Loading...
HomeMy WebLinkAboutTR-9543 Glenn Goldsmith, President *0 SO Town Town Hall Annex --- — -- - A.Nicholas Krupski,Vice President ,`O — �� - - - — 54.O. Bo 11 25. -- P.O. Box 1179 John M. Bredemeyer III l�[ Southold,New York 11971 Michael J.Domino G Telephone(631) 765-1892 Greg Williams �� Fax(631) 765-6641 COUNTI,� BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE # 1791C Date: JanuqM 26, 2021 THIS CERTIFIES-that the removal of approximately 130 feet of existing'wood sheathed -bulkhead,whalers top cap tie rods and 8" diam pilings Dispose of offsite. Install approx.130 lin feet of new vinyl (medium weight)bulkhead consisting of two (2) 6"x 6"whalers, one(1) 4"x 6"back board IPE top cap 8" diam pressure treated pilings 6 feet O.C. w/%" galy. steel tie rods connected to 8"thick retaining wall w/3/8"x 6" square steel back plate Construct new four(4 `)wide dock seaward from existing dock(El 7.39')w/a two tread staircase to El. 5.5', a distance of 64 feet w/nine (9)•sets of 8"pressure treated pilings @ 8.feet O.C. (256 S.F.). Construct right angle dock section four(4')in width @ 32 feet in length w/four(4) sets of 8" pressure treated pilings (128 SX).Install a 3'x 8' aluminum removable ramp (24 S.F.), Construct and install a 6'x 20 ` floating dock w/two (2) 10"pressure treated pilings and one (1) batter piling w/(2) 10"pressure treated_pilings. (120 S F) Install four(4)batter pilings' consisting of(2) 10"pressure treated pilings Decking for new fixed dock sections and floating dock to be 5/4"x 6"IPE wood w/stainless steel screw fasteners Total new fixed dock,ramp and floating dock: 432 S F Remove 562.5 S F of existing wood decks w/staircases and replace w/ pressure treated wood framing and IPE wood decking w/stainless steel screw fasteners. Remove 596.3 S F of remaining walkways and staircases and replace w/pressure treated wood framing' and IPE 'wood treads w/stainless steel screw fasteners Remove 436 S.F. of existing wood walkway/deck w/wood retaining wall and piers and replace w/223 lin. ft.+/- of 8"-concrete retaining walls w/footings filled w/gravel and topped w/ 1 1/2" -2"peastone O/E for pervious walkway/deck area Existing deck is 44ft in length x 4 ft in width (176 SF)with a wood bench (2ft x 8.5 ft(17 SF) for a total of 193 SF The connecting�staircase is proposed to be removed and replaced as part of the wood decks walkways and staircases replacements. (part of 396 SF above).Reframe deck beams to'fasten'replacement decking of 5/4"x 6' IPE wood with stainless steel screw fasteners Note: overall existing fixed deck(193 SF)plus proposed fixed deck extension ramp and floatingdock(432 SF) is 625 SF; remove two (20 8" and 20" caliper trees at the base of the existing bulkhead and between the new proposed bulkhead and concrete retaining wall Replace with four(4) 31/2"-4"caliper Bloodgood Sycamore trees planted along the mace between the new retaining wall and bulkhead; At 1240 Inlet Lane Extension, Greenport Suffolk County Tax Map#1000-36-2-24 - --- - - --- --- - - ------- ------ - - - Conforms to the application for a Trustees Permit heretofore-filed in this office Dated May 31, 2019 pursuant to which Trustees Wetland Permit#9543 Dated September 18, 2019,was issued and conforms to all the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the removal of approkimately 130 feet of ekisting wood sheathed bulkhead whalers,top cap, tie rods and 8"diam pilings Diose of offsite Install approx.130 lin. feet of new vinyl (medium weight)_bulkhead consisting of two (2) 6"x 6"Whalers,one (1)4"x 6"back board, IPE top cap 8"diam `pressure treated pilings(ate 6 feet O C w/��4" alv steelie rods comYected -- ----- to 8"thick retaining wall w/3/8"x 6" square steel back plate Construct new four(4 `)wide dock seaward from,existing dock(EL-7.39')39')w/a two tread-staircase to El. 5.5' a distance of 64- feet w/nine(9) sets of 8"pressure treated pilings na 8 feet O C (256 S F.). Construct right angle dock section four(4') iri width,@ 32 feet in length w/four 4) sets of 8"pressure treated pilings. (128 S F) Install a 3'x 8' aluminum removable ramp(24 S.F.), Construct and install.a 6'x 20 ` floating dock w/two (2) 10"pressure treated pilings and one (1)batter piling w/(2) 10" pressure treated pilings (120 S F) Install four(4)*batter pilings consisting of(2) 10"pressure treated,pilings. Decking for new fixed dock sections and floating dock to be 5/4 "x 6"IPE,wood w/stainless steel screw fasteners Total new fixed dock ramp and floating dock: 432 S.F. Remove 562.5 S.-F of existing-wood decks w/,staircases and replace w/pressure treated wood framing and IPE wood deckirigw/stainless steel screw fasteners. Remove 396.3 S.F. of remaining walkways and "staircase"s and re�lace w/pressure treated wood,framing and,IPE:wood_ treads w/stainl'e'ss steel`'screw`fasteners Remove 436'S.F of existingwood y�alkwav/deck,W/ 'wood`reta ng wall=and piers`and replace w/223 lin ft+/-of 8" concrete retainuia.wald c footiri s filled w/gt�avel-&idtopped-w/ 1 1/2" -2"peastorie O/E for pervious walkway/deck ~ area` Existing deck is,44ft in length x 4 ft in width (176 SF)with a wood bench(2ftx.8.5 ft 17 9F)for a°total'of 193 SF: The connecting staircase is proposed to be removed and replaced as, part of the wood decks walkways and staircases Mlacements (part of 396,SF above). Reframe deck beams to,fasten reolacement decking of 5/4"x 6' IPE wood with stainless steel screw fasteners Note•-overall ekisting fiked deck 093 SF)plus proposed fixed deck extension; ramp arid'floating dock(432 SF); is-625 SF• remove two (20 8" and 20" caliper trees at the base-of the existing bulkhead and between the new promsed bulkhead and concrete retaining wall. Replace with four(4) 31/2"-4"caliper Bloodgood Sycamore trees planted along the space between the new retaining wall and bulkhead. The certificate is issued to 1240 Gull Pond, LLC owner of the aforesaid property, Authorized Signature t Glenn Goldsmith,President �Qf SO!/T Town Hall Annex Michael J. Domino,Vice-President ,`O� yOIO 54375 Route 25 P.O.Box 1179 John M.Bredemeyer'III Southold,New York 11971 A.Nicholas Krupski G Q Telephone(631) 765-1892 Greg Williams �� Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD DATE OF INSPECTION: '.['v ! L�:,::711 e.1. :'?.v "t'.Ja•-s..F, - z Ch. 111 INSPECTION SCHEDULE Pre-coasftudton; haybatec orirr/silt curtain. 1st day of construction % constructed Project complete, compliance inspection ;CQM,MENTS: OF CERTIFICATE OF COMPLIANCE: jj�C Michael J_ Domino, President `o�osuFForkcoG Town Hall Annex John M. Bredemeyer, III, Vice-President f �1 ; 54375 Route 25 Glenn Goldsmith T C P_O_ Box 1179 A Nicholas Krupski y s �, Southold, NY 11971 Greg Williams' �ol ,�{ �� Telephone (631) 765-1892 K •�aT`- Fax (631) 765-6641 SOUTHOLD TOWN BOARD OF TRUSTEES YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE ACTIVITIES CHECKED OFF BELOW INSPECTION SCHEDULE Pre-construction, hay bale line/silt boom/silt curtain 1St day of construction '/2 constructed When project complete, call for compliance inspection; . i C BOARD OF SOUTHOLD TOWN TRUSTEES & SOUTHOLD,NEW YORK 9-5 PERMIT NO.9543 DATE: SEPTEMBER 18,2019 ' ISSUED TO: 1240 GULL POND,LLC PROPERTY ADDRESS: .1240 INLET LANE EXTENSION,GREENPORT SC I IvIff 1000-36-2-24 AUTHORIZATION Pursuant to the provisions of Chapter 275 of the Town Code of the Town of Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on September 18, 2019, and in consideration of application fee in the sum of$250.00 paid by 1240 Gull Pond, LLC and subject to the & Terms and Conditions as stated in the Resolution,the Southold Town Board of Trustees authorizes and permits the following: Wetland Permit for the removal of approximately 130 feet of existing wood sheathed bulkhead, whalers,top cap,tie rods and 8" diam. pilings. Dispose of offsite.Install approx.130 lin. feet of new vinyl (medium weight) bulkhead consisting of two (2)611 x 6"whalers, one(1) 4"x 6" back board, IPE top cap, 811 diam. pressure treated pilings @ 6 feet O.C.w/V galv.steel tie rods connected to 8"thick retaining wall w/3/8" x 6" square steel back plate.Construct new four(4 ')wide dock seaward from existing dock(El.7.391)w/a two tread staircase to El. I 5.5', a distance of 64 feet, w/ nine (9) sets of 811 pressure treated pilings @ 8 feet O.C. (256 S.F.). Construct right fi angle dock section four (41) in width @ 32 feet in length, w/ four (4) sets of 811 pressure treated pilings. (I Install a Yx 8' aluminum removable ramp (24 S.F.), Construct and install a 61x 20 ' floating dock w/two (2) 10" pressure treated pilings and one(1)batter piling w/(2)1011 pressure treated pilings. (120 S. Install four(4)batter pilings consisting of(2) 10" pressure treated pilings.Decking for new fixed dock sections and floating dock to be 5/4 46x 6" IPE wood w/stainless steel screw fasteners. Total new fixed dock, ramp and floating dock: 432 S.F. Remove 562.5 S.F.of existing wood decks w/staircases and replace w/pressure treated wood framing and IPE wood decking w/stainless steel screw fasteners. Remove 396.3 S.F. of remaining walkways and staircases and replace w/pressure treated wood framing and IPE wood treads w/ stainless steel screw fasteners. Remove 436 S.F. of existing wood walkway/ deck w/ wood retaining wall and piers and replace wl 223 lin. ft.+/- of 8" concrete retaining walls w/ footings, filled w/gravel and topped w/ 1 1/2" -2" peastone O/E for pervious walkway/deck area. Existing deck is 4411.in length x 4 ft.in width (176 SF)with a wood bench (2ft.x 8.5 ft(17 SF)for a total of 193 SF.The connecting staircase is proposed to be removed and replaced as part of the wood decks,walkways and staircases replacements. part of 396 SF above).Reframe deck beams to fasten replacement decking of 5/411 x 6' IPE wood with stainless steel screw fasteners. Note: overall existing fixed deck (193 SF) plus proposed fixed deck extension, ramp and floating dock(432 SF) is 625 SF; remove two (20 8" and 20" caliper trees at the base of the existing bulkhead and between V I the new proposed bulkhead and concrete retaining wall.Replace with four(4)31/2"-4" caliper Bloodgood Sycamore trees planted along the space between the new retaining wall and bulkhead;with the condition that dock will be built entirely with thru-flo decking; and as depicted on the survey prepared by G&A Land Surveying Inc., received on September 5,2019 and stamped approved on September 18,2019. IN WITNESS WHEREOF,the said Board of Trustees hereby causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of the 18th day of September,2019. �51V _-0 AA TERMS AND CONDITIONS i The Permittee 1240 Gull Pond,LLC, residing at 1240 Inlet Lane Ext., Greenport,New York, as part of the consideration for the issuance of the Permit does understand and prescribe to the following: 1. That the said Board of Trustees and the Town of Southold are released from any and all damages, or claims for damages, of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Permittee will, at his or her own expense, defend any and all such suits initiated by third parties, and the said Permittee assumes full liability with respect thereto,to the complete exclusion of the Board of Trustees of the Town of Southold. j 2. That this Permit is valid for a period of 24 months,which is considered to be the estimated time required to complete the work involved,but should circumstances warrant, request for { an extension may be made to the Board at a later date. 3. That this Permit should be retained indefinitely, or as long as the�said Permittee wishes to maintain the structure or project involved,to provide,evidence,to anyone concerned that authorization was originally obtained. 4. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. 5. That there will be no unreasonable interference with navigation as a result of the work herein authorized. 6. That there shall be no,interference with the right of the public to pass and repass along the beach between high and low water marks. 7. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trustees, the work shall cause unreasonable obstruction to free navigation,'the said Permittee will be required, upon due notice,to remove or alter this work project herein stated without expenses to the Town of Southold. 8. That the said Board will be notified by the Permittee of the completion of the work authorized. 9. That the Permittee will obtain all other permits and consents that may be required supplemental to this,permit,which may be subject to revoke upon failure to obtain same. 10. No right to trespass or interfere with riparian rights. This permit'does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest in real or personal property held or vested in a person not a party to the permit. i , MAP OF DESCRIBED PROPERTY BATHYMETRIC SURVEY LOCATED AT GREENPORT, ELEVATIONS HEREON TOWN OF SOUTHOLD, ° N 82°55'50 E BASED UPON MEAN N CO. OF SUFFOLK, ST. OF N.Y. 27 5510 E 15.00 27 5 � ^ LOW WATER DATUM SCTM NO. 9000 - 36 - 02 - 24 & 25.1 dot PROPOSED 96' X 4' WIDE NEW FIXED DOCK cS's 0 EXTENSION WITH 3'X8' REMOVABLE ALUMINUM �° IO RAMP, 6'X 20'FLOATIMG RAMP W/ (2)10"PILINGS I ��p & (1)10"BATTER PILING&(4)10"BATTER PILINGS- .001 ILINGS"-7.19 \\ ED 6.81 �p•F� BED \ SCALE. 1"=20' ,� \6.05 •k\ 49.50 Z -4.81 \ \ I c BED LT 0.13 `� -3.79\ • OCG • o SEgG ��••• QPM • \ -: I SCTM LOT 24 24Sg 1.45 SG -2.76\ BED\, ,�1� r- A� • w \` 9�� Q BED0,16 ° • y� -1.80\ d� \ LA • o MHW 2 1.91 SG `� BED\ 5a'I •\ 11 g \ 15 dl '.� s p \ . P• G� 0 g \ � o ``o �.r. �SDW SEAG/ZgSS SGT BEDRF�OV \sF \ 1.78 0.17 \ \RO�s(E1 X31 \ \ \9'BED ! �v I 1 r aUlyyFAiST4V SG L ♦_ GO��� \ BED -6.19 l w. •3o a 'c \ \cn OOH \-4.43 \ �rt,w. LANDWARD END FLAGGED �, `•�, O NFK,VRF G K'OpQ N C 0 / ?�\ GOL \ Gin o ' / L4 \� SG -- - _ WETt A ,, Y�B FIy, ) / 0 / BED l \ 9 O TIDAL „ �� ,W"�" ,, ,, U�fy '9'DpR \ cto,, 1.58 % P% 3.38 ,�00 � � ii, Fop Ox \ �� �lool* \ \BED , QVP�G 1.48 \2.19`. \� A \A -6.88 \ �1y(.� yG�9'� \ BED . e �� PORTION OF \ \ '�0,�•�(JPP� BED \N FP -5.94 \ ,. I REMOOD PECK tE&REPLACE J( � 0� :0.88\ \\ :\ \ B 48 BED RT LL WO CK LIN tERIA -\ srn BED ?�� -3.51 \ I = _ I R T �A WI PERVIOUS MA ooWA '` - �\, \ ��'� \\ 0 LT \\ -2.79 BED P, rn• \yN \G� 1 BED �G O GPUP6 28.1 BN f' O , _ BED, �Q �0\SP`�gOP LANDWARD EDGE `.. ;�. . \ ' -2.08 ` vol, �0 F LAND .tCK o 12 0 o = �' I � F O�0 OF TIDAL WE I�RtI .` _> :.. _..... DESF .O w \a \-' -0.80 j. -1.52 Et g6 5� FLAGGED ao'' 34 e3 30.4 :y \ I o I BED BED , 0 BP�� PROP., 0.13 � e FH EC w o LT r A� j^' - y 6 PROP•) r m. \a \ , N 1co St ME FRAM A m o \ 77 Iv' A' s -'� ► ', o. v D�E�'� 'o: �'� \w�' 1.17SG2 - - m NO, 1240 z• = i �',, I i m I A PROP•) �I30,0/ / OP, /°' _ \�END OFREMOVAL OFEXISTING R 0 -� "F R z = WOOD BULKHEAD& REPLACE \ I '. -• ND St0 / °a = = W1 NEW VINYL BULKHEAD 26EDR00 0 20.8 BH-- _ I I / 304 op CE _ jCK s� 47.7 •. ..- ?� \ o rn wR tiE Q I I { x z I I I Z cn S 8405o'so"W 209.43 ° I am, 1 y I I 0 L o\ �f I � I Z . . . - 114+/- o °7 cn I I I \ \ A �NN I N APPROVED BY I \ \ °� cn W �,\ o� on I I Z �\ m BOARD OF I RUSTEES I m I y o ��°°� TOWN OF SOUTHOLD D E SEp ,ve cx_ 19, 201f I �_ � • x i m f I I � I I ► SCTM LOT 25.1 =\ ------ WOODED/VACANT - I t SEP 5 2019 i! I i 42+� 1 I I b CM 0.5E � .. ..:..-�..::-.... . ....- .t..:,:�;..�•<::.,.�:�•. ,�a =LANDWARD EDGE OF TIDAL WETLANDS AS FLAGGED BY DENNIS �t •c $g4�50'S0"W;�05.Q.. CIO COLE ENVIRONMENTAL 10 OCT 2018. I T SOT 26.1 SCTM ti 49"50 SITE DATA: ® =CONC. MONUMENT TYPICAL F E w I rn � P G� y\\ I m�. l GF� DESCRIPTION TOTAL LOT NOTES: �P <� I I;='•' ''' COVERAGE AC:ASPHALT fd I AP:ANGLE POINT � fix.`- `��-. .• .a. m I BUILDABLE LOT AREA 14,330 SF 0.33 ACRES BED:FLOOR OF GULL POND ,acv saR�y�n���ive. �^ Cl BK:BRICK \PE ER A.GROBE�f/ I EXISTING HOUSE 1,833 SF 0.128% BLD:BUILDING ,\ � >c,..f; I CF: CURB FACE LAND SU`FZVE�(OI"Y l . 50869 I I EXISTING DECKAREAS 562.5 SF 0.039% EP:EDGE OF PAVING P.O. BOX'704.�2�DGE,NY 11961 I I ETW.'EDGE OF TRAVELLED WAY 631.849.4750 I REMAINING WOOD 396.3 SF 0.028% EX.=EXISTING WALKWAYS LT.'LOW TIDE @ TIME OF SURVEY NG:NATURAL GROUND TOTAL 2,791.8 SF 0.195% PCC:CONCRETE THE OFFSETS OR DIMENSIONS SHOWN HERON FROM THE PROPERTY LINES TO (=PROPOSED) THE STRUCTURES ARE FOR A SPECIFIC PURPOSE&USE.THEREFORE,THEYARE *NOTE:436 S.F. WOOD WALK, DECK, WOOD RETAINING WALL & SG:SEA GRASS NOT INTENDED TO MONUMENT THE PROPERTY LINES OR TO GUIDE THE ERECTION PIERS TO BE REMOVED AND REPLACED W/CONCRETE RETAINING SSMH.SEWER MANHOLE OF FENCES,ADDITIONAL STRUCTURES OR ANY OTHER IMPROVEMENT. SUPPORT WALLS FILLED W/GRAVEL & TOPPED WITH PEASTONE TBH: TOP OF BULCKHEAD UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS SURVEY IS A VIOLATION OF FOR PERVIOUS WALKWAY/DECK. TBM. TO BE MOVED SECTION 7209 SUBDIVISON 20 OF THE NEW YORK STATE EDUCATION LAW. COPIES TBR: TO BE REMOVED OF THIS SURVEY MAP NOT BEARING THE LAND SURVEYOR'S INKED SEAL OR ; SURVEYED:06 OCT 2018 TC: TOP OF CURB EMBOSSED SEAL SHALL NOT BE CONSIDERED TO BE A VALID TRUE COPY. REVISION:27 MAR 2019;CONT. LABEL(PROP. BLD.) TE: TRASH ENCL. CERTIFICATIONS INDICATED HEREON SHALL RUN ONLY TO THE PERSON FOR WHOM REVISION: 12 APRIL 2019;PROP. DOCK/BATHYMETRIC TG: TOP OF GRATE THE SURVEY IS PREPARED, AND ON THEIR BEHALF TO THE TITLE COMPANY,GOV- REVISION:29 MAY 2019;PROP. DOCK, LOT COVERAGES, TH. TEST HOLE ERNMENT AGENCY AND LENDING INSTITUTION LISTED HEREON. CERTIFICATIONS B.H., WALKWAY&BOAT NOTES. TW.' TOP OF WALL ARE NOT TRANSFERABLE TO ADDITIONAL INSTITUTIONS OR SUBSEQUENT OWNERS. WIFENCE; WROUGHT IRON NO RESPONSIBILITY IS ASSUMED BY THE UNDERSIGNED FOR ANY SURFACE, SUB- MANVHA SSET A ,E REVISION:21 JUN 2019;DECK WALK REMOVAL SURFACE, AERIAL EASEMENTS,SUB-SURFACE UTILITIES AND/ OR STRUCTURES REVISION:22 AUG 2019;CONVERT TO MLW, REVISE DOCK IN OR OUT OF EASEMENTS IF SO PROVIDED. REVISION:01 SEPT 2019,54'DOCK NOTE SCTM 1000- 36- 02- 24 Michael J.Domino,President QF S0(/TTown Hall Annex John M. Bredemeyer III,Vice-President ,`O ��� 54375 Route 25 P.O.Box 1179 Glenn Goldsmith Southold,New York 11971 A.Nicholas Krupski G Telephone(631) 765-1892 Greg Williams �� Fax(631) 765-6641 Irou BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD September 23, 2019 Michael Kimack P.O. Box 1047 Southold, NY 11971 RE: 1240 GULL POND, LLC 1240 INLET LANE EXTENSION, GREENPORT SCTM# 1000-36-2-24 Dear Mr. Kimack: The Board of Town Trustees took the following action during its regular meeting held on Wednesday, September 18, 2019 regarding the above matter: WHEREAS, Michael Kimack on behalf of 1240 GULL POND, LLC applied to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold Town Code, the Wetland Ordinance of the Town of Southold, application dated May 31, 2019, and WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and to the Local Waterfront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, the LWRP Coordinator issued a recommendation that the request to remove approximately 130' of existing wood sheathed bulkhead, whalers, top cap, tie rods and 8" diameter pilings and dispose of off-site; install approximately 130 linear feet of new vinyl bulkhead consisting of two (2) 6"x6" whalers,,one (1) 4"x6" back board, IPE top cap, 8" diameter pressure treated pilings @ 6' o.c. with 3/" galvanized steel tie rods connected to 8" thick retaining wall with 3/8"x6" square steel back plate be found Consistent with the Local Waterfront Revitalization Program policy standards, and, WHEREAS, the LWRP Coordinator recommended that the removal of wood decking from existing fixed dock and reframe deck beams to fasten new 5/4" thick by 6"wide IPE wood decking,with stainless steel screw fasteners; decking for new fixed dock sections and floating dock to be 5/4" thick by 6"' wide IPE wood with stainless steel screw fasteners; total new fixed dock, ramp and floating dock: 432sq.ft., and overall total dock: 625sq.ft.; remove 562.5sq.ft.of existing wood decks with staircases and replace with pressure treated wood framing and IPE wood decking with stainless steel screw fasteners; remove 396.3sq.ft. of remaining walkways and staircases and replace with pressure treated wood framing and IPE wood treads with stainless steel screw fasteners; remove 436sq.ft. of existing wood walkway/deck with existing wood retaining wall and piers and replace with 223 linear feet of f8" concrete retaining walls with footings, filled with gravel and topped with 1 Y2° —2" peastone o/e for pervious 2 walkway/deck area; for the existing 44' long by 4' wide dock (176sq.ft.) with a 2'x8.5' (17sq.ft.) wood bench for a total of 193sq.ft.; the connecting staircase,is proposed to be removed and replaced as part of the wood decks, walkways and staircase replacements (part of 396sq.ft. above); and reframe deck beams to fasten replacement decking of 5/4" x 6' IPE wood with stainless steel screw fasteners be found Inconsistent with the LWRP,;and, WHEREAS, the Board of Trustees has furthered the Local Waterfront Revitalization Program policies 6.3, 9.3 & 9.4 to the greatest extent possible through the imposition of the following Best Management Practice requirements: the issuance of a permit for the structures; the use of thru- flow decking on entirety of dock; shortening of dock, removal of two (2) tie off piles; and, WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on July 17, 2019, August 14, 2019 and September 18, 2019, at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the structure complies with the standards set forth in Chapter 275 of the Southold Town Code, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT, RESOLVED, that for the mitigating factors and based upon the Best Management Practice requirement imposed above, the Board of Trustees deems the action to be Consistent with the Local Waterfront Revitalization Program pursuant to Chapter 268 of the Southold Town Code, and, RESOLVED, that the Board of Trustees APPROVES the application`of 1240 GULL POND, LLC for the removal of approximately 130 feet of existing wood sheathed bulkhead, whalers, top cap, tie rods and 8" diam. pilings. Dispose of offsite. Install approx.130 lin. feet of new vinyl (medium weight) bulkhead consisting of two (2) 6" x 6" whalers, one (1) 4" x 6" back board, IPE top cap, 8" diam. pressure treated pilings @ 6 feet O.C. w/3/" galv. steel tie rods connected to 8" thick retaining wall w/3/8" x 6" square steel back plate. Construct new four(4 ')wide dock seaward from existing dock ( EI. 7.39') w/ a two tread staircase to El. 5.5', a distance of 64 feet, w/ nine (9) sets of 8" pressure treated pilings @ 8 feet O.C. (256 S.F.). Construct right angle dock section four (4') in width @ 32 feet in length, w/four(4) sets of 8" pressure treated pilings. (128 S.F). Install a 3'x 8' aluminum removable ramp (24 S.F.), Construct and install a 6'x 20 'floating dock w/two (2) 10" pressure treated pilings and one (1) batter piling w/ (2) 10" pressure treated pilings. (120 S.F). Install four (4) batter pilings consisting of(2) 10" pressure treated pilings. Decking for new fixed dock sections and floating dock to be 5/4 "x 6" IPE wood w/stainless steel screw fasteners. Total new fixed dock, ramp and floating dock: 432 S.F. Remove 562.5 S.F. of existing wood decks w/staircases and replace w/ pressure treated wood framing and IPE wood decking w/stainless steel screw fasteners. Remove 396.3,S.F. of remaining walkways and staircases and replace w/ pressure treated wood framing and IPE wood treads w/ stainless steel screw fasteners. , 3 Remove 436 S.F of existing wood walkway/ deck w/wood retaining wall and piers and replace w/223 lin. ft +/- of 8" concrete retaining walls w/footings, filled w/ gravel and topped w/ 1 1/2" - 2" peastone O/E for pervious walkway/ deck area. Existing deck is 44ft. in length x 4 ft. in width (176 SF) with a wood bench (2ft.x 8.5 ft ( 17 SF) for a total of 193 SF. The connecting staircase is proposed to be removed and replaced as part of the wood decks, walkways and staircases replacements. ( part of 396 SF above). Reframe deck beams to fasten replacement decking of 5/4" x 6' IPE wood with stainless steel screw fasteners. Note: overall existing fixed deck (193 SF) plus proposed fixed deck extension, ramp and floating dock( 432 SF) is 625 SF; remove two (20 8" and 20" paliper trees at the base of the existing bulkhead and between the new proposed bulkhead and concrete retaining wall. Replace with four (4) 31/2"-4" caliper Bloodgood Sycamore trees planted along the space between the new retaining wall and bulkhead; with the condition that dock will be built entirely with thru-flo decking; and as depicted on the survey prepared by G&A Land Surveying Inc., received on September 5, 2019 and stamped approved on September 18, 2019. Permit to construct and complete project will expire two years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Inspections are required at a fee of$50.00 per inspection. (See attached schedule.) Fees: $1,634.00 Very truly yours, a Michael J. Domino President, Board of Trustees MJD/dd Michael J. Domino, PresidentTown Hall Annex John M. Bredemeyer, III, Vice-President > .�: 54375 Route 25 Glenn Goldsmith y ,, " ,? P.O. Box 1179 A Nicholas Krupski � aolY Southold, NY 11971 Greg Williams v ,0!if; Telephone (631) 765-1892 Fax (631) 765-6641 TO: 1240 GULL POND. LLC c/o MICHAEL KIMACK Please be advised that your application dated May 31, 2019 has been reviewed by this Board at the regular meeting of September 18, 2019 and your application has been approved pending the completion of the following items checked off below. Revised Plans for proposed project Pre-Construction Hay Bale Line Inspection Fee ($50.00); 1St Day of Construction ($50.00) r % Constructed ($50.00) xx Final Inspection Fee ($50.00) - xx Dock Fees ($3.00 per sq. ft.) The Permittee is required to provide evidence that the non-turf buffer condition of the Trustee permit has been recorded with the Suffolk County Clerk's Office as a notice covenant and deed restriction to the deed of the subject parcel. Such evidence shall be provided within ninety (90) calendar days of issuance of this permit Permit fees are now due. Please make check or money order payable to Town of Southold. The fee is computed below according to the schedule of rates as set forth in Chapter 275 of the Southold Town Code. The following fee must be paid within 90 days or re-application fees will be necessary. You will receive your permit upon completion of the above.! _ COMPUTATION OF PERMIT FEES: 4'x96' catwalk = 384 sq. ft;x $3.00 = $ 1,152.00 3'x8' ramp = 24 sq. ft x $3.00 = 72.00 6'x20' floating dock = 120 sq. ft x $3.00 = 360.00 TOTAL FEES DUE- $ 1,634.00 BY: Michael J. Domino, President �V Board of Trustees i i DEPARTMENT OF THE AR ¢-, U.S.ARMY CORPS OF ENGINEERS,NEW YORK ( S � IJ E V L' JACOB K.JAVITS FEDERAL BUILDIN I 26 FEDERAL PLAZA �LtI DD NEW YORK NEW YORK 10278-0090 REPLY TO u 1 8 E P - 5 ce �03 ATTENTION OF REGULATORY BRANCH ca ol rard ofc,� 2 8 2019 SUBJECT: Letter of Coordination for Department of the Army Permit Application-Number NAN-2019-00733-EMI by 1240 Gull Pond, LLC The New York District, Corps of Engineers has received an application for a Department of the Army permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403): APPLICANT: 1240 Gull Pond, LLC 115 Sutton Street Brooklyn, New York 11222 ACTIVITY: Remove an existing ramp and float and extend an existing four-foot-wide by 45-foot-long fixed pier with an additional 96-linear-feet in an "L" configuration with twenty six (26) eight-inch diameter timber piles. A three-foot-wide by eight-foot-long ramp will lead from the fixed pier to a six-foot-wide by 20-foot-long float. Three (3) 10-inch diameter two-pile dolphins will also be installed. Under Nationwide Permit No. 3 — MAINTENANCE: Replace the existing four-foot-wide by 45-foot-long fixed pier and replace, in-place approximately 130-linear feet of bulkhead. The proposed structures will extend approximately 75-linear feet into the waterway from the plane of Mean Low Water. The purpose of this project is to provide safe recreational mooring and stabilize the shoreline. WATERWAY: Gull Pond, a tributary of the Peconic River LOCATION: 1240 Inlet Lane Extension, Village of Greenport, Town of Southold, Suffolk County, New York As the proposed work is minor in nature, authorization may be by Letter of Permission. This is in accordance with current Federal Regulations governing work in navigable waters of the United States. To accomplish the coordination required, prior to the issuance of a Letter of Permission, your review of the enclosed drawings is requested. ** PLEASE USE THE ABOVE 18-CHARACTER FILE NUMBER ON ALL CORRESPONDENCE WITH THIS OFFICE' I - f � REGULATORY BRANCH AUG 2 8 2019 SUBJECT: Letter of Coordination for Department of the Army Permit Application Number NAN-2019-00733-EMI by 1240 Gull Pond, LLC - 2 - For more information on New York District Corps of Engineers programs, visit our website at http://www.nan.usace.army.mii. In order for us to better serve you, please complete our Customer Service Survey located at: http://www.nan.usace.army.miI/Missions/Regulatory/CustomerSurvey.aspx To allow for the timely processing of the subject application, your comments are requested within 20 days of the date of this letter. If you have any questions or comments concerning this application, you may contact Mr. Christopher Minck of this office at (91.7) 790-8547 or Christopher.W.Minck@usace.army.mil Sincerely, Ronald R. Pin zon Chief, Eastern Se on Enclosure D ECE0 � SEP ® 5 2019 "-- Sceiiold i�.wn B ar o Tiasices I 8/27/2019 1240 Inlet Ln-Google s Go:79[e Maps 1240 Inlet Ln LISACE FILE: NAN-2019-00733-EMI F-W.M wf smk,.a ma Q S.I.Harbor Midirg Cleaves P-1 Ur r—A-1k W4 Clanton M—.1j -9 9 rdrsann Hay B:ad V-10 Go gle Map data @2019 500 ft, 1240 GULL POND ,LLC 12-40 IN LET C)(TQN5 1OW w 116144 E C EE, E _ 1 �, J SEP 5 2.019 So;jihA Town Board of Trustecs 1240 Inlet Ln Greenport,NY 11944 0 @ @ Directions Save Nearby Send to your Share phone I OFS https://www.google.com/maps/place/1240+inlet+Ln,+Greenport,+NY+11944/@41.1117953,-72.3536867,16z/data=!4m5!3m4l1sOx89e89f46509dbdd5:... 1/1 USACE FILE _ NOW 33®C�, k MAP OF DESCRIBED PROPERTY BATHYMETRIG SURVEY ^LOCATED AT GREENPORT, ELEVAnONS HEREON TOWN OF SOUTHOLD, N 82155'50.15 RASED UPON MEAN CO.OF SUFFOLK, ST.OF N.Y. H82 10 50 ('1 LOWER LOWWA7ERDATUM SCTM NO.1000-36-02-24$25.1 I PROPOSED 26•X 4'WIDE NEW FDXD DOCK I .00% SXIPASION WON 3'X6'REMOVABIEALUNINUM RAMP 6'X20'rLOAnNGRANP W/T/)10-PILINGS S O�Q 6(010-SATEERP/LING 5(4)10-MTrERPa/NOS- Od BED\ SCAB 1120 .••� 13y �u'B6\ \ sEa°.¢ass \e`ED\\dz; ¢R�- ••.� SCTAILOT24 \ b \V+1� '•\asa MISS ,-1 ao \ �+ .,.� \ Fa BPn •. 1 VUIOWARD SEICRaSS SO513a am \�°pe,,'5��`:y,, tS Ti,*a\ la4\•Bm - 4 & Caro \ \ h \® \ \� ass\ •, ............ 'fWD o \ i X \ \BD, \Yed\\ \ at �SI1. ............................. ....... r�\ f]H+i•o '�i/\ \ em \1f: \\ \\ sm \\d' •a .� ' I_ si 13 aavnox liTOFhM1YI 1 '�i '°c•6\a{ 0 a\ eEo 00\ \\ \\ ze een�\ i I BuuNEaD 1 ,WPU• A .. m \\Bir\ .\ FDdE BED,.. ° P6 sS fC: _i_l�, °y y 18H•••,C z .\� \\ ''\ Bm-f BB On \ <�� •,Y�::`,.x of TAe \ saa 1+ ,euem 0 P�AdOP paGc�� �:�,�,�,^�=a.'a;,°•a 1 foA E` i\fib 1 pY}ks"P� jti1Jy . Y.n/ PRO?, & A r \ . p 'xac-. —J/J ••'`t;''ipt`?... o✓•y.t��.,.`i-� S� Y YY\ 1 1 do . _� `.S.b•^ a� qas PRD` � �' '\ '� rG 4l �N �i •_ :=i,•a;,: °a pAM� s may, " I f as saz .°- ^� � _t` a. - `?F� P� •:'� i 131 scz rn NoENOOFREROVALOFZVSVNO O WOOD BVIJWEADS REP W/ \ I •i'�iyD$TOO�R NEW VN f't BUIlOff.1D Qa s I 11 11 m , I I M 4 I € N ; S84°50.50-W 209.43 I I 1 Q \ \\ 114+1- fjD 1 � I [ii 1 I I j SCTM LOT 25.1 I \ S E P 5 20191 I ! i WOODED/VACANT I1 I 142 4/- I southoic aa(' of{(I1S P s I I ¢°ft, `J °JN"e�.�•�"., ••••••••• ­eooEorn°aL st/„rAh,'+� l• yg WERANaSAS FLAGGm BY0ENN16 I a nrDtkTJI41'•cc LOT 26.1 �{ I [: `.r �I,fioRw$+•_. SCTM a 49 50• "`UtizA Y '�y h SREDATA: ®•GONG MONUMENT TYPICAL I I•�++�i��^=i:% DESCRIPTION TOTAL LOT NOTES: • I C+ -' COVERAGE AC.ASPHALT I AP ANGLEPOINT Ig I w BUILDABLELOTAREA 14,330 SF 033ACRES BED:FLOOR OF GULL POND g1A ZA WSAR1/ByJIf.A'Q IF I BK BRICK PETER A.GROBEN I MUS77NGHOUSE 1.833 SF 0128% BLD BUILDING LAND SURVEYOR NY LIC.50869 I I CF.CURB FACE i EJ I571N8 DECKARFAS 56255E 0038% ETVVEDG OF MG TRAY • PO.BOX 704 RIDGE,NY 11961 I I ETW EDGE OF TRAVELLED WAY 637.6494750 I I REMAINING WOOD 386.3 SF 0028%% FX=IXISTING WALKWAYS LT.LOW TIDE@ 77MEOF SURVEY NG NATURAL GROUND TOTAL 2,791.85E I 0.105% PCC:CONCRETE THE CFPSE190A DMENSIONS SHOWN HFRONFflONRIE PflOPEAD'ONES m (=PROPOSED) WE SRar/CNRESA MR A SAE PURPG4E8 USE.TNEREFa9G MEYARE SG SEA GRASS NOTWfENDmrouDNUNENr THEPROPD+ttuNES OR TOO—STWE—DON 'NOM*436 SF.WOOD WAU(DECK WOOD RETAINING WALL B SSMH SEWER MANHOLE OFFENCES,ADDMONALSRR/OIURESOR ANY ORIERINPflaYENErr PIERS TO BEREMOVEDAND REPLACED WI CONCRETERETAINING TBH TOP OF BULCKHEAD uNAtmfoR¢m aI.TERA1ID,vs MMDRIONSTOMSSURVEYISAWDuna SUPPORT WALLSFILLED WIGRAVEL B TOPPED WfTHPEASTONE 7BM.TO REMOVED SECRON72 SUWMSON200FRIENEWYORK=MEDU61 -Y COPIES FOR PERVIOUS WALKWAYIDECK. TBR:TOSEREMOVED °F_S SURVEY MAP NDT BFAWNO THE LAND SWtVEY0R5 IfA'FD SEV.OR TC.TOP OF CURB D.IHOSSEO SEAL SNALLfNTeEDONSDERm TOBEAVAUD iRUE WPY TE TRASH ENCL. SURVEYED.06 COT2018 TG.TOP OF GRATE MRTI8=0NS/0IrA7EDHLREONDfAILRINOAYT0 PEPERSGNFORWNOU REVISION 27MAR 2019,CONT LABEL(PROP BLD) THESUWVEYIS PREPMW,,ANDON RIENBBBRPTDTHW=SCOMPANY,GOV- THTH TESTHOLE EWAMVrAGSNCY ANDIENDNO rfRRIUIION OSMNEREON.Cu+nFrMV= REVISION'Y2 APRIL 2019,PROP.DOCKIBAYMETRIC 17 WALL ARENOT TRAN9FERABIEI°ADD1710WILINSI)NnDNS ORSUSSE0USWOWNERS A/IA A/[��q� /� REVISION:29MAY 2019,PROP.DOCK LOTCOVERAGES, TW TOP OWROU NOREBPONSIBfW.ASGUNm SYWEWDOt6/DA°FGRAHYSVRFAM$ �/�/�`IN J ETAVE A.H.W�YAYB BOATNO7ES. WIFENCEWROUGHTIRON SURFACE AHUAL EASEMc MSUBSURFACE fl faRiES MY°R51HU°R1 N°ROur°FEasG MIFSOPROWED. SCTM 1000-35-02.{224 2— 0 PROPOSED FIXED DOCK EXTENSION:64 FT. {'--7 EXISTING FIXED DOCK:45 FT'. EL.7,39' 2 TREADS$11^13 RISERS Y17- ///-----���----��� VALIANT 42:BEAM-'12.75 KT'. EL.5.5' / LOA:42 FT.,GRAFT:6 FT. pMHWsI °I II II {I - MLPAI POINT 4116 FTI FROM MLLW j1 °I II °I °i II T02614OF11I5TANCETO II II II 11 I) °I (I II J OPPOSITE SNORE.460 FT. II II I� ii �I II {° II 1I;1 I I II• II I GULL POND BOTTOM EXISTING BULKHEAD ° J 41 0"DIAM PILINGS OFT.D.C. / SET MIN 12 FT IN GROUND PROPOSED 3FT,X 8 FT.ALUMINUM and 3 FT ABOVE FIXED DOCK REMOVABLE RAMP PROPOSED G4 FT.FIXED DOCK EXTENSION L�•�• PROPOSED FIXED DOCK L EXTENSION:32 FT.-7 PROPOSED GFT.X20FT.FLOATING DOCK WI(2)10^PILINGS&(1)BATTER PILING \ - \ — - — 2.6— MHW NOTES 4 FEET - — - f D..Q 1.REPLACE EXISTING DECKING WITH IPE.6/4"X 6` 2.ALL NEW DECKING FOR FIXED DOCK AND FLOATING DOCK TO BE IPE:/4"X 6" /1. 'PE-SAX 6"W/2 Y,"STAINLESS S,FASTENERS TO BE STAINLESS STEEL-2 114 STEEL SCREWS 4.ACO WOOD TO BE PRESSURE GULL POND BOTTOM _ I ' TREATED TO MIN.0.6 1 / ° r - 2. 2"X 10"ACQ @261,O.C.CONTINUOUS pp E -�,� •.µ�a '�( III 3. 3'X10"ACQ LATERAL SUPPORT W/ I (2)5/8"X12" GALV.BOLTS W/WASHERS EA.PILING Y` r r, 4. 8"DIAM,PILINGS @$Ff.O.C. � ,✓ '1240 GULL POND LLC PRPOSED 6 ff.SEPARATION BETWEEN - FIXED DOCK AND FLOATING DOCK 1240 INLET EXTENSION GREENPORT,TOWN OF SOU 'A PROPOSED FIXED DOCK L EXT. W1 ALUM. RAMP & FLOATING DOCK SCALE:1 INCH=3 FEET SCALE:7 INCH=15 FEET By: M.A. Kimack Date:April 17,2019 • I r--� j r I SEP ® 5 2019 11 - I -- So :;eSa;d own ?� a Tr!s�ea AA 1240 GULL POND LLC Write a description f• • .• 25 ICU Mae W s Gull Pond 1240 Inlet Ln Goo le EarthN < v 2018 Go4IF „ EXISTING FIXED DOCK:45 FT. EL.7.39' PROPOSED FIXED DOCK EXTENSION:454 Ft.� 14 FT 2 TREADS4 11•••3 RISERS 0 7•• VALIANT 42: BEAM-12.75 FT. EL.5.5' LOA:42 FT.,DRAFT:6 FT. 1 f2.6 MHW MLLW POINT(116 FT.)FROM MLLW TO 25%OF DISTANCE TO r OPPOSITE SHORE:460 FT. GULL POND BOTTOM EXISTING BULKHEAD II (I II If I'i I I I (I i II �I it I� ii PI 8-DIAM.PILINGS 8FT.O.C. SET MIN.12 FT.IN GROUND PROPOSED 3FT.X 8 FT.ALUMINUM and 3 FT.ABOVE FIXED DOCK REMOVABLE RAMP PROPOSED 154 Ft.FIXED DOCK EXTENSION PROPOSED 6FT.X20FT.FLOATING DOCK PROPOSED� FIXED DOCK L EXTENSION:32 FT.•� W/(2)10”PILINGS&(1)BATTER PILING i 2.6 MHW NOTES i - —-- - --- -- - 1.REPLACE EXISTING DECKING WITH IPE:514'X 6- 4FEET Or� MLLW 2.ALL NEW DECKING FOR FIXED DOCK AND FLOATING DOCK TO BE IPE 514-X 6- /1. IPE:5/4 X 6"W/2 Y<<"STAINLESS 3.FASTENERS TO BE STAINLESS STEEL:2 114' 4.ACQ WOOD TO BE PRESSURE STEEL SCREWS - TREATED TO - ( - GULL POND BOTTOM 2. 2"X 10"ACQ @ 16"O.C.CONTINUOUS f ( �c I I 1 I t 3; 3'X 10"ACQ LATERAL SUPPORT W/ (2) 5/8"X 12" AUG 16 2019 GALV.BOLTS W/WASHERS EA.PILING Southold Town 4. 8"DIAM.PILINGS @8 FT.O.C. Board of Trustees PRPOSED 6 ff.SEPARATION BETWEEN 1240 GULL POND LLC FIXED DOCK AND FLOATING DOCK 1240 INLET EXTENSION GREENPORT, TOWN OF SOUTHOLD PROPOSED FIXED DOCK L EXT. W/ ALUM. RAMP & FLOATING DOCK SCALE:1 INCH=3 FEET SCALE: 1 INCH =10 FEET By: M.A. Kimack Date: April 17, 2019 Revised: August 15, 2019 tv 9i�'6�,,d '�����1�': "J 15''09 / eco CO '�o �� r .°� a 3?JnS070N3 N �A yGj 0,8 CP cS v J? i Cn O po c9 'W - 6� 6 <: 'G .+ cbCO V o 0�,, �9 � '� LEGEND Q) bo rnCz �„ �V °q °' e' rr• C� 0 V Ca - PROPOSED REPLACEMENT OF EXISTING WOOD e ..t Ne h^ RETAINING WALLS& PIERS WITH CONCRETE r p O °'+• O _ _ RETAINING WALLS :l) ' ) 3 ,lsf• '• a �`'` o�` Tl ,� y �,• ! ,�"'• G:3 , r --+CIO >1 cn PROPOSED REPLACEMENT OF EXISTING WOOD c, TO jYO �i°11\ O �r �V ,' O� " m W W O t/ /� ,CV .� BULKHEAD W/VINYL BULKHEAD IN PLACE 0) t ri)N N _ •', rn O ,•'O CO �```� " �.'''�' PROPOSED REPLACEMENT OF EXISTING WOOD vti a �� ,. ,� DECKS,STAIRCASES AND WALKWAYS W/ ONOO rr f (dONd 9`ZZ) r/' P'09 r' J' r'r �`, � A ;^(w•� IPE WOOD DECKING AND STAIRCASES tVOM Y IsY ,6 v O V ds Votpl:F O�� r'"++' r,.+'''••'^ � .r'� a••r V(r��a\.• ,� �„J �/^ ^ � O fir•"` � .✓ DJ�e`}+�� " �``l, �`�. r rr'� Q1`C ' ,''r`',r •"J 0� a`'a�o3 L'�a r`�} 'A �. �..J7 J• !I 030 7/I/ ;-i' ~� �V� �' � j� DIMENSIONS MATERIAL gC'6 r 00 t� ' � ';.\ ® AL SPECS. Ij Cb 69'C t 1�� o , a = / ;�� (,�• 223 LIN. FEET+/-CONCRETE RETAINING WALLS 00 bd Z 6c1 - _ - --- - •,`" "�. \ 'I For 436 S.F OF PERVIOUS WALKWAY k , 130 LIN. FEET+ NEW VINYL BULKHEAD IN PLACE v �/ ""� " ..° c� '4�O 6�` C� • '+ .�' 3a NO 7 DOOM /- �.�. 562.5 S.F. EXISTING DECKS REMOVED AND REPLACED ���� "^"" W/PRESSURE TREATED WOOD(MIN.0.6) &IPE WOOD DECKING I Jl1111JJJJJ1fl�j^T-� D ,uf __........ - _ _a_b'3_H�17n9 STAIRWAYS _ "�^J 396.3 S.F. EXISTING REMAINING WALKWAYS, �.� .�.___._.--.�.,,t.:T"T.y... .r.,i'"[^T"„T�T"i"'i"'��;T1�"�"�'T`"j�('*T�.�>��.:�'v,..n.,.�.•.,..."`..`w.W.•"�.':`�:., �_'.,"...r,,.:.: f"1 1�^A.'"'"t cJp ,}` j•' p -•• IVIED.WEIGHT VINYL SHEETHING ��.� �' 3 TO BE PRESSURE TREATED FRAMING, PIERS W/ Remove 8"caliper tree TWO(2)SETS OF 6"),o WHALERS(CONT.) IPE WOOD FOR DECKING MATERIAL and TREADS. to bulkhead and 20" caliper tree at walkway One(1)4"x 6"BACK BOARD 3ft.avg.from TOB + NOTE:ALL FASTENERS TO BE STAINLESS STEEL SCREWS 4FEET %"TIE BACK RODS VI/3/8"X 6"X 6"STEEL TOP CAP to bottom of ftg. .GRAVEL BACKFILLl �--BACK PLATES IN COMC.SUPPORT WALL P s 2019 1 Y,"- 2"PEASTONE(O/E) TOPPING 1240 GULL POND Li` 1240 INLET EXTENSION s L'�` Y 1. �•t a=•r� 8ft, distance from inside bulkhead GREENPORT, TOWN OF SOUTHOLD w� `t`=:•+ ; to seaward side retaining wall 8"CONC.WALLS W/8"X16"coNc.FTGs. A-A PROPOSED REMOVAL AND REPLACEMENT OF: NOTE:UTILIZE 10"(+IAM.PRESSURE TREATED '• W/(2) Y."REBAR(CONT.) PORTION OF WOOD BULKHEAD T rmn DEADMEN AS APPROPRIATE REBAR @ 3FT W/"'L" TIED TO Y." FTG. REBAR @ 2 FT.O.C. 8"PILINGS @ 6 FEET D.C. ALL WOOD DECKS, WALKWAYS, STAIRCASES. VINYL BULKHEAD By: M.A.Kimack DATE: May 3, 2019 RETAINING WALLS W/ FOOTINGS(TYP.) SCALE; 1„ =4 FEET (Revised; September 16, 2019 SCALE 1” =3 Ft. Michael J. Dommo, Pre; t tiQ� C ` Town Hall Annex John M. Bredemeyer III,Vice'`tidentGV_ `' '' 54375 Route 25 Glenn'Goldsmith y P.O.Box 1179 A.Nicholas Krupski � Southold,NY 11971 Greg Williams � p! Telephone(631)765-1892 Fax(631)765-6641 BOARD OF TOWN TRUSTEES j TOWN OF SOUTHOLD Date/Time: V�� ` � Completed in field by: 8t Michael Kimack on behalf of 1240 GULL POND, LLC requests a Wetland Permit to remove!approximately 130' of existing wood sheathed bulkhead,whalers, top cap, tie rods'and 8"diameter pilings and dispose of off-site, install approximately 130 linear feet of new vinyl bulkhead consisting of two(2)6"x6"whalers, one (1)4"x6"back board, IPE top cap, 8"diameter pressure treated pilings @ 6' o c.with W galvanized steel tie rods connected to 8"thick retaining wall with 3/8"x6"square`steel back plate; construct new 4'wide dock seaward from existing 193sq ft fixed dock(includes bench)with a two-tread staircase'a distance of 64',with nine (9)sets of 8" diameter pressure treated pilings @ 8' o c (256sq ft); construct right angle fixed dock section 4' in width and 32' in length with four(4) sets of 8"diameter pressure treated pilings (128sq.ft); install a 3'x8'aluminum removable ramp (24sq ft); construct and install a 6'x20' floating dock with two (2) 10"diameter pressure treated pilings and one (1) batter piling withi(2) 10"diameter pressure treated pilings (120sq.ft.), install four(4) batter pilings consisting of(2) 10"diameter pressure treating pilings; remove wood decking from existing fixed dock and reframe deck beams to fasten new 5/4"thick by 6"wide IPE wood decking with stainless steel screw fasteners, decking for new fixed dock sections and floating dock to be 5/4"thick by 6"'wide IPE wood with stainless steel screw fasteners;total new fixed dock, ramp and floating dock:432sq.ft ,and overall total dock 625sq ft.; remove 562.5sq.ft iof existing wood decks with staircases and replace with pressure treated wood framing and IPE wood decking with stainless steel screw fasteners; remove 396 3sq.ft, of remaining walkways and staircases and replace with pressure treated wood framing and IPE wood treads with stainless steel screw fasteners, remove 436sq.ft.of existing wood walkway/deck with existing wood retaining wall and piers and replace with 223 linear feet of±8" concrete retaining walls with footings,filled with gravel and topped with 1 '/"—2"peastone o/e for pervious walkway/deck area;for the existing 44' long by 4'wide dock(176sq.ft.)with a 2'x8 5' (17sq ft.)wood bench for a total of 193sq.ft.,the connecting staircase is proposed to be removed and replaced as part of the wood decks,walkways and staircase replacements (part of 396sq.ft above), and reframe deck beams to fasten replacement decking of 5/4"x 6' IPE wood with stainless steel screw fasteners. Located- 1240 Inlet Lane Extension, Greenport. SCTM# 1000-36-2-24 CH. 275-3 - SETBACKS WETLAND, BOUNDARY: Actual Footage or OK=4 Setback Waiver Required 1. Residence: 100 feet 2. Driveway: 50 feet 3. Sanitary Leaching Pool (cesspool): 100 feet 4. Septic Tank: 75 feet 5. Swimming Pool and related structures: 50 feet 6. Landscaping or gardening: 50 feet 7. Placement of C&D material: 100 feet TOP OF BLUFF: 1. Residence: 100 feet 2. Driveway: 100 feet 3. Sanitary leaching pool (cesspool) 100 feet: 4. Swimming pool and related structures: 100 feet Public Notice of earing Card Posted: Y % N Ch. 275 Ch: 111, SEQRA Type: 1 II Unlisted Action Type of Application: Pre-Submission Administrative Amendment ' Wetland Coastal Erosion Emergency ;Violation Non-Jurisdiction Survey :5 5 years: Y/N Wetland Line by: C.E.H.A. Line Additional information/suggested modifications/conditions/need for outside review/consultant/application completeness/comments/standards: I have read & acknowledged the foregoing Trustees comments: Agent/Owner: Present were: Y J. Bredemeyer M. Domino G. Goldsmith N. Krupski G. Williams Other Michael J. Domino, Pre' 1t Q5 IrC ! Town Hall Annex esi A" { 54375 Route 25 John M. Bredemeyer III, Vice-president �`� �,� Glenn Goldsmith ro P.O. Box 1179 A.Nicholas Krupski Southold,NY 11971 Greg Williams Telephone(631)765-1892 Fax(631)765-6641 BOARD OF TOWN TRUSTEES q TOWN OF SOUTHOLD Date/Time: �/10% / /�°�� Completed infield by: 6--'e4 Michael Kimack on behalf of 1240 GULL POND, LLC requests a Wetland Permit to remove approximately 130' of existing wood sheathed bulkhead, whalers, top cap, tie rods and 8" diameter pilings and dispose of off-site, install approximately 130 linear feet of new vinyl bulkhead consisting of two (2) 6"x6"whalers, one (1) 4"x6 " back board, IPE top cap, 8 diameter pressure treated pilings @ 6' o.c. with 3/" galvanized steel tie rods connected to 8" thick retaining wall with 3/8"x6" square steel back plate; construct new 4' wide dock seaward from existing 193sq.ft. fixed dock (includes bench) with a two-tread staircase a distance of 64', with nine (9) sets of 8" diameter pressure treated pilings @ 8' o c (256sq ft), construct right angle fixed dock section 4' in width and 32' in length with four(4) sets of 8" diameter pressure treated pilings (128sq ft), install a 3'x8' aluminum removable ramp (24sq.ft.), construct and install a 6'x20' floating dock with two (2),10" diameter pressure treated pilings and one (1) batter piling with (2) 10" diameter pressure treated pilings (120sq.ft); install four(4) batter pilings consisting of(2) 10" diameter pressure treating pilings, remove wood decking from existing fixed dock and reframe deck beams to fasten new 5/4" thick by 6"wide IPE wood decking with stainless steel screw fasteners, decking for new fixed dock sections and floating dock to be 5/4" thick by;6"'wide IPE wood with stainless steel screw fasteners, total new fixed dock, ramp and floating dock: 432sq ft , and overall total dock. 625sq.ft.; remove 562 5sq ft of existing wood decks with staircases and replace with pressure treated wood framing and IPE wood decking with stainless steel screw fasteners, remove 396.3sq.ft. of remaining walkways and staircases.and replace with pressure treated wood framing and IPE wood treads with stainless steel screw fasteners; remove 436sq ft of existing wood walkway/deck with existing wood retaining wall and piers and replace with 223 linear feet of±8" concrete retaining walls with footings, filled with gravel and topped with 1 '/2"—2" peastone o/e for pervious walkway/deck area; for the existing 44' long by 4' wide dock (176sq ft)with a 2'x8.5' (17sq.ft.)wood bench for a total of 193sq ft ; the connecting staircase is proposed to be removed and replaced as part of the wood decks, walkways and staircase replacements (part of 396sq ft above), and reframe deck'beams to fasten replacement decking of 5/4" x 6' IPE wood with stainless steel screw fasteners. Located 1240 Inlet Lane Extension, Greenport. SCTM# 1000-36-2-24 CH. 275-3 - SETBACKS WETLAND BOUNDARY: Actual Footage or OK=4 Setback Waiver Required 1. Residence: 100 feet 2. Driveway: 50 feet 3. Sanitary Leaching Pool -(cesspool): 100 feet 4. Septic Tank: 75 feet 5. Swimming Pool and related structures: 50 feet 6. Landscaping or gardening: 50 feet 7. Placement of C&D material: 100 feet TOP OF BLUFF: 1. Residence: 100 feet 2. Driveway: 100 feet 3. Sanitary leaching pool (cesspool) 100 feet: 4. Swimming pool and related structures: 100 feet Public Notice of Hearing Card Posted: Y / N Ch 275 Ch. 111 SEQRA Type: 1 II Unlisted Action Type of Application: Pre-Submission Administrative Amendment Wetland Coastal Erosion Emergency IViolation Non-Jurisdiction Survey :5 5 years: Y/N Wetland Line by: C.E.H.A. Line Additional information/suggested modifications/conditions/need for outside review/consultant/application completeness/comments/standards: y�JS6rb11+ / 6� ''64-ems 010CY. I1/7AJ� Flog J k.-"5 Q--\ � 1 '-rGJk` -D Oro of-(- 4eJA of I have read & acknowledged the foregoing Tru tees comments: Agent/Owner: 1 Present were: J. Bredemeyer _Zm. Domino L-�G. Goldsmith / N. Krupski _Y Williams Other �� •� y�. �'�iR `� �. .^\"p � .tom '�_ .�• .�f 1 ull Pond,LLC 1240 •♦ Inlet 111 10/19 e''y r ).}� ' �� -'ad's.: _�•. �t._�.s �� -S« L�� Y }~ S MA Vii... .a. 4m. _.. 7 / 10 / 2019 11 : 25 �. "11111111111114:0�.Jdmllb; J t+r• ...f� ;MI .��710 1.01 , .. mk. A. U _ mmmut I a. l- 'r ~7 / 10 /2019 11 ' 25 .fir^ � s. �`'�'t .�� •. �ti�' �." - •� 4F �f ��` sF t .- - C��M,�; _ v .j. .�.- "� .¢,.•�� ,lie woo sit win vw FMQlW A — 7. / 10/2019 11 25 ra� L, ���'� 1�Y�� ► h�. Yea _ _�, � •y. '� _ f � '� .s� ��� �? 1w tea?`'+ �• �. ' ���, r� �; s, r 40 . y .r..,.•�''- of ai c-s. �- -- - -=.s y�'��• �?.'fh` i'- 1 "L'4�.f' �i� PIMP Apo 3 p; .r ti.M �Y v -40 PW 7/ 10 / 2019 11 • 25 u(JU I 1"ll 1,0r 24 1\ 005 VOAP SCALE. 1"=20' IDO t -1.21 Ad WARDX),. all TLJOW3,40- WA r). a I? ��w "I, ,"�44, 0 3 TWL5 YJ�L TOE 3 31 jo \ I -I- .I . '& ':Z4 I t 1, �i� I, "s, I Z77Ir, 00 mt��_11�o - - 7 r) 10 1 A,0/ 61AX NG 7.20 J' 7.98NGGB 7z� ­40 7 9.13 1 W;)B(; Nq Is 74aro� TCA 0 1p's TCAP 8.8 L)" \N G' WDAP . b' q V, bu �Voop vv BLD li 13LI) 8.1 T M?VD 9 1 Pi3. -0.38 SG2 OA 00 B 7 lo.i 8 6fGK 933WDA 12�_o ID 8,ssf: 30.4 .64 TCAP 9:" NQ '9 _06)-, POP-- -3,w :A < -0.55S _cK > 1) �o 2.09 NG 9 40 13KAP�p OS;:-- m .6 9' 6.44 _AP 79:664)S&T- un. ,,(a BKAiD:9.44 P.) G2 29 13KJ U TBHPOL\ 58 fzo �3 -t 6p > �, -, -0 opo . R3w S-rofz '3> N : I , 42 SG2 6.6 SIE oo -.ENCAPiqd--- FRA, 3VCAP_kld9 ­1 -0.73 sG2 z 16 )Vvet� - 7om 1: 127a ND• .40 . .....w6.m r S G,(A -r 24,1 --A pfzop-j Un) 6 74JVG -4-- (30. 84NG 5"> r0RY -0.55SG2pfz 03ccmoy>t"i 3A)a0 x 0&7( :j 0 9249�:TGAP" S In ir ww, i 1.21 2 R00fo / T :� SG3 .7 NO 0 - 1/a_­- 20.8 BH 9.70 NG 'o 4. ;, PLNK -_q.4-7 NG IV, U4RAP N ._'�WN -44 al POOP PL -9 da S_ OLT rPl 1�4 fGK no O 2?\'l 8 OWDAP TWL I 47.7 91 0.79 SG2 cc)- 6 80 NG 1.35 SG3 "I , 701 8ODSET 'NG 9,38 09' __j T 10.23xco. T 6.67 L3AP 6 2.66 N11 x 0.84 SIL2 __j 10.56 GB NG 3 3. 11 m 'b TM 12 TOE '9>6 x x 10.44 r x 14 SG3\ S 8450,50"W 209.43 TOP NG 4-54: 0.57 SG2 fi ti. ps (1)1240 Gull Pond LLC Taken May 11,2019 Looking NE (2) 1240 Gull Pond LLC Taken May 11,2019 LookingNE l _ 1 �q .. iiia sr OY•" _r .i (3)1240 Gull Pond LLC Taken May 11,2019 ..'. Looking NE i i v _ "yam�"i►. '�,"�.... -..� - -,.. :.., -.. _="�tiw` 'iia. .. (4) 1240 Gull Pond LLC Taken May 11,2019 Looking SE f } aA { -_� I i r a " ..may �✓y�.,. A..:.R 4.} Y - - . ~ i Wiry_.. fr' •.,�. (7)1240 Gull Pond LLC Taken May 11,2019 Looking SSE ��. 77 _- : J (8)1240 Gull Pond LLC - - --.0 Taken May 11,2019 - —- - _ - ---' Looking NNE LEI (9)1240 Gull Pond LLC Rk off'=rt* Taken May 11,2019 Looking NNE � iY' 3 F �'. Y ...r X�•-F.. t •, w8 4 ` • (10) 1240 Gull Pond LLC Taken May 11,2019 Looking NW �44 �4 f r r .• �f 'F v ♦ } ft--6; >_ r, mGM .... T -rw. r l 'dr - ` a m \ MIFF Yll- �� ' ,�F' f r lk tt � �---=_•.ems----- # 1r% -_=�,��-oma.-� -,� � ,�.�.. _ • r � � I _ �cq r. a , t0..`. 'i"�'"+�+✓:`�ti'•7p• � � 14 3,.. j, I t fA 7-1 ' =.• .sem � , �� tlR �' � Y ti�n � ,.! '7' 6. ?, '�' ,v. �I• _� S .._x 3 , {7.,-?�l,'E 7"�'1�567"l�y t,,.a Y1 ,�� � M�' �� S�, /�X��i}' 'r :e.,,, yt� ,`y ��_ss�{ ' .,1,;'.:.'" •'t` gg, Y '-tit..a.•� ,_, y i fig ,' � 1•y ".� r 777 e, ba \ \ .y m tAyc) \ 8 Zd4 ` I IA(.) 232 W--OW --------------- 4 -4• 10HKET t2 22 24 le 1Hc1 A pe.t 9 13 I ,, .. ./ .YS S p.t 25.t iA 21 / 27 FOR ML NO 261 FOR PCL NO / ./ SEE SEC NO. SEE SEC NO r4gs asmmu A M1�-00] / 0' / I I MATO — --�-- LINE 22'----- LINE Qo `S'OG rtiO�Q� I� Q? SRT "'^i15gE') AVE i55, R \ COUNTY OF SUFFOLK © x ms *�^'a' awTNOLo SECTION NO NOTICE E E ,..,. —� ,. (zt) O �—� w _ v..u.—_�._— Real Property Tax Service AgenCy r 36 Gam+,,, o..x,.. -- — cexmT c.nr.RNen..a.xrnwt O wrx. a .� n.t Hals+zu P t000 PROPERTY MAP z+Nc) —____ —_ __ wmr[.xawvMa r>t am+ Cantrell, Elizabeth From: mkimack2@ve ' Sent: Monday, S ember 6 2019 6:50 PM To: Cantrell, Eliz Subject: 1240 Gull Pond LLC application: Hi Liz: As per my meeting with the Trustees at the workshop meeting last evening, pleasei add the.following language-to the description of the above referenced application: Remove two (20 8" and 20" caliper trees at the base of the existing bulkhead and between the new proposed bulkhead and concrete retaining wall. Replace with four(4) 31/2"-4" caliper Bloodgood Sycamore trees planted along the space between the,new retaining wall and bulkhead ATTENTION: This email came from an external source. Do not open attachments or click on links from unknown senders or unexpected emails. i I ' i OFFICE LOCATION: ®��'®f ® MAILING ADDRESS: Town Hall Annex ® P.O. Box 1179 54375 State Route 25 Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) CIO 4W Southold, NY 11971a� Telephone: 631765-1938 ® Fax: 631765-3136 COU LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MEMORANDUM To: Michael Domino, President Town of Southold Board of Trustees From: , Mark Terry, AICP LWRP Coordinator Date: July 16, 2019 Re: LWRP Coastal Consistency Review for 1240 GULL POND, LLC SCTM# 1000-36-2-24 Michael Kimack on behalf of 1240 GULL POND, LLC requests a Wetland Permit to remove approximately 130' of existing wood sheathed bulkhead, whalers, top cap, tie rods and 8" diameter pilings and dispose of off-site; install approximately 130 linear feet of new vinyl bulkhead consisting of two (2) 6"x6" whalers, one (1) 4"x6" back board, IPE top cap, 8" diameter pressure treated pilings @ 6' o.c. with 3/" galvanized steel tie rods connected to 8" thick retaining wall with 3/8"x6" square steel back plate; construct new 4',wide dock seaward from existing 193sq.ft. fixed-dock (includes bench) with a two-tread staircase a distance of 64', with nine (9) sets of 8" diameter pressure treated pilings @ 8' o.c. (256sq.ft.); construct right angle fixed dock section 4' in width and 32' in length with four(4) sets of 8" diameter pressure treated pilings (128sq.ft.); install a 3'x8' aluminum removable ramp (24sq.ft.); construct and install a 61x20' floating dock with two (2) 10" diameter pressure treated pilings and one (1) batter piling with (2) 10" diameter pressure treated pilings (120sq.ft.); install four(4) batter pilings consisting of(2) 10" diameter pressure treating pilings; remove wood decking from existing fixed dock and reframe deck beams to fasten new 5/4" thick by 6" wide IPE wood decking with stainless steel screw fasteners; decking for new fixed dock sections and floating dock to be 5/4" thick by 6"' wide IPE wood with stainless steel screw fasteners; total new fixed dock, ramp and floating dock: 432sq.ft., and overall total dock: 625sq.ft.; remove 562.5sq.ft. of existing wood decks with staircases and replace with pressure treated wood framing and IPE wood decking with stainless steel screw fasteners; remove 396.3sq.ft. of remaining walkways and staircases and replace with pressure treated wood framing and IPE wood treads with stainless steel screw fasteners; remove 436sq.ft. of existing wood walkway/deck with existing wood retaining wall and piers and replace with 223 linear feet of±8" concrete retaining walls with footings, filled with gravel and topped with 1 'h"—2" peastone o/e for pervious walkway/deck area; for the existing 44' long by 4' wide dock (176sq.ft.)with a 2'x8.5' (17sq.ft.) wood bench for a total of 193sq.ft.; the connecting staircase is proposed to be removed and replaced as part of the wood decks, walkways and staircase replacements (part of 396sq.ft. above);,and reframe deck beams to fasten replacement decking of 5/44"-'x`6' IPE wood with stainless steel screw fasteners. Located: 1240 Inlet Lane Extension, Greenport. SCTM# 1000-36-2-24 The proposal to remove approximately 130' of existing wood sheathed bulkhead, whalers, top cap, tie rods and 8" diameter pilings and dispose of off-site; install approximately 130 linear feet of new vinyl bulkhead consisting of two (2) 6"x6" whalers, one (1) 4"x6" back board, IPE top cap, 8" diameter pressure treated pilings @ 6' o.c. with %" galvanized steel tie rods connected to 8" thick retaining wall with 3/8"x6" square steel back plate is CONSISTENT with the LWRP policies: No permits were found for the below listed structures in Town records. The proposed actions to remove wood decking from existing fixed dock and reframe deck beams to fasten new 5/4" thick by 6" wide IPE wood decking with stainless steel screw fasteners;,decking for new fixed dock sections and floating dock to be 5/4" thick by 6"' wide IPE wood 'with stainless steel screw fasteners; total new fixed dock, ramp and floating dock: 432sq.ft., and overall total dock: 625sq.ft.; remove 562.5sq.ft. of existing wood decks with staircases and replace with pressure treated wood framing and IPE wood decking with stainless steel screw fasteners; remove 396.3sq.ft. of remaining walkways and staircases and replace with pressure treated wood framing and IPE wood treads with stainless steel screw fasteners; remove 436sq.ft. of existing wood walkway/deck with existing wood retaining wall and piers and replace with 223 linear feet of±8" concrete retaining walls with footings, filled with gravel and topped with 1 Y2" —2" peastone o/e for pervious walkway/deck area; for the existing 44' long by 4' wide dock (176sq.ft.) with a 2'x8.5' (17sq.ft.) wood bench for a total of 193sq.ft.; the connecting staircase is proposed to be removed and replaced as part of the wood decks, walkways and staircase replacements (part of 396sq.ft. above); and reframe deck beams to fasten replacement decking of 5/4" x 6' IPE wood with stainless steel screw fasteners is recommended as INCONSISTENT with the LWRP. Further, it is my recommednation that the proposed action to construct new 4' wide dock seaward from. existing 193sq.ft. fixed dock (includes bench) with a two-tread staircase a distance of 64', with nine (9) sets of 8" diameter pressure treated pilings @ 8' o.c. (256sq.ft.); construct right angle fixed dock section 4' in width and 32' in length with four (4) sets of 8" diameter pressure treated pilings (128sq.ft.); install a 3'x8' aluminum removable ramp (24sq.ft.); construct and install a 6'x20' floating dock with two (2) 10" diameter pressure treated pilings and one (1) batter piling with (2) 10" diameter pressure treated pilings (120sq.ft.); install four(4) batter pilings consisting of(2) 10" diameter pressure treating pilings are INCONSISTENT with the below listed LWRP policy standards; 6; 9.1 (B), 9.2 (A.1 and A.3), 9.3 (A, B, D, E and F) and 9.4 (A and E) and therefore is INCONSISTENT with the LWRP. Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems 6.3 Protect and restore tidal and freshwater wetlands. The applicant has not demonstrated that the following dock standards pursuant to § 275-11. Construction and operation standards have been met. (d) Review and approval of dock applications. Before issuing a permit for a dock structure, the Trustees shall consider whether the dock will have any of the following harmful effects: [2] Whether the dock will unduly interfere with the public use of waterways for swimming, boating, fishing, shellfishing, waterskiing and other water-dependent activities, The applicant fails to show that the proposal would meet the dock line. It appears that the proposed dock would extend farther seaward than the existing, adjacent docks. Private dock structures extending into public waters decreases the public use of bottomlands and the nearshore area. [5] Whether the dock will cause degradation of surface water quality and natural resources, l [11] Whether the cumulative impacts of a residential and commercial dock will change the waterway or the environment and whether alternate design, construction, and location of the dock will minimize cumulative impacts, and I The alternative use of seasonal moorings in areas of low biological productivity and with adequate water depths is a better option to accommodate vessels requiring greater water depths. Extending permanent dock structures further into public waters to accommodate private vessels is not supported by the LWRP. [121 Whether adequate facilities are available to boat owners and/or operators for fueling, discharge of waste and rubbish, electrical service and water service. This information has not been provided. 9.3 Preserve the public interest in and use of lands and waters ,held in public trust by the state and the Town of Southold. A. Limit grants, leases, easements, permits or lesser interest in lands underwater in accordance with an assessment of potential adverse impacts of the proposed use, structure, or facility on public interest in public lands under water. Use the following factors in assessing potential adverse impact. 1. environmental impact, The action would result in impacts to benthic organisms in the construction of the dock (piles) and from shading of the substrate. 2. values for natural resource management, public recreation, and commerce, 3. size, character, and effect of the transfer in relation to neighboring uses, 4. potential for interference with navigation, public uses of waterway, and riparian rights, Dock structures impede and interfere with public uses of waterways. The applicant enjoys access to public waters currently. Opportunities to seasonally moor vessels are available. 5. water-dependent nature of use, The parcel is improved with a residential structure and in not water dependent. B. Limit the transfer of interest in public trust lands to the minimum necessary conveyance of public interest. 2. Limit the physical extent of any conveyance to the minimum amount of land necessary. i Seasonal open water moorings for vessels are avI ilable. D. Retain a public interest in the transfer of interest in underwater lands that will be adequate to preserve public access, recreation opportunities, and-other public trust purposes. j E. Private uses, structures, or facilities on underwater lands are limited to those circumstances where ownership of the underwater lands oar 'riparian interest has been legally validated either through proof of ownership of the underwater lands or adjacent riparian parcel, or by assignment of riparian interest by the riparian owner. The dock structure is proposed on public underwater lands. F. Avoid substantial loss of public interest in public trust lands by assessing the cumulative impact of individual conveyances of grants, easements, and leases of public trust lands. Conglomerate dock structures could result in public exclusion areas due to placement, orientation and length from the shoreline. 9.4 Assure public access to public trust lands and navigable waters. A. Provide free and substantially unobstructed passage along public trust shorelands. E. Provide access to, and reasonable recreational use of, navigable waters and public trust lands under water. Piers, docking facilities, and catwalks must not result in an unnecessary interference with use of public trust lands. Alternatives to long piers or docks include use of dinghies to reach moored boats and mooring in nearby marinas. ' The dock structure will result in a net decrease in public access to public underwater lands. The LWRP does not support the construction of private, dock structures over/in the public trust lands and waters. The LWRP supports the use of seasonal moorings and the mooring of vessels in nearby marinas. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed actions. Cc: Damon Hagan, Assistant Town Attorney . i Peter Young,Chairman ti Town Hall,53095 Main Rd. Lauren Standish,Secretary P.O.Box 1179 Southold,NY 11971 Telephone(631)765-1889 Fax(631)765-1823 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held Wed., July 10, 2019 the following recommendation was made: Moved by John Stein, seconded by Peter Meeker, it was RESOLVED to SUPPORT the application of 1240 GULL POND, LLC to remove deteriorated decks, walkways and staircases and replace to conform to coverage limitation. Remove and replace a portion of bulkhead to secure(property; and extend existing dock to accommodate a 42 ft. sailing vessel and two (2) smaller craft. Located: 1240 Inlet Extension, Greenport. SCTM#36-2-24 Inspected by: John Stein, Peter Meeker, Carol Brown Vote of Council: Ayes: All Motion Carried r i i Cantrell, Elizabeth From: mkimack2@verizon.net Sent: Monday,July 1, 2019 3:33 PM To: Cantrell, Elizabeth Subject: Pfanner Application Attachments: Pfanner Project Description.docx �I Hi Liz: Attached find the revised description which now includes a section to legalize existing deck/stairs Best ATTENTION: This email came from an external source. Do not open attachments or click on links from unknown senders or unexpected emails. i, 1 I � J r � PROJECT DESCRIPTION REPLACEMENT OF PORTION OF EXISTING BULKHEAD Remove approximately 130 feet of existing wood sheathed bulkhead,whalers,top cap, tie rods and 8" diam. pilings. Dispose of offsite. Install approxi. 130 lin. feet of new vinyl (medium weight) bulkhead consisting of two (2) 6" x 6"whalers, one (1) 4" x 6" back board, IPE top cap, 8" diam. pressure treated pilings @ 6 feet O.C. w/%" galy. steel tie rods connected to 8" thick retaining wall w/3/8" x 6" square steel back plate. NEW FIXED DOCK, RAMP, FLOATING DOCK Construct new four (4 ')wide dock seaward from existing dock ( El. 7.39')w/a two tread staircase to EI. 5.5 ,a distance of 64 feet, w/ nine (9) sets of 8" pressure treated pilings @ 8 feet O.C. (256 S.F.). Construct right angle dock section four (4') in width @ 32 feet in length, w/four(4) sets of 8" pressure treated pilings. ( 128 S.F.). Install a 3'x 8' aluminum removable ramp (24 S.F.), Construct and install a 6'x 20 'floating dock w/two (2) 10" pressure treated pilings and one (1) batter piling w/(2) 10" pressure treated pilings. ( 120 S.F. ). Install four (4) batter pilings consisting of(2) 10" pressure treated pilings. Decking for new fixed dock sections and floating dock to be 5/4 "x 6" IPE wood w/ stainless steel screw fasteners.Total new fixed dock, ramp and floating dock: 432 S.F. REMOVE AND REPLACE WOOD DECKS, WALKWAYS, STAIRCASES Remove 562.5 S.F. of existing wood decks w/staircases and replace w/ pressure treated wood framing and IPE wood decking w/stainless steel screw fasteners. Remove 396.3 S.F. of remaining walkways and staircases and replace w/ pressure treated wood framing and IPE wood treads w/stainless steel screw fasteners. REMOVE WOOD RETAINING WALL, PIERS, WOOD WALKWAY/DECK AND REPLACE WITH CONCRETE RETAINING WALLS/ GRAVEL FILLED Remove 436 S.F. of existing wood walkway/ deck w/wood retaining wall and piers and replace w/223 lin. Ft.+/- of 8" concrete retaining walls w/footings, filled w/gravel and topped w/ 11/2" -2" peastone O/E for pervious walkway/ deck area. ® VE1 �� E L 2019 i LEGALIZE EXISTING FIXED , BENCH AND STAIRCASE Existing = is 44ft. in length x 4 ft. in width (176 SF) with a wood bench (2ft.x 8.5 ft ( 17 SF) for a total of 193 SF.The connecting staircase is proposed to be removed and replaced as part of the wood • , walkways and staircases replacements. ( part of 396 SF above). Reframe deck beams to fasten replacement decking of 5/4" x 6' WE wood with stainless steel screw fasteners. Note: overall existing fixed d Ek (193 SF ) plus proposed fixed deck extension, ramp and floating dock(432 SF ) is 625 SF. ® E E I I E JUL - 1 2019 L—Southold-Town arofrs Michael J. Domino, President �o� �Gy Town Hall Annex John M. Bredemeyer, III, Vice-President ' 54375 Route 25 Glenn Goldsmith N = P.O. Box 1179 A Nicholas Krupski y Southold, NY 11971 Greg Williams dol , dao Telephone (631) 765-1892 Fax (631) 765-6641 SOUTHOLD TOWN BOARD OF TRUSTEES TO: SOUTHOLD TOWN BUILDING DEPARTMENT RE: VERIFICATION OF BUILDING DEPARTMENT PERMIT RIREMENTS P"D .i ?l'40 SCTM#: JUN 6 2019 Property Owner Name: 12ga cyu p6N0 WC-1 Date Sent to Bldg. Dept: The Office of the Board of Trustees is forwarding the above referenced application for verification of the Building Department's permitting requirements stated below: YES NO Will the proposed project require a Building Permit? Will the,,proposed project require a variance determination from the Zoning Board of Appeals? Will any part of this application be considered a Demolition as described under Town Code? COMMENTS: !V 1-7h q Ji ure of Revi wer Date yMichael J.Domino,President �:� Town Hall Annex 54375 Route 25 John M.Bredemeyer III,Vice-President P.O.Box 1179 Glenn Goldsmith ;, Southold,New York 11971 A.Nicholas KrupskiV Telephone(631) 765-1892 Greg Williams �`/ )' Fax(631) 765-6641 0'4u BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD This Section For Office Use Only Coastal Erosion Permit Application Wetland Permit Application Administrative Permit Amendment/Transfer/Extension 4a; MAY 3 1 2019 6' n Received Application: Jr g Ig Of— Received Fee: Completed Application: qtu!t!o;:i ios;r Incomplete: "" SEQRA Classification: Type I Type II Unlisted Negative Dec. Positive Dec. Lead Agency Detennination Date: Coordination:(date sent): 6 24,l q V, LWRP Consistency Assessment Form Sent: CAC Referral Sent: Date of Inspection: �.(D•(q Receipt of CAC Report: Technical Review: Public Hearing Held: • Resolution: Owner(s) Legal Name of Property(as shown on Deed): 1,940 �L RO/flh� LG G Mailing Address: NV 012 2 Z Phone Number: 183 —404Z Suffolk County Tax Map Number: 1000- Z2 /_ -�=-'-S _ Property Location: Z40 /A&,Er jEXIMAIROA1. (If necessary,provide LILCO Pole#, distance to cross streets, and location) AGENT(If applicable): h ,061 A 9111.4 CSC Mailing Address: )PC- BOX 1047, SO UZ� 614-d ,(/ Y /-/!?7 Phone Number: ,'� 6 66J�— 6907 �Y ��S Board of Trustees Application GENERAL DATA Land Area(in square feet): Area Zoning: -4O Previous use of property: QA46 A/V/e k Intended use of property: fJ,g/1/7"l,$L 0405 ��11414Y Covenants and Restrictions on property? Yes No If"Yes", please provide a copy. Will this project require a Building Permit as per Town Code? Yes No If"Yes", be advised this application will be reviewed by the Building Dept. prior to a Board of Trustee review and Elevation Plans will be required. Does this project require a variance from the Zoning Board of Appeals? Yes X No If"Yes",please provide copy of decision. Will this project require any demolition as per Town Code or as determined by the Building Dept.? X_Yes No Does the structure (s) on property have a valid Certificate of Occupancy? Yes No Prior permits/approvals for site improvements: Agency Date /997 No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency? No—Yes If yes, provide explanation: Project Description (use attachments if necessary): �I PROJECT DESCRIPTION REPLACEMENT OF PORTION OF EXISTING BULKHEAD Remove approximately 130 feet of existing wood sheathed bulkhead, whalers, top cap, tie rods and 8" diam. pilings. Dispose of offsite. Install approx.. 130 lin, feet of new vinyl (medium weight) bulkhead consisting of two (2) 6" x 6" whalers, one (1) 4" x 6" back board, IPE top cap, 8" diam. pressure treated pilings @ 6 feet O.C. w/%" galy. steel tie rods connected to 8" thick retaining wall w/3/8" x 6" square steel back plate. BEDECK EXISTING FIXED DOCK; EXTEND W/ NEW FIXED DOCK, RAMP, FLOATING DOCK Construct new four (4 ')wide dock seaward from existing dock ( EI. 7.39') w/ a two tread staircase to EI. 5.5', a distance of 64 feet, w/ nine (9) sets of 8" pressure treated pilings @ 8 feefO.C. (256 S.F.). Construct right angle dock section four (4') in width @ 32 feet in length, w/four (4) sets of 8" pressure treated pilings. ( 128 S.F.). Install a 3'x 8' aluminum removable ramp (24 S.F.), Construct and install a 6'x 20 'floating dock w/ two (2) 10" pressure treated pilings and one (1) batter piling w/ (2) 10" pressure treated pilings. ( 120 S.F. ). Install four (4) batter pilings consisting of (2) 10" pressure treated pilings. Remove wood decking from existing fixed dock and reframe deck beams to fasten new 5/4" x 6" IPE wood decking w/ stainless steel screw fasteners. Decking for new fixed dock sections and floating dock to be 5/4 "x 6" IPE wood w/ stainless steel screw fasteners. Total new fixed dock, ramp and floating dock: 432 S.F. Existing fixed dock is 184 S.F. ( includes bench). Overall total:616 S.F. REMOVE AND REPLACE WOOD DECKS, WALKWAYS, STAIRCASES Remove 562.5 S.F. of existing wood decks w/ staircases and replace w/ pressure treated wood framing and IPE wood decking w/stainless steel screw fasteners. Remove 396.3 S.F. of remaining walkways and staircases and replace w/ pressure treated wood framing and IPE wood treads w/ stainless steel screw fasteners. REMOVE WOOD RETAINING WALL, PIERS, WOOD WALKWAY /DECK AND REPLACE WITH CONCRETE RETAINING WALLS/ GRAVEL FILLED Remove 436 S.F. of existing wood walkway/ deck w/wood retaining wall and piers and replace w/223 lin. Ft.+/- of 8" concrete retaining walls w/footings, filled w/gravel and topped w/ 11/2" -2" peastone O/E for pervious walkway/ deck area. I , i Board of Trustees Applicazi:on i WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations:, 10.P.r,�VO f,14— TJ4�/O,P.4T pJECLCS 4r/1CkU_JAV5 J7,XZRCASE5 d 1PEPLA i?4 rd i S41glV a VhSrel_ e z I&A-cG4e CRA1'7' Area of wetlands on lot: __ square feet Percent coverage of lot: O % Closest distance between-nearest existing structure and upland edge of wetlands:., feet Closest distance between nearest proposed structure and upland edge of wetlands:feet Does the project involve excavation or filling? No Yes If yes, how much material will be excavated? Q cubic yards How much material will be filled? 5- cubic yards ¢ Depth of which material will be removed or deposited: �� feet 4V&. Proposed slope throughout the area of operations: ,�L ZZV FLA 7— Manner Manner in which material will be removed or deposited: Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations(use attachments if appropriate): T.�c4n 5 I SI/[L NGT 4�crc cT' U46rz'#_ US .�'V /,VR MY-IM94& 4A55_C7-A5 64111Y r" ���D OOCdG �x r,�NSIaU- ' i 1 61 Z20 Appendix B Short Environmerntal Assessment Form Instructions for Completing, Part l -Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding,are subject to public review,and may be subject to further verification. Complete Part 1 based on infonnation currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part 1 -Project and Sponsor Information Name of Action or Project: /2 40 Gi2moo" 4LG - Project Location(describe,and attach a location map): 1-5—W 67 WZEr j5XX. 67F N P OR7- Brief Description of Proposed Action: IF .S� /'�D��r✓`r' 1>,�SC�lyT�QitJ Goy��lJ/NC> Name of Applicant or Sponsor: Telephon 6� �- Address: O 164-7 _ City/PO: W State: Zip Code: G �� 7 1.Does the proposed action only involve the legislative adoption of a plan,local law,ordinance, NO YES administrative rule,or regulation? If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that ❑ may be affected in the municipality and proceed to Part 2. If no,continue to question 2. 2. Does the proposed action require a permit,approval or funding from any other governmental Agency? NO YES If Yes,list agency(s)name and permit or approval: Wsa,��, USA Com, Al Y,0-0-5 ❑ 3.a.Total acreage of the site of the proposed action? acres b.Total acreage to be physically disturbed? _acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? Q, ,3 acres 4. Check all land uses that occur on,adjoining and near the proposed action. ❑Urban ❑Rural(non-agriculture) ❑Industrial ❑Commercial esidential(suburban) El Forest ClAgriculture El Aquatic ❑Other(specify):_ � ❑Parkland Page Y of 4 1 PROJECT DESCRIPTION REPLACEMENT OF PORTION OF EXISTING BULKHEAD Remove approximately 130 feet of existing wood sheathed bulkhead, whalers, top cap,tie rods and 8" diam. pilings. Dispose of offsite. I Install approx.. 130 lin. feet of new vinyl (medium weight) bulkhead consisting of_two (2) 6" x 6" whalers, one (1) 4" x 6" back board, IPE top cap, 8" diam. pressure treated pilings @ 6 feet O.C. w/W galy. steel tie rods connected to 8"thick retaining wall w/ 3/8" x 6" square steel back plate. BEDECK EXISTING FIXED DOCK; EXTEND W/ NEW FIXED DOCK, RAMP, FLOATING DOCK Construct new four (4 ') wide dock seaward from existing dock ( El. 7.39') w/ a two tread staircase to El. 5.5', a distance of 64 feet, w/ nine (9) sets of 8" pressure treated pilings @ 8 feefO.C. (256 S.F.). Construct right angle dock section four (4') in width @ 32 feet in length, w/four(4) sets of 8" pressure treated pilings. ( 128 S.F.). Install a 3'x 8' aluminum removable ramp (24 S.F.), Construct and install a 6'x 20 'floating dock w/two (2) 10" pressure treated pilings and one (1) batter piling w/ (2) 10" pressure treated pilings.,( 120 S.F. ). Install four (4) batter pilings consisting of(2) 10" pressure treated pilings. Remove wood decking from existing fixed dock and reframe deck beams to fasten new 5/4" x 6" IPE wood decking w/ stainless steel screw fasteners. Decking for new fixed dock sections and floating dock to be 5/4 "x 6" IPE wood w/stainless steel screw fasteners. Total new fixed dock, ramp and floating dock: 432 S.F. Existing fixed dock is 184 S.F. ( includes bench). Overall total:616 S.F. REMOVE AND REPLACE WOOD DECKS, WALKWAYS, STAIRCASES Remove 562.5 S.F. of existing wood decks w/ staircases and replace w/ pressure treated wood framing and IPE wood decking w/stainless steel screw fasteners. Remove 396.3 S.F. of remaining walkways and staircases and replace w/ pressure treated wood framing and IPE . wood treads w/ stainless steel screw fasteners. REMOVE WOOD RETAINING WALL, PIERS, WOOD WALKWAY /DECK AND REPLACE WITH CONCRETE RETAINING WALLS/ GRAVEL FILLED Remove 436 S.F. of existing wood,walkway/deck w/wood retaining wall and piers and replace w/223 lin. Ft.+/- of 8" concrete retaining walls w/footings,'filled w/gravel and topped w/ 11/2" -2" peastone O/E for pervious walkway/ deck area. 5. Is the proposed action, NO YES N/A a.A permitted use under the zoning regulations? ❑ �( ❑ b.Consistent with the adopted comprehensive plan? 1:1--X�J ❑ 6. is the proposed action consistent with the predominant character of the existing built or natural NO YES landscape? ❑ INJI 7. Is the site of the proposed action located in,or does it adjoin,a state listed Critical Environmental Area? NO YES If Yes,identify: _ ❑ 8. a.Will the proposed action result in a substantial increase in traffic above present levels? NO YES b.Are public transportation service(s)available at or near the site of the proposed action? 111271 ❑ c.Are any pedestrian accommodations or bicycle routes available on or near site of the proposed action? ❑ 9.Does the proposed action meet or exceed the state energy code requirements? NO YES If the proposed action will exceed requirements,describe design features and technologies: � ❑ 10. Will the proposed action connect to an existing public/private water supply? NO YES If No,describe method for providing potable water: /V14 I I.Will the proposed action connect to existing wastewater utilities? NO YES If No,describe method for providing wastewater treatment. /�/ ❑ 12. a.Does the site contain a structure that is listed on either the State or National Register of Historic NO YES_ Places? I �`l b. Is the proposed action located in an archeological sensitive area? !❑ 13.a.Does any portion of the site of the proposed action,or lands adjoining the proposed action,contain NO YES wetlands or other waterbodies regulated by a federal,state or local agency? b.Would the proposed action physically alter,or encroach into,any existing wetland or waterbody? ❑ If Yes,identify the wetland or waterbody and extent of alterations in square feet or acres: 14. Identify the typical habitat types that occur on,or are likely to be found on the project site. Check all that apply: 10 Shoreline ❑Forest ❑Agricultural/grasslands ❑Early mid-successional Al Wetland ❑Urban Suburban 15.Does the site of the proposed action contain any species of animal,or associated habitats, listed NO YES by the State or Federal government as threatened or endangered? Z ❑ 16.Is the project site located in the 100 year flood plain? NO YES P17.Will the proposed action create storm water discharge,either from point or non-point sources? NO YES If Yes, a.Will storm water discharges flow to adjacent properties? ❑NO DYES Nor I ❑ b.Will storm water discharges be directed to established conveyance systems(runoff and storm drains)? If Yes,briefly describe: ❑NO DYES Page 2 of 4 i - i i 18 Does the proposed action include construction or other activities that result in the impoundment of NO YES water or other liquids(e g.retention pond,waste lagoon,dam)? If Yes,explain purpose and size; �[ ❑ 19.Has the site of the proposed action or an adjoining property been the location of an active or closed NO YES solid waste management facility? If Yes,describe; _ ❑ 20.Has the site of the proposed action or an adjoining property been the subject of remediation(ongoing or NO YES completed)for hazardous waste? If Yes,describe: 1 AFFIRM THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor name: /�' _ ,�J C'K Date: Signature: Part 2-impact Assessment. The Lead Agency is responsible for the completion of Part 2. Answer all of the following questions in Part 2 using the information contained in Part I and other materials submitted by the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by the concept"Have my responses been reasonable considering the scale and context of the proposed action?" No,or Moderate small to large impact impact [nay may Occur occu1' 1. Will the proposed action create a material conflict with an adopted land use plan or zoning regulations? 2. Will the proposed action result in a change in the use or intensity of use of land? ❑ L 3. Will the proposed action impair the character or quality of the existing community? 4. Will the proposed action have an impact on the environmental characteristics that caused the ❑ establishment of Critical Environmental Area(CEA)? 5. Will the proposed action result in an adverse change in the existing level of traffic or ❑ affect existing infrastructure for mass transit,biking or walkway? 6. Will the proposed action cause an increase in the use of energy and it fails to incorporate _ Elrcttsonably available energy conservation or renewable energy opportunities? 7. W ill the proposed action impact existing: a a.public/private water supplies? b.public/private wastewater treatment utilities? FI 8. Will the proposed action impair the character or quality of important historic,archaeological, architectural or aesthetic resources? 9. Will the proposed action result in an adverse change to natural resources(e.g.,wetlands, (� waterbodies,groundwater,air quality, flora and fauna)? J—! Page 3 of 4 l ; I No,or Moderate small to large impact impact may may occur occur 10. Will the proposed action result in an increase in the potential for erosion,flooding or drainage (---I problems? M 0 11. Will the proposed action create a hazard to environmental resources or human health? Part 3-Determination of significance. The Lead Agency is responsible for the completion of Part 3. For every question in Part 2 that was answered"moderate to large impact may occur",or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact,please complete Part 3. Part 3 should, in sufficient detail, identify the impact,including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant. Each potential impact should be assessed considering its setting,probability of occurring, duration,irreversibility,geographic scope and magnitude. Also consider the potential for short-term, long-term and cumulative impacts. ❑ Check this box if you have determined,based on the information and analysis above,and any supporting documentation, /nvironmental t the proposed action may result in one or more potentially large or significant adverse impacts and an impact statement is required. eck this box if you have determined,based on the information and analysis above,and any supporting documentation, that the proposed action will not result in any significant adverse environmental 'mpac s. Town of Southold-Board of Trustees y Name of Lead Agency Date President President —Print or Type Name of Responsible O !icer in Lead Agency. _ _ Title of Responsible Officer... ~Siff Respons,14 Officer in Lead Agency Signature of Preparer(if different from Responsible Officer) PRINT Page 4 of 4 I . l Board of Trustees Application I � I ' AFFIDAVIT ` i i x(/0,2 SUSr.4/V/y ,� BEING,DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMITS) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF,AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE BOARD OF TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES,THEIR AGENT(S) OR REPRESENTATIVES,INCLUDING THE CONSERVATION ADVISORY COUNCIL,TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH THIS APPLICATION, INCLUDING A FINAL INSPECTION. I FURTHER AUTHORIZE THE BOARD OF TRUSTEES TO ENTER ONTO MY PROPERTY AND AS REQUIRED TO INSURE COMPLIANCE WITH ANY CONDITION OF ANY WETLAND OR COASTAL EROSION PERMIT ISSUED BY THE BOARD OF TRUSTEES DURING THE TERM OF THE PERMIT. I Signa ert Owner Signature of Property Owner MEI SWORN TO BEFORE ME THIS ,� DAY OF_ 1201? Y ' Notary Public MICHAELA.110MACK Ndry Public,State of New'Ywk No.02105058823 Cualified in Nassau County Commission Expires March 11,2022 ; I i � I Board of Trustees Application I, AUTHORIZATION i (Where the applicant is not the owner) j - 1 owners of the property identified as SCTM# 1000- Z& IS /0 in the town of New York, hereby authorizes .4. ORA C/C to act as my agent and handle all necessary work involved with the application process for permit(s)from the Southold Town Board of Trustees for this property. Property Owner's Signatu Property Owner's Signature SWORN TO BEFORE ME THIS .DAY OF ,�,� )/ '.20 /9 Xo4z a Notary Public MICHAEL A.I(IMACK Notary Public,State of New York No.021<15056823 oualified in Nassau County Commission Expires March 11,20M APPLICANUAGENT/REPRESENTATIVE TRANSACTIONAL DISCLOSURIi{FORM The Town of Sottthold's Code of Ethics nroliibits conflicts of interest on the part of town irfl'icers and emnlovees.The purpose of this form is toprovide information which can alert the town ofpossible conflicds of interestand allow it to take whatever action is neMary to avoid,same. 9 YOUR NAME: Pr,_4_N Ee A�Q96A U-S (Last name,first name,piiddle initial,unless you are applying in the name of someone else or other entity,such as a company.If so,indicate the other person's or company's name.) NAME OF APPLICATION: (Check all that apply.) Tax grievance Building Variance Trustee Change of Zone _ Coastal Erosion Approval of plat Mooring Exemption from plat or official map Planning _ Other (If"Other',name the activity.) _ Do you personally(or through your company,spouse,sibling;parent,or child)have a relationship with any.officer oremployee of the Town of Southold? "Relationship"includes by blood,marriage,or business interest."Business interest"means a business, including a partnership,in which the town officer or employee has even a•parlial ownership of(or cmploymcat by)a corporation in which the town officer of employee owns more than S%of the shares. YES NO If you answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicant/agcnt/representative)and the town officer or employee.Either check the appropriate line A)through D)and/or describe in the space provided. The town officer or employee or his or her spouse,sibling,parent,or child is(check all that apply): A)the owner of greater than S%of the shaves of the corporate stock of the applicant (when the applicant is a corporation); l3)the legal or beneficial ownet of any Interest in a noir-corporate entity(when the applicant is not a corporation); C)an officer,director,partner,or employee of the applicant;or D)the actual applicant. DESCRIPTION OF RELATIONSHIP Submitted this day of /l 20� Signature Print Name. FMAMIAe Form TS l i I APPLICANT/AGENT/REPRESENTATIVE TRANSACTIONAL DISCLOSURE FORINT The Town of S cthold's"Code fEthics prohibits conflicts pf interest cin the Rart of town bffi6drs and em fo ees.The RuEpose of this farm is to Mvide information}which can alert the town,of possible conflicts of interest and allow it to take whatever action is necessary to avoid same. YOUR NAME: KZ y C'�C C���4 (Last name,first nfime,rpiddle initial,unless you are applying in the name of someone else or other entity,such as a company.If so,indicate the other person's or company's name.) NAME OF APPLICATION: (Check all that apply.) Tax grievance Building Variance Trustee Change of Zone Coastal Erosion Approval of plat Mooring Exemption from plat or official map Planning Other (If"Other',name the activity.) Do you personally(or through your company,spouse,sibling,parent,or child)have a relationship with any officer or employee of the Town of Southold? "Relationship"includes by blood,marriage,or business interest.`Business interest"means a business, including a partnership,in which the town officer or employee has even a partial ownership of,(or employment by)a corporation in which the town officer or employee owns more than 50/4 of the shares. YES NO If you answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicant/agent/representative)and the town officer or employee.Either check the appropriate line A)through D)and/or describe in the space provided. The town officer or employee or his or her spouse,sibling,parent,or child is(check all that apply): A}the owner of greater than 5%of the shares of the corporate stock of the appiicunt (when the applicant is a corporation); B)the legal of beneficial owner of any interest in a non-corporate entity(when the applicant is not a corporation); C}an officer,director,partner,or employee of the applicant;or D)the actual applicant. DESCRIPTION OF RELATIONSHIP Submitted this _day of ,4 /20,/0 Signature a Print Name 4f/ ,F/A .L k &MfAVe- Form TS 1 a Michael J.Domino, President { `O�Q e � Town Hall Annex John M. Bredemeyer I11, Vice-President bl tiy` ��q 54375 Route 25 Glenn Goldsmith y P.O.Box 1179 A.Nicholas Krupski Pry# Southold,NY 11971 Greg Williams ��D �pl� Telephone(631)765-1892 r Fax(631)765-6641 BOARD OF TOWN TRUSTEES i TOWN OF SOUTHOLD BOARD OF TRUSTEES: TOWN OF SOUTHOLD --------------------------------------------------------------- In the Matter of the Application of PETER& MARISA PATINELLA COUNTY OF SUFFOLK STATE OF NEW YORK AFFIDAVIT OF POSTING THIS FORM IS TO BE COMPLETED AFTER POSTING REMAINS IN PLACE FOR AT LEAST SEVEN DAYS PRIOR TO THE PUBLIC HEARING DATE I, C�1i / , � eding at/dba D SPUN oLITAI &?V being duly sworn, depose and say: That on theZAoday of 1-ULV , 2017, I personally posted the property known as 44 O -royny 4A/L & 4077 g6D/V by placing the Board of Trustees official poster where it can easily be seen, and that I have checked to be sure the poster has remained in place for eight days prior to the date of the public hearing. Date of hearing noted thereon to be held Wednesday, July 17, 2019. Dated: &:9/'/�_ "�/'��/"'�z (signature) Sworn to before me this /r fh day of fyq 20Iq got*,., DIANE DtSAlVO Notary Public NOTARY PUBLIC-STATE OF NEW YORK No, 0101475593 Q4011NOCI In Suffolk County MV C®I+ MIAt1®n Explrss April 30, 202y YC' f PROOF OF MAILING OF NOTICE ATTACK CERTIFIED MAIL RECEIPTS i I, Name: Address: �6-z- 23.z Nlch�os ou�z�a p a. aa"'� C�?R pL rUrfllLL /`�U/✓7rhlG TOp/, N Y c oz P o- ,��'� )6 z rvriylL� �,� yoT N Y -Ur7-0A/ Sr ll�o J,�utL �a� �Lc �,g,�oo1�LY�/, ,N-Y 11227 STATE OF NEW YORK COUNTY OF SUFFOLK hf 5� , fi�J_ Jf , residing at �? Q. ,�aX �� �7 rouI-yacD. Aly/147i , being duly sworn, deposes and says that on the day of---Q , 20ff, deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite there respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at , that said Notices were mailed to each of said persons by CERTIFIED MAIL/RETURN RECEIPT. Sworn to before me this Day o 20 Notary Public CONNIE Q.BUNCH (Votary Public,State of New York No.01 BU6185050 Qualified in Suffolk County Commission Emires April 14,,2_t�O .n J7 BRQtfI:LYA�� i�Y 1122� � �, ;� � -� •� � BRQpK�.YAlr NY 21,s2�3. � � : —1 i n.1 i J lV u t: :f., r.(U L�J .- W.. I.t a jf All I� � 9 Ln Certified Mad Fee $3.�� [14 Ti I Lf) Certified Mall Fee 0 0 $3.50 097.1 i $ i $ 02 Extra Services&Fees(check box,add fee�s.�pp t V Extra Services&Fees(checkbox,add feeppprpLY(dte) ❑Retum Receipt(hardcopy) $ iU.LrV 7 ��y�'\, E:3 ❑Return Receipt(hardcopy) $ VV•11..�f . C-3 Return Receipt(electronic) $___ O El Return Receipt(electronic) $ \`✓ —' \ L/Postmark \ ' 0 El Certified Mail Restricted Deli $ s`` / Here El Certified Mail Restricted Delivery $_$�_0� �+/ Here C ❑Adult Signature Required $ w.r. .tiny(�1\ i 0 E]Adult Signature Required $ r•,./y i ❑Adult Signature Restricted Delivery$�����) VVV���� LI Adult Signature Restricted Delivery$ GG t0 ®� 6® � $ostage $0.70 �� � Postage $1.70 U) nj $tel Postage and Fees - 19 ru $Total Postage and Fgy, 00 7; 6/ 019 / ., us _ 1L Sent To 1— Sent To a 1/ .? LL_ ---------------------- �j��1flJ ��s/�-+-{I�,_CA Z,04 7'f1TlL C3 Sff'at d Apt No.,or PU Box No C3 StrZet and Apf No.,br F�Bdk I(O, { Citye� f1TXhh�O�/ fiAI-,V - ---- 7A -BL7X lbz OV AI- State,Z + 1 T' o o a,- j ® a o ® .. a) u1 o>a o RE w €€m ¢ Ir "Da ® Q-7Q O� �Z u2;•� a cc> a o• - a - w . o❑ � ❑ �vv �°i'v'UUC � � � � � uA ,n � 1] � �d, � j HUN� GTQ�l�NY Jam , �� h E I E £ (' U T C W�j�p NiQ-C Cl LP) Certified Mad Fee $3.�0 0971 • a.Ei o nc.¢¢eA 2 COy M a`)i O $ � ❑013 YI ❑O o Extra Services&Fees(check box,add fee 2 Rn 2 V VU ) �•+e � �L • aj � ani 'Q O ❑ Return Receipt(hardcopy) $ • i (7 El Return Receipt(electronic) $ $f1.00 ��A Postmark • Z "� - Q ❑Certified Mail Restricted Delivery $ $()-�� Her,% r3 ❑Adult Signature Required $ et r. AfY r•y o� 6 1 C to > O d Q :—VLT �d tri_ � •p c O E]Adult Signature Restricted Delivery$ / •C v to rn 1O Postage $� ? /' V v�v v r ..A $ 11 �y J v a®¢Eru > m Total Postage and Fe s r,00 , at at d COL o Io o —•d ¢ I Iti Sent To `, (��Mot n ♦ 04) y_ "r Y �O 0 U�YLiSIJ_X Y��-- _T_ .LC�--����4/---------- • 4 X CO p ani •9'C'L=dr_c e �. S eet, Apt No.,or Pb Box No ��fj? ¢¢� U U N Nv tti `? ai❑O ❑17f717❑ �s._� d 9 �,ty state, f i 1A16OR— "" V NY !1743 a a'w' CO 4. N (V p 0 W V1 N c C o ti • No E �/ V _® N era. I th � � YE c00 Er C3 M an.1 z - C -L .O Q �� E 0 a CO N*+ a) 0 to C U C3 LO 'OS CCOL CO CD rLO " N �+ O .a rn mo a � v V ® C:) � DIr � 0) E 0000 CLcomic m 0 LO M PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS Name: STATE OF NEW YORK COUNTY OF SUFFOLK residing at being duly sworn, deposes and says that on the day of , 20_____, deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite there respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at , that said Notices were mailed to each of said persons by CERTIFIED MAIL/RETURN RECEIPT. Sworn to before me this Day of , 20 Notary Public NUTILL Uim Ht: AKING NOTICE IS HEREBY GIVEN that a Public Hearing will be held by the Southold Town Board of Trustees at the Town Hall, 53095 Main Road, Southold, New York, concerning this property. OWNER(S) OF RECORD : 1240 GULL POND, LLC SUBJECT OF PUBLIC HEARING : Please see attached Project Description Page posted with this notice. TIME & DATE OF PUBLIC HEARING : Wednesday, July 17, 2019 — at or about 5 :30P. M . If you have an interest in this project, you are invited to view the Town file(s) which are available for inspection prior to the day of the hearing during normal business days between the hours of B a.m. and 4 p.m. BOARD OF TRUSTEES * TOWN OF SOUTHOLD * (631) 765-1892 Michael J.Domino,President OQF SOUTl Town Hall Annex John M.Bredemeyer III,Vice-President 54375 Route 25 h O P.O.Box 1179 Glenn Goldsmith Southold,New York 11971 A.Nicholas Krupski Telephone(631) 765-1892 Greg Williams �Q Fax(631) 765-6641 lroulm,� 1 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD PUBLIC HEARING FOR THIS PROPOSED PROJECT TO BE HELD ON WEDNESDAY, JULY 17, 2019 AT OR ABOUT 5:30P.M. IN THE TOWN HALL MEETING HALL PROJECT DESCRIPTION FOR: Michael Kimack on behalf of 1240 GULL POND, LLC LOCATED: 1240 INLET LANE EXTENSION, GREENPORT SCTM# 1000-36-2-24 For a Wetland Permit to remove approximately 130' of existing wood sheathed bulkhead, whalers, top cap, tie rods and 8" diameter pilings and dispose of off-site; install approximately 130 linear feet of new vinyl bulkhead consisting of two (2) 6"x6" whalers, one (1) 4"x6" back board, IPE top cap, 8" diameter pressure treated pilings @ 6' o.c. with 3/a" galvanized steel tie rods connected to 8" thick retaining wall with 3/8"x6" square steel back plate; construct new 4' wide dock seaward from existing 193sq.ft. fixed dock (includes bench) with a two-tread staircase a distance of 64', with nine'(9) sets of 8" diameter pressure treated pilings @ 8' o.c. (256sq.ft.); construct right angle fixed dock section 4' in width and 32' in length with four (4) sets of 8" diameter pressure treated pilings (128sq.ft.); install a 3'x8' aluminum removable ramp (24sq.ft.); constructand install a 6'x20' floating dock with two (2) 10" diameter pressure treated pilings and one (1) batter piling with (2) 10" diameter pressure treated pilings (120sq.ft.); install four (4) batter pilings consisting of (2) 10" diameter pressure treating pilings; remove wood decking from existing fixed dock and reframe deck beams to fasten new 5/4" thick by 6" wide'IPE wood decking with stainless steel screw fasteners; decking for new fixed dock sections and floating dock to be 5/4" thick by 6"' wide IPE wood with stainless steel screw fasteners; total new fixed dock, ramp and floating dock: 432sq.ft., and overall total dock: 625sq.ft.; remove 562.5sq.ft. of existing wood decks with staircases and replace with pressure treated wood framing and IPE wood decking with stainless steel screw fasteners; remove 396.3sq.ft. of remaining walkways and staircases and replace with pressure treated wood framing and IPE wood treads with stainless steel screw fasteners; remove 436sq.ft. of existing wood walkway/deck with existing wood retaining wall and piers and replace with 223 linear feet of ±8" concrete retaining walls with footings, filled with gravel and topped with 1 '/z" — 2" peastone o/e for pervious walkway/deck area; for the existing 44' long by 4' wide dock (176sq.ft.) with a 2'x8.5' (17sq.ft.) wood bench for a total of 193sq.ft.; the connecting staircase is proposed to be removed and replaced,'as part of the wood decks, walkways and staircase replacements (part of 396sq.ft. above); and reframe deck beams to fasten replacement decking of 5/4" x 6' IPE wood with stainless steel screw fasteners. Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS 1 1.. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used I by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion HazardArea. 2. Before answering-the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action willi be evaluated as to its significant beneficial and adverse effects u on the coastal area which includes all of Southold Town . 3: If any question in Section C on this form is answered "yes" or"no", then the proposed action will affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, each answer must be explained in detail', listing both,supporting and non- supporting facts: If an action cannot be certified as consistent with the LWRP policy standards and conditions, it-shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold's website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# PROJECT NAME- 1,24 O GOGL pON0 1_4C The Application has been submitted to(check appropriate response): Town Board ❑ Planning.Board❑ Building Dept. ❑ Board of Trustees 1. Category of Town of Southold agency action(check appropriate response): (a) Action undertaken directly by Town agency(e.g. capital ❑ construction,planning activity,agency regulation,land transaction) (b) Financial assistance(e.g. grant,loan,subsidy) (c) Permit,approval,license,certification: Nature and extent of action: II PROJECT DESCRIPTION REPLACEMENT OF PORTION OF EXISTING BULKHEAD Remove approximately 130 feet of existing wood sheathed bulkhead, whalers, top cap, tie rods and 8" diam. pilings. Dispose of offsite. Install approx.. 130 lin. feet of new vinyl (medium weight) bulkhead consisting of two (2) 6" x 6" whalers, one (1) 4" x 6" back board, IPE top cap, 8" diam, pressure treated pilings @ 6 feet O.C. w/W gaiv. steel tie rods connected to 8" thick retaining wall w/ 3/8" x 6" square steel back plate. kEDECK EXISTING FIXED DOCK; EXTEND W/ NEW FIXED DOCK, RAMP, FLOATING DOCK Construct new four (4 ') wide dock seaward from existing dock ( EI. 7.39') w/ a two tread staircase to EI. 5.5', a distance of 64 feet, w/ nine (9) sets of 8" pressure treated pilings @ 8 feefO.C. (256 S.F.). Construct right angle dock section four (4') in width @ 32 feet in length, w/ four (4) sets of 8" pressure treated pilings. ( 128 S.F.). Install a 3'x 8' aluminum removable ramp (24 S.F.), Construct and install a 6'x 20 'floating dock w/two (2) 10" pressure treated pilings and one (1) batter piling w/ (2) 10" pressure treated pilings. ( 120 S.F. ). Install four (4) batter pilings consisting of(2) 10" pressure treated pilings. Remove wood decking from existing fixed dock and reframe deck beams to fasten new 5/4" x 6" IPE wood decking w/ stainless steel screw fasteners. Decking for new fixed dock sections and floating dock to be 5/4 "x 6" IPE wood w/stainless steel screw fasteners. Total new fixed dock, ramp and floating dock: 432 S.F. Existing fixed dock is 184 S.F. ( includes bench). Overall total:616 S.F. REMOVE AND REPLACE WOOD DECKS, WALKWAYS, STAIRCASES Remove 562.5 S.F. of existing wood decks w/ staircases and replace w/ pressure treated wood framing and IPE wood decking w/stainless steel screw fasteners. Remove 396.3 S.F. of remaining walkways and staircases and replace w/ pressure treated wood 'framing and IPE wood treads w/ stainless steel screw fasteners. REMOVE WOOD RETAINING WALL, PIERS, WOOD WALKWAY /DECK AND REPLACE WITH CONCRETE RETAINING WALLS/ GRAVEL FILLED Remove 436 S.F. of existing wood walkway/ deck w/wood retaining wall and piers and replace w/ 223 lin. Ft.+/- of 8" concrete retaining walls w/footings, filled w/gravel and topped w/ 11/2" -2" peastone O/E for pervious walkway/ deck area. Location of action: 1-2402 ,/6 r77 li Site acreage:_ Present land use: Present zoning classification: �— Q i 2. If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: Z-240 n UCL P Q&D a LZ C b Mailing address: 13,70 6 A/ „ 1122Z ` (c) Telephone number: Area Code (d) Application number, if any: /V/)q- Will the action be directly undertaken,require funding,or approval by a state or federal agency? Yes ❑ No If'yes,which state or federal agency? i C. Evaluate the project to the following policies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form be returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space,makes efficient use of infrastructure,makes beneficial use of a coastal location,and minimizes adverse effects of development. See LWRP Section III–Policies; Page 2 for evaluation criteria. Oyes ❑ No ❑ Not Applicable VAL ILL: A10 M7725,oMl &5 d M4 C S L(1lLL c wu57 o5 o Attach additional sheets if necessary ' Policy, 2. Protect and preserve historic- and archaeological resources, of the Town of Southold. See LWRP Section III–Policies Pages 3 through 6 for evaluation criteria ❑ Yes ❑ No 21 Not Applicable ' t j . AAA ,4"Zoc C,k,Ai&,tn .)t 1 Attach additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III—Policies Pages 6 through 7 for evaluation criteria ❑ Yes ❑ NoZ Not Applicable of c c PMEV " Attach additional sheets if necessary NATURAL. COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III—Policies Pages 8 through 16 for evaluation criteria 16J Yes F] No ❑ Not Applicable !� !G D Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III —Policies Pages 16 through 21 for evaluation criteria ❑ Yes ❑ No J!KK Not Applicable C NO rk A,-8Z-J C D Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III—Policies; Pages 22 through 32 for evaluation criteria. ❑ ❑ Yes No Not Applicable � 1 EGUCY (2 &07' A->"-2JZ C,4&e TO zz�s ?,eOT)E:CT- �� Attach additional sheets if necessary „ Policy 7. Protect and improve air quality in the Town of Southold. `See LWRP Section III — Policies Pages 32 through 34 for evaluation criteria. ❑ Yes ❑ No Z Not Applicable &XI CY PZOZ15C Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III—Policies; Pages 34 through 38 for evaluation criteria. ❑Yes ❑ NoZ1 Not Applicable PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III—Policies; Pages 38 through 46 for evaluation criteria. ❑ Yel—I No KI Not Applicable 9 Ae&jc,#�� ri0 Attach additional sheets if necessary , - I I WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III—Policies; Pages 47 through 56 for evaluation criteria. ❑ Yes ❑ No.� Not Applicable _- 32941Cy io 1167" c Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III—Policies; Pages 57 through 62 for evaluation criteria. ❑ Yes 1221 No ❑ Not Applicable L� C o e Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III—Policies; Pages 62 through 65 for evaluation criteria. ❑ Yes ❑ Noz Not Applicable M 6Z Mw , RZICA 13c� Tb eRAD�%- c= Attach,additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III—Policies; Pages 65 through 68 for evaluation criteria. ❑ Yes ❑ No, Not Applicable GG/Cy IF Nom d&1Z/C,, Trs o cT PREPARED BYE, kl/"A C TITLEDATE