre-existing"land uses: 1. Accurate survey of property showing all property lines,streets,building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is denied,the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees 1. Certificate of Occupancy-New dwelling$50.00,Additions to dwelling$50.00,Alterations to dwelling$50.00, Swimming pool$50.00,Accessory building$50.00,Additions to accessory building$50.00,Businesses$50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy-$.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy-Residential$15.00, Commercial$15.00 n Date. (VJ�Dh New Construction: Old or Pre-existing Building: (check one) Location of Property: 800 Theresa Dr Mattituck, NY 11952 House No. Street Hamlet Owner or Owners of Property: Carloine & Robert Debenedittis p Suffolk County Tax Map No 1000, Section 115 Block 13 Lot 18 Subdivision Filed Map. Lot: Permit No. Date of Permit. Applicant: Sunation Solar Systems, Inc. Health Dept.Approval: Underwriters Approval: Planning Board Approval: Request for: Temporary Certificate Final Certificate: (check one) Fee Submitted: $ 1 lican oF sovj�®� Town Hall Annex ® Telephone(631)765-1802 54375 Main Road Fax(631)765-9502 P.O.Box 1179 ® @ sea n.deviin(W-town.Southold.ny.us Southold,NY 11971-0959 BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: Robert Debenedittis Address: 800 Theresa Dr city:Mattituck st: NY zip: 11952 Building Permit#. 43924 Section. 115 Block: 13 Lot 18 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: DBA: SUNation Solar Systems Inc. License No: 33412-ME SITE DETAILS Office Use Only Residential X Indoor X Basement Service Only Commerical Outdoor X 1 st Floor Pool New Renovation 2nd Floor Hot Tub Addition Survey X Attic Garage INVENTORY Service 1 ph X Heat Duplec Recpt Ceiling Fixtures HID Fixtures Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Fluorescent Fixture Pumps Transformer Appliances Dryer RecptEmergency Fixtures Time Clocks Disconnect 2 Switches Twist Lock Exit Fixtures 11 TVSS Other Equipment: 40A Photovoltiac Disconnect, Enphase Combiner with 3 Breakers. 2-20A 220 Breake 1-10A 220 Breaker, 17- Solar Panels Notes: Inspector Signature: Date: August 13, 2019 S Devlin-Cert Electrical Compliance Form.xls ho�aOP 50Ulyo� * # TOWN OF SOUTHOLD- BUILDING DEPT: cou765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLEIG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL)��� � [ ] CODE VIOLATION ] CAULKING REMARKS: DATE �77 INSPECTOR Graham Associates 1981 Union Blvd. Bay Shore,N.Y. 11706 Building Consultants & Expeditors (631)665-9619 Fax(631)969-0115 November 10, 2019 r ; r¢. Town of Southold r ` 'moi `----° , Building Department Li NOV 1 4 2019 Re: Permit#43924 DeBenedittis Residence 800 Theresa Dr., Mattituck Installation Inspection Date: 8/27/2019 To Whom It May Concern, The roof mounted photovoltaic system at the above referenced residence has been generally observed to be installed properly in accordance with the approved plans and is certified by Graham Associates to be in compliance with the minimum requirements of the Town, the 2015-International Residential Code and the 2017-New York State Uniform Code Supplement and the Provisions of ASCE 7-10. If you have any further questions, do not hesitate to call. Sincerely, EC7 LU g >- , RA TSTA FIELD INSPECTION REPORT .DATE COMMENTS FOUNDATION (1ST) ...................................... 'FOUNDATION (2ND) � • O ROUGH FRAMING& PLUMBING y INSULATION PER N. Y: H STATE ENERGY CODE FINAL ADDITION4L COMMENTS d 1 TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health SOUTHOLD,NY 11971 4 sets of Building Plans TEL:(631)765-1802 C' Planning Board approval FAX:(631)765-9502 / Survey SoutholdTown.NorthFork.net PERMIT NO. Check Septic Form N.Y.S.D.E.C. Trustees C.O.Application Flood Permit Examined .120 r` Single&Separate Stonn-Water Assessment Form Contact: Approved 20 Mail to:SUNatton Solar Systems,Inc Disapproved a/c 171 Remington Boulevard,Ronkonkoma 1Y 11779 1 t., Phone:(631)750-9454 Expiration 120 Btiilditig I�nspeC Ior APPLICA`V—0 BUILDING PERMIT Date ,20 tq INSTRUCTIONS a.This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans,accurate plot plan to scale.Fee according to schedule. b.Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or areas,and waterways. c.The work covered by this application may not be commenced before issuance of Building Permit. d.Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant.Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f.Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not-been completed within 18 months from such date.If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize,in writing,the extension of the permit for an addition six months.Thereafter,a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk County,New York,and other applicable Laws,Ordinances or Regulations,for the construction of buildings,additions,or alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code,housing code,and regulations,and to admit authorized inspectors on premises and in building for necessary inspections. -------,Signature o app icant or name,if a corporation) SUNathon Solar Systems,Inc 171 Remington Boulevard,Ronkonkoma NY 11779 (Mailing address of applicant) State whether applicant is owner,lessee,agent,architect,engineer,general contractor,electrician,plumber or builder SUNahon Solar Systems,Inc-Contractor Name of owner of premises Robert Debenedittis - (As on the tax roll or latest deed) If applicant is a corporation,signature of duly authorized officer Scott Maskln-President (Name and title of corporate officer) Builders License No.44104-H Plumbers License No. N/A Electricians License No.33412-ME Other Trade's License No. 1. Location of land on which proposed work will be done: 800 Theresa Dnve Mathtuck House Number Street Hamlet County Tax Map No. 1000 Section 115 Block 13 Lot 18 Subdivision Filed Map No. Lot 18 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy Residence b. Intended use and occupancy Residence with addition of Solar Panels 3. Nature of work(check which applicable):New Building Addition Alteration_ ✓2 Repair Removal Demolition Other Work 9..,P_,. (Description) 4. Estimated Cost $23,023.00 Fee $200 00 (To be paid on filing this application) 5. If dwelling,number of dwelling units Number of dwelling units on each floor If garage, number of cars 6. If business,commercial or mixed occupancy,specify nature and extent of each type of use. 7. Dimensions of existing structures,if any:Front Rear Depth Height Number of Stories Dimensions of same structure with alterations or additions: Front Rear Depth Height Number of Stories 8. Dimensions of entire new construction:Front Rear Depth Height Number of Stories 9. Size of lot: Front Rear Depth 10. Date of Purchase Name of Former Owner 11.Zone or use district in which premises are situated 12. Does proposed construction violate any zoning law,ordinance or regulation?YES_NO X 13. Will lot be re-graded?YES_NO X Will excess fill be removed from premises?YES_NO X 14. Names of Owner of premises Robert Debenedittis Address 800 Theresa Dr Mathtuck Phone No. 516-457-3865 Naive of Architect William c Fisher Address PO Box 30,Oakdale,NY 11769 Phone N0631-78&4419 Name of Contractor suNatlonSolar Systems,Inc Address 771 Remington aoawa,d,Ronkonkoma NYPhone No. 631-750-9454 15 a.Is this property within 100 feet of a tidal wetland or a freshwater wetland?*YES NO X *IF YES,SOUTHOLD TOWN TRUSTEES&D.E.C.PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland?*YES NO x *IF YES,D.E.C.PERMITS MAY BE REQUIRED. 16. Provide survey,to scale,with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below,must provide topographical data on survey. 18.Are there any covenants and restrictions with respect to this property?*YES NO X *IF YES,PROVIDE A COPY. STATE OF NEW YORK) SS: COUNTY OF Suffolk ) Scott Maskin-President-SUNation Solar Systems,Inc being duly sworn,deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)He is the contractor (Contractor,Agent,Corporate Officer,etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief;and that the work will be performed in the manner set forth in the application filed therewith. S before me,tilia ay of 20 Notary Public Signature of Applicant t t Scott A. Mussell ,� 0S111FQ/r00 ST 1R.MWA\T]ER. SUPERVISOR MANAGEMENT SOUTHOLD TOWN HALL-P.O.Box 1179 v' 53095 Main Road-SOUTHOLD,NEW YORK 11971 Town of Southold CHAPTER 236 - STORMWATER MANAGEMENT WORK SHEET ( TO BE COMPLETED BY THE APPLICANT ) DOES THIS PROJECT ECT INVO LVIE ANY OF TIED IFOLI .©WANG: Yes No (CHECK ALL THAT APPLY) ❑® A. Clearing, grubbing, grading or stripping of land which affects more than 5,000 square feet of ground surf ace. ❑® B. Excavation or filling involving more than 200 cubic yards of material within any parcel or any contiguous area. ❑© C. Site preparation on slopes which exceed 10 feet vertical rise to 100 feet of horizontal distance. ❑® D. Site preparation within 100 feet of wetlands, beach, bluff or coastal erosion hazard area. ❑® E. Site preparation within the one-hundred-year floodplain as depicted on FIRM Map of any watercourse. E][D F. Installation of new or resurfaced impervious surfaces of 1,000 square feet or more, unless prior approval of a Stormwater Management Control Plan was received by the Town and the proposal includes in-kind replacement of impervious surfaces. If you answered NO to all of the questions above, STOP! Complete the Applicant section below with your Name, Signature, Contact Information, Date & County Tax Map Number! Chapter 236 does not apply to your project. If you answered YES to one or more of the above, please submit Two copies of a Stormwater Management Control Plan and a completed Check List Form to the Building Department with your Building Permit Application. APPLICANT (Property Owner,Design Professional,Agent,Contractor,Other) S.C.T.M. #: 1000 Date Dutnct NAME Scott Maskln, SUNatlon Solar Systems, Inc. Section Block Lot ���° ****FOR BUILDING DEPARTMENT USE ONLY**** Contact Information 454 RdeP>mne t•um4r1 Reviewed By J& qittfLk - - - - - - - - - - - - - - - - - — Date: Property Address/ Location of Construction Work: — — — — — — — — — — — — — — — — 800 Theresa Drive Approved for processing Building Permit. Stormwater Management Control Plan Not Required. Mattituck, NY 11952 ❑ Stormwater Management Control Plan is Required. (Forward to Engineering Department for Review.) FORM # SMCP-TOS MAY 2014 "^� S Dy/ L4 Town Hall Annex Tel p one(631)7 12 l 54375 Main Road y (631)765 5 J P.O.Box 1179 G r0 er.richert (W' SO UT I� US Southold,NY 11971-0959 Q ``�� BUILDING DEPARTMENT )'= `,7 TOWN OF SOUTHOLD APPLICATION FOR ELECTRICAL INSPECTION REQUESTED BY- Date: (Q Company Name: SUNation lar Systems, Inc. Name: Scott Maskin License No.: 33412-ME Address: 171 Remington Blvd, Ronkonkoma, NY 11779 Phone No.: 631-750-9454 JOBSITE INFORMATION: (*Indicates required information) *Name: *Address: *Cross Street: *Phone No.: Permit No.: Tax-Map District: 1000 Section:—�1 S _ Block: _ Lot: . *BRIEF DESCRIPTION OF WORK(Please Print Clearly) 'r e� 5'_'0\cam tioln vol' Cokc. LG LrG�ro L3 EQhck&e— \c 0A (Please Circle All That Apply) *Is job ready for inspection: E ! NO Rough In Final *Do-you need a Temp Certificate: E ! NO Temp Information(if needed) *Service Size: 1 Phase 3Phase 100 150 200 300 350 400 Other *New Service: Re-connect Underground Number of Meters Change ofService Overhead Additional Information: PAYMENT DUE WITH APPLICATION 11 .82z-Request for Inspection FormC i 3 0 1 pF SOUp�®l 0 Town Hall Annex Telephone(631)765-1802 54375 Main Road Fax(631)765-9502 P.O.Box 1179 G Southold,NY 11971-0959 'r a BUILDING DEPARTMENT TOWN OF SOUTHOLD August 27, 2019 SUNation Solar 171 Remington Blvd Ronkonkoma NY 11779 Re: DeBenedittis, 800 Theresa Dr, Mattituck TO WHOM IT MAY CONCERN: The Following Items(if Checked)Are Needed To Complete Your Certificate of Occupancy: � VMAOTE: Engineer's certification required stating the panels were installed per NYS Building Code Electrical Underwriters Certificate A fee of$50.00. Final Health Department Approval. Plumbers Solder Certificate. (All permits involving plumbing after 4/1184) Trustees Certificate of Compliance. (Town Trustees#765-1892) Final Planning Board Approval. (Planning#765-1938) Final Fire Inspection from Fire Marshall. Final Landmark Preservation approval. Final inspection by Building Dept. Final Storm Water Runoff Approval from Town Engineer BUILDING PERMIT —43924— Solar Panels 1 tit SUFFOLK COUNTY DEPT OF LABOR, LICENSING 8 CONSUMER AFFAIRS HOMEIMPROVEMENT CONTRACTOR LICENSE �I SCOTTAMASKIN This certifies that the Gus" 'm bearer Is duty SUNATION SOLAR SYSTEMS INC licensed by the Lw— b� ow...u.a County of Suffolk 03106/2008 44104-H ean""'`".' Emrunm Dale 03101/2020 Y i Show Receipt Detail Page 1 of 2 I RECEIPT r Suffolk County Government SUFFOLK COUNTY LABOR, LICENSING&CONSUMER AFFAIRS P.O. BOX 6100 HAUPPAUGE, NY 11788 James M Andrews Application:ME-33412 Application Type:ConsumerAffairs/Licenses/Master Electrician/NA Address: Owner Name:SUNATION SOLAR SYSTEMS INC owner Address:171 REMINGTON BLVD RONKONKOMA,NY 11779 Application Name: Receipt No. 160594 Payment Method Ref Number Amount Paid Payment Date Cashier ID Received Comments Check 27486 $400.00 06/04/2019 CLEMON RENEWAL Owner Info.: SUNATION SOLAR SYSTEMS INC 171 REMINGTON BLVD RONKONKOMA, NY 11779 Work Description: Suffolk County Dept.of Labor,Licensing 8 Consumer Affairs MASTER ELECTRICAL LICENSE Name SCOTT A MASKIN Business Name This certifies that the SLINATION SOLAR SYSTEMS INC bearer is duly licensed by the County of suffolk License Number:ME-33412 Fra*k,Na.rde" Issued: 06/24/2003 f Commissioner Expires: 06/01/2021 https://avprod.suffolkeountyny.gov/portlets/fee/recciptV iew.do?mode=view&autoPrint=fals... 6/4/2019 0 New York State Insurance Fund Workers'Compensation&Disability Benefits Specialists Since 1914 199 CHURCH STREET,NEW YORK,NY.10007-1100 CERTIFICATE OF WORKERS' COMPENSATION INSURANCE D D E = AAAAAA 753118816 SUNATION ROOFING SERVICES INC 171 REMINGTON BOULEVARD RONKONKOMA NY 11779 SCAN TO VALIDATE AND SUBSCRIBE POLICYHOLDER CERTIFICATE HOLDER SUNATION SOLAR SYSTEMS INC TOWN OF SOUTHOLD 171 REMINGTON BOULEVARD 54375 ROUTE 25 RONKONKOMA NY 11779 SOUTHOLD NY 11971 POLICY NUMBER CERTIFICATE NUMBER POLICY PERIOD DATE Z2160 670-2 482687 01/01/2019 TO 01/01/2020 3/12/2019 THIS IS TO CERTIFY THAT THE POLICYHOLDER NAMED ABOVE IS INSURED WITH THE NEW YORK STATE INSURANCE FUND UNDER POLICY NO. 2160 670-2, COVERING THE ENTIRE OBLIGATION OF THIS POLICYHOLDER FOR WORKERS' COMPENSATION UNDER THE NEW YORK WORKERS' COMPENSATION LAW WITH RESPECT TO ALL OPERATIONS IN THE STATE OF NEW YORK, EXCEPT AS INDICATED BELOW, AND, WITH RESPECT TO OPERATIONS OUTSIDE OF NEW YORK, TO THE POLICYHOLDER'S REGULAR NEW YORK STATE EMPLOYEES ONLY. IF YOU WISH TO RECEIVE NOTIFICATIONS REGARDING SAID POLICY,INCLUDING ANY NOTIFICATION OF CANCELLATIONS, OR TO VALIDATE THIS CERTIFICATE,VISIT OUR WEBSITE AT HTTPS://WWW.NYSIF.COM/CERT/CERTVAL.ASP.THE NEW YORK STATE INSURANCE FUND IS NOT LIABLE IN THE EVENT OF FAILURE TO GIVE SUCH NOTIFICATIONS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS NOR INSURANCE COVERAGE UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICY. NEW YORK STATE INSURANCE FUND J, C� DIRECTOR,INSURANCE FUND UNDERWRITING VALIDATION NUMBER:453899859 U-26.3 Graham Associates 1981 Union Blvd. Bay Shore,N.Y. 11706 Building Consultants & Expeditors (631)665-9619 Fax(631)969-0115 June 19, 2019 Town of Southold Building Department 54375 Rt. 25 Southold, NY 11971 Re: DeBenedittis Residence 800 Theresa Drive Mattituck, NY 11952 6.205 KW Rooftop Solar Photovoltaic System To Whom It May Concern, Please be advised that I have analyzed the existing roof structure at the above-mentioned premises and have determined that it is adequate to support the additional load of the solar panels and a 130 mph wind load without overstress, in accordance with the following: 2015 International Residential Code (2015 IRC, 2ND PRINTING) + 2017 New York State Uniform Code Supplement (2017 NYSUCS); Town of Southold Local Code, Long Island Unified Solar Permit Initiative, (LIUSPI); and 2014 National Electric Code NFPA 70/2014 National Electric Code including ASCE?-10 If you have:ant's ern questions, do not hesitate to call. c `J ����� ct ® yVex ,fir x �2 ION� Sincerely' i N Michael K D fi?:' UTILITY METER - �mu PLAN KEY SERVICE DISCONNECT ED ON FRT G¢NOUSE-FAGNG STREET DRIVE AY �L�K MAIN SERVICE PANEL- ~E Pv-1 SITE PLAN ' • tl "- WIFI ROUTER- _ !� �a ��.z 9 Z g (E3> A-I PARTIAL LAYOUT VENT PIPE - DATE: B.P.#. INVERTER - (Exr) s n e A-2 ROOF ACCESS PLAN PANEL PHOTOVOLTAIC - El A-3 ENPHASE CIRCUIT DIAGRAM FEE. BY y _ AC DISCONNECTAUE. -® pd . ,A 298`t 1 NOTIFY BUILDING Gf 'ARTtu�[=�I"9URAr RLY SIDE CONNECTION A-4 ATTACHMENT SPACING PLAN SENSE MONITOR ELECTRICAL ONE UNE 765-1802 8 AM TO 4 PM FOR THE EV CHARGER - E-1 DIAGRAM FOLLOWING INSPECTIONS: EXTERIOR LOCATION—cT) L-I LABELING SCHEMATIC 1. FOUNDATION - TWO REQUIRED IST FLOOR LOCATION- (IST) ALTERNATE VENTILATIGN-le`- G-1 PHOTOS FOR POURED CONCRETE BASEMENT LOCATION-w o o 1 ,� 2. ROUGH - FRAMING & PLUMBING GARAGE LOCATION-IG) � SUNatIOn �+ p� ______________ ❑O �O �O O �p p I k` solar a,usname se 3. INSULATION SUNATION SOLAR SYSTEMS ROOF `l; STRUCTURE o 0 0 o I71 REMINGTON BLVD 4. FINAL - CONSTRUCTION MUST ROOF I RONKONKOMA NY IITl9 RAFTER /SPACING 2" X 8°/I6" OC BE COMPLETE FOR C.O. wc 0 ❑o � o Q Q ❑o ACTUAL SPAN 11'-I 5" ALL CONSTRUCTION SHALL MEET THE L NSTAI IE REQUIREMENT.. F THE CODES OF NEW � i �� /1\ INSTALLER SHEATHING PLYWOOD �� . NUMBER YORK STATE. NO ESPONSIBLE FOR -FENCE CUSTOMER INFO COLLAR TIES:2" X 8" /48" O C DESIGN OR CONSTRU N ERRORS. DEBENEDITTIS RESIDENCE TYPE / LAYERS:ARCH. ASPHALT I 1L 800 THERESA DR RIDGE 11-45 �t,1.®� a COMPLY WITH ALL CODES OF MATTITUCK 11952 ENPHASE HARDWARE / QTY. PHOTOVOLTAIC ���,L ica, 1 Vea. NEW YORK STATE TOV�II�IN CODES iceNUM15ER ENPHASE IQIPLUS•11 Q-SEAL-10'I �� AS REQUIRED A t ajo ENVOY NIA Q-DISC-10)NIA e� �O DATE COMB. W/ ENVOY I Q-CONN-10F 3 SO 43A ro.1�.19 1-TERM-10 1 0-CONN-10M N/A �,I1����I/±±®�I/�� 0-12-20-240 NIA Q-12-10-240.21 RAIL I�WII>i`7�y Joe Notes COASTAL LOCATION,USE 48'" RAFTER FENCE— S SPACING SNAP N' RACK HARDWARE / QTY. 2"X 8" /I6"O C MI. KITS'11 L-FEET'32 168" RAIL'9 LUGS'2 SOFFIT ACTUAL SPAN �� FULL HOUSE ROOF PLAN t RAIL SPLICES 8 8"X100'SCREEN I MID CLAMPS'30 U-ANCHORS*32 EMEROR WALL \, SCALE: N T.S RETAIN STORM WATER RtJNOF END CLAMPS-8 PITCH POCKETS'NIA ROOFSCALE'N T S P) SECTION PURSOAIIT TO CHAPTER 23 FASTENER REQUIREMENTS' BUILDING REVIEW NOTE NOTES OF THE TOWN CODE. TOTAL ARRAY AREA=366 SF TOWN BUILDING PLANS EXAMINER HAS RECEIVED THE I. AN 18" WIDE CLEARING(FREE OF SOLAR WIND LOAD ASCE 10(SEE CALCULATIONS, THIS SHEET)41.5 ENCLOSED DOCUMENT FOR MINIMUM ACCEPTABLE EQUIPMENT)SHALL BE PROVIDED ALONG AT PLAN SUBMITTAL REQUIREMENTS OF THE TOWN AS LEAST ONE SIDE OF THE ROOF RIDGE ON THE PSF MAX SPECIFIED IN THE BUILDING AND/OR RESIDENTIAL SAME SIDE AS THE SOLAR EQUIPMENT OR ON LG MODEL MONOX LG365QIC-v5 TOTAL UPLIFT=41.5 PSF X 366 SF=15,189 LBS CODE OF THE STATE OF NEW YORK THIS REVIEW ANOTHER SIDE OF THE RIDGE THAT DOES NOT ADDITIONAL MATERIALS 365 WATT EA DOES NOT GUARANTEE COMPLIANCE WITH THAT CODE HAVE SOLAR EQUIPMENT ON IT SUFFICIENT I N/A 66.9"L X 40'W X 1.6'D, 18 58 FTZ FASTENER' THAT RESPONSIBILITY IS GUARANTEED UNDER THE ACCESS PATHWAYS,ROOF ACCESS POINTS, AND 40.19#/MODULE (2 2#/SF)06/2018 SEAL AND SIGNATURE OF THE NEW YORK STATE GROUND ACCESS AREAS SHALL BE PROVIDED IN LAG SCREW SPEC 203 2, 8/04' (FLAT WASHERS REQUIRED TO BE USED WITH LAG LICENSED DESIGN PROFESSIONAL OF RECORD THAT ACCORDANCE WITH THE 2015 IRC AND 2011 NYS MODULE (IT) 1BOLTS) SEAL AND SIGNATURE HAS BEEN INTERPRETED AS AN USG TO ALLOW FOR RIDGE VENTILATION MICRO INVERTER51 Cn)IQIPLUS-PLus-72-v5-2-us BRANCH#1 p ICI X9) LAC,BOLT WITHDRAWAL VALUE, 5/16" DIA,266 L8/IN X 2-INCH THREAD DEPTH = ATTESTATION THAT, TO THE BEST OF THE LICENSEE'S 2. ROOF SHALL HAVE NO MORE THAN A SINGLE BRANCH#2 b1(1 x8) 5321_15 CAP EACH BELIEF AND INFORMATION THE WORK IN DOCUMENT IS- LAYER OF ROOF COVERING IN ADDITION TO THE BRANCH#3 N/A MINIMUM NUMBER OF LAG BOLTS REQUIRED=15,189 L15S /532 L59/LAG BOLT =29 . ACCURATE 50LAR EQUIPMENT DRAWN BY RACKING SNAP'N'RACK-ULTRA RAIL TOTAL RAIL FEET=126'-0"RAIL FT 125 BOLTS=4'-4" . CONFORMS WITH GOVERNING CODES APPUCABLE 3. INSTALLATION OF SOLAR EQUIPMENT SHALL BE PACKAGE STANDARD MAXIMUM SPAN BETWEEN MOUNTING FEET BOLTS"X"USE 4-4" MAX AT THE TIME OF THE SUBMISSION FLUSH-MOUNTED,PARALLEL TO AND NO MORE JAYSON MORALES SYSTEM RATING(DC) 6205 KW o CONFORMS WITH REASONABLE STANDARDS OF THAN 6-INCHES ABOVE THE SURFACE OF THE REVISION EST PRODUCTION(AC) 6,314 KWH/YR PRACTICE AND WITH VIEW TO THE SAFEGUARDING ROOF DATE DESIGNER NOTE EST PRODUCTION SOURCE SUNATION PRODUCTION CALCULATOR OF LIFE, HEALTH, PROPERTY AND PUBLIC 4 WEIGHT OF THE INSTALLED SYSTEM SHALL NOT SPECIAL ATTACHMENTS ❑Q (32)PITCH-POCKETS WELFARE 15 THE RESPONSIBILITY OF THE LICENSEE EXCEED MORE THAN 5-PSF XXXXXX N/A N/A 5 ANY PLUMBING VENTS ARE NOT TO BE CUT OR XX XX XX N/A N/A STRUCTURAL STATEMENT COVERED FOR SOLAR EQUIPMENT INSTALLATION xx xx xx NIA N/A ANY RELOCATION OR MODIFICATION OF THE VENT CLIMATIC I GEOCaRAPHIC DESIGN CRITERIA - TABLE 8301.20) THE EXISTING STRUCTURE IS ADEQUATE TO SUPPORT REQUIRES A PLUMBING PERMIT AND INSPECTION XXxxx N/A N/A THE NEW LOADS IMPOSED BY THE PHOTOVOLTAIC scALE f] WIND DESIGN SUBJECT TO DAMAGE MODULE SYSTEM INCLUDING UPLIFT I SHEAR THE w EXISTING RAFTER SIZES I DIMENSIONS CONFORM TO N.T.S. w1No WIND ICE THIS PV SYSTEM HAS BEEN DESIGNED TO MEET THE SPECIAL SEISMIC CLIMATE FROST WINTER AIR MEAN IRC-2015 TABLE 8802.5(1)-RAFTER SPANS MINIMUM DESIGN STANDARDS FOR BUILDING AND GROUND SPEED TOPOGRAPHIC WIND EXPOSURE BORNE DESIGN WEATHERING 11NE TERMITE DESIGN BARRIER FLOOD FREEZING ANNUAL TITLE SITE PLAN SNOW LOAD (MPH) EFFECTS CATEGORY DEBRIS ZONE UNDERLAYMENT HAZARD REGION ZONE CATEGORY DEPTH TEMP REOUIRED INDEX TEMP MOUNTING BRACKETS AND HARDWARE MEET OR OTHER STRUCTURES OF THE ASCE 1-10, IRC 2015 MOD SEE EXCEED NEW YORK STATE CODE REQUIREMENTS FOR AND NEW YORK STATE UCS 2011 P � 20 PSF 136 B YES C 2 C 4A SEvERE 3-0" TO 15 DEG NA PLANS 55S 51 THE DESIGN CRITERIA OF THE TOWN HEAVY EXAMINER N. RIDGE SUNation �' t �' Solas®s it 6houltl be SU14ATIM SOLAR SYSTEMS Ill REMINGTON BLVD. AiA2 /�3 RONKONKOMA NY 11119 / r� NYSERDA4355 SNAP N RACK SYSTEM INSTALLER NUMBER (TYPICAL RAIL ACROSS IV IV v v I v ��-v V. �-v EACH ROW OF ARRAY) CUSTOMER INFO DEBENEDITTIS RESIDENCE (ONLY TWO SHOWN FOR CLARITY) FA VENT PIPE see THERESA OR � /-2"0 PVC - MATTITUCK W552 2° SPACING �J JOB NUMBER BETWEEN Rows O O O 1910810 DATvvvvE PHOTOVOLTAIC 1 10.18.19 MODULE (TYP.) JOB NOTES I NIA Eo,1 ROOF AREA VET PIPE S 1 X O o PVC N VENT PIPE _ 2„0 Pvc W- a A6 ADDITIONAL MATERIALS (l) BOH UPPER WEST ROOF GUTTER u I NIA 21o0° TRUE; 100 TILT; 2/12 PITCH Cl 1) MODULES DRAWN BY TAMMY LEA REVISION DATE DESIGNER NOTE 61819 JIM FINAL PARTIAL HOUSE ROOF PLAN XXXXXX N/A N/A _ XXXX N/A N/A SCALE' 1/4” - 1'e" XXxxxx NIA I N/A SCALE 1/4 It — 1 TITLE PARTIAL LAYOUT APPROVED 5Y: ' A l 1'Ai 9C�i FRONT OF HOUSE—FACING STREET DRIVEWAY 41 +a Ir fprG J ~, ROOF v.- SUNation so�a.a,n.eowae< SUNATION SOLAR SYSTEMS ALTERNATE VENTILATION-18"- Ill REMINGTON BLVD RONKONKOMA RY 11115 NI NYSERDA V,V—J \\YVV N TALLER NUMBER 4355 ____________________ ❑O E �O O lfl �O O u CUSTOMER INFO 0 0 0 0 o DEBENEDITTIS RESIDENCE v v 800 THERESA DR ❑o ❑O ❑O O ❑O ❑o ❑o (11)PV MODULES MATTITUGK 11952 JOB NUMBER _ 19ro8�o ° DATE ° 6.18.19 NOTES I NIA FENCE ACCESS ROOF A ROOF SURFACE WHICH PROVIDES ACCESS TO THE RIDGE OR PEAK OF AN ADJOINING ROOF SURFACE CONTAINING SOLAR PANELS,MODULES OR ARRAYS AND IS I. RELATIVELY FREE OF VENTS, SKYLIGHTS AND OTHER OBSTRUCTIONS AND 2 DOES NOT CONTAIN SOLAR PANELS,MODULES OR ARRAYS,OR IS A SINGLE RIDGE ROOF WHERE THE TOTAL EDGE WIDTH OF THE SOLAR PANELS,MODULES OR ARRAYS DOES DRAWN BY NOT EXCEED 33 PERCENT OF THE RIDGE LENGTH TAMMY LEA R3241 ACCESS AND PATHWAYS-ROOF ACCESS, PATHWAYS AND SPACING REQUIREMENTS FOR SOLAR PHOTOVOLTAIC SYSTEMS SHALL BE PROVIDED IN ACCORDANCE WITH SECTIONS R32411 THROUGH R32416 REvISION DATE DESIGNER NOTE R32414 SINGLE RIDGE ROOFS-PANELS,MODULES OR ARRAYS INSTALLED ON ROOFS WITH A SINGLE RIDGE SHALL BE LOCATED IN A MANNER THAT PROVIDES TWO 36 INCH WIDE(914MM)ACCESS PATHWAYS EXTENDING FROM THE ROOF ACCESS POINT TO THE RIDGE ACCESS PATHWAYS ON OPPOSING ROOF SLOPES SHALL NOT BE 61819 J M FINAL LOCATED ALONG THE SAME PLANE AS THE TRUSS,RAFTER OR OTHER SUCH FRAMING SYSTEM THAT SUPPORTS THE PATHWAY xxxxxx NIA NIA EXCEPTIONS) XX XX xx NIA NIA I. ROOFS WITH SLOPES OF 2 UNITS VERTICAL AND 12 UNITS HORIZONTAL(I.&f.PERCENT)AND LESS 2. STRUCTURES WHERE AN ACCESS ROOF FRONTS A STREET, DRIVEWAY OR OTHER AREA READILY ACCESIBLE TO EMERGENCY RESPONDERS XXXxXX NIA NIA 3 ONE ACCESS PATHWAY SHALL BE REQUIRED WHEN A ROOF SLOPE CONTAINING PANELS,MODULES OR ARRAYS I5 LOCATED NOT MORE THAN 24 INCHES(610MM) SCALE VERTICALLY FROM AN ADJOINING ROOF WHICH CONTAINS AN ACCESS ROOF N.T.S. R32411 ALLOWANCE FOR SMOKE VENTILATION OPERATIONS-PANELS AND MODULES SHALL NOT BE LOCATED LESS THAN IS INCHES(451 MM)FROM A RIDGE OR PEAK TITLE ROOF ACCESS PLAN EXCEPTION(S) 1. WHERE AN ALTERNATIVE VENTILATION METHOD HAS BEEN PROVIDED OR WHERE VERTICAL VENTILATION METHODS WILL NOT BE EMPLOYED BETWEEN THE UPPER MOST PORTION OF THE SOLAR PHOTOVOLTAIC SYSTEM AND THE ROOF RIDGE OR PEAK 2 DETACHED GARAGES OR ACCESSORY STRUCTURES A=2 FRONT OF HOUSE— FACING STREET, DRIVEWAY Ste. UM (EXT.) n IQ S == SUNation ACCESS I War as a awme ne ROOF SUNATION SOLAR SYSTEMS III REMINGTON BLVD RONKONKOMA N.Y.HITS NSTAI I E 4.3 E)=..) INSTALLER NUMBER CUSTOMER INFO DEDENEDITTIS RESIDENCE ALTERNATE VENTILATION— 18' — 800 THERESA OR MATTITUCK 11952 _ JOB NUMBER 0 ED Y 19686 DATE ————————————————————————————— 6.18.19 NOTES A/\L I N/A 0 0 CIRCUIT 2 CIRCUIT I DRAWN IIY JAYSON MORALES REVISION DATE DESIGNER NOTE XxXXXX NIA NIA XX>oc NIA NIA XX.XX NIA N/A XX.XX.Xk NIA N/A SCALE N.T.S. FENCE TITLE ENFHASE CIRCUIT DIAGRAM A=3 o h`I I-- RIDCxE 4,_3Y„ 4, , d' �, 4, 2,_8„ Z,_8„ Z,_8„ �'_y�" SUNation 2 I 5me,.111 e..1d ea SUNATION SOLAR SYSTEMS O O O O O O RONKONKOMANN YL ID 9 NSTAIIE 4355 INTALLER NUMBER CUSTOMER INFO DE5ENEDITTIS RESIDENCE 800 THERESA DR MATTITUGK 11952 JOB NUMBER F<61 El ❑ 1§1 El El O 19108(0 DATE NOTES I NIA (o'-I IY" l°1 1 (O, (1) BOH UPPER WEST ROOF GUTTER 2600 TRUE; 100 TILT; 2/12 PITCH (1-1) MODULES DRAWN BY JAYSON MORALES REVISION DATE DESIGNER NOTE PARTIAL HOUSE ROOF PLAN XX>00cx NIA NIA SCALE: 1/�4" = , „ 18XXXXXX N/A N/A \ XX.XXX NIA NIA XXXXXX NIA NIA SCALE N.T.S. TITLE ATTACHMENT SPACING A=4 UTILITY SERVICE, I� { f SUNation 1 2 8 S SUPPLY SIDE somr n.rt:nowd ee CONNECTION SUNATION SOLAR SYSTEMS • tj Ill REMINGTON BLVD MENPHASE RONKONKOMA NY 11719 ICRO VERTER YSEROA YP) NSTAIIE INSTALLER MODULE J-BOX PLAQUE PLAQUE NUMBER (TTP.) SERVICE DISCONNECT SERVICE DISCONNECT 10 COMBINER PANEL 2 OF 2 I OF 2 CUSTOMER INFO STRING (ACTIVATES RAPID SECOND DISCONNECT PV MODULE ATTIC ENPHASE ENVOY SHUTDOWN) LOCATED NEM TO DEBENEDITTIS RESIDENCE (TYP) 'MO"TO— RIMARY 015CONNECT 200A METER PAN STRING OF ROOF MOUNTED 2 LOCATED IN MAIN MAIN I 800 THERESA DR (9)LG36501C-V5 MODULES W/ 50LADECK SERVICE PANEL (9)ENPHASE IQIPLUS-12-2-US 2120A MATTITUGK 11952 1 2 MICRO-INVERTERS IN PARALLEL 8 /1 JOB NUMBER 2P 20A ENCLOSURE • SERVICE RATED ..Il[7VlD 2P 20A 40A MIN.60A DATE r------- — ----- — ---- -- —� OCPO MIN. 22K AIG I I NOTES II L_ I I 3 __ __�__ _____ __ _� _ _� MAIN9ERVIGE 1 N/A • I EXTERIOR WALL I PANEL STRING 2 I I _1 4 6 I STRING (8)LG36MODULES ODULE5 W/ _ (8)ENPHASE 10'IPLUS-12-2-U9 EGG ATTACHED MICRO-INVERTERS IN PARALLEL TO RAIL(TYP) BUILDING GROUNDING ELECTRODE CONDUIT AND CONDUCTOR SCHEDULE TAG DESCRIPTION OR CONDUCTOR NUMBER OF CONDUIT CONDUIT RUN CONDUCTOR TYPE GAUGE CONDUCTORS TYPE SIZE LENGTH I ENFHASE Q-CABLE 12 4 N/A N/A 5' 2 TYPE NM 10 4 N/A N/A 40' 3 HWN-2 10 4 PVC SCH. 80 1.25" IS' GC/GEC 6 I PVC SCH. 80 1.25" 18, 4 HWN-2 10 3 PVC SCH. 80 1.25" 5' GC/GEC 6 I PVC SCH. 80 1.25" 5' 5 HWN-2 6 3 PVC SCH. 80 1.25" 5' DRAWN BY 6 EC 6 1 PVC SCH. 80 0 50" 5' �—IIYSON MORALES SCALE N.7.�. TITLE ONE—LINE DIAGRAM E- 1 SUNation TAG LABEL QTY. LOCATION NOTE EXAMPLES SUNATION SOLAR SYSTEMS Ill REMINGTON BLVD RONKONKOMA N.Y.11119 q2-314.2014NEC O8031(0)(3) O 12 DG CONDUITS 1 A EVERY SEPERATION BY ENCLOSURES/WNY5ERDA ,L/,L/ ALLS/ 43` ` `I f f' f PARTITIONS/CEILINGS/FLOORS OR NO MORE THAN I e" O _..c. I N TAI I ER 40 -C '-,) tN• r CUSTOMER INFO DO NOT DISCONNECT I SPLICE/COMBINER 1 A ANY COMBINER BOX IF USED DEBENEDITTIS RESIDENCE UNDER L= 800 THERESA DR I MATTITUCK 11952 • • • • 1 • ----- --- JOD NUMBER CIRCUIT I WNM� 1*41.,s W� 19(p$rp TSD•l1�� _ DATE . . • sss CIRCUIT 2 SUN,�c.S 6.18.19 240. _ 750.94 NOTES I OF EACH fl AC DISCONNECT I NIA © 2 SOURCE CIRCUITS COMPLETE VOLTAGE AND CURRENT VALUES ON m • DISCONNECT LABEL AS NEEDED 4 . 108102 2014 NEC 89017(E) ° f • WARNING I AC SERVICE I OF EACH A FUSED AC DISCONNECT c',t�REU,c��,Cy . O ELECTRIC SHOCK AZARD DISCONNECTING COMPLETE VOLTAGE AND CURRENT VALUES ON ?� IX of oowottala+rEwwlus MEANS DISCONNECT LABEL _;,.,,,.., nmwva ON NTM THE L•E•1C y LOM fOE9►Mr ff EM9101?'fD N lFf3 OPEN NIBIlk11 ~v' I � X29817 1 Ca chis B,lilding..qui an - ,n•rpnnscleo Litimic Powol Plodudlon Source `s fob!Mw1•Vlrl!•b - - - �nWLiiGY1L In. Ih•re 1.14 O •ter, + I MAIN DISCONNECT I OF EACH A BUILDING MAIN DISCONNECT PANEL PANEL D ;ThisBuHdi-nq Is s-"44Wed wNh an Cpo EJears:Power DRAWN BYucibn Soule• JAYSON MORA 5'o.al� I UTILITY METER 1 0 PSEQG UTILITY METER E sCALE �'. N.T.S. •....w•..•.1..at.•.+ TITLE LABELING SCHEMATIC .2A,-700-BW M L- 1 SUN.ition .NATION SOLAR SYSTEMS Ill REMINGTON BLVD RONKONKOMA N.Y 11lT9 `+ ,s NYSERDA 4355 355 + ' I. �.. ./'. � > `.• (NUMBER CUSTOMER INFO DEBENEDITTIS RESIDENCE ♦ � 800 THERESA DR MATTITUCK 11552 - ,l„ �+`,R' R j_•" f �. i 1 \..��.e `t` :\ - Fp JOB NUMER F' DATE 6.18.19 a NOTES I N/A �. InII'uI lam- or ARRAY LOCATIONS ARRAY LOCATIONS SATELLITE IMAGE VIA GROUND VIA ROOF QAC, �PEL K. VIM DRAWN By .a •h', JATSON MORALES SCALE N.T.S. SOUTH VIEW PROPOSED EXISTING METER TITLE PHOTOS VIA ROOF EQUIPMENT LOCATION AND MDP G- 1 LG Life's Good i LG Ne®N° R ,. LG NeONO R is new powerful product with global top level performance Applied new cell structure without electrodes 60 cell on the front,LG NeONO R maximized the utilization of light and enhanced Its reliability LG NeONO R demonstrates LG's pVE UL USC E ,� '4 efforts to Increase customer's values beyond efficiency It �. features enhanced warranty,durability,performance under real environment,and aesthetic design suitable for roofs Enhanced Warranty Go High Power Output LG now offer 25 years product warranty to accommodate i The LG NeON(9 R has been designed to performance warranty as well LG NeON®R has an significantly enhance its output making it efficient enhanced performance warranty After 25 years,LG even in limited space NeONO R is guaranteed at least 87 0%of initial performance Aesthetic Roof ® Outstanding Durability LG NeON®R has been designed with aesthetics in With its newly reinforced frame design,LG mind no electrode on the front that makes new NeON©R can endure a front load up to 6000 Pa, product more aesthetic LG NeONO R can increase and a rear load up to 5400 Pa the value of a property with its modern design • Better Performance on a Sunny Day Near Zero LID (Light Induced Degradation) LG NeONO R now performs better on a sunny The n-type cells used in LG NeONO R have days thanks to its improved temperature coefficient almost no boron,which may cause the initial L performance degradation,leading to less LID About LG Electronics LG Electronics is a global player who has been committed to expanding its capacity,based on solar energy business as its future growth engine We embarked on a solar energy source research program in 1965, supported by LG Group's rich experience in semi-conductor,LCD,chemistry,and materials industry We successfully released first Mono X®series to the market in 2010,which were exported to 32 countries in the following 2 years,thereafter in 2013,NeON—(previously known as Mono X®NeON)&2015 NeON2 with CELLO technology won"Intersolar Award",which proved LG is the leader of innovation in the industry t T LG NeONO R .• Mechanical Properties Electrical Properties(STC*) Cells 6 x 10 Module 365 360 355 350 Cell Vendor LG Maximum Power(Pmax) 365 360 355 350 Cell Type Monocrystalllne/N-type MPP Voltage(Vmpp) 367 365 363 361 Cell Dimensions 161 7 x 161 7 mm/6 inches MPP Current(Impp) 995 987 979 970 Dimensions(L x W x H) 1700 x 1016 x 40 mm Open Circuit Voltage(Voc) 428 427 427 427 66 93 x 40 0 x 1 57 Inch Short Circuit Current(Isc) 108 1079 1078 1077 Front Load 6000Pa Module Efficiency 21 1 208 206 203 Rear Load 5400Pa Operating Temperature -40-+90 Weight 18 5 kg Maximum System Voltage 1000 Connector Type MC4 Maximum Series Fuse Rating 20 Junction Box IP68 with 3 Bypass Diodes Power Tolerance(%) 0-+3 Length of Cables 1000 irm x 2 ea *STC(Standard Test Condition)Irradiance 1,000 W/m',Ambient Temperature 25°C,AM 1 5 Glass High Transmission Tempered Glass 'The nameplate power output is measured and determined by LG Electronics at its sole and absolute discretion * Frame Anodized Aluminium The typical change in module efficiency at 200 W/m'in relation to 1000 W/m'is-2 0% Electrical Properties(NOCT*) Certifications and Warranty Module 365 360 355 350 Certifications IEC 61215,IEC 61730-1/-2 Maximum Power(Pmax) 275 271 267 263 UL 1703 MPP Voltage(Vmpp) 366 364 362 360 IEC 61701(Salt mist corrosion test) MPP Current(Impp) 751 745 739 732 IEC 62716(Ammonia corrosion test) Open Circuit Voltage(Voc) 402 402 402 401 ISO 9001 Short Circuit Current(Isc) 870 869 868 867 Module Fire Performance(USA) Type 1 •NOCT(Nominal Operating Cell Temperature)Irradiance 800 W/m=,ambient temperature 20°C,wind speed 1 m/s Fire Resistance Class(CANADA) Class C(ULC/ORD C1703) Product Warranty 25 years Output Warranty of Pmax Linear warranty** Dimensions(mm/in) **1)First 5 years 95%2)After 5th year 0 4%annual degradation,3)25 years 870V. Temperature Characteristics NOCT 44 t 3°C Pmpp -0 30%/°C Voc -0 24%/°C Isc 0 04%/°C Characteristic Curves 0 (•1 a100ow a�zrom�, 1000RQQW i•.moi'"' 800 J 600 600 \aoo 400 ve. 400 200 — Voltage(V) 2 i 000 500 1000 1500 2000 2500 3000 3500 4000 4500 gi 81 ,8.` 0 140 120 - E �— -_ --- - - isc a - too 80 Pmai- 60 --- - -_- - - -- _ 40 B 20 - 0 Temperature(°C) -40 -25 0 25 50 75 90 The distance between the center of the mounting/grounding holes North Amenca Solar Business Team Product specifications are subject to change without notice io%121'LG LG Electronics USA Inc DS-T1-72-W-G-P-EN-60630Life's Good 1000 Sylvan Ave,Englewood Cliffs,N107632 Copyright©2017 LG Electronics All rights reserved Innovation for a Better LifeContact Igsolar@a Igecom 01/01/2017 www Igsolarusa com Enphase Microinverters AM[ RIC"A'S SUN The high-powered smart grid-ready Enphase Enphase IQ 7X Micros'' dramatically simplifies the IQ 7X Microinverter installation process while achieving the highest system efficiency for systems with 96-cell modules. Part of the Enphase IQ System,the IQ 7X Micro integrates with the Enphase IQ Envoy", Enphase IQ Battery', and the Enphase EnlightenT" monitoring and analysis software. The IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install • Lightweight and simple • Faster installation with improved,lighter two-wire cabling • Built-in rapid shutdown compliant(NEC 2014&2017) Efficient and Reliable • Optimized for high powered 96-cell*modules • Highest CEC efficiency of 97.5% Q More than a million hours of testing Class II double-insulated enclosure • UL listed Smart Grid Ready • Complies with advanced grid support,voltage and frequency ride-through requirements • Remotely updates to respond to changing grid requirements • Configurable for varying grid profiles • Meets CA Rule 21 (UL 1741-SA) UL *The IQ 7X is required to support 96-cell modules ENPHASE• To learn more about Enphase offerings,visit enphase.com Aphase IQ 7X Microinverter ,- Y INPUT DATA(DC) IQ7X-96-2-US and IQ7X-96-B-US mmonly used module pairings' _ __320`W-460 W+ -Co Module compatibility 96-cell PV modules Maximum input DC voltage 79.5 V Peak power tracking voltage 53V-64V Operating range 25 V-79.5 V Min/Max start voltage 33 V/79 5 V Max DC short circuit current(module Isc) 10A Overvoltage class DC port II DC port backfeed current 0 A PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA(AC) @a 240 VAC (a 208 VAC Peak output power 320 VA Maximum continuous output power 315 VA Nominal(L-L)voltage/range2 240 V/211-264 V 208 V/183-229 V Maximum continuous output current 1.31 A(240 VAC) 1 51 A(208 VAC) Nominal frequency 60 Hz Extended frequency range 47-68 Hz AC short circuit fault current over 3 cycles 5.8 Arms Maximum units per 20 A(L-L)branch circuit3 12(240 VAC) 10(208 VAC) Overvoltage class AC port III AC port backfeed current 18 mA Power factor setting 1.0 Power factor(adjustable) 0 85 leading. 0 85 lagging EFFICIENCY @240 VAC @208 VAC CEC weighted efficiency 97.5% 97.0% MECHANICAL DATA Ambient temperature range -40°C to+60°C � Relative humidity range 4%to 100%(condensing) Connectortype(IQ7X-96-2-US) MC4(or Amphenol H4 UTX with optional Q-DCC-5 adapter) Connectortype(IQ7X-96-B-US) Friends PV2,may require adapters for modules with MC4 or UTX connectors, -PV2 to MC4:order ECA-S20-S22 -PV2 to UTX:order ECA-S20-S25 Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2 38 lbs) Cooling Natural convection-No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor FEATURES Communication Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options Compatible with Enphase IQ Envoy Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690 12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according manufacturer's instructions. 1.No enforced DC/AC ratio.See the compatibility calculator at https•//Qnpbase,gpmlo�n_u4/sugpprtlrpoduLe-QoMpatibliity. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings,visit enphase.com EN PHAS Ea V 2018 Enp'ase Energy All rights reserved All trademarks or brands used a-e the property of Enphase Energy,Inc 2018-11-19 Entire Mounting System from �e Snap-in features make the Single Manufacturer under 1 install process intuitive and Warranty fast Industry Leading Technical The Most Comprehensive UL Support Services for Every V(, 2703 Listing in the Industry Customer t43Llt r=n., NT• • IL The top-of-the-line features of the SnapNrack mounting system reduce install times and labor cost while eliminating the need for service calls creating the lowest install lifecycle cost of any mounting system. Wire Management . : 11vilil— • Products such as the standard rail channel keep wires neatly organized providing a clean finished look to every install - Industry's largest offering of wire management accessories include snap in junction box, 4-wire and trunk cable clamps, as well as conduit clamps for both composition shingle and tile roofs. Undeniable Aesthetics • Render the mounting system invisible by using Universal End Clamps that fasten modules while remaining hidden underneath the array • Array skirt provides a sleek look and attractive design to the front of the array • Rail-based system provides rigid structure tucked away underneath array with no unsightly mounts at the top or bottom 'Quality. Performance , Innovation . , SnapNrack solutions are focused on simplifying the installation experience through intuitive products and the best wire management in the industry. SnapNrack Solutions . • www.snapnrack.com • Snap rack- Series 100 Solar Mounting Solutions Flashed L Foot Reliable & Weatherproof Roof Attachment Cutting of' shingles not Preassembled, snap-in required hardware reduces installation time Single tool installation, using Included in Series 100 UL • . • 1/2" socket ° 2703 RESOURCES snapnrack.com/resources DESIGN snapnrack.com/configurator WHERE TO BUY snapnrack.com/where-to-buy t SnapNrack Series 100 Flashed L Foot Kit is an industry-leading, weatherproof solution for attaching to composition shingle roofs. The Flashed L Foot provides a fully flashed method for mounting the SnapNrack Series 100 system. The combination of Series 100 and the Flashed L foot is guaranteed to improve labor times and ensure the highest quality install possible. Flashing • Available in black galvanized steel or aluminum for enhanced corrosion resistance • L Foot is attaches to bottom edge of flashing, removing the need for shingle cutting • Innovative stamped features provide increased rigidity L Foot • Engineered for maximum adjustability with the ability to orient in any direction • Vertical adjustability up to 3" using available spacers fir; .- L Foot Base • Provides a long lasting watertight seal over the life of the system that does not rely on rubber (elastomeric seals) that will degrade over time _ , • Easily installs with off-the-shelf lag screws Channel Nut Provides snap-in installation to the rail channel with no 4 drilling required 1 Wide range of adjustability due to sliding ability in rail prior to final tightening Quality. Performance . Innovation . 1 SnapNrack solutions are focused on simplifying the installation experience through intuitive prod- • thebest wire management • Solar Mounting Solutions • 2016 . - - -.