Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
6/9/17 Presubmission Application
7/2/20 Approved Plans
Andrew Hintze re MFD Radio Communications
AT&T Propagation Maps Recvd 2-6-2018
AT&T's Supplemental RF materials, including search ring maps
Base Pole Calculations from Vector Engineers rcvd 2/24/2020
Base Pole Drawings from Vector Engineers rcvd 2/24/2020
CityScape 11/5/18 Report
CityScape Correspondence Preliminary Review
CityScape Review 5/2018
Construction Drawings w/ Site Plans & Elevations dated 10/7/16
Construction Drawings w/ Site Plans & Elevations dated 4/14/17
Crane Drawings and Calculations Received 6/24/2020
Elite & ATT Sublease
Engineering Report Scinetx
FAA Determination of No Hazard
Fall Zone Letter from Vector Engineers rcvd 2/24/2020
FCC ATT
FCC MFD
Lease Agreements
Propagation Maps for AT&T
Property Survey
Real Estate Consulting Report Recvd 7-8-2018
Revised Site Plan 2-10-2020
Revised Site Plans Received 6/25/2020
Site Photos
Subject File
Top Pole Calculations from Vector Engineers rcvd 2/24/2020
Top Pole Drawings from Vector Engineers rcvd 2/24/2020
Valmont Structural Certification Letter
Verizon RF Report
Verizon Supplemental RF Report Recvd 2-6-2018
Verizon Wireless' Search Ring Maps
VHB Planning, Zoning and Visual Impact Analysis July 2018
VHB Visibility Study